Summary of 870429 Meeting W/Util to Discuss Environ Info Needed to Support Proposed License Extension.Util Agreed to Provide Environ Info by 870731.List of Attendees Encl
ML20214H537
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/20/1987
From: Erickson P
Office of Nuclear Reactor Regulation
To: Berkow H
Office of Nuclear Reactor Regulation
References
NUDOCS 8705270410
Download: ML20214H537 (3)


Text

_ . .._ - . -

1_ a May 20, 1987.

4 Docket No. 50-16 MEMORANDUM FOR: Herbert N. Berkow, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, .IV, V and Special Projects-FROM: Peter B. Erickson, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV V and Special Projects-

SUBJECT:

SUMMARY

'0F APRIL 29, 1987 MEETING WITH DETROIT EDIS0N TO DISCUSS ENVIRONMENTAL INFORMATION NEEDED TO SUPPORT PROPOSED LICENSE EXTENSION FOR FERMI-1.

i This meeting was held at the Nuclear Regulatory Comission's Offices, Room 9609 Maryland National Bank Building at 1:30 PM on April 29, 1987. The purpose of the meeting was to discuss the NRC requirements-for environmental information in support of the proposed license extension for Fermi 1. Those- '

participating in the meeting are listed in Enclosure No. 1.

J Our letter of May 22, 1986 requested environmental information as described in l 10CFR51.45(b). This request was reiterated in our December 2,1986 letter to Detroit Edison. '

The proposed rule on decommissioning was discussed with respect to the submittal of environmental information. The NRC staff and OGC stated that environmental information would be required for Femi-1 even if the proposed rule on decommissioning were in effect. This rule, which is scheduled to become final in October of this year, would remove the specific requirement for the NRC to prepare environmental statements for all decomissioning actions. The rule would, however, require that an environmental report be submitted by the licensee and that an environmental assessment be prepared by i the NRC for all decommissioning actions.

4 Detroit Edison representatives agreed to-provide environmental'infonnation in

, support of their plan by July 31, 1987. A copy of the' environmental 1 '

information submitted by Philadelphia Electric for Peach Bottom 1 (March 4, 1987) was provided for guidance. Detroit Edison staff was advised that the i NRC had not completed its review of the Peach Bottom I information but will I inform Detroit Edison of any additional environmental topics that shculd be included in the Detroit Edison submittal.

Peter orB.ginal signed Erickson, by Manager Project l B705270410 870520 Standardization and Non-Power PDR ADOCK 05000016 Reactor Project Directorate i P PDR Division of Reactor Projects III, IV, V and Special Projects l

DISTRIBUTION (N PErickson OGC-Beth PDSNP Reading HBerkow NRC~& Local PDRs EHylton NRC Participants PpS PDSNP PD at ton PEric.Kson:bd H 5 /87 5/f/87 5/P/87-

, ( )

-8 o g UNITED STATES -

'_8 n NUCLEAR REGULATORY COMMISSION g y WASHINGTON, D. C. 20555

,,, . f May 20, 1987 Docket No. 50-16 -

MEMORANDUM FOR: Herbert N. Berkow, Director ,

Standardization and Non-Power i Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects FROM:' Peter B. Erickson, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV V and Special Projects

SUBJECT:

SUPMARY OF APRIL 29, 1987 MEETING WITH DETROIT EDISON TO DISCUSS ENVIRONMENTAL INFORMATION NEEDED TO SUPPORT-PROPOSED LICENSE EXTENSION FOR FERMI-1.

This meeting was held at the Nuclear Regulatory Consnission's Offices, Room

- 9609 Maryland National Bank Building at 1:30 PM on April 29, 1987. The

. purpose of the meeting was to discuss the NRC requirements for environmental information in support of the proposed license extension for Femi 1. Those participating in the meeting are listed in Enclosure No. 1.

Our letter of May 22, 1986 requested environmental infomation as described in 10 CFR 51.45(b). This request was reiterated in our December 2,1986 letter to Detroit Edison.

The proposed rule on decommissioning was discussed with respect to the submittal of environmental information. The NRC staff and OGC stated that environmental infomation would be required for Fermi-1 even if the proposed rule on decommissioning were in effect. This rule, which is scheduled to become final in October of this year, would remove the specific requirement for the NRC to prepare environmental statements for all deconsnissioning actions. The rule would, however, require that an environmental report be submitted by the licensee and that an environmental assessment be prepared by-the NRC for all deconnissioning actions.

Detroit Edison representatives agreed to provide environmental information in support of their plan by July 31, 1987. A copy of the environmental i information submitted by Philadelphia Electric for Peach Bottom 1 (March 4, 1987) was provided for guidance. Detroit Edison staff.was advised that the j NRC had not completed its review of the Peach Bottom I information but will i inform Detroit Edison of any additional environmental topics that should be .

included in the Detroit Edison submittal.

Peter B. Erickson, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III', IV, l V and Special Projects J

m

-. .. t.

t Enclosure No. 1 Meeting with Detroit Edison April 29, 1987 Participants Organization 4

Peter Erickson - NRC Herbert Berkow NRC Joseph Scinto NRC Coleen Woodhead NRC

. Thomas Randazzo Detroit Edison Evelyn Madsen Detroit Edison Peter Marquardt Detroit Edison Gerald Charnoff Detroit Edison i