Summary of 970422 Meeting W/Licensee at NRC Headquarters Re Issues Related to EECW Sys at Plant
ML20140H848
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/05/1997
From: Kugler A
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9705130299
Download: ML20140H848 (4)


Text

. _

.-- _ _ - .. . . . . - ~ . = - - - .-

PCC

[jo%g% UNITED STATES g j 2

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20665-0001 y o _3q g g

'% # May 5, 1997 LICENSEE: Detroit Edison Company l FACILITY: Fermi 2 Nuclear Plant i

' I

SUBJECT:

MEETING WITH THE DETROIT EDISON COMPANY TO DISCUSS ISSUES RELATED I TO THE EMERGENCY EQUIPMENT COOLING WATER SYSTEM AT FERMI 2 A meeting was held at NRC Headquarters on April 22, 1997, to discuss the l status of issues related to the emergency equipment cooling water (EECW) system at the Fermi-2 plant. The licensee had requested the meeting to discuss corrective actions it was taking in response to problems that had been discovered associated with the design and the licensing basis for the system. 1 The first issue discussed in the meeting was related to the potential for certain high-energy line breaks to damage the piping in one of the two divisions of the EECW system in the drywell. This piping damage, in conjunction with a loss-of-coolant-accident (LOCA, the initiating event) and a single active failure in the other division of EECW, could lead to the loss of the safety function performed by EECW. The licensee is implementing two system modifications which, when completed, are intended to ensure that one or both divisions of the system (depending on the specific scenario) will continue to perform its safety function throughout the event. The operation of one division is sufficient to mitigate the consequences of the accident.

The licensee committed to complete these modifications prior to the restart of the plant from the current outage. The staff acknowledged that if the modifications function as described in the meeting, it appeared that the system function would be maintained. As part of the modification process, the licensee will evaluate the changes using the criteria in 10 CFR 50.59.

The second issue involved high-energy line breaks, currently postulated in the Updated Final Safety Analysis Report (UFSAR), which the licensee proposes to  !

eliminate from consideration. The licensee bases this proposal on certain statements in the UFSAR which would allow this elimination. However, the [j staff has raised the issue of other statements within the UFSAR which the staff interprets to mean that consideration of these pipe breaks is required.

The licensee committed to complete an evaluation of this issue using the criteria in 10 CFR 50.59 and take any appropriate action that is indicated by I)61)

J {

that evaluation. The licensee also committed to complete this evaluation and any associated actions related to system operability prior to the restart of the plant from the current outage. In addition, the licensee will complete an operability evaluation for the EECW system prior to restart.

130025 ilP188HE88!!r NRC FRE CENTER COPY

'A list of the meeting attendees is enclosed.

ORIGINAL SIGNED BY Andrew J. Kugler, Project Manager Project Directorate III-1 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

As stated cc w/ encl: See next page DISTRIBUTION:

Hard Cop.y Docket File PUBLIC PD3-1 R/F OGC ACRS E-mail SCollins/FMiraglia (SJMl/FJM)

RZimmerman (RPZ)

JRoe (JWR)

MJordan, RIII (MJJ)

Plougheed, RIII (VPL)

SDupont (SGD)

Dross (SLM3)

BMcCabe (BCM)

WLeFave (WTL1)-

GHubbard (GTH)

Yli (YCL)

WLong (WOL)

DOCUMENT NAME: G:\WPDOCS\ FERMI \FE-EECW.MTS

v. . , .e mi. w,io m m. wm c . copy wnout .n.ch ne.new. T/- copy we .u. chm.nu.new w . noc.,, t ]

0FFICE PM:PD31 lN LA:PD31 .l E PD:PD3- y / l NAME AKugler @C - CJamerson & JHannoy /

DATE 05/r/97" 04/30/97 // 057f797 1 0FFICIAL RECURD COPY l

~

l Detroit Edison Company Fermi-2 i 1

cc:

John Flynn, Esquire Mr. Douglas R. Gipson Senior Attorney Senior Vice President Detroit Edison Company Nuclear Generation 2000 Second Avenue Detroit Edison Company Detroit, Michigan 48226 6400 North Dixie Highway Newport, MI 48166 ,

Drinking Water and Radiological '

Protection Division Michigan Department of Environmental Quality  :

3423 N. Martin Luther King Jr Blvd P. O. Box 30630 CPH Mailroom Lansing,iiichigan 48909-8130 U.S. Nuclear Regulatory Commission )

Resident Inspector's Office l 6450 W. Dixie Highway ,

Newport, Michigan 48166

)

Monroe County Emergency Management l Division 963 South Raisinville i Monroe, Michigan 48161 Regional Administrator, Region III U.S. Nuclear Regulatory Commission ,

801 Warrenville Road i Lisle, Illinois 60532-4351 Peter W. Smith Director, Nuclear Licensing i Detroit Edison Company Fermi 270 TAC 6400 North Dixie Highway '

Newport, Michigan 48166

-1996

MEETING ATTENDEES FOR APRIL 22. 1997.

FERMI 2 MEETING ON THE EMERGENCY EQUIPMENT COOLING WATER SYSTEM HAME AFFILIATION John Hannon NRC/NRR/PD3-1, Director Andrew Kugler NRC/NRR/PD3-1, Fermi Project Manager George Hubbard NRC/NRR/SPLB, Section Chief William LeFave NRC/NRR/SPLB, Staff Yueh-Li Li NRC/NRR/EMEB, Staff William Long NRC/NRR/SCSB, Staff Stevie Dupont NRC/RIII/DRP, Project Engineer Michael Jordan NRC/RIII/DRP,BranchChjef Patricia Lougheed NRC/RIII/DRS, Inspector Douglas R. Gipson Detroit Edison, Senior Vice President Peter Smith Detroit Edison, Licensing Manager William Terrasi Detroit Edison, Project Manager

! (

i

' Connected to meeting by telephone Enclosure l

. _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _