LICENSEE: Detroit Edison Comp:ny (DECO)

August 5, 1999 FACILITY:

F:rmi 2 Nucinr Pimt

SUBJECT:

MEETING WITH DECO TO DISCUSS THE FERMI 2 IMPROVED STANDARD TECHNICAL SPECIFICATIONS CONVERSION The NRC staff met with DECO (the licensee) at NRC Headquarters on July 8 and 9,1999, to discuss issues related to the Fermi 2 submittal for the conversion of the current technical specifications to improved standard technical specifications (ITS). Enclosure 1 lists the meeting participants. The primary focus of the meeting was to discuss comments from the sections

  • reviewers on the licensee's revisions to Sections 3.5,3.6, and 3.8. Enclosure 2 is a listing of the tracking numbers for the requests for additional information for these sections that remained open at the conclusion of the meeting. The licensee continues to work with the NRC staff to reach resolution on these issues. For the majority of the listed items, a path to resolution was determined during the meeting and the item will be closed when the licensee implements the resolution.

The NRC staff and the licensee also discussed the disposition of the Configuration Risk Management Program (CRMP), which is currently contained in Section 6.8.5.h of the technical specifications. The NRC staff has agreed that this program can be relocated to the Technical Requirements Manual based on current staff guidance for the location of the CRMP. In Revision 9 of its submittal, dated July 7,1999, the licensee has modified Section 5.0 accordingly. is a corrected list of meeting attendees for related meetings held on April 12 and 13, 1999. This enclosure was previously issued as Enclosure 1 to the summary of these meetings dated Aoril 16,1999.

Original signed by:

Andrew J. Kugler, Project Manager, Section 1 Project Directorate til Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosures:

1. List of Meeting Attendees
2. List of RAI Tracking Numbers
3. Corrected List of Meeting Attendees for April 12-13,1999, Meetings

\\

\\

cc w/encis: See next page DISTRIBUTION-

,,h E-mail THiltz NGilles RGiardina JZwolinski SBlack WBeckner AVegel JFoster ETomlinson

. N)y Hard Copy Docket File PUBLIC PD3-1 R/F AKugler OGC ACRS DOCUMENT NAME: G:\\PD3-1\\ FERMI \\MTSSTS15.,WPD OFFICE PM:PD3-1 lE Q:PD%1 lE SC:PQ1-h k

NAME AKugler (94 RBdpM Q CCraigW (ml DATE 8 / 4 /99 (

3/ 4 /99 8/ $ '/99 OFFICIAL RECORD COPY 9908090156 990805 PDR ADOCK 05000341 P

PDR

LICENSEE: Detrcit Edison Company (DECO)

August 5, 1999 FACILITY:

Firmi 2 Nuclair Plant 4

SUBJECT:

MEETING WITH DECO TO DISCUSS THE FERMI 2 IMPROVED STANDARD TECHNICAL SPECIFICATIONS CONVERSION The NRC staff met with DECO (the licensee) at NRC Headquarters on July 8 and 9,1999, to discuss issues related to the Fermi 2 submittal for the conversion of the current technical specifications to improved standard technical specifications (ITS). Enclosure 1 lists the meeting participants. The primary focus of the meeting was to discuss comments from the sections' reviewers on the licensee's revisions to Sections 3.5, 3.6, and 3.8. Enclosure 2 is a listing of the tracking numbers for the requests for additional information for these sections that remained open at the conclusion of the meeting. The licensee continues to work with the NRC staff to reach resolution on these issues. For the majority of the listed items, a path to resolution was determined during the meeting and the item will be closed when the licensee implements the resolution.

The NRC staff and the licensee also discussed the disposition of the Configuration Risk Management Program (CRMP), which is currendy contained in Sectica 6.8.5.h of the technical specifications. The NRC staff has agreed that this program can be relocated to the Technical Requirements Manual based on current staff guidrnce for the location of the CRMP. In Revision 9 of its submittal, dated July 7,1999, the licensee has modified Section 5.0 accordingly. is a corrected list of meeting attendees for related meetings held on April 12 and 13, 1999. This enclosure was previously issued as Enclosure 1 to the summary of these meetings dated April 16,1999.

Original signed by:

Andrew J. Kugler, Project Manager, Section 1 Project Directorate lil Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosures:

1. List of Meeting Attendees
2. List cf RAI Tracking Numbers
3. Corrected List of Meeting Attendees for April 12-13,1999, Meetings cc w/ enc's: See next page DISTRIBUTION:

E-mail THiltz NGilles RGiardina JZwolinski SBlack

]

WBeckner AVegel JFoster ETomlinson 1

Hard Copy Docket File PUBLIC PD3-1 R/F AKugler OGC ACRS i

DOCUMENT NAME: G:\\PD3-1\\FERMlWITSSTS15NVPD j

OFFICE PM:PD3-1 lE LA; PDM lE SC:PQ1-$

lE NAME AKugler Q)4 RB MM CCrai7 M DATE 6 / 4. /99 V al 6 /99 8/ 6 '/99 OFFICIAL RECORD COPY

weg 4

g i

UNITED STATES g

j NUCLEAR REGULATORY COMMISSION o

WASHINGTON, D.C. 30806-0001

%g

  • August 5, 1999 l

LICENSEE:

Detroit Edison Company (DECO)

FACILITY:

Fermi 2 Nuclear Plant

SUBJECT:

MEETING WITH DECO TO DISCUSS THE FERMI 2 IMPROVED STANDARD TECHNICAL SPECIFICATIONS CONVERSION The NRC staff met with DECO (the licensee) at NRC Headquarters on July 8 and 9,1999, to discuss issues related to the Fermi 2 submittal for the conversion of the current technical specifications to improved standard technical specifications (ITS). Enclosure 1 lists the meeting participants. The primary focus of the meeting was to discuss comments from the sections' reviewers on the licensee's revisions to Sections 3.5,3.6, and 3.8. Enclosure 2 is a listing of the tracking numbers for the requests for additional information for these sections that remained open at the conclusion of the meeting. The licensee continues to work with the NRC staff to reach resolution on these issues. For the majority of the listed items, a path to resolution was determined during the meeting and the item will be closed when the licensee implements the resolution.

The NRC staff and the licensee also discussed the disposition of the Configuration Risk Management Program (CRMP), which is currently contained in Section 6.8.5.h of the technical specifications. The NRC staff has agreed that this program can be relocated to the Technical Requirements Manual based on current staff guidance for the location of the CRMP. In Revis;on 9 of its submittal, dated July 7,1999, the licensee has modified Section 5.0 accordingly. is a corrected list of meeting attendees for related meetings held on April 12 and 13, 1999. This enclosure was previously issued as Enclosure 1 to the summary of these meetings dated April 16,1999.

Andrew J.

ugler, roject Manager, Section 1 Project Directorate lil Division of Licensing Project Management i

Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosures:

1. List of Meeting Attendees
2. List of RAI Tracking Numbers
3. Corrected List of Meeting Attendees for April 12-13,1999, Meetings cc w/encis: See next page

q Detroit Edison Company Fermi 2 cc:

John Flynn, Esquire Senior Attorney Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 Drinking Water and Radiological Protection Division Michigan Department of Environmental Quality 3423 N. Martin Luther King Jr Blvd P. O. Box 30630 CPH Mailroom Lansing, Michigan 4890g-8130 U.S. Nuclear Regulatory Commission l

- Resident inspector's Office L

6450 W. Dixie Highway Newport, Michigan 48166 Monroe County Emergency Management Division 963 South Raisinville Monroe, Michigan 48161 Regional Administrator, Region lli l

U.S. Nuclear Regulatory Commission i

801 Warrenville Road i

Lisle, Illinois 60532-4351 Norman K. Peterson Director, Nuclear Licensing Detroit Edison Company Fermi 2 - 280 TAC

. 6400 North Dixie Highway Newport, Michigan 48166 Mr. Douglas R Gipson Sr. Vice President, Nuclear Generation Detroit Edison Company 6400 N Dixie Highway Newport, Michigan 48166 June 1999

l MEETING ATTENDEES l

FOR JULY 7 & 8,1999, FERMI 2 MEETING ON THE IMPROVED STANDARD TECHNICAL SPECIFICATIONS CONVERSION l

NAME AFFILIATION Andrew Kugler NRC/NRR/DLPM/PD31, Project Manager l

Jack Foster

  • NRC/NRR/ DRIP /TSB, Conversion Lead Reviewer i

Bob Giardina*

NRC/NRR/ DRIP /TSB, Section 3.6 Lead Reviewer Nan Gilles*

NRC/NRR/ DRIP /TSB, Section 3.5 Lead Reviewer Ed Tomlinson*

NRC/NRR/ DRIP /TSB, Section 3.8 Lead Reviewer Glen Ohlemacher Detroit Edison, Licensing i

Dan Williamson Excel Inc. (contractor to Detroit Edison) j i

i l

NRR = Office of Nuclear Reactor Regulation DLPM/PD31 = Division of Licensing Project Management, Project Directorate Ill, Section 1 DRIP /TSB = Division of Regulatory improvement Programs / Technical Specifications Branch

  • Part-time participant ENCLOSURE 1

LIST OF REQUEST FOR ADDITIONAL INFORMATION NUMBERS WITH OPEN ISSUES AFTER THE JULY 7 AND 8,1999, MEETING ON THE FERMI 2 TECHNICAL SPECIFICATION CONVERSION l

3.5.2-1 3.6.2.3-2 3.6.1.1-5 S3.6.2.4-1 3.6.1.1-7 3.6.4.1-3 3.6.1.2-6 3.6.4.2, New issue (TSTFs 46 and 269) 3.6.1.3-4 3.6.4.2-2 3.6.1.3-5 3.6.4.2-3 3.6.1.3-6 3.6.4.2-4 3.6.1.3-9 3.6.4.2-5 3.6.1.3-10 3.6.4.2-6 3.6.1.3-14 3.6.1.3-19 3.8.1-10 3.6.1.3-27 3.8.1-14 3.6.1.3-28 3.8.1-15 1

3.6.1.3-31 3.8.5-2 3.6.1.7-5 3.6.1.7-6 3.8.6-2 3.6.1.7-7 3.8.6-3 3.6.1.8-3 3.8.7-2 3.6.2.1-4

)

ENCLOSURE 2 j

I

)

r-l l }

CORRECTED LIST OF MEETING ATTENDEES l

FOR APRIL 12 & 13,1999, FERMI 2 MEETING ON THE IMPROVED STANDARD TECHNICAL SPECIFICATIONS CONVERSION 4

t NAME AFFILIATION l

Andrew Kugler NRC/NRR/DLPM/PD31, Project Manager j

Jack Foster

  • NRC/NRR/ DRIP /TSB, Conversion Lead Reviewer Bob Tjader*

NRC/NRR/ DRIP /TSB, Section 2.0,3.1,3.2, & 3.10 Lead Reviewer Nan Gilles*

NRC/NRR/ DRIP /TSB, Section 3.5 Lead Reviewer Glen Ohlemacher Detroit Edison, Licensing i

Rod Johnson

  • Detroit Edison, Licensing Supervisor Charles Boyce Excel Inc. (contractor to Detroit Edison) l l

l l

NRR = Office of Nuclear Reactor Regulation DLPM/PD31 = Division of Licensing Project Management, Project Directorate lil, Section 1 l

DRIP /TSB = Division of Regulatory improvement Programs / Technical Specifications Branch i

l l

  • Part-time participant l

l ENCLOSURE 3 l