|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999 Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 ML20217J4971999-10-18018 October 1999 Requests Addl Info Re Results of Util Most Recent Steam Generator Insp at ANO-2 & Util Methodology Used to Predict Future Performance of SG Tubes ML20217J3871999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through SG, Rev 0 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs ML20217J3601999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Integranular Attack in Tubesheets of Once-Through SG, Rev 1 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp ML20217D1721999-10-0808 October 1999 Forwards RAI Re 990729 Request for Amend to TSs Allowing Special SG Insp for Plant,Unit 2.Questions Re Proposed Insp Scope for Axial Cracking Degradation in Eggcrate Support Region Submitted.Response Requested by 991015 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included ML20212L0621999-10-0101 October 1999 Forwards Safety Evaluation & Exemption from Certain Requirements of 10CFR50,App R,Section III.G.2, Fire Protection of Safe Shutdown Capability 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR ML20212F5031999-09-22022 September 1999 Forwards SER Granting Relief Requests 1-98-001 & 1-98-002 Which Would Require Design Mods to Comply with Code Requirements,Which Would Impose Significant Burden Pursuant to 10CFR50.55a(g)(6)(i) 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments ML20212D9961999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Arkansas Nuclear One.Nrc Plan to Conduct Core Insps at Facility Over Next 7 Months.Details of Insp Plan Through March 2000 Encl 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested1999-09-0909 September 1999 Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested 1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments1999-09-0707 September 1999 Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) 0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs1999-09-0101 September 1999 Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs ML20211L4901999-09-0101 September 1999 Forwards Insp Repts 50-313/99-12 & 50-368/99-12 on 990711- 0821.No Violations Noted ML20211J2351999-08-31031 August 1999 Forwards Request for Addl Info Re SG Outer Diameter Intergranular Attack Alternate Repair Criteria for Plant, Unit 1 ML20211E6161999-08-25025 August 1999 Forwards Amend 15 to ANO Unit 2,USAR,per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of 10CFR50.59 Evaluations Associated with Amend 15 of ANO Unit 2 SAR Will Be Provided Under Separate Cover Ltr with 30 Days 0CAN089905, Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 19991999-08-25025 August 1999 Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 1999 ML20211F4181999-08-25025 August 1999 Forwards SE Accepting Licensee 980603 & 990517 Requests for Approval of risk-informed Alternative to 1992 Edition of ASME BPV Code Section Xi,Insp Requirements for Class 1, Category B-J Piping Welds ML20211G0731999-08-19019 August 1999 Forwards Applications for Renewal of Operating License for Kw Canitz & Aj South.Without Encls 1CAN089904, Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl1999-08-19019 August 1999 Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl 0CAN089903, Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves1999-08-12012 August 1999 Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves IR 05000368/19990111999-08-12012 August 1999 Forwards Insp Repts 50-313//99-11 & 50-368/99-11 on 990719-23.No Violations Noted.Insp Focused on Review of Licensed Operator Requalification Program & Observation of Requalification Exam Activities at Unit 1 2CAN089901, Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 9907291999-08-0606 August 1999 Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 990729 1CAN089902, Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License1999-08-0505 August 1999 Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License 2CAN089902, Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested1999-08-0404 August 1999 Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams 0CAN089902, Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified1999-08-0202 August 1999 Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified 0CAN089901, Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 9906031999-08-0202 August 1999 Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603 ML20210L3581999-07-29029 July 1999 Ltr Contract,Task Order 43, Arkansas Nuclear One Safety System Engineering Insp (Ssei), Under Contract NRC-03-98-021 1CAN079903, Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-07-29029 July 1999 Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks ML20216D8131999-07-28028 July 1999 Forwards Request for Addl Info Re SG Tube End Cracking Alternate Repair Criteria for Plant,Unit 1 ML20216D3561999-07-23023 July 1999 Discusses non-cited Violation Identified in Insp Rept 50-313/98-21,involving Failure to Have Acceptable Alternative Shutdown Capability for ANO-1 ML20210C2191999-07-21021 July 1999 Forwards Insp Repts 50-313/99-08 & 50-368/99-08 on 990530-0710 at Arkansas Nuclear One,Units 1 & 2,reactor Facility.No Violations Noted.Conduct of Activities at Plant Generally Characterized by safety-conscious Operations ML20209H5251999-07-15015 July 1999 Informs That as Result of NRC Review of Licensee 980701 & 990311 Responses to GL 92-01,rev 1 & Suppl 1 & Suppl 1 RAI, Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 1CAN079901, Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages1999-07-14014 July 1999 Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages 0CAN079902, Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl1999-07-14014 July 1999 Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl ML20209E5551999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1,staff Revised Info in Rv Integrity Database & Releasing Database as Rvid Version 2 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999 Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested1999-09-0909 September 1999 Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) 1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments1999-09-0707 September 1999 Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments 0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs1999-09-0101 September 1999 Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs ML20211E6161999-08-25025 August 1999 Forwards Amend 15 to ANO Unit 2,USAR,per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of 10CFR50.59 Evaluations Associated with Amend 15 of ANO Unit 2 SAR Will Be Provided Under Separate Cover Ltr with 30 Days 0CAN089905, Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 19991999-08-25025 August 1999 Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 1999 ML20211G0731999-08-19019 August 1999 Forwards Applications for Renewal of Operating License for Kw Canitz & Aj South.Without Encls 1CAN089904, Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl1999-08-19019 August 1999 Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 0CAN089903, Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves1999-08-12012 August 1999 Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves 2CAN089901, Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 9907291999-08-0606 August 1999 Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 990729 1CAN089902, Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License1999-08-0505 August 1999 Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License 2CAN089902, Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested1999-08-0404 August 1999 Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested 0CAN089901, Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 9906031999-08-0202 August 1999 Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603 0CAN089902, Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified1999-08-0202 August 1999 Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified 1CAN079903, Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-07-29029 July 1999 Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks ML20216D3561999-07-23023 July 1999 Discusses non-cited Violation Identified in Insp Rept 50-313/98-21,involving Failure to Have Acceptable Alternative Shutdown Capability for ANO-1 1CAN079901, Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages1999-07-14014 July 1999 Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages 0CAN079902, Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl1999-07-14014 July 1999 Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl ML20210K1621999-07-0707 July 1999 Informs That Licensee in Process of Preparing Scope of Service Delineation for Environ Assessment to Be Performed for New Airport Located Near Russellville,Ar,To Identify Anticipated Environ Impacts from Various Agencies 1CAN079902, Documents ANO-1 Position Discussed on 990705,with Members of NRC Staff & Formally Requests Enforcement Discretion from Requirements of TS 3.7.2.C to Allow Continued Power of Operation1999-07-0606 July 1999 Documents ANO-1 Position Discussed on 990705,with Members of NRC Staff & Formally Requests Enforcement Discretion from Requirements of TS 3.7.2.C to Allow Continued Power of Operation ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl 0CAN069906, Forwards Corrected Pages to 1997 & 1998 Annual Radiological Environ Operating Repts, Issued 980430 (0CAN049804) & 990506 (0CAN059902).Ltr Number & Page Number Are at Top of of Corrected Pages to Replace Originally Pages1999-06-30030 June 1999 Forwards Corrected Pages to 1997 & 1998 Annual Radiological Environ Operating Repts, Issued 980430 (0CAN049804) & 990506 (0CAN059902).Ltr Number & Page Number Are at Top of of Corrected Pages to Replace Originally Pages 1CAN069905, Forwards non-proprietary Version of Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs1999-06-17017 June 1999 Forwards non-proprietary Version of Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs 0CAN069903, Submits Rept of Each Change to or Error Discovered in Acceptable Evaluation Model or in Application of Such Model for ECCS That Affects Peak Cladding Temp,Iaw 10CFR50.46(a) (3)(ii)1999-06-10010 June 1999 Submits Rept of Each Change to or Error Discovered in Acceptable Evaluation Model or in Application of Such Model for ECCS That Affects Peak Cladding Temp,Iaw 10CFR50.46(a) (3)(ii) 2CAN069901, Forwards Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14. Replacement of SGs Planned for Next Refueling Outage (2R14) Scheduled for Fall of 20001999-06-0202 June 1999 Forwards Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14. Replacement of SGs Planned for Next Refueling Outage (2R14) Scheduled for Fall of 2000 1CAN069901, Submits 10CFR50.46 Rept Re Inconsistent Input in SBLOCA Analysis.Rept Submitted in Accordance with Recommendations Stated in Notice1999-06-0202 June 1999 Submits 10CFR50.46 Rept Re Inconsistent Input in SBLOCA Analysis.Rept Submitted in Accordance with Recommendations Stated in Notice 0CAN059906, Forwards Response to NRC 990402 RAI Re GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs1999-05-28028 May 1999 Forwards Response to NRC 990402 RAI Re GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs ML20207E4341999-05-25025 May 1999 Submits 30-day Written Rept on Significant PCT Changes in ECCS Analysis for ANO-1.CRAFT2 Limiting PCT for ANO-1 Was Bounded by 1859 F PCT Calculated at 2568 Mwt for Crystal River 3 Cold Leg Pump Discharge Break Size of 0.125 Ft 1CAN059904, Informs NRC That Wl Franklin No Longer Has Need to Maintain Operating License on Ano,Unit 1.Requests License for Wl Franklin Be Withdrawn1999-05-20020 May 1999 Informs NRC That Wl Franklin No Longer Has Need to Maintain Operating License on Ano,Unit 1.Requests License for Wl Franklin Be Withdrawn 2CAN059906, Informs That ANO-2 UFSAR Will Be Revised to Include Comprehensive Discussions of Each Category of Containment Penetration Overcurrent Protective Devices,Per NRC Review of 980806 TS Change Request Re Relocation of TS Table 3.8-11999-05-18018 May 1999 Informs That ANO-2 UFSAR Will Be Revised to Include Comprehensive Discussions of Each Category of Containment Penetration Overcurrent Protective Devices,Per NRC Review of 980806 TS Change Request Re Relocation of TS Table 3.8-1 1CAN059902, Responds to NRC 990406 RAI Re risk-informed Inservice Insp Pilot Application,Submitted 980603.Approval of Alternative Is Requested Prior to End of July 1999,to Allow Sufficient Time for Util to Revise ANO-1 ISI Program1999-05-17017 May 1999 Responds to NRC 990406 RAI Re risk-informed Inservice Insp Pilot Application,Submitted 980603.Approval of Alternative Is Requested Prior to End of July 1999,to Allow Sufficient Time for Util to Revise ANO-1 ISI Program 2CAN059905, Expresses Appreciation for Staff & Mgt Team Efforts in Aggressively Pursuing Risk Informed ISI Initiative1999-05-14014 May 1999 Expresses Appreciation for Staff & Mgt Team Efforts in Aggressively Pursuing Risk Informed ISI Initiative ML20206P7681999-05-10010 May 1999 Forwards Applications for Renewal of Operating License (Form 398) for MW Little & F Uptagrafft.Without Encl 2CAN059903, Forwards Rev to Footnote Submitted to Provide Clarity to Aforementioned Guidance1999-05-10010 May 1999 Forwards Rev to Footnote Submitted to Provide Clarity to Aforementioned Guidance ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 ML20206H7121999-05-0606 May 1999 Forwards 1998 Annual Radiological Environ Operating Rept, for Ano.All Radionuclides Detected by Radiological Environ Monitoring Program During 1998 Were Significantly Below Regulatory Limits 1999-09-09
[Table view] Category:LEGAL/LAW FIRM TO NRC
MONTHYEARML20065H1891990-10-16016 October 1990 Notifies of Change of Firm Name from Bishop,Cook, Purcell & Reynolds to Winston & Strawn ML19354E4191990-01-25025 January 1990 Comments Re Issuance of OL Amends & Proposed NSHC Determination Re Transfer of Operational Mgt Control of Plants & Views on anti-trust Issues Re Application for Amend for Plants ML19332D8511989-11-30030 November 1989 Forwards Antitrust Comments W/Exhibits & One Copy of Comments Sans Exhibits of Cities of Benton,Conway,North Little Rock,Osceola,Prescott & West Memphis,Ak & Farmers Electric Cooperative Corp ML19325E3711989-10-30030 October 1989 Forwards 891027 Ltr to Counsel for NRC for Filing on Appropriate Dockets & Legal Issues Re Antitrust Aspect of NRC Review of Consolidation of License Amend Application ML19325E3741989-10-27027 October 1989 Lists Three Legal Issues Re Antitrust Aspects of NRC Review of Consolidation of License Amend Application for Facilities.Licensee Supplemental Info Filed W/Nrr ML20244D8421989-04-0606 April 1989 Forwards Endorsements 77 & 66 to Nelia Policy NF-210 & Maelu Policy MF-74,respectively ML20154A0601988-09-0101 September 1988 Requests That Svc Lists Be Amended Accordingly to Reflect Deletion of Liberman from Firm Name ML20151H5381988-04-12012 April 1988 Forwards Endorsements 1 & 2 to Nelia Policy NW-116 & Maelu Policy MW-47 ML20148S7801988-04-0808 April 1988 Forwards Endorsement 74 to Nelia Policy NF-210 & Endorsement 63 to Maelu Policy MF-74 ML20149M9031988-02-17017 February 1988 Forwards Endorsement 72 to Nelia Policy NF-210 & Endorsement 61 to Maelu Policy MF-74 ML20148K9501988-01-13013 January 1988 Forwards Endorsement 73 to Nelia Policy NF-210,Endorsement 62 to Maelu Policy MF-74 & Endorsement 10 to Nelia Certificates N-68 & N-48 & Maelu Certificates M-68 & M-48 ML20236A0041987-10-13013 October 1987 Forwards Usc Comment on Proposed Rule 10CFR50 Re Proposed Rev of Backfitting Process for Power Reactors ML20214A7461987-05-11011 May 1987 Forwards Endorsement 70 to Nelia Policy NF-210 ML20092P3651984-07-0202 July 1984 Requests Amend to Svc List to Reflect Name Change of Law Firm Counsel for Arkansas Power & Light Co to Ns Reynolds, Bishop,Liberman,Cook,Purcell & Reynolds ML20079J5011984-01-19019 January 1984 Informs That Firm Name of Counsel for Applicants/Licensees Charged from Debevoise & Liberman to Bishop,Liberman,Cook, Purcell & Reynolds.Svc Lists Should Be Revised Accordingly ML20003A6011981-01-30030 January 1981 Advises That Licensee Has No Objection to NRC 810116 Proposal Re Util Request for Hearing Re 801024 Order for Mod of License.Request Will Be Held in Abeyance,Pending Issuance of Safety Evaluations ML19345C8361980-12-0404 December 1980 Requests Hearing on Issue of Whether All safety-related Electrical Equipment Should Be Environmentally Qualified in Accordance W/Ofc of Nuclear Reactor Regulation Guidelines or NUREG-0588 ML19338G6381980-10-30030 October 1980 Notifies of Util Withdrawal of 801023 Request for Extension to Petition for Hearing on Orders for Mod of Facility Licenses Re Environ Qualification of Class IE Equipment.Ie Bulletin 79-01B,Suppl 3 Revises Requirements of Orders ML19338G1291980-10-23023 October 1980 Requests 1-wk Extension of Time to Request Hearing on 800919 Orders to Respond to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. Imminent Issuance of Suppl 3 to Subj Bulletin May Resolve Util Concerns ML20064C6921978-10-12012 October 1978 Discusses Application for Ol.Documents Efforts by City of Paragould,Ar to Participate w/2% Interest in Planned Facility.Supporting Documentation Encl ML19326C9081977-10-21021 October 1977 Forwards Endorsements 17 Through 31 to Nelia Policy NF-210 & Endorsements 11 Through 26 to Maelu Policy MF-74 ML19326C6671974-05-0808 May 1974 Confirms Increase Limit of Liability for Util Under Nelta Policy NF-210 Effective 740510 ML19326C6631974-05-0707 May 1974 Confirms Increase Limit of Liability for Util Under Nelih Policy NF-210,effective 740510 ML19326C8941972-10-25025 October 1972 Supplements Nelia Telegram Re Nelia Policy NF-210 W/ Description of Facilities Locations ML19326C9761972-10-24024 October 1972 Confirms Nelia Policy NF-210 W/Effective Date of 720915 & Specified Policy Limit.Site Description Specified ML19326C7551972-10-24024 October 1972 Forwards Nelia Policy NF-210 W/Endorsements 1-3 & 5-7 Effective 720915 ML19326C7581972-09-0808 September 1972 Confirms 720908 Telcon W/I Dinitz Re Nelia Insurance Policy to Be Written for Facility.Policy to Be Effective Upon Delivery of Nuclear Fuel ML19326D0441968-11-0505 November 1968 Provides Review of Transcript of Public Hearing.No Corrections Suggested ML19326D0451968-10-0808 October 1968 Forwards Corrected Pages 20 & 21 of Application Summary Forwarded 680928 ML19326C3911968-09-12012 September 1968 Informs That Util 680912 Suppl 10 to License Application Revises Psar,Vols I & Ii,Correcting Semantic & Numerical Errors ML19317H1271968-05-17017 May 1968 Forwards 680513 Acknowledgement of Svc of Suppl 3 to Application ML19320A3181967-12-0101 December 1967 Forwards Acknowledgement of Svc of Application on 671128 1990-10-16
[Table view] |
Text
'
l
\. ~.
yarsh& l ugennan J
M & M Nuclear Consultants 2121 San Jacinto Street 1300 San Jacinto Tower Dallas, Texas 75201 Telephorie 214 979-990()
April 12, 1988 Mr. Ira Dinitz Senior Insurance Indemnity Analyst Office of Nuclear Reactor Regulation Mail Stop 12E4 U.S. Nuclear Peculatory Comission Washington, D. C. 20555 Re: Paster Worker Policy Arkansas Power & Light Company ANI Certificate NW-116, End.1 & 2 PAELU Certificate MW-47,- End.1 & 2
Dear Pr. Dinitz:
Enclosed are two certified copies of the captioned certificates and endorsements.
Please do not hesitate to call with any cuestions.
Sin ly,
/ WW John L. Samuels Nuclear Consultant
/pwp 7891K-2 Enclosure s cc: M. Wilson - APFL (w/ enclosures)
C. Faulk - PSU l R. Nerget - PAP Little Pock )
i I I
(,0 i ,
8804200420 88041% i PDR ADOCK 05000313 J DCD
O MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS NUCLEAR ENERGY LIABILITY POLICY (Facility Worker Form) herein called-the MASTER WORKER POLICY CERTIFICATE OF INSURANCE Certificate'No. MW-47 Date of_ Issue Jan. 22. 19 88~
This is to certify that the insureds named in Item 1 of the Declarations hereof, hereinafter called the "Named Insureds", have obtained insurance under the Master Worker Policy-issued by Mutual Atomic Energy Liability Underwriters on behalf of its members. -The insurance is subject to all of the provisions of this "Certificate" an'd the Master Worker Policy.
1 DECLARATIONS Item 1. Named Insureds and Addresses:
Arkansas Power & Light Company P.O. Box 551 Little Rock, Arkansas 72203 Item 2. Certificate Coverage Period:
Beginning at 12:01 a.m. January 1, 1988 and ending j at the close of December 31, 1992, Eastern Standard !
Time, or at the time and date this Certificate is '
cancelled or terminated, whichever first occurs.
MMWPC-1 (1/1/88) Page 1 i
i
Item 3. Description of the Facility:
Location: All of the premises including the land and all buildings and structures known as the named insured's Arkansas Nuclear One - Units 1 and 2. Arkansas Nuclear One is located in Pope County, Arkansas approximately six (6) miles West-Northwest of Russellville, Arkansas.
Type: Power Reactor (0perating) operator of the Facility: Arkansas Power & Light Company.
Item 4. Amount of Insuranco Available:
The amount of insurance afforded by the Master.
Worker Policy through this Certificate shall be determined by Section VIII of the Master Worker Policy and all of the other provisions of the policy relating thereto.
Item 5. Advance Premium: 59,675.00 2
APPLICATION OF CERTIFICATE This certificate applies only to bodily injury to a new worker (1) which is caused during the certificate Coverage Period by the nuclear energy hazard and (2) which is dis-covered and for which written claim is first made against an insured under the certificate within the discovery period of the Master Worker Policy.
3 INDUSTRY RETROSPECTIVE RATING PLAN All insurance under the Master Worker Policy is subject to the Industry Retrospective Rating Plan in use by the companies. No insurance is provided under this Certificate unless and until the first Named Insured has accepted in writing the Industry Retrospective Rating Plan Premium En-dorsement and a copy of the signed endorsement has been issued by the companies to form a part of this certificate.
MMWPC-1 (1/1/88) Page 2
e Ill WITliESS WHEREOF, the companies subscribing the Master Worker Policy have caused this Certificate to be executed and attested on their behalf by the Manager of Mutual Atomic Energy Liablity Underwriters and duly countersigned by an authorized representative.
For the Subscribing Companies of MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS J. Michael O'Connell, '!a nage r By .W _ 612L e Mutti5rlstri Egenqh Countersigned "-
[.[d (Authorized Representative)
Tras i:, to certfg that tl kForm) is aa, dct-true copy of of the Nudear Emasy UebDy Pd.cy (Faul,' ypdcr.
igstedhc cit 14 f asuranc is d' ~ L 45 T.
- s. vee rwaera-tiatary vom16a
.:eu. ca Awe Sdar t.turm ;
l l
l MMWPC-1 (1/1/88) Page 3
t NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION NUCLEAR ENERGY LIABILITY POLICY i (Facility Worker Form) ;
1 herein called the '
MASTER WORKER POLICY ;
, CERTIFICATE OF INSURANCE certificate No. NW-116 Date of Issue Jan. 22, 19 88 ;
This is to certify that the insureds named'in Item 1 of the Declarations hereof, hereinafter called the "Named Insureds", have obtained insurance under the Master Worker t Policy issued by Nuclear Energy Liability Insurance Associa-tion on behalf of its members. The insurance is subject to all of the provisions of this "Certificate" and the Master '
Worker Policy.
1 ,
j DECLARATIONS Item 1. Named Insureds and Addresses: i Arkansas Power & Light Company :
P.O. Box 551 Little Rock, Arkansas 72203 1
i l
4 i Item 2. Certificate Coverage Period:
l Beginning at 12:01 a.m. January 1, 1988 and ending at the close of December 31, 1992, Eastern Standard Time, or at the time and date this Certificate is
- cancelled or terminated, whichever first occurs.
NMWPC-1 (1/1/88) Page 1 a
- , _ _ . . _ _ . _ _ . _ . _ . . , . . _ , , , _ _ _ . _ _ = __ , _ ,,._,.___,__, _ , . _ _ . , _ _ _ _ _ . _ . . . _ . , . _ ,
i Item 3. Description of the Facility: ,
Location: All of the premises including the land and all buildings and structures known as the named insured's
~
Arkansas fluclear One - Units 1 and 2. Arkansas Nuclear One is located in Pope Co.nty, Arkansas approximately six (6) miles West-Northwest of Russellville, Arkansas.
l Type: Power Reactor (Operating)
! operator of the Facility: Arkansas Power & Light Company i
Item 4. Amount of Insurance Available:
1 1 The amount of insurance afforded by the Master 4
Worker Policy through this Certificate shall be determined by Section VIII of the Master Worker ,
l Policy and all of the other provisions of the policy '
relating thereto. .
Item 5. Advance Premium: $ 33,325.00 1
i APPLICATION OF CERTIFICATE l !
This Certificate applies only to bodily injury to a new '
2 worker (1) which is caused during the Certificate Coverage i
Period by the nuclear energy hazard and (2) which is dis- j i
covered and for which written claim is first made against an -
] insured under the certificate within the discovery period of l the Master Worker Policy.
i 3
- INDUSTRY RETROSPECTIVE RATING PLAN j All insurance under the Master Worke~ Policy is subject to 4
the Industry Retrospective Rating Plan in use by the companies. No insurance is provided under this certificate unless and until the first Named Insured has accepted in writing the Industry Retrospective Rating Plan Premium En-dorsement and a copy of the signed endorsement has been issued by the companies to form a part of this certificate.
NMWPC-1 (1/1/88) Page 2
s Ill WITilESS WHEREOF, the companies subscribing the Master Worker Policy have caused this Certificate to be executed and attested on their behalf by the President of Nuclear Energy Liability Insurance Association and duly counter-signed by an authori:ed representative.
For the Subscribing Companies of NUCLEAR ENERGY LIABILITY I!!SURANCE ASSOCIATION Burt C. Proom, President By . W M o 1 'WA
( Auth%)ized AgdTR)~
/4 ' '
Countersigned , m M ~
dc
~
(Authorized Representative)
This ic to cortify that this h a true copy of the originci Certificat0 t,a nting tha numbcr ciesigncted her can, for irsug.nco covera;o tr. der the Nucicar En' *gy Liab!!;t/ Fclicy (Fr.cility V.ff korc Form) horo!n cal10d tw M stui 'JarL < -"' Hcv i ggjaiordcd by tho copy.
, , _ . - ~
John L. Quattrc 't, Vice Presidcot - L!abih y uti Jctwritir,0 American Nuc! car msurors NMWPC-1 (1/1/88) page 3 i
Nuclear Energy Liability Insurance MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS l ADVANCE PREMIUM AND STANDARD PREMIUM ENCORSEMENT CALENDAR YEAR 1988
- 1. ADVANCE PREMIUM: It is agreed that the Advance Premium cue the ccmpanies for the period designated above is:
$ 9,675.00 .
- 2. STANDARD PREMIUM AND RESERVE PREMIUM: In the absence of a enange in tne Advance Premium indicated above, it is agreed that, subject to the provisions of the Indus-try Retrospective Rating Plan, the Standard Premium is said Advance Premium and the estimated Reserve Premium element of the Standard Premium is:
This is to certify that this is a truo copy of the original Endorsernant
$ 7,740.00 having tho endorsoment number and being mado part of tho Cortificate of Inscrance bearing the r. umber designate.djercon for insuranca comage und t the Nuc! car Energv t i' N%#clicy (Facility Workers Form). Na Int rang.ffc {My John L. Quattu :hi, Vice President - Liability Underwriting American Nuclear incurers Effective Date of this Endorsement January 1, 1988 To form a part of Certificate No. MW-47 12:01 A.M. Standard Time Issusd to Arkansas Power & Light Company Date of Issue January 22, 1988 For the Subscribing Companies MUTUAL ATOMIC ENERCT LIABILITT UNDERWRITERS A
By Endorsement No. 2 Countersigne M<
ME k'- 2 (1/1/88)
Nuclear Energy Liability Insurance MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS INDUSTRY RETROSPECTIVE RATING PLAN PREMIUM ENDORSEMENT It is agreed that:
- 1. DEFINITIONS With reference to the premium for the Certificate of which this endorsement forms a part:
"Master Worker Policy" means the Master Worker Policy issued by MAELU; "Certificate Holder" means the first Named Insured in a Certificate issued to form a part of the Master Worker Policy; "advance premium", for any caludar year, is the esti-mated standard premium for that calendar year; "standard premium", for any calendar year, is the premium for that calendar year computed in accordance with the companies' rules, rates, rating plans (other than the Industry Retrospective Rating Plan), premiums and minimum premiums applicable to this insurance.
Standard premium includes elements for premium taxes, expenses, profit and contingencies, guaranteed cost insurance and estimated reserve premium. The elements of standard premium, other than for premium taxes and estimated reserve premjum, are not subject to retrospr..-
tive adjustment; "reserve premium" means that portion of the premium for a certificate (including reserve premium charges paid) that is specifically allocated under the Industry Retro-spective Rating Plan for ratable incurred losses; "industry reserve premium", for any period, is the sum of the reserve premiums for that period for all Certifi-cates issued to form a part of the Master Worker Policy; "retrospective adjustment ratio", for any period, is the ratio of the reserve premium for this certificate for that period to the industry reserve premium for the same period; I
"incurred losses" means the sum of all:
(1) losses and expenses paid by MAELU, and !
(2) reserves for losses and expenses as estimated by MAELU, ME-W-1 (1/1/88) Page 1 J
a.
because of obligations assumed and expenses incurred in connection with such obligations by the members of MAELU under the Master Worker Policy; "ratable incurred losses" means 95% of incurred losses.
Ratable incurred losses are the portion of incurred losses which are not covered by the guaranteed cost insurance element of standard premiums; "non-ratable incurred losses" means 5% of incurred losses. Non-ratable incurred losses are the portion of incurred losses which are covered by the guaranteed cost insurance element of standard premiums; "reserve for refunds", as of any date, is the algebraic difference between:
(1) all industry reserve premium fo: the period from January 1, 1986 through such date, minus (2) the total for the same period of (a) all ratable incurred losses and (b) all industry reserve pre-mium refunds made under the Industry Retrospective Rating Plan by members of MAELU; "industry reserve premium charge", for any period, means the amount determined pursuant to the provisions of Section 4 of this endorsement for payment by the Named Insureds under Certificates; "reserve prerolum charge" means the portion of an indus-try reserve premium charge payable by the Named Insureds under this Certificate; "industry reserve premium refund", for any period, means the amount determined pursuant to the provisions of Section 4 of this endorsement for return to the Named '
Insureds under Certificates; "reserve premium refund" means the portion of an indus-try reserve premium refund returnable to the Named Insureds under this certificate.
- 2. PAYMENT OF ADVANCE AND STANDARD PREMIUMS The Named Insureds shall pay the companies the advance premium stated in the declarations, for the period from the ef fective date of this Certificate through December 31 following. Thereafter, at the beginning of each calendar year while this certificate is in force, the Named Insureds shall pay the advance premium for such year to the companies.
l ME-W-1 (1/1/88) Page 2
The advance premium for each calendar year shall be stated in the Advance and Standard Premium Endorsement for the year issued by the companies as soon as practic-able prior to or after the beginning of the year.
As soon as practicable after the end of a calendar year or the certificate coverage Period, the standard premium for the preceding year shall be finally determined and stated in the Advance and Standard Premium Endorsement for that year. If the standard premium exceeds the ad-vance premium paid for that year, the Named Insureds shall pay the excess to the companies; if less, the com-panies shall return to the Named Insureds the excess portion paid.
The Named Insureds shall maintain records of the inform-ation necessary for premium computation and shall send copies of such records to the companies as directed, at the end of each calendar year, at the end of the Certi-ficate Coverage Period and at cuch other times as the companies may direct.
- 3. SPECIAL RESERVE ACCOUNT; USE OF RESERVE PREMIUMS MAELU shall maintain on behalf of its members a Special Reserve Account for holding collectively all reserve premiums paid for all Certificates issued to form a part of the Master Worker Policy. Such premiums, together with any undistributed net income realized thereon after taxes and investment expenses, shall be used for the following purposes only:
(1) to pay ratable incurred losses or, in the event ratable incurred losses are paid under the Master Worker Policy from funds advanced by the members of MAELU subscribing the policy, to reimburse such t
members as a matter of first priority for the funds advanced;
- (2) to refund any amounts so held to the Named i Insureds, as provided in Section 4.
No members of MAELU and no Named Insureds shall have any individual interest in or claim upon amounts held in the Special Reserve Account, except to participate propor-tionally in any refund or reimbursement provided for above.
All reserve premiums paid or payable for this certifi-cate may be used by MAELU to discharge the obligations of its members under the Master Worker Policy with re- '
spect to the above purposes and arising out of claims l made under any Certificate issued to form a part of the l Master Worker Policy.
i i
i ME-W-1 (1/1/88) Page 3 l
l
___________-___0
i l
- 4. PAYMENT OF RESERVE PREMIUM CHARGES AND REFUNDS As soon as practicable af ter each December 31 the com- l panies will review the status of the reserve for refunds i and report their findings to all Certificate Holders. )
If, at any time, the companies find that there is a negative balance in the reserve for refunds and that j such condition is likely to prevail, they shall deter-mine an appropriate industry reserve premium charge.
Similarly, if the companies find that there is a surplus i positive balance, they shall determine an appropriate i industry reserve premium refund.
The portion of an industry reserve premium charge or an industry reserve premium refund that is:
(1) payable by the Named Insureds as a reserve premium charge, or (2) due such insureds as a reserve premium refund, shall be determined by multiplying the industry reserve premium charge or the industry reserve premium refund by the retrospective adjustment ratio applicable to this Certificate.
The amount of any reserve premium charge shall be stated in a Retrospective Reserve Premium Charge Endorsement.
The charge shall be. paid promptly after receipt of the endorsement.
When all claims covered by the Master Worker Policy are closed the companies shall make a final review and report, and shall determine a final induratry reserve premium charge or industry reserve premium refund equal to the amount of the balance.
- 5. FINAL PREMIUM l
The final premium for this certificate shall be (a) the '
sum of the standard premiums for each calendar year, or portion thereof, during which the certificate remains in t
1 force plus (b) the sum of all reserve premiums, includ- I ing all reserve premium charges, minus (c) the sum of I all reserve premium refunds.
- 6. RESERVE PREMIUM CHARGE AGREEMENT In consideration of (a) the participation of Named Insureds in other certificates subject to the Industry Retrospective Rating Plan, (b) the undertaking of such Named Insureds to pay their appropriate share of any industry reserve premium charge and (c) the obligations assumed by the members of MAELU under the Master Worker 3 l
ME-W-1 (1/1/88) Page 4 l
l
__________________-____-________-____-________\
Policy, the Named Insureds, by acceptance of the Master l Worker Policy, agree:
(1) That the insurance provided by the Master' Worker Policy applies collectively to all claims covered by the policy through any and all Certificates '
issued to form a part of the policy.
(2) That the right of each Named Insured'under a Cert--
ificate to receive reserve premium refunds and the 1 obligation of each such insured to pay ' reserve ,
l premiums charges applies to all claims covered by the Master Worker Policy . and continues until all such claims are closed, whether or not such claims i were before the inception of the Certificate or i after its termination. ,
3 (3) To pay all reserve premium charges due promptly i
after receipt of the Retrospective Reserve Premium Charge Endorsement,-whether or not the Certificate is terminated. Any reserve premium charge shall be overdue if not paid within 60 days of the date of the invoice for the charge. !
overdue reserve premium charges shall bear interest i
, from the due date until paid at an annual rate equal to the sum of (a) 34 plus (b) a rate of in-terest equal to Moody's Average Public Utility Bond
' Yield described in - the issue of Moody's Bond Survey current on the due date. Any reserve ,
premium refund due to Named Insureds under a Certi- '
ficate shall be used to pay any overdue reserve premium charges to such Named Insureds.
- 7. RESERVE PREMIUM REFUND AGREEMENT '
s
- Each member of MAELU subscribing the Master Worker
, Policy for any calendar year, or portion thereof, with :
a respect to which an industry reserve premium refund is I determined to be payable thereby agrees fer itself,
] severally and not jointly, and in the respective pro- l' portion of its liability assumed under the Master Worker Policy for that calendar year, to return promptly to the l Named Insureds that portion of such refund due such Insureds, as determined in accordance with the i provisions of this endorsement.
1 f
i j
i 1
i 1
ME-W-1 (1/1/88) ~
Page 5 i
a <
-_ , ---.-<-~--w -w - r-
Pcg3 6 Accepted and agreed by the first Named Insured in behalf of itself and every other Named Insured stated in the Declara-tions of the certificate of which this endorsement forms a part.
ARKANSAS POWER & LIGHT C0fiPANY (First Named Insured - Print or Type) _
Date ll!/f[67 By / MI MM I '(Sigr 2re of Authorized of ficer)
HENRY L. WARREN, Vice-President, Administrative Services (Prant or Type Name and Title of Officer)
Thic is to cor ily that this is a due copy of the original Endorremont hailng the endcrcement number t.nd being mede partof the Certificate of in;uranca bearing the number destgaared)ptcon for insurance coverago unc r tPc huc :;r Encrpy Liabilir,f/3iic/ (Fa$lity Workers Form). No ns ran !
John L. Our.th :hi, Vico Fres: dent Liatia:y unJerariting Americtn Nuchar incureru l
l Effective Date of To form a part of this Endorsement January 1, 1988 of Certificate No. MU-47 12:01 A.M. Standard Time Issued to Arkansas Power & L1,ht Company l
Date of Issue October 19, 1987 For the Subscribing Companies MUTUAL ATOMIC ENERGY LIABILITY ERWRITERS By . ey w c
Erdorsement No. I Countersigned by ,
W/
Aut ho'r t'r e d )(e pr e's e n skit ive ME-W-1 (1/1/88)
Nuclear Energy Liability Insurance NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ADVANCE PREMIUM AND STANDARD PREMIUM ENDORSEMENT CALENDAR YEAR 1988
- 1. ADVANCE PREMIUM: It is agreed that the Advance Premium cue the ccmoanies for tne period designated above is:
$ 33,325.00 .
- 2. STANDARD PREMIUM AND oESERVE PREMIUM: In the absence of a cnange in the Acvance Prem1um indicated above, it is agreed that, subject to the provisions of the Indus-try Retrospective Rating Plan, the Standard Premium is said Advance Premium and the estimated Reserve Premium element of the Standard Premium is:
$ 26,660.00 .
This is to cert!!/ thet this !s a true copy of the original Endorcomcat heving the endersDme 1 t' umber a id being mado part of the CertifiOtto of Insurance besring the number do:gnate herre fer insuranc9 i ccveraga ur icr the NJc:eSr Encrgy Liabili' Pclir- a0ility Wo.Sers i~orm). fio 1 iurtq ,a e g, -
John L Qua, cchi Vico President- Llahunderwriting American Nuctaar Inturors Effective Date of this Endorsement January 1. 1988 Te form a part of Certificate No. NW-116 12:01 A.M. Standard Time Issued to Arkansas Power & Light Company Date of Issue January 22. 1988 For the Su ribing Co anies By
- PRESIDENT Endorsement No. 2 Countersigned I
, NE-W-2 (1/1/88)
Nuclear Energy Liability insurance NUCLEAR ENERGY LIAI11LITY INSURANCE ASSOCIATION INDUSTRY RETROSPECTIVE RATING PLAN PREMIUM ENDORSEMENT It is agreed that:
- 1. DEFINITIONS ,
With reference to the premium for the Certificate of which this endorsement forms a part:
"Master Worker Policy" means the Master Worker Policy issued by NELIA; "Certificate Holder" means the first Named Insured in a certificate issued to form a part of the Master Worker Policy; "advance premium", for any calendar year, is the esti-mated standard premium for that calendar year; "standard premium", for any calendar year, is the pre-mium for that calendar year computed in accordance with the companies' rules, rates, rating plans (other than the Industry Retrospective Rating Plan), premiums and minimum premiums applicable to this insurance. Standard premium includes elements for premium taxes, expenses, profit and contingencies, guaranteed cost insurance and estimated reserve premium. The elements of standard premium, other than for premium taxes and estimated reserve premium, are not subject to retrospective adjustment; "reserve premium" means that portion of the premium for a certificate (including reserve premium charges paid) that is specifically allocated under the Industry Retro-spective Rating Plan for ratable incurred losses; "industry reserve premium", for any period, is the sum of the reserve premiums for that period for all Certifi-cates issued to form a part of the Master Worker Policy; "retrospective adjustment ratio", for any period, is the ratio of the reserve premium for this Certificate for that period to the industry reserve premium for the same period; 1
"incurred losses" means the sum of all:
(1) losses and expenses paid by NELIA, and (2) reserves for losses and expenses as estimated by l NELIA, i
l NE-W-1 (1/1/88) Page 1
)
because of obligations assumed and expenses incurred in connection with such obligaticas by the members of NELIA under the Master Worker Policy; "ratable incurred losses" means 95% of incurred losses.
Ratable incurred losses are the portion of incurred losses which are not covered by the guaranteed cost insurance element of standard premiums; "non-ratable incurred losses" means 5% of incurred l o.3 s e s . Non-ratable incurred losses are the portion of incurred losses which are covered by the guaranteed cost insurance element of standard premiums; "reserve for refunds", as of any date, is the algebraic difference between:
(1) all industry reserve premium for the period fror January 1, 198c through such date, minus (2) the total for the same period of (a) all ratable incurred losses and (b) all industry reserve pre-mium refunds made under the Industry Retrospective Rating Plan by members of NELIAJ "industry reserve premium charge", for any period, means the amouat determined pursuant to the provisions of Section 4 of this endorsement for payment by the Named Insureds under Certificates; "reserve premium charge" means the portion of an indus-try reserve premium charge payable by the Named Insureds under this certificate; "industry rsserve premium refund", for any period, means the amount determined pursuant to the provisions of Section 4 of this endorsement for return to the Named Insureds under Certificates; "reserve premita refund" means the portion of an indus-try reserve premium refund returnable to the Named In-sureds under this certificate.
- 2. PAYMENT OF ADVANCE AND STANDARD PREMIUMS The Named Insureds shall pay the companies the advance premium stated in the declarations, for the period from the effective date of this Certificate through December 31 following. Thereafter, at the beginning of each calendar year while this Certificate is in force, the Named Insureds shall pay the advance premium for such 1 year to the companies. l l
The advance premium for each calendar year shall be l stated in the Advance and Standard Premium Endorsement l
NE-W-1 (1/1/88) Page 2
l l
J
.- t for the year issued by the companies as soon as pract'.c-able prior to or after the beginning of the year. L As soon as practicable af ter the end of a calendar yeak-or the Certificate Coverage Period, the standard premium for the preceding year shall be finally determined and stated in the Advance and Standard Premium Endorsemont for that year. If the standard premium exceeds the ed-vance premium paid for that year, the Named Insureds shall pay the excess to the companins; if less, the com-panies shall return to the Hared Insureds the. excess portion paid.
- The Named Insureds shall maintain records of the inform-ation necessary for premium computation and shall send copies of such records to the companies as directed, at the end of each calendar year, at the end of the (art 1 -
ficate Coverage Period and at such other times as ;P companies may direct.
- 3. SPECIAL RESERVE ACCOUNT; USE OF RESLnVE FREMIUMS NELIA shall maintain on behalf of its me'.abers a Special !
Reserve Account for holding collectivelf all reserve I premiums paid for all Certificates issued to form a part of the Master Worker Policy. Such promiums, together ;
with any undistributed net incom; realized thereon af ter taxes and investment expenses, shall be used for tite t following purposes only:
(1) to pay ratable incurred losses or, in the event i
ratable incurred losses are paid under the Master ,
Worker Policy from funds advanced by the members of '
- NELIA subscribing the policy, to reimburse such members as a matter of first priority for the funds '
- advanced; (2) to refund any amounts so held to the Nacol Insureds, as provided in Section 4. i No members of NELIA and no Named Insureds shall have any i
, individual interest in or claim upon amounts held in the Special Reserve Account, ru xcept to participate propor-
]
i tionally in any refund or reimbursement provided for above.
All reserve premiums paid or payable for this Certifi-cate may be used by NELIA to discharge the obligations ,
j of its members under the Master Worker Policy with re- '
) spect to the above purposes and arising out of claims l
made under any Certificate issued to form a part of the i Master Worker Policy.
4 I l
i NE-W-1 (1/1/89) Page 3
1 l 4. PAYMFNT OF RESERVE PREMIUM CHARGES AND REFUNDS As soon a;; practicable after each December 31 the con-canies will review the status of the reserve for refunds and report their findings to all Certificate Holders.
If, at any time, the companies find that there is a negative balance in the reserve for refunds and that such condition is likely to prevail, they shall deter-mine an app opriate industry reserve premium charge.
Similarly, if the companies find that there is a surplus positive balance, they shall determine an appropriate industry reserve premium refund.
The pcrtion of an industry reserve premium charge or an industry reserve premium refund that is:
(1) payable by the Named Insureds as a reserve premium charge, or (2) due such insureds as a reserve premium refund, shall be determined by multiplying the industry reserve '
premium charge or the industry reserve premium refund by i the retrospective adjustment ratio applicable to this !
Certificate.
The amount of any reserve premium charge shall be stated in a Retrospective Reserve Premium Charge Endorsement.
The charge shall be paid promptly after receipt of the endorsement.
When all claims covered by the Master Worker Policy are closed the companies shall make a final review and re- ,
port, and shall determine a final industry reserve premium charge or industry reserve premium refund equal {
i to the amount of the balance. l
- 5. FINAL PREMIUM The final premium for this Certificate shall be (a) the sum of the standard premiums for each calendar year, or l portion thereof, during which the Certificate remains in force plus (b) the sum of all reserve premiums, includ-ing all reserve premium charges, minus (c) the sum of {
l all reserve premium refunds. '
- 6. RESERVE PREMIUM CHARGE AGREEMENT In consideration of (a) the participation of Named Insure t a in other Certificates subject to the Industry Retrospective Rating Plan, (b) the undertaking of such Named Insureds to pay their appropriate share of any industry reserve premium charge and (c) the obligations assumed by the members of NELIA under the Master Worker NE-W-1 (1/1/88) Page 4
Policy, the Named Insureds, by acceptance of the Master Worker Policy, agree:
(1) That the insurance provided by the Master Worker Policy applies collectively to all claims covered by the policy through any and all Certificates issued to forn. a part of the policy.
(2) That the right of each Named Insured under a Cert-ificate to receive reserve premium refunds and the obligation of each such insured to pay reserve premiums charges applies to all claims covered by the Master Worker Policy and continues until all such claims are closed, whether or not such claims were before the inception of the Certificate or after its termination.
(3) To pay all reserve premium charges due promptly after receipt of the Retrospective Reserve Premium Charge Endorsement, whether or not the Certificate is terminated. Any reserve premium charge shall be overdue if not paid within 60 days of the date of the invoice for the charge.
overdue reserve premium charges shall bear interest from the due date until paid at an annual rate equal to the sum of (a) 3% plus (b) a rate of in-tersst equal to Moody'r 'verage Public Utility Bond Yield described in -
issue of Moody's Bond Survey current on the e date. Any reserve pre-mium refund due to Named Insureds under a Certificate shall be used to pay any overdue reserve premium charges to such Named Insureds.
- 7. RESERVE PREMIUM REFUND AGREEMENT Each member of NELIA subscribing the Master Worker Policy for any calendar year, or portion thereof, with respect to which an industry reserve premium refund is determined to be payable thereby agrees for itself, severally and not jointly, and in the respective pro-portion of its liability assumed under the Master Worker Policy for that calendar year, to return promptly to the Named Insureds that portion of such refund due such Inrureds, as determined in accordance with the provi-sions of this endorsement.
NE-W-1 (1/1/88) page 5
, Page 6 4 .
Accepted and agreed ny the first Named Insured in behalf of itself and every other Named Insured stated in the Declara-tions of the certificate of which this endorsement forms a part.
ARKANSAS POWER & LIGHT C0itPANY (First' Named Insured - Print or Type)
Date // l'i 8 7 By LAl?n ? n (Signt *ge of Authorized Of ficer)
HENRY L. WARREN, Vice-President, Administrative Services (Print or Type Name and Title of Officer) lhic is to cortify that this is a true copy of the original Endorsemont having ihe codorsement number nd being made p:rt of the Certificate of in.rurance bosring the number cecignated tercon for insurance l coverage unc 'r the Nucicar Energy Liabl!!!' olicy (Facility Workets
~
d.. 'W Form), f40 In. :rargaffm John L. Guatti chi, Vica President - Licbihty adorarliing American Nuclocr insuiers l
Effective Date of to form a part of this Endorsement January 1, 1988 of Certificate No. NW-ll6 12:01 A.M. Standard Time Issued to Arkansas Power & Light Company Date of Issue October 19, 1987 For the scribing companies By General Manager Endorsement No, I Countersigned by j ,
NE *n'-l (1/1/88)