ML20189A255

From kanterella
Revision as of 23:48, 31 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
2021 Westinghouse Inspection Schedule Letter
ML20189A255
Person / Time
Site: Westinghouse
Issue date: 07/02/2020
From: Suzanne Dennis
NRC/RGN-II/DFFI/FFB2
To: Annacone M
Westinghouse
References
Download: ML20189A255 (5)


Text

July 2, 2020 Mr. Mike Annacone Vice President, Columbia Fuel Operations and Manager, Columbia Plant Westinghouse Electric Company 5801 Bluff Road Hopkins, SC 29061

SUBJECT:

WESTINGHOUSE ELECTRIC COMPANY - CALENDAR YEAR 2021 INSPECTION SCHEDULE

Dear Mr. Annacone:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at the Westinghouse Columbia Fuel Fabrication Facility (CFFF) in Hopkins, SC, for calendar year 2021. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that any regional initiative or other reactive inspection is not included in the schedule. If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Tom Vukovinsky at (404) 997-4622 with any questions or concerns you may have regarding this letter or the inspection schedule.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

M. Annacone 2 ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Suzanne K. Dennis, Acting Chief Projects Branch 2 Division of Fuel Facility Inspection Docket No. 70-1151 License No. SNM-1107

Enclosure:

Westinghouse Columbia Fuel Fabrication Facility Calendar Year 2021 Inspection Schedule (See page 2) cc: w/ encl: Distribution via LISTSERV

ML20189A255 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DFFI/PB2 RII:DFFI/PB2 NAME T. Vukovinsky S. Dennis DATE 7/2/2020 7/6/2020 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO WESTINGHOUSE COLUMBIA FUEL FABRICATION FACILITY CALENDAR YEAR 2021 INSPECTION SCHEDULE NCS1/FP Dates February 22 - 26, 2021 Number of Inspectors 2 88015 - Nuclear Criticality Safety Inspection Procedures (IPs) 88055 - Fire Protection OPS1 Dates April 26 - 30, 2021 Number of Inspectors 1 Inspection Procedures (IP) 88020 - Operational Safety EPX Dates May 10 - 14, 2021 (Placeholder)

Number of Inspectors 3 Inspection Procedure (IP) 88051 - Evaluation of Exercises and Drills MC&A Dates July 12 - 16, 2021 Number of Inspectors 2 85401, 85402, 85403, 85404, 85405, 85406, 85407, Inspection Procedures (IPs) 85408 NCS2/TRANS Dates July 19 - 23, 2021 Number of Inspectors 2 88015 - Nuclear Criticality Safety Inspection Procedures (IPs) 86740 - Inspection of Transportation Activities MC&A Observation Dates September 27 - October 1, 2021 (Placeholder)

Number of Inspectors 1 Inspection Procedure (IP) 85404 Enclosure

PMT Dates October 25 - 29, 2021 Number of Inspectors 3 Inspection Procedure (IP) 88072 - Plant Modifications (Triennial)

OPS2 Dates November 15 - 19, 2021 Number of Inspectors 1 Inspection Procedure (IP) 88020 - Operational Safety 2