MONTHYEARML20217E8021999-10-0707 October 1999 CPSES Unit 1 Cycle 8 Colr ML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 ML20212F7671999-09-24024 September 1999 SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20216J5701999-09-16016 September 1999 Rev 2 to CPSES Unit 2 Cycle 5 Colr TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20210D8321999-07-23023 July 1999 Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20209H7661999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209H2721999-07-0909 July 1999 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage ML20209H2631999-07-0909 July 1999 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage ML20209G7501999-07-0808 July 1999 SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station ML20196L0191999-07-0808 July 1999 Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20196J0621999-06-29029 June 1999 Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20216E0711999-05-21021 May 1999 1999 Graded Exercise - Comanche Peak Steam Electric Station ML20206Q0091999-05-14014 May 1999 Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 ML20206H2061999-05-0606 May 1999 SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205J7831999-04-0101 April 1999 Rev 0 to ERX-99-001, CPSES Unit 2 Cycle 5 Colr ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20203A4881999-02-0303 February 1999 Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2 ML20210J9201999-02-0101 February 1999 CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802- 990201 ML20202D0101999-01-27027 January 1999 Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20207D6091998-12-31031 December 1998 1998 Annual Operating Rept for Cpses,Units 1 & 2. with ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20154B5741998-09-30030 September 1998 Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable Program ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20151Q1211998-08-14014 August 1998 Rev 0 to Control of Hazard Barriers ML20237C4061998-08-14014 August 1998 Safety Evaluation Supporting Request to Implement Risk Informed IST Program ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216B8661998-04-0101 April 1998 Rev 0 to ERX-98-001, CPSES Unit 1 Cycle 7 Colr ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20197A6951998-02-24024 February 1998 Inservice Insp Summary Rept,First Interval,Second Period, First Outage ML20199J5391998-02-0202 February 1998 CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801 1999-09-30
[Table view] Category:TOPICAL REPORT EVALUATION
MONTHYEARML20059D1911993-12-30030 December 1993 Topical Rept Evaluation of RXE-91-005, Methodology for Reactor Core Response to Steamline Break Events ML20056E3961993-08-0505 August 1993 Safety Evaluation of RXE-90-006-P, Power Distribution Control Analysis & Overtemperature N-16 & Overpower N-16 Trip Setpoint Methodology. Methodology Acceptable ML20056E3811993-08-0505 August 1993 Safety Evaluation of RXE-89-002, Vipre-01 Core Thermal- Hydraulic Analysis Methods for Comanche Peak Steam Electric Station Licensing Applications. Rept Is Acceptable for Ref in CPSES Core thermal-hydraulic Analyses ML20056E2571993-08-0505 August 1993 Corrected Safety Evaluation for Topical Rept RXE-91-001, Transient Analysis Methods for Commanche Peak Steam Electric Station Licensing Applications. Corrections Made to Second Sentense of Second Full Paragraph on Page Two ML20128B8101993-01-19019 January 1993 Safety Evaluation Accepting Methodology Described in Topical Rept RXE-91-002 Reactivity Anomaly Events Methodology for Reload Licensing Analyses for CPSES 1993-08-05
[Table view] |
Text
E 1 guouq'o UNITED STATES
, s g
/- ' n NUCLEAR REGULATORY COMMISSION
{. ,i WASHINGTON, D. C 20555
\..../ SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACJDR REGULATION RELATING TO REACTIVITY ANOMALY EVENTS METHODOLOGY TOPICAL REPORT RXE-91-002 TEXAS UTILITIES ELECTRIC COMPANY COMANCHE PEAK STEAM ELECTRIC STATION. UNITS 1 AND 2 DOCKET NOS. 50-445 AND 50-446
1.0 INTRODUCTION
By letter dated May 31, 1991, Texas Utilities Electric Company (TV Electric) submitted the topical report RXE-91-002, entitled " Reactivity Anomaly Events Methodology". The topical report describes the methods and models proposed for TV Electric application to the reload analyses of Comanche Peak Steam Electric Station Units 1 and 2 (CPSES). The report includes a descri) tion of the computer codes and modes, and the qualification of these metaods. The CPSES methods for performing transient calculations are described in detail, 2.0 EVALUATION Topical Report RXE-91-002 describes the TU Electric methodology for performing the event analyses for the CPSES Final Safety Analysis Report (FSAR) Chapter 15 events characterized as reactivity anomalies. Specifically, this report addresses those events described in Section 15.4 of the CPSES FSAR. The reactivity anomaly events include transients that are initiated by. movement of the control rods or changes in the reactor coolant system (RCS) boron concentration, and those events resulting from mispositioning of control rods or fuel assemblies. The methodology described in this report expands on methods previously developed by TU Electric related to core reload design, core thermal-hydraulic analysis and system thermal-hydraulic analysis.
The CASMO-3 computer code was used to generate fuel assembly cross sections.
CASMO-3 is a multi-group, two-dimensional transport theory code utilized for burnup calculations on BWR and PWR assemblies. Steady-state three-l dimensional core neutronics calculations are performed with SIMULATE-3. The l SIMULATE-3 computer code is used to determine reactivity coefficients,
! kinetics parameters, control-rod worth, multi-dimensional power distributions, l and event-specific axial power shapes.
1 The CPSES core thermal-hydraulic model employs VIPRE-01 to calculate the i thermal-hydraulic state and the core minimum departure from nucleate boiling l ratio (MONBR). The VIPRE-01 model includes a detaile.d fuel model which allows the determination of the fuel pellet temperature distribution.
I 9302030181 930119 i PDR ADOCK 05000445 l P PDR l
0 The staff reviewed and evaluated the methodology described in Topical Report-RXE-91-002 for analyzing and qualifying core physics methods, and its intended use at CPSES. The staff was aided by-the technical assistance of Brookhaven National Laboratory (BNL). The evaluation and findings are described in detail in the BNL technical evaluation report (TER) which is enclosed as an attachment to this report.
3.0 CONCLUSION
The staff finds the methodology described in Topical Report RXE-91-002
" Reactivity Anomaly Events Methodology" acceptable for reload licensing analyses for CPSES, subject to the applicable limitations and restrictions presented below:
- 1. Since supporting methodologies, as described in Topical Report RXE-91-002, can have significant impact on the consequences of the reactivity events, it is the licensee's responsibility to ensure that the application of the RXE-91-002 methods are carried out with approved versions of these related methods (Section-3.1 of attachment).
- 2. A generic overpressurization analysis for the control rod ejection event is provided in the CPSES FSAR. While this analysis is believed to be generally bounding, it is the licensee's responsibility to confirm conservatism in the FSAR overpressurization analysis for each CPSES reload core design.
- 3. The TER conclusion restricts the use of the TU Electric point kinetics rod ejection analysis to reload designs similar to the CPSES cycle-1 benchmark, and use of the conservatism utilized in the scram reactivity analysis. If significantly different fuel designs are introduced or operating conditions vary from those included in the benchmark data base, or if the conservatism in the scram reactivity analysis is relaxed, the rod ejection analysis will require requalification.
- 4. The uncertainty values and bases used in the statistical combination of uncertainties method must be provided in the cycle-specific application of the RXE-91-002 methodology.
Attachment:
Technical Evaluation Report Principal Contributor: A. Attard Date: January 19, 1993