Revised Monthly Operating Rept for Oct 1996 for LaSalle County Nuclear Station Unit 2
ML20132B341
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 10/31/1996
From: Calfa L
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20132B303 List:
References
NUDOCS 9612170154
Download: ML20132B341 (1)


Text

- - -. _ . . . __ .

. , h ,

- ~

B. OPERATING DATA REPORT FOR UNIT TWO DOCKET NO.: 050-374 UNIT: LaSalle Two DATE: 12/07/96

. COMPLETED BY: L. Calfa TELEPHONE: (815)357-6761 x2620 i

OPERATING STATUS i 1. Reporting Period: October,1996 Gross Hours: 720

2. Currently Authorized Power Level: 3,323 (MWt)

Design Electrical Rating: 1,078 (MWe-net)

Max Dependable Capacity: 1,036 (MWe-net)

3. Power Level To Which Restricted (If Any): None
4. Reasons For Restriction (If Any): N/A THIS MONTH YEAR-TO-DATE CUMULATIVE
5. Reactor Critical 0.0 5,738.8 77,028.4 Hours
6. Reactor Reserve 0.0 0.0 1,716.9 Shutdown Hours
7. Hours Generator On- 0.0 5,644.0 75,970.2 une
8. Unit Reserve 0.0 0.0 0.0 Shutdown Hours
9. Gross Therrnal 0.0 17,128,001 230,522,687 Energy (MWHt)
10. Gross Electric Energy 0.0 5,824,691 77,175,924 (MWHe)
11. Net Electrical Energy 0.0 5,642,329 73,973,643 (MWHe)
12. Reactor Service 0.0 71.4 72.5 Factor (%)
13. Reactor Availability 0.0 71.4 74.1 Factor (%)
14. Unit Service Factor 0.0 70.2 71.5

(%)

15. Unit Availability 0.0 70.2 71.5 Factor
16. Unit Capacity Factor 0.0 67.7 67.2 (MDC)
17. Unit Capacity Factor 0.0 65.1 64.6 (design MWe)
18. Unit Forced Outage 0.0 10.6 9.1 Factor (%)
19. Shutdowns Scheduled Over Next 6 Months: Refuel, 09/20/96,12 weeks
20. If Shutdown at End of Report Period, Estimated Date of Startup: 1/16/97 9612170154 961209 PDR ADOCK 05000373 R PDR