ML20117M510

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Aug 1996 for LaSalle County Station Units 1 & 2
ML20117M510
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 08/31/1996
From: Cialkowski M, Ray D
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9609170462
Download: ML20117M510 (15)


Text

. __ _ .

Q>mmonwealth lihwm Comluny

, la salle Generating Station 2601 North 21st Road Marseilles, 11.61341-9757 Trl HI5-3%74761 September 9,1996 United States Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Desk i

Subject:

LaSalle County Station Units 1 and 2 i Monthly Performance Report '

NRC Docket Numbers 50-373 and 50-374.

Enclosed is the LaSalle County Station Monthly Performance Report for the month of August,1996.

I Respectfully, D.J.R y Station Manager LaSalle County Station i Enclosure cc: A.B. Beach, NRC Region lli Administrator M. P. Huber, NRC Senior Resident inspector - LaSalle B. L. Jorgensen - NRC Region lli Branch Chief D. M. Skay, Project Manager, NRR - LaSalle C. H. Mathews, IDNS Resident inspector - LaSalle D. Deppa, IDNS Reactor Safety - Springfield P. Doverspike, GE Representative - LaSalle D. L. Farrar, Nuclear Regulatory Services Manager INPO - Records Center DCD - Licensing (Hardcopy: Electronic: )

Central file pgc/ /

9609170462 960831 PDR ADOCK 05000373 R PDR A rnimm 0>mruni

.. +,

. t a

LASALLE NUCLEAR PONER STATION ,

UNIT 1 MONTHLY PERFORMANCE REPORT August 1996 CONNONNEALTN EDISON COMPANY NRC DOCKET NO. 050-373 LICENSE NO. NPF-11 i

i 4

I 1.

J i

l TABLE OF CONTENTS

, (UNIT 1).

I. INTRODUCTION  ;

1 II. REPORT l

1 A.

SUMMARY

OF OPERATING EXPERIENCE 1 l

B. DATA TABULATIONS

1. Operating Data Report
2. Average Daily Unit Power Level
3. Unit Shutdowns and Power Reductions C. UNIQUE REPORTING REQUIREMENTS
1. Main Steam Safety Relief Valve Operations
2. Major Changes to Radioactive Waste Treatment System
3. Off-site Dose Calculation Manual changes I

l l

1 l

l l

\

1 i

l I

I i

e _ _ _ _ _ _ _ _ _ , _ _ .

r _ -- _ . - . . .

I. IN'RODUCTION (UNIT 1)

The LaSalle County Nuclear Power Station is a two-Unit facility owned by Comunonwealth Edison Company and located near Marseilles, Illinois. Each unit is a Boiling Water Reactor with a designed not

electrical output of 1078 Megawatts. Waste heat is rejected to a man-made cooling pond using the Illinois river for make-up and j blowdown. The architect-engineer was Sargent and Lundy and the l contractor was Conanonwealth Edison Company.

Unit one was issued operating license number NPF-11 on April 17, 1982. Initial criticality was achieved on June 21, 1982 and commercial power operation was conunenced on January 1, 1984.

This report was compiled by Lyle E. Calfa, telaphone number t815)357-6761, extension 2620.

i  !

l l I

l

II. MONTHLY REPORT A.

SUMMARY

OF OPERATING EXPERIENCE (Unit 1) j l

Par Time Event 1 0000 Reactor critical, generator on-line at 1124 Mwe 3 2300 Commenced power reduction for condensate booster pump swap 4 0045 Power level 850 Mwe l 4 1253 Power reduction to 1075 Mwe for condensate and condensate booster pump swap 4 1630 Power level 1110 Mwe l 14 0330 Commenced power reduction from 1110 Mwe to 1060 Mwe for heater drain pump swap 14 0424 Power level 1107 Mwo 15 0123 Reduced power to 1057 Mwe for heater drain pumps swap 15 0241 Power level 1101 Mwe 16 0300 Power reduced to 1075 Mwe for condensate and condensate booster pump swap 16 0350 Power level 1101 Mwe 1220 23 Reduced power to 1020 Mwe to shutdown circulating water pumps 25 1015 Power level 1105 Mwe l

31 2400 Reactor critical, power level 1120 Mwe B. DATA TABULATIONS (Unit 1)

1. Operating Data Report (See Table 1)
2. Average Daily Unit Power Level (See Table 2)
3. Unit Shutdowns and Significant Power Reductions (See Table 3)

C. UNIQUE REPORTING REQUIREMENTS (UNIT 1)

1. Safety Relief Valve Operations (None)
2. Major Changes to Radioactive Waste Treatment Systems (None)
3. Changes to the Off-site Dose Calculation Manual (None)

TABLE 1 B.1 OPERATING DATA REPORT DOCKET Wo. 050-373 UNIT LASALLE ONE DATE September 10, 1996 COMPLETED BY M.J. CIALK0WSKI TELEPHONE (815) 357 6761 OPERATING STATUS

1. REPORTING PERIOD: AuBust 1996 GROSS HOURS IN REPORTING PERIOD 744
2. CURRENTLY AUTh0RIZED POWER LEVEL (MWt): 3,323 MAX DEPEND CAPACITY (MWe-Net): 1,036 DESIGN ELECTRICAL RATING (MWe-N 1,078
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net): N/A
4. REASONS FOR RESTRICTION (IF ANY): N/A REPORTING PERIOD DATA THIS MONTH YEAR TO-DATE CUMULATIVE
5. REACTOR CRITICAL TIME (HOURS) 744.0 3,256.4 75,527.5
6. REACTOR RESERVE SHUTDOWN TIME (HOURS) 0.0 0.0 1,641.2
7. GENERATOR ON-LINE TIME (HOURS) 744.0 2,830.2 76,170.3
8. UNIT RESERVE SHUTDOWN TIME (HOURS) 0. (> 0.0 1.0
9. THERMAL ENERGY GENERATED (MWHt) 2,446,631 8,595,167 227,049,984
10. ELECTRICAL ENERGY GENERATED (MWHe-Cross) 818,180 2,828,238 75,872,090
11. ELECTRICAL ENERGY GENERATED (MWHe Net) 798,063 2,714,011 72,852,439
12. REACTOR SERVICE FACTOR (%) 100.0 55.6 68.0
13. REACTOR AVAILABILITY FACTOR (1) 100.0 55.6 69.5
14. UNIT SERVICE FACTOR (%) 100.0 48.3 68.6
15. UNIT AVAILIBILITY FACTOR (%) 100.0 48.3 68.6
16. UNIT CAPACITY FACTOR (USING MDC) (%) 103.5 44.7 63.3
17. UNIT CAPACITY FACTOR (USING DESIGN MWe) (%) 99.5 43.0 60.8 l
18. UNIT FORCED OUTAGE FACTOR (%) 0.0 16.5 8.2 l l
19. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): N/A 1
20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A N/A l

t DOCKET NO. 050-373 TABLE 2 UNIT LASALLE ONE B.2 AVERAGE DAILY UNIT power LEVEL (MWe-Net) DATE September 10, 1996 COMPLETED BY M.J. CIALK0WSKI TELEPHONE (815)-357-6761 REPORT PERIOD: August 1996 DAY POWER DAY POWER 1 1,090 17 1,081 2 1,088 18 1,086 3 1,080 19 1,088 4 993 20 1,086 5 1,084 21 1,082 ,

6 1,084 22 1,082 7 1,082 23 1,020 8 1,079 24 975

. 9 1,083 25 1,050 10 1,082 26 1,076 11 1,082 27 1,079 12 1,080 28 1,081 13 1,080 29 1,079 14 1,078 30 1,080 15 1,083 31 1,079

-i 16 1,080 I

1 4

)

l 1

1

. . _ _ _ _ - - - - - _ _ - - - - - - 1

~

l TABLE 3 B.3 UNIT SHUTDOWNS AND POWER REDUCTIONS >'20%

(UNIT 1) t 4

METHOD OF CORRECTIVE '

YEARLY TYPE SHUTTING DOWN ACTIONS / COMMENTS SEQUENTIAL DATE F: FORCED DURATION THE REACTOR OR (LER # if NUMBER (YDOEDD) St SCHEDULED (HOURS) REASON REDUCING POWER applicable)

None

SUMMARY

OF OPERATION: The unit remained on-line throughout the month. Several minor power reductions were  !

required for routins maintenance and surveillance activities.

1 I

l i

- _. - . . . . ,, -- . ~ . . _ . - . . . . . . . . . .- . . . - - . . - . - -

r p

a t

v

~

LASALLE NUCLEAR PONER STATION UNIT 2' I

MONTHLY PERFORMANCE REPORT.

i l August 1996 COMMONNEALTH EDISON COMPANY i

4 e

NRC DOCKET NO. 050-374 i

LICENSE NO. NPF-18 a

r k

1 4

i I

i 4

1 4

4 i

r

_ .__ _ _ .._ _ . . . _ __ ~ . _ , _ . - , _ _ , _ . .

TABLE OF CONTENTS (UNIT 2)

I.- INTRODUCTION II. REPORT

A.

SUMMARY

OF OPERATING EXPERIENCE B. DATA TABULATIONS

. 1. Operating Data Report l 2. Average Daily Unit Power Level i 3. Unit Shutdowns and Power Reductions 1

C. UNIQUE REPORTING REQUIREMENTS l 1. Main Steam Safety Relief Valve Operations

! 2. Major Changes to Radioactive Waste Treatment System 4 3. Off-Site Dose Calculation Manual Changes 7

i 1

a 4

4 f

j f

1 d

J l

d

, .. . ~ _ . . - . . -. . . . ~ . . . _ .. . . - . - . - - - . . - .. .

l I. INTRODUCTION (UNIT 2)

$ The LaSalle County Nuclear Power Station is a two-Unit facility owned by Commonwealth Edison Company and located near Marseilles, Illinois. Each unit is a Boiling Water Reactor with a designed not electrical output of 1078 Megawatts. Waste heat is rejected to a ,

man-made cooling pond using the Illinois river for make-up and i

blowdown. The architect-engineer was Sargent and Lundy and the

.i contractor was Commonwealth Edison Company.

. Unit two was issued operating license number NPF-18'on December-16, 1983. Initial criticality was achieved on March 10, 1984 and ,

commercial power operation was commenced on October 19, 1984. j j This report was compiled by Lyle E. Calfa,. telephone l number (815)357-6761, extension 2620.

d 1

t A a k

1 d

I i

l i

II. MONTHLY REPORT-A.

SUMMARY

OF OPERATING EXPERIENCE (Unit 2) 4

  • EAX Time Event i

1 0000 Continuing power reduction due to reactor recirculating flow increasing, power level 1057 Mwe 2 1000 Power level 1055 Mwe 4

11 0100 Power reduction to 850 Mwe to perform surveillances 4 11 1900 Power level 1030 Mwe -

19 0213 Reduced power level to 945 Mwe due to a problem

^

with the No.' 2 Turbine Control Valve i

] 31 2400 Reactor critical, power level 940 Mwe  !

B. DATA TABULATIONS (Unit 2)

1. Operating Data Report (See Table 1) ,
2. Average Daily Unit Power Level (See Table 2)
3. Unit shutdowns and Significant Power Reductions (See Table 3) 2 l

C. UNIQUE REPORTING REQUIREMENTS (UNIT 2)

1. Safety Relief Valve Operations (No.:9
2. Major Changes to Radioactive Waste Treatment Systems ,

(None)  !

3. Changes to the Off-site Dose calculation Manual (None) ,

L b

(

TABLE 1 ,

8.1 OPERATING DATA REPORT DOCKET No. 050-374 UNIT LASALLE TWO DATE September 10, 1996 COMPLETED SY M.J. CIALK0WSKI TELEPHONE (815) 357-6761 OPERATING STATUS

1. REPORTING PERIOD: August 1996 GROSS HOURS IN REPORTING PER?OD: 744 '
2. CURRENTLY AUTHORIZED POWER LEVEL ( w t): 3,323 MAX DEPEND CAPACITY (MWe-Net): 1,036 DESIGN ELECTRICAL RATING (We Net): 1,078
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): N/A 4 REASONS FOR RESTRICTION (IF ANY): N/A REPORTING PERIOD DATA THIS MONTH YEAR-TO-DATE CUMULATIVE
5. REACTOR CRITICAL TIME (HOURS) 744.0 5,297.1 76,586.7
6. REACTOR RESERVE $NUTDOWN TIME (HOURS) 0.0 0.0 1,716.9
7. GENERATOR ON LINE TIME (HOURS) 744.0 5,193.9 75,035.4
8. UNIT RESERVE $NUTDOWN TIME (HOURS) 0.0 0.0 0.0
9. THERMAL ENERGY GENERATED (MWHt) 2,198,737 15,930,227 227,899,482
10. ELECTRICAL ENERGY GENERATED (MWHe Gross) 736,808 5,416,253 76,314,109
11. ELECTRICAL ENERGY GENERATED (MWHe-Net) 718,941 5,247,742 73,400,414
12. REACTOR SERVICE FACTOR (%) 100.0 90.5 73.6
13. REACTOR AVAILASILITY FACTOR (%) 100.0 90.5 75.2
14. UNIT SERVICE FACTOR (%) 100.0 88.7 72.1
15. UNIT AVAILISILITY FACTOR (%) 100.0 88.7 72.1
16. UNIT CAPACITY FACTOR (USING MDC) (%) 93.3 86.5 68.1
17. UNIT CAPACITY FACTOR (UhlNG DESIGN MWe) (%) 89.6 83.1 65.4 18.' UNIT FORCED OUTAGE FACTOR (%) 0.0 11.3 10.1 ,
19. SNUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): Refuel, 09/20/M, 8 weeks
20. IF SWTDOWN AT END OF REPORT PERIOD, ESilMATED DATE OF STARTUP: N/A N/A

DOCKET No. 050 374 TABLE 2 UNIT LASALLE TWO B.2 AVERAGE DA!Lf UNIT POWER LEVEL (MWe Net) DATE September 10, 1996 COMPLETED BY M.J. CIALK0WSKI TELEPHONE (815) 357-6761 REPORT PERIOD: August 1996 DAY POWER DAY PDWER 1 1,034 17 983 2 1,029 18 982 3 1,023 19 927 4 1,024 20 913 5 1,030 21 902 6 1,024 22 901 7 1,020 23 910 8 1,016 24 912 9 1,013 25 908 10 1,009 26 917 11 922 27 916 12 1,006 28 922 13 995 29 910 14 993 30 910 15 994 31 924 16 986

p .

l TABLE 3 l

B.3 UNIT SHUTDOWNS AND POWER REDUCTIONS > 20%

l (UNIT 2)

METHOD OF CORRECTIVE YEARLY TYPE SHUTTING DOWN ACTIONS / COMMENTS SEQUENTIAL DATE Ft FORCED DURATION THE REACTOR OR (LER # if NUMBER (YYMNDD) St SCHEDULED (HOURS) REASON REDUCING POWER- applicable)

None

SUMMARY

OF OPERATION: The unit remained on-line throughout the month. Several minor power reductions were required for routine maintenance and surveillance activities.

- - - - - - - - _ - _ _ . _ _ _ - - . - - - . - . _ - - _ - _ _ . - - - - . _ - - _ - - _ _ -e-.r- - - --- _ - _- _- -- e w --w e - e --e-- .-n -

=w- - -a _--- - - - - - . _ . - _ _ _ - - - _ ---- . . _- . - - -