B. OPERATING DATA REPORT FOR UNIT TWO DOCKET NO.: 050-374 UNIT: LaSalle Two DATE: 12/07/96 COMPLETED BY:
L. Calfa TELEPHONE: (815)357-6761 x2620 i
OPERATING STATUS i
- 1. Reporting Period: October,1996 Gross Hours: 720
- 2. Currently Authorized Power Level: 3,323 (MWt)
Design Electrical Rating: 1,078 (MWe-net)
Max Dependable Capacity: 1,036 (MWe-net)
- 3. Power Level To Which Restricted (If Any): None
- 4. Reasons For Restriction (If Any): N/A THIS MONTH YEAR-TO-DATE CUMULATIVE 5.
Reactor Critical 0.0 5,738.8 77,028.4 Hours 6.
Reactor Reserve 0.0 0.0 1,716.9 Shutdown Hours 7.
Hours Generator On-0.0 5,644.0 75,970.2 une 8.
Unit Reserve 0.0 0.0 0.0 Shutdown Hours 9.
Gross Therrnal 0.0 17,128,001 230,522,687 Energy (MWHt) 10.
Gross Electric Energy 0.0 5,824,691 77,175,924 (MWHe) 11.
Net Electrical Energy 0.0 5,642,329 73,973,643 (MWHe) 12.
Reactor Service 0.0 71.4 72.5 Factor (%)
13.
Reactor Availability 0.0 71.4 74.1 Factor (%)
14.
Unit Service Factor 0.0 70.2 71.5
(%)
15.
Unit Availability 0.0 70.2 71.5 Factor 16.
Unit Capacity Factor 0.0 67.7 67.2 (MDC) 17.
Unit Capacity Factor 0.0 65.1 64.6 (design MWe) 18.
Unit Forced Outage 0.0 10.6 9.1 Factor (%)
- 19. Shutdowns Scheduled Over Next 6 Months: Refuel, 09/20/96,12 weeks
- 20. If Shutdown at End of Report Period, Estimated Date of Startup: 1/16/97 9612170154 961209 PDR ADOCK 05000373 R