ML20116M129

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jul 1996 for LaSalle County Station Unit 1 & 2
ML20116M129
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 07/31/1996
From: Cialkowski M, Ray D
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9608200041
Download: ML20116M129 (15)


Text

. - --

Ormmonwealth lidison O)mpan)

. lasalle Generating Station

  • 2601 North 21st Road Alarscilles, 11.61361-9757 i Tel HI5 357#'6I i

August 7,1996

United States Nuclear Regulatory Commission  !

Washington, D.C. 20555 I

$ Attention: Document Control Desk

Subject:

LaSalle County Station Units 1 and 2 i Monthly Performance Report 1

NRC Docket Numbers 50-373 and 50-374.

Enclosed is the LaSalle County Station Monthly Performance Report for the month of July,1996. I Respectfully, 1

D . Ray l Station Manager i LaSalle County Station  ;

Enclosure cc: A.B. Beach, NRC Region ill Administrator M. P. Huber, NRC Senior Resident inspector - LaSalle ,

B. L. Jorgensen - NRC Region ill Branch Chief I D. M. Skay, Project Manager, NRR - LaSalle C. H. Mathews, IDNS Resident Inspector - LaSalle D. Deppa, IDNS Reactor Safety - Springfield P. Doverspike, GE Representative - LaSalle ,

D. L. Farrar, Nuclear Regulatory Services Manager .g ,..

INPO - Records Center vv DCD - Licensing (Hardcopy: Electronic: ) kb Central file /

9608200041 960731 \

g0

,. PDR ADOCK 05000373 \

R PDR 3 rna om o.mpan>

4 i

e , 9 4 +

t+

1 4 -

l 1.

J 4

4 3

i

! LASALLE NUCLEAR POWER STATION 4

i d

i UNIT 1 MONTHLY PERFORMANCE REPORT l 1

,i

\

July 1996 l r

CChe00NWEALTH EDISON COMPANY 1

1 4

1 l NRC DOCKET NO. 050-373 1

2 LICENSE NO. NPF-11 i

k 4 ,

T 1

4 4

1 E

1 k

4 3

i 1

i i I

I r

l

TABLE OF CONTENTS (UNIT 1)

I. INTRODUCTION II. REPORT  ;

)

i A. SIBedARY OF OPERATING EXPERIENCE j

B. DATA TABUI.ATIONS

1. Operating Data Report
2. Average Daily Unit Power Level
3. Unit Shutdowns and Power Reductions C. UNIQUE REPORTING ROQUIREMENTS
1. Main Steam Safety Relief Valve operations
2. Major Changes to Radioactive Waste Treatment System
3. Off-site Dose Calculation Manual Changes l

l l

I

I. INTRODUCTION (UNIT 1)

The LaSalle County Nuclear Power Station is a two-Unit facility owned by comanonwealth Edison Company and located near Marseilles, Illinois. Each unit is a Boiling Water Reactor with a designed not electrical output of 1078 Megawatts. Waste heat is rejected to a man-nade cooling pond using the Illinois river for make-up and blowdown. The architect-engineer was sargent and Lundy and the contractor was Comanonwealth Edison Company.

Unit one was issued operating license number NPF-11 on April 17, 1902. Initial criticality was achieved on June 21, 1982 and cosamercial power operation was comunenced on January 1,1984.

This report was compiled by Michael J. Cialkowski, telephone nunpber (015)357-6761, extension 2056.

l

, II. MONTHLY REPORT A. St2dNARY OF OPERATING EXPERIENCE (Unit 1)

Day Time Event 1 0000 Reactor sub-critical, Generator off-line.

13 2129 Reactor critical.

14 2047 Generator on-line at 50 Mwe.

15 1900 Power level at 1036 Mwe. l 16 0330 Power level at 1115 Mwe.

18 0200 Reduced power level to 740 Mwe for rod pattern adjustments.

0600 Increased power level to 1115 Mwe.

26 1130 Reduced power level to 1016 Mwe due to drifting of control rod 34-11.

1330 Increased power level to 1106 Mwe.

1906 F. educed power level to 900 Mwe for rod pattern adjustments.

27 1100 Increased power level to 1120 Mwe.

31 2400 Reactor critical, Generator on-line at 1120 Mwe.

B. DATA TABULATIONS (Unit 1)

1. Operating Data Report (See Table 1)
2. Average Daily Unit Power Level (See Table 2)
3. Unit Shutdowns and Significant Power Reductions (See Table 3)

C. UNIQUE REPORTING REQUIREMENTS (UNIT 1)

1. Safety Relief Valve Operations (None)
2. Major Changes to Radioactive Waste Treatment Systems (None)
3. Changes to the Off-Site Dose Calculation Manual (None) i i
  • 1 I

TABLE 1  ;

B.1 OPERATING DATA REPORT DOCKET NO. 050 373 UNIT LASALLE ONE DATE August 09, 1996 COMPLETED BY M.J. CIALK0WSKI TELEPHONE (815) 357-6761 OPERATING STATUS

1. REPORTING PERIOD: July 1996 GROSS HOURS IN REPORTING PERIOD 744
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3,323 MAX DEPEND CAPACITY (MWe-Net): 1,036 DESIGN ELECTRICAL RATING (MWe-N 1,078
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net): N/A
4. REASONS FOR RESTRICTION (IF ANY): N/A REPORTING PERIOD DATA THIS MONTH YEAR-TO-DATE CUMULATIVE
5. REACTOR CRITICAL TIME (HOURS) 434.5 2,512.4 75,527.5
6. REACTOR RESERVE SHUTDOWN TIME (HOURS) 0.0 0.0 1,641.2
7. GENERATOR ON-LINE TIME (HOURS) 411.2 2,086.2 75,426.3
8. UNIT RESERVE SHUTDOWN TIME (HOURS) 0.0 0.0 1.0
9. THERMAL ENERGY GENERATED (MWHt) 1,312,680 6,148,536 224,603,353
10. ELECTRICAL ENERGY GENERATED (MWHe-Gross) 440,093 2,010,058 75,053,910  ;
11. ELECTRICAL ENERGY GENERATED (MWHe Net) 424,667 1,915,948 72,054,376
12. REACTOR SERVICE FACTOR (%) 58.4 49.2 68.5
13. REACTOR AVAILABILITY FACTOR (%) 58.4 49.2 69.9
14. UNIT SERVICE FACTOR (%) 55.3 40.8 68.4 ,
15. UNIT AVAILIBILITY FACTOR (%) 55.3 40.8 68.4
16. UNIT CAPACITY FACTOR (USING MDC) (%) 55.1 35.2 63.0 l
17. UNIT CAPACITY FACTOR (USING DESIGN MWe) (%) 52.9 34.8 60.6
18. UNIT FORCED OUTAGE FACTOR (%) 44.7 21.2 8.3 l
19. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): N/A
20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A i

l l

l l

l

DOCKET NO. 050 373 TABLE 2 UNIT LASALLE ONE B.2 AVERAGE DAILY UNIT POWER LEVEL (MWe-Net) DATE August 09, 1996 COMPLETED BY M.J. CIALK0WSK!

TELEPHONE (815)-357-6761 REPORT PERIOD July 1996 DAY POWER DAY POWER 1 -12 17 988 2 12 18 1,053 3 -12 19 1,095 4 13 20 1,094 5 -13 21 1,096 6 13 22 1,098 7 -14 23 1,094 8 14 24 1,092 9 -13 25 1,093 10 14 26 1,039 11 -14 27 1,056 12 -14 28 1,086 13 14 29 1,087 14 3 30 1,087 15 681 31 1,086 16 1,040 1

- . . . - . - - - . - . _ ... - .-. - ~ ..~. .. - . - - . . - - . - - . . . _ - . . ,

TABLE 3 B.3 UNIT SEUTDOWNS AND POWER REDUCTIONS > 20%

(UNIT 1)

METHOD OF CORRECTIVE YEARLY TYPE SHUTTING DOWN ACTIONS /CCtedENTS SEQUENTIAL DATE F: FORCED DURATION THE REACTOR OR (LER f if NUMBER (YDedDD) 5: SCHEDULED (HOURS) REASON REDUCING POWER applicable) 04 960626 F 332.77 G 3 Unit shutdown due to ECCS and CSCS equipunent cooling systeens inoperable due to foreign material in the Service Water system tunnel (LERf 96-008).

CUtedARY OF OPERATION: The unit started the smonth off-line due to foreign snaterial in the Service Water system tunnel which required the ECCS and the CSCS equipement cooling systesne to be declared inoperable. The unit was returned to service on 08/14/96 and remained on-line for the remainder of the month.

1 1

i LASALLE NUCLEAR POWER STATION UNIT 2 MONTELY PERF031MANCE REPORT July 1996 t

CatedONNEALTE EDISON COMPANY NRC DOCERT NO. 050-374 LICENSE NO. NPF-18 1

t i

i

... _ _ . . _ - . _ _ . - _ _ _ _ _ . _ _ . . . . . _ . _ . . . _ . __ - ___.._m . . . _ . - _ . .. .. .. . _.

k .

4 j TABLE OF CONTENTS

(UNIT 2) l
I. INTRODUCTION  ;

i l j II. REPORT - I

. A. SERGEARY OF OPERATING EXPERII.lNCE

{ 5. DATA TABULATIONS j 1. Operating Data Report i 2. Average Daily Unit Power Invel

{ 3. Unit Shutdowns and Power Reductions i

{ C. UNIQUE REPORTING REQUIREMENTS j 1. Main Steam Safety Relief Valve operations j 2. Major Changes to Radioactive Waste Treatment System j 3. Off-Site Dose Calculation Manual changes t

h 1

1 j .

1 ,

I l

i l

l

I. INTRODUCTION (UNIT 2)

The LaSalle County Nuclear Power Station is a two-Unit facility owned by cosanonwealth Edison Company and located near Marseilles, Illinois. Each unit is a Boiling Water Reactor with a designed net electrical output of 1078 Megawatts. Waste heat is rejected to a j

anan-made cooling pond using the Illinois river for make-up and

blowdown. The architect-engineer was sargent and Lundy and the

{ contractor was Commmonwealth Edison Company.

Unit two was issued operating license number NPF-18 on De<*=har

. 16, 1983. Initial criticality was achieved on March 10, 1984 and I

commercial power operation was comumenced on October 19, 1984.

i l This report was compiled by Michael J. Cialkowski, telephone l number (815)357-6761, extension 2056.

l l

4 i

t 4

4 i

l 1

IT MONTELY REPORT A. SUbeULRY OF OPERATING EXPERIENCE (Unit 2)

D E Time Event 1 0000 Reactc:: sub-critical, Generator off-line.

l 15 1635 Reactor critical.

16 0940 Generator on-line at 60 Mwe.

19 0630 Power level at 1024 Mwe.

l 20 0430 Reduced power level to 745 Mwe for rod pattern adjustments.

21 0830 Increased power level to 1124 Mwe.

31 2400 Reactor critical, Generator on-line at 1060 Mwe.

B. DATA TABULATIONS (Unit 2)

1. Operating Data Report (See Table 1)
2. Average Daily Unit Power Level (See Table 2) j l
3. Unit shutdowns and Significant Power Reductions (See Table 3) l C. UNIQUE REPORTING REQUIREMENTS (UNIT 2)
1. Safety Relief Valve Operations ]

(None)

2. Major Changes to Radioactive Waste Treatment Systems (None)
3. Changes to the Off-Site Dose Calculation Manual (None)

, . - ~ , - . . - , - ~ ~ . . - _

~

. . ~ - ,

l TABLE 1 B.1 OPERATING DATA REPORT DOCKET NO. 050-374 UNIT LASALLE TWO DATE August 09, 1996 l COMPLETED BY M.J. CIALK0WSKI l TELEPHONE (815)-357-6761 l

OPERA? LNG STATUS

1. REPORTING PERIOD July 1996 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3,323 MAX DEPEND CAPACITY (MWe-Wet): 1,036 DESIGN ELECTRICAL RATING (MWe Net): 1,078 l

( 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net): N/A 41 REASONS FOR RESTRICTION (IF ANY): N/A REPORTING PERIOD DATA THIS MONTH YEAR TU-DATE CUMULATIVE

5. REACTOR CRITICAL TIME (HOURS) 391.4 4,553.1 75,842.7
6. REACTOR RESERVE SHUTDOWN TIME (HOURS) 0.0 0.0 1,716.9
7. GENERATOR ON LINE TIME (HOURS) 3 74.4 4,449.9 74,291.4 1
8. UNIT RESERVE SHUTDOWN TIME (HOURS) 0.0 0.0 0.0 l 9. THERMAL ENERGY GENERATED (MWHt) 1,115,539 13,731,490 225,700,745
10. ELECTRICAL ENERGY GENERATED (MWHe-Gross) 373,030 4,679,445 75,577,301 l 11. ELECTRICAL ENERGY GENERATED (MWHe Net) 359,138 4,528,801 72,681,473 i
12. REACTOR SERVICE FACTOR (%) 52.6 89.1 73.4
13. REACTOR AVAILABILITY FACTOR (%) 52.6 89.1 75.1
14. UNIT SERVICE FACTOR (%) 50.3 87.1 71.9 i
15. UNIT AVAILIBILITY FACTOR (%) 50.3 87.1 71.9

- 16. UNIT CAPACITT FACTOR (USING MDC) (%) 46.6 85.5 67.9

17. UNIT CAPACITY FACTOR (USING DEfi!3N MWe) (%) 44.8 82.2 65.3 I

i 18. UNIT FORCED OUTAGE FACTOR (%) 49.7 13.0 10.2 j

19. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): Refuel, 09/07/96, 10 Weeks.
20. IF SHUTDOWN AT END OF REPOR7 PERIOD, ESilMATED DATE OF STARTUP: N/A l

1 i

(

l r

i 4

I i

.. _ o . _ . __ __ -._ m. _ _. .m . __..m. .._ _ _ _ _ _ . . .

_ _1 __ _ . _. _ _ .._ . _ _ __

l i

DOCKET No. 050-374 4

TABLE 2 UNIT LASALLE TWO B.2 AVERAGE DAILY UNIT POWER LEVEL (MWe-Net) DATE August 09, 1996

- COMPLETED BY M.J. CIALK0WSK!

TELEPHONE (815) 357-6761

' REPORT PERIOD: July 1996 DAY POWER DAY POWER l

! 1 12 17 548 l f.

2 12 18 842 l 3 -12 19 986 l 5 '

1 4 -12 20 931 j 5 -13 21 1,086 l

i.  !

6 13 22 1,090 1 7 13 23 1,089 l 8 -13 24 1,082 i l i l 9- 13 25 1,080 i

' I 10 -14 26 1,070 .

i

! 14 1,064 11 27

i.  ;

! 12 14 28 1,059 'l 4

13 14 29 1,048 14 -15 30 1,042  ;

t '

{ 15 -11 31 1,037 t ,

f- 16 103 '

i 1 ,

I .l i 6 l

l i

l

TABLE 3 .

B.3 UNIT SHUTDOWNS AND POWER REDUCTIONS > 20% *

(UNIT 2)

METHOD OF CORRECTIVE YEARLY TYPE SHUTTING DOWN ACTIONS /CODGGENTS SEQUENTIAL DATE F: ICRCED DURATION THE REACTOR OR (LER I if NUMBER (YDe4DD) S: SCHEDULED (HOURS) REASON REDUCING POWER applicable) 05 960629 F 369.65 H 2 Unit shutdown due to the ECCS and CSCS equipment cooling systems being inoperable due to foreign material in the Service Water system tunnel (LER# 96-008).

t I

LIRE 4ARY OF OPERATION: The unit started the month off-line due to foreign materlad, in the Service Water system tunnel which required the ECCS and the CSCS equipment cooling systems to be declared inoperable. The unit was returned to service on 08/16/96 and remained on-line for the remainder of the month.

. _ _ _ - _ _ _ _ _ - _ - _ _ _ _ _ - _ _ _ _-_______ - ___ - - _ _ _ - _ _ _ _ - - - . . _- - - _ - _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ .