Forwards Updated Copy of 820630 Const Status Rept (NUREG-0030) for 850630,as Requested by NRC 811030 Ltr.Plant 94.9% Complete.Leak Detection Sys 52 Days Behind.Fuel Load Schedule Date Continues to Be 860103
ML20137F926
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/23/1985
From: Hall D
ILLINOIS POWER CO.
To: Hartfield R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
RTR-NUREG-0030, RTR-NUREG-30 U-600235, NUDOCS 8508270127
Download: ML20137F926 (10)


Text

{{#Wiki_filter:.. U-600235 c30-85(08-23)-L 1A.120 llLINDIS POWER COMPANY QQ , CLINTON POWER STATION P.O. BOX 678. CLINTON. ILLINOts 61727 Docket No. 50-461 August 23, 1985 Mr. R. A. Hartfield, Chief Management Information Branch Office of Management and Program Analysis U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

Construction Status Report (NUREG-0030)

Dear Mr. Hartfield:

The USNRC letter dated October 30, 1981, from R. A. Hartfield to L. J. Koch requested that Illinois Power Company provide quarterly updates of the Construction Status Report (NUREG-0030) for Clinton Power Station. Enclosed is an updated copy of the June 30, 1982, report indicating the status as of June 30, 1985. As of June 30, 1985, construction of Unit 1 is estimated at 94.9% complete. The critical path schedule analysis shows that the limiting system schedule, Leak Detection System, is about fifty-two days behind. Near term corrective actions have already been effected, and evaluation for additional improvement continues. Management attention is being focused on this system consistent with other priority systems which support Fuel Load. The scheduled date for Fuel Load continues to be January 3, 1986. Reactor Plant Hot Operation commenced on July 3, 1985, within approximately two months of the target date. As of this reaort, all project milestones scheduled through June 1985 have been acTieved. We will continue to submit quarterly updates of the Unit I construction schedule. erel yours,

                                                  ,P      a1 Vice President CDS/pkr              ,

Enclosures cc: NRC Resident Office Regional Administrator, Region III Illinois Dept. of Nuclear Safety

                                                                                                   \

8508270127 850823 Wh PDR ADOCK 05000461 l\ A PDR

C0N5TRUCTION 5TATUS REPORT PAGE NO: 2-028 CLIETDM t MUCLEAR POWER PLANT 5 ST ATUS A5 0F g 7gg-PLANT C M A R A C T E R I 5 T I C 5: KEY PER50NNEL 0 DCCKET NO: 35858461 CORPORATE CONTACT: W. C. GER5THER. EXEC VICE PRESIDENT CP MO. 8 DATE ISSUED: CrPR-837/ 82-24-76 CP EXPIRATION DATE: CORPORATE ADDRESS: 500 50UTM 27TN STREET APPLICANT: ILLIN015 POWER DECATUR. ILLINOIS 62525 FLANT LOCATION: 6 MI E OF CLINTON. ILL IE REGIDM: 3 CORPORATE PHONE NO: (2173935-8881 EXT . -Et+4- 37I3 AE: SARGENT a LUNDY P555: CENERAL ELECTRIC CONSTRUCTOR: BALDWIN ASSOCIATES NRC LPM: -# s-4H444 Am6--- 8. Siegel REACTOR TYPE: BWR IE PROJECT INSPECTOR: IE RESIDENT INSPECTOR: M- - M - -WE900T T--

                                                                                                -M:--ti+E4tMORE---

F* Jablonaki DER (t%4E3 : 8958 IP5PECTION 5 T A T U 5: FUEL L0AD DATE CHANGE 5 TIME PERIOD A5 REP 0RTED EY UTILITY Ase. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANCE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NtmtEl 0F TMSP. DF T MSL 85-09-77 84-08-81 REEVALUATION OF CONSTRUCTION SCHEDULE. 8115 06-02-81 02-05-82 06-23-78 04-00-82 TIME LOST DUE 10 SEVERE WEATHER 8284 82-86-82 83-38-82 CONDITIONS. 8286 84-28-82 84-38-82 09-21-81 88-08-83 REEVALUATION OF CONSTRUCTION SCNEDULE. 8207 85-17-82 85-28-32 34-29-82 08-83-84 REEVALUATION OF CONSTRUCTION SCNEDULE. - 82e9 e6-e9-82 e6-to-82 05-24-83 01-03-86 Reevaluation of ConstruC. tion Inwtion Reports are available at Iecal PDRs. Schedule. Status to be provided og the NRC. L0 CAL PUSLIC D0CUMENT R 0 0 M: VESPA5IAN WARNER PUBLIC LIBRARY 828 WEST J0lmSON STREET CLIN 10!8 ILLINDIS 68727 9 i

CDN5TRUCTIDN 5TATUS REPORT PAGE NO: 2-029 CL!t; TON 1 NUCLEAR P O la E R PLANT 5 STATUS A5 0F: .564442 6 8 5 CDN 5TRUCTION 5TA T U 5: APPLTCANT'S CURRENT ESTIMATED FUEL LOADING DATE: -0 6-Ql-Q3-{[g APPLICANTS CONSTRUCTION COMPLETION ESTIMATE A5 Af rtICANT'S PR[WIOUS ESTIr*ATED FUEL LOADING DATE: -0 W4-ul-u3-84 DEFINED IN CP: (EARLIEST) 10-08-80 iPPLItat3T'S ESTIt:ATED FUEL LOADII;G DATE AT CP ISSUANCE: IG-00-80 (LATEST) 4 5- s 5 01-86 ArPLICAt;T'S CURRLtIT [5TIrtATED Cor1rtERCI AL OPERATION DATE + 10-86 I l CURREt4T ESTIMATED PERCENT CONSTRtICTION COMPL FTE: -444- 94. 9% C0.NEhT5 REGAPD*ttG CURREteT CONSTRUCTIDH STATUS: II A Critical Path Analysia shotos the limiting systCRI schedule, leak Detection Systers, is about 52 days behind. Target for Fuel Load remains at January 3,1986. 2) Commodities are reported ccsplete if % completed exceeds 99%. 3) Estimated dates are hete defined as schedutc target dates. 2 ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED MOBILIZE AND PREPARE SITE: STARY HAR 10-06-15 C0t1PLETION COMPLETI0li 1 COMPLETE 03-86-16 1904 PLACE STRUCIURAL CONCRETE: 02-25-76 49-&t '"* 08-05-83 l INSTALL REACTOR PRESSURE VESSEL: 10-06-79 10-15-79 8004 INSTALL LARGE BORE PROCESS PIPE: 05-01-76 47-.es45- 06-30-84 -**wf00% INSTALL LARGE sc2E PIPE HANGERS. RESTRAINTS AND $NUBBERS: J 545-08-01-8 5 05-01-76 -s** 98 % INST ALL SMALL 3CEE PIPE: 06-01-77 44-s&-09-01-85 -*** 981 1 INSTALL CASLE TRaf: 06-01-78 .32sJ845-08-01-8 5 -Sn 980 l INSTALL EXPOSED F1ETAL CONDUIT: 06-01-78 sa-a*-*L-10-01-85 455 8?? i INSTALL P0'JER. CONTROL. INSTRUF1ENT ATION AND SECURITY CASLE: 12-12-79 44-et-09-0 I-8 5 -M

  • 90%

INSTALL ELECTRICAL TERMINATIONS: 04-08-80 LJ,4445-09-01-85 -44* 791 i CCNDUCT REACTOR CCLD HYDeOSTATIC TEST: -43 4 4 01-06-85 .e4-4445 01-26-8 5 0x100% i I l l Cot:CUCT NOT rUNCTIOllAL TEST: N/A N/A N/A N/A N/A CnHDUCT PREcP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD: 03-06-81 -M-et-65-i t- 19-8 5 -,, 30 %

C0N5iRUCTION 5TATUS REPORT PAGE NO: 2-030 CLINTON 2 NUCLEAR POMER PLANT 5 STATUS AS OF: -6g-PLANT CNARACTERI5 TIC 5: KEY P E R 5 0 N N E L: DOCKET NO: 85000462 CORPORATE CONTACT: W. C. GERSTMER, EXEC VICE PRESIDENT CP No. 4 DATE ISSUED: CPPR-138/ 02-24-76 CP EXPIRATION DATE: CORPORATE ADDRESS: 500 50'JTH 27TH STREET APPLICANT: ILLINCIS POWER DECATUR. ILLIN0!$ 62525 PLANT LOCATION: 6 MI E OF CLINTON, ILL IE REGION: 3 CORPORATE PHONE NO: (2173 935-8881 EX T .-te4 +- 37 I 3 AE SARGENT a LUNDY N555: GENERAL ELECTRIC CONSTRUCTOR: BALDWIN ASSOCIATES NRC LPM: -b-W4 M-34MG- 8, $legg{ REACTOR TYPE: BWR IE PROJECT INSPECTOR: -N r -M.- 4eE 6 G G E T-F* .loblon5M DER (NWE): 0950 IE RESIDENT INSPECTOR: 4h-HWE4M04E-T. Geyan i IN5PECTION 5 T A T U 5: FUEL L0AD DATE CHANGE 5 i TIME PERIOD A5 REP 0RTED 8Y UTILITY Aar. 19A2 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHED.1[LE REPORTED SY UTILITY NUMBER OF INSP. OF INSP. 83-24-77 10-08-87 FINANCIAL CONSIDERATIONS AND UNCERTAINTY OVER FEDERAL NUCLEAR GENERATION AND FUEL POLICIES. 11-20-88 N/5 REDUCED LOAD GROWTH RATE. 10-14-83 Cancelled Reduced Load Grotath Rate - 9 Status to be provided by NRC. l 1 LOCAL PUBLIC DOCUMENT R O O M: l VESPASIAN WARNER PUBLIC LIBRARY 120 WEST J0MN50N STREET CLINTON. ILLINOIS 61727 i

C0N5TRUCTION 5TATUS REPORT PAGE NO: 2-031 CLINTON 2 NUCLIAR POWER PLANT 5 STATUS A5 0F -;g, }g,gy-C0N5TRUCTION 5 T A T U 5: APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE: N/5 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE A5 APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE: 18-05-87 DEFINED IN CP* (EARLIEST) 10-01-83 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE: 18-00-83 (LATEST) 10-01-85 APPLICANT'S CURRENT ESTIMATED CDMMERCIAL OPERATION DATE: N/5 CURRENT ESTIMATED PERCENT CONSTRUCTION COP 1PLETE: 12 had 6EEM canccffed. COPMENTS REGARDING CURRENT CONSTRUCTION STATUS: UNIT 2 -00NS4RUeM04-9EFEMEO-4NSEfHH444Ve ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMA7CD START $1 ART CnMrLETION {_0MP_t E1J93 LCOEPJJTI T MOSILIZE AND PREPARE SITE: 10-06-75 05-16-76 100% PLACE STRUCTURAL CONCRETE: INSTALL REACTOR PRES 5URE VE5SEL: INSTALL LARGE ECRE PROCESS PIPE: INST ALL L ARCE BORE PIPE MANGERS. RESTRAINTS AND SMUBBERS: INSTALL SMALL BORE PIPE: d INSTALL CABLE TRAY: INSTALL EXPOSED METAL. CONDUIT INSTALL PDWER. CONTROL,INSTRUMENTATICH AND SECURITY CABLE: INSTALL ELECTRICAL TERMINATIONS: CONDUCT REACTOR COLD NYDR0 STATIC TEST: CONDUCT NOT FUNCTIONAL TEST: l CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD: I I

U-600235

          ,                                                 C30-85(08-23)-L 1A.120
    /LL/NOIS POWER COMPANY
                                       ,,,     m,. CLINTON POWER STATION. P.O. BOX 678. CLINTCN ILLINCIS 61727 Docket No. 50-461                                         August 23, 1985 Mr. R. A. Hartfield, Chief Management Information Branch Office of Management and Program Analysis                                                                         -

U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

Construction Status Report (NUREG-0030) s

Dear Mr. Hartfield:

The USNRC letter dated October 30, 1981, from R. A. Hartfield to L. J. Koch requested that Illinois Power Company provide quarterly updates of the Construction Status Report (NUREG-0030) for Clinton Power Station. Enclosed is an updated copy of the June 30, 1982, report indicating the status as.of June 30, 1985. As of June 30, 1985, construction of Unit 1 is estimated at 94.9% complete. The critical path schedule analysis shows that the limiting system schedule, Leak Detection System, is about fifty-two days behind. Near term corrective actions have already been effected, and evaluation for additional improvement continues. Management attention is being focused on this system consistent with other priority systems which support Fuel Load. The scheduled date for Fuel Load continues to be January 3, 1986. Reactor Plant Hot Operation commenced on July 3, 1985, within approximately two months of the target date. As of this re? ort, all project milestones scheduled through June 1985 have been achieved. We will continue to submit quarterly updates of the Unit I construction schedule. S erel yours,

                                                               .P    a1 Vice President CDS/pkr Enclosures cc:   NRC Resident Office                                                           -

Regional Administrator, Region III Illinois Dept. of Nuclear Safety

C0N5iRUCT ION 5iA TU5 REPORT PAGE HO: 2-028 CLINTON I NUCLEAR POWER PLANT 5 STATUS A5 0F , PLANT CHARACTERI5iICSt KEY PERSONNELa DOCKET NO: 65000461 CORPORATE CONTACT: W. C. GER$THER. EXEC VICE PRESIDENT CP HO. 8 DATE ISSUED: CPPR-137/ 02-24-76 CP EXPIRATION DATE: CORPORATE ADDRESS: 500 SOUTH 277H STRtET APPLICANT: ILLINDIS POWER DECATUR. ILLIH0IS 62525 PLANT LOCATION: 6 NI E OF CLIHTON. ILL IE REGION: 3 CORPORATE PHONE HO (217) 935-888) EX T . -PerH- 371 3 AE SARGENT 8 LUNDY H555: GEtiLRAL ELECIRIC CONSIRUCTOR: REACTOR TYPE: OALDWIN ASSOCIATES HRC LPM: -M,--MI444 AM4--- 8. Siegel OWR IE PROJECT INSPECTOR: tt- - M - moH - - F* Jablons M DER (t*WE ) : 0950 IE RESIDENT INSPECTOR: -M.--t-44EitMORE-- T. Gwimn I t' 5 P E C T ION 5iA T U 5: FUEL L0AD DATE CHANGE 5 TIME PERIOD A5 REP 0RTED 8Y UTILITY Apr. 198 2 - Jim. 1982 REPORT HEW REASON FOR CHANGE REPORT GEC DATE END DATE DATE SCHEDULE REPORTED BY UTILITY Hy@f_g 0F INSP. OF INSL 05-09-17 04-00-84 REEVALUATION OF CONSTRUCTION SCHEDULE. 8115 06-02-81 02-05-82 06-23-78 04-00-82 TIME LOST DUE TO SEVERE WEATHER 8204 02-16-82 03-38-82 CONDITIONS. 8206 04-28-82 04-30-82 01-21-88 08-08-83 REEVALUATION OF CONSTRUCTION SCHEDULE. 8207 05-87-82 05-20-32 04-29-82 08-03-84 REEVALUATION OF CONSTRUCTION SCHEDULE. 8209 06-09-82 06-10-82 05-24-83 01-03-86 Reevaluation of Construction i Inspection Reports are available at local PDRs. Seltedule. . Status to be provided by the NRC. L0CA L PU0L IC D0CUMENT R 0 0 M:

 ,      VESPASIAH WARMER PUOLIC LIORARY 120 WEST JollH50tl STREET CL IllT 0!4 ILLINDIS 68727 I                                                                                                            -- _

l C0H5TRUCTION 5iATUS REP 0RT PAGE HO: 2-029 CL iti10H I HUCLEAR POMER PLAHT5 STATUS A5 0F -N-6 8 5 CON 5TRUCT ION 5iA T U 5:

 ,        APPLICAHI'5 CURRENT [5TIMAl[D FUEL LOADING DATE:              -6 5-44-4 +   -

6APPLICAHTS CONSTRUCTIDH COMPLETION ESTIMATE A5 AFPt IC AHI'S PRLVIOUS [51It'ATED FUEL L GADING DATE: -t 5--04-44 - 4 DEFINED IN CP: (EARLIEST) 18-81-88

  • APPLICAtlI'5 ESIII;ATED ruEL LOADII;G DATE AT CP ISSUANCE: IG-00-80 (LATEST) 44-s a- 10-01-86 APPL IC AIII'5 CURRLili ESTINAl[D E0rW1ERCIAL OPERATIDH DATE: 0 ^. ": 4+ 10-86 CURREtt i ESTINATED PERC[Ili CONSTRUCTION COMPL FT E: - 844- 94. 9%

CD.Nf t.IS REGAPD!!!G CtfRRENT CONSTRUCTIDH ST ATUS: 1) A Critical Path Analysis shows the limiting system schedule, Leak Detection System, is about 52 days behind. Target for Fuel Load remains at January 3,1986. 2) Commodities are reported complete if % completed exceeds 99%. 3) Estimated dates are here defined as schedute target dates.

                                              '                                       ESTIMATED      ACTUAL     ESTIMATED           ACTUAL     ESTIMATED 5 TART       51 ail ,   COMPLE1 ION N3BILIZE AND PREPARE SITE:                                                                                        SAMELLUDM T COMPLETE 10-06(15 03-86-76        880%

PLACE SIRUCIURAL CONCRET.E: 02-25-76

     ,                                                                                                           -9 t-* * ~"

08-05-83 test , IN'aT AL L RE ACTOR PRESSURE VESSEL : 10-06-79 18-15-79 lett ItISTALL L ARGE BORE PROCESS PIPE: -,nI00% 05-8t-76 47--a s-n- 06-30-84 Itl51 ALL L ARGE BORE PIPE HANGERS. RE51RAINTS AnD SHUBBERS: 05-88-76 -85-n-08-01 -8 5 -uu 98% IH5f ALL SMALL BCRE PIPE: 86-09-77 44-s5-09-01-85 -+ n 980 INSTALL CABLE TRAY:

  • 06-01-78 12sJ8a*L-08-0 I-8 5 -su. 93 l INST ALL Exr0 SED t1ET AL CONDUIT: 86-01-78 -s n 32; I 24-43 -I0-01-85 IH5T AL L PO'4ER. COHIROL. INSTRUMENT ATION AND SECURITY CABLE: 12-12-79 44-n-09-01-8 5 -sw 90%

IH5 TALL ELECTRICAL TERnlilATIDHS: 04-01-80 8.3,4 8-*L-09-01-85 -683 79% I CONDUCT REACTOR CCLD HYDROSTATIC TEST: l -e2-23-aa- 01-06-8 5 44-n-O f-26-8 5 e:100% l Cot:cuCT HOT ruHCTIOilAL TEST: N/A N/A N/A N/A N/A Cat 4 DUCT PREOP AND ACCEPIANCE TESIS HECE55ARY FOR FUEL LOAD: 03-06-81 -+4-es-n 19-8 5 -w MI e. 6

C005TR5CTIOO 5 TAT 35 REPORT 94GE NO: 2-834 CLINTON 2 NUCLEAR POWER PLANT 5 STA1U5 A5 0F: -6g-PLANT CHARACTERI5 TIC 5: KEY PER50NNELa DOCKET NO: 85008462 CORPORATE CONTACT: W. C. GERSTNER, EXEC VICE PRESIDENT CP MO. 4 DATE ISSUED: CPPR-138/ 02-24-76 CP EXPIRATION DATE: CORPORATE ADDRESS: 500 50'JTH 27TH STREET ' APPLICANT: ILLINGIS POWER DECATUR. ILLIMOIS 62525 PL ANT LOCATIOsl: 6 tlI E OF CLINTON. ILL IE REGION: 3 CORPORATE PHONE NO: * (287) 935-888i Ex T .-een- 37I3 AE: SARGENT 8 LUNDY M555: GENERAL ELECTRIC CONSTRUCTOR: BALDWIN ASSOCIATES MRC LPM: 4-W4 bb4efE- 8. Siegel REACTOR TYPE BWR If PROJECT INSPECTOR: - M c -M.- ME6Ge FT-DER (MWEls 8958 IE RESIDENT INSPECTOR: 468-t &MGHOSE- f. JobloMM T. Genmn IMSPECTISM STATUS: FUEL LOAD D A ,T E CHANGES TIME PERIOD A5 REP 0RTED 8Y UTILITYs Anr. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDjlf REPORTED BY UTILITY NUMBER OF INSP. OF INSP. 83-24-77 18-88-87 FINANCIAL CONSIDERATIONS AND UNCERTAINTY OVER FEDERAL NUCLEAR GENERATION AND FUEL POLICIES. 81-28-81 N/5 REDUCED LOAD GROWTH RATE. 10-14-83 Cancelled Reduced load Grosoth Rate Status to be provided by NRC. L8 CAL PURLIC D0CUMENT R 0 0 M: VESPASIAN WARMER PUBLIC LIBRARY . 120 WEST JOHN 50M STREET CLINTON. ILLINGIS &lI27

C0N5TRUCTION 5TATUS REP 0RT PAGE ND: 2-031 CLINTON 2 NUCLEAR P0WER PLANT 5 STATUS A5 0F: -Dg7]g jg-C0N5TRUCTION 5iA T U 5: APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE: N/5 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE: 10-00-47 DEFINED IN CPt (EARLIEST) 15-81-43 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE: 10-80-83 (LATEST) 80-08-45 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE8 N/5 . CURRENT ESTIMATED PERCENT CONSTRUCTION COPIPLETE: ** gg3 gggg eggggffgg, C0rftENTS REGARDING CURRENT CONSTRUCTION STATUS: UNIT 2 4NNetf tweHe#-9EFE##ED-4NGEF-14H4f4V,

                                                                         ' ESTIMATED    ACTUAL     ESTIMATED          ACTUAL       ESTIMATED START      $1ARL      COMPtJ T ION    {.0. UP_L EJ Jgll 3_gDLT_(LI{

MOBILIZE AND PREPARE SITE: 10-e6-75 83-86-76 test PLACE STRUCTURAL CONCRETE ' l INSTALL REACTOR PRE 550RE VESSEL . INSTALL LARGE BORE PROCESS PIPE:

  • INSTALL L ARGE BORE PIPE MANGERS. RESTRAINTS AND $NUBBERS:

INSTILL SMALL BORE PIPE: INSTALL CABLE 1 RAY INSTALL EXPOSED METAL.CDMDUIT: INSTALL POWER. CONTROL. INSTRUMENTATION AND SECURITY CABLE: INSTALL ELECTRICAL TERMINATIONS CONDUCT REACTOR C0' L D NYDROSTATIC TEST CONDUCT NOT FUNCTIONAL TEST! CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD: t 9 9}}