|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20196F3641988-01-31031 January 1988 Monthly Operating Rept for Jan 1988 ML20237H7861987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 ML20237K8471987-06-30030 June 1987 Monthly Operating Rept for June 1987 ML20237K4221987-05-31031 May 1987 Monthly Operating Rept for May 1987 ML20237K5311987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20205C0891987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20212P8841986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20211Q0541986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20212L8991986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20207F8221986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20207D6041986-08-31031 August 1986 Monthly Operating Rept for Aug 1986 ML20215D4281986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 ML20214L7861986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20205D6071986-05-31031 May 1986 Monthly Operating Rept for May 1986 ML20197D1711986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20203E0151986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20210F2361985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20137U3771985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20141F2501985-10-31031 October 1985 Monthly Operating Rept for Oct 1985 ML20138B5751985-09-30030 September 1985 Monthly Operating Rept for Sept 1985 ML20138R3681985-08-31031 August 1985 Monthly Operating Rept for Aug 1985 ML20132F7891985-07-31031 July 1985 Monthly Operating Rept for Jul 1985 ML20135B2781985-06-30030 June 1985 Monthly Operating Rept for June 1985 ML20133H5181985-05-31031 May 1985 Monthly Operating Rept for May 1985 ML20132E1671985-04-30030 April 1985 Monthly Operating Rept for Apr 1985 ML20129G3921985-03-31031 March 1985 Monthly Operating Rept for Mar 1985 ML20062G3391982-07-19019 July 1982 Monthly Operating Rept for June 1982 ML20054M0071982-06-0202 June 1982 Monthly Operating Rept for May 1982 ML20062H2031979-05-31031 May 1979 Monthly Operating Rept for May 1979 ML20062F2931978-12-0101 December 1978 Monthly Oper Rept for Nov 1978 ML20062C9171978-11-0101 November 1978 Monthly Operating Rept for Oct 1978 ML20062A9391978-10-0404 October 1978 Monthly Operating Rept for Sept 1978 1988-01-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20211J6651998-12-31031 December 1998 10CFR50.59 Annual Rept of Changes,Tests & Experiments for 980101-981231 for Humboldt Bay Power Plant,Unit 3 DCL-99-045, 1998 Annual Financial Rept for PG&E Corp. with1998-12-31031 December 1998 1998 Annual Financial Rept for PG&E Corp. with ML20151U1691998-08-28028 August 1998 Rev 2 to DSAR for Humboldt Bay Power Plant,Unit 3 ML20216C8821998-04-0808 April 1998 Safety Evaluation Supporting Amend 32 to License DPR-7 ML20203J6601998-02-28028 February 1998 Post-Shutdown Decommissioning Activities Rept for Humboldt Bay Power Plant,Unit 3 ML20217G5151997-12-31031 December 1997 1997 PG&E Corp Annual Rept ML20195F4541997-12-31031 December 1997 10CFR50.59 Annual Rept of Changes,Tests & Experiments for Jan-Dec 1997 HBL-97-013, Annual Rept of Changes,Tests & Experiments for Plant for Jan-Dec 1996,per 10CFR50.591997-12-19019 December 1997 Annual Rept of Changes,Tests & Experiments for Plant for Jan-Dec 1996,per 10CFR50.59 ML20205F5881997-07-24024 July 1997 Decommissioning Cost Estimate for Diablo Canyon Power Plant,Units 1 & 2 05000133/LER-1997-002-02, :on 970425,observed That Demineralized Water Tank Level Dropped to 1900 Gallons.Caused by Personnel Error.Applied Positive Discipline to Personnel Involved & Revised Edoi B-1 W/Enhanced Intructions1997-05-29029 May 1997
- on 970425,observed That Demineralized Water Tank Level Dropped to 1900 Gallons.Caused by Personnel Error.Applied Positive Discipline to Personnel Involved & Revised Edoi B-1 W/Enhanced Intructions
05000133/LER-1997-001-02, :on 970408,discovered Incorrect Settings of Process Monitor Warning & High Alarms.Caused by Personnel Error.Reset Settings Correctly,Counseled Operators Re Settings & Will Revise STP 3.21.31997-05-15015 May 1997
- on 970408,discovered Incorrect Settings of Process Monitor Warning & High Alarms.Caused by Personnel Error.Reset Settings Correctly,Counseled Operators Re Settings & Will Revise STP 3.21.3
ML20205F5991997-04-12012 April 1997 Decommissioning Cost Estimate for Humboldt Bay Power Plant, Unit 3 DCL-97-045, Pacific Gas & Electric Co 1996 Annual Rept1996-12-31031 December 1996 Pacific Gas & Electric Co 1996 Annual Rept ML20129J4311996-10-18018 October 1996 Safety Evaluation Approving Corporate Restructuring & Establishment of Holding Company Under Temporary Name PG&E Parent Co.,Inc of Which PG&E Would Become Wholly Owned Subsidiary 05000133/LER-1993-001-02, :on 931124,specifies Missed Surveillance Due to Personnel Error.Caused by Surveillance Being Inadvertently Left Unscheduled.Instructions for Scheduling Replaced & Surveillance Reviewed1993-12-23023 December 1993
- on 931124,specifies Missed Surveillance Due to Personnel Error.Caused by Surveillance Being Inadvertently Left Unscheduled.Instructions for Scheduling Replaced & Surveillance Reviewed
ML20058P6281993-08-31031 August 1993 Rev 6 to Pacific Gas & Electric Co Humboldt Bay Power Plant Unit 3 - Safstor QA Plan ML20141M0471991-12-31031 December 1991 Pge Annual Rept - 1991 05000133/LER-1990-001-02, :on 900623,auto Transfer Scheme Failed to Perform,Per Tech IV.B.6.a & IV.B.6.b During Surveillance Testing.Caused by Relay Not Operating at 465 Volts.Relay Replaced1990-07-23023 July 1990
- on 900623,auto Transfer Scheme Failed to Perform,Per Tech IV.B.6.a & IV.B.6.b During Surveillance Testing.Caused by Relay Not Operating at 465 Volts.Relay Replaced
05000133/LER-1989-001-02, :on 890321,technician Discovered That Particulate Filter Holder Empty Thereby Violating Tech Spec Requirement.Caused by Personnel Error.Spare Filter Holder Removed & Technician Involved Counseled1989-04-18018 April 1989
- on 890321,technician Discovered That Particulate Filter Holder Empty Thereby Violating Tech Spec Requirement.Caused by Personnel Error.Spare Filter Holder Removed & Technician Involved Counseled
ML20236E0581988-12-31031 December 1988 Pacific Gas & Electric Co Annual Rept 1988 ML20151G2361988-07-19019 July 1988 Safety Evaluation Supporting Amend 23 to License DPR-7 05000133/LER-1988-002-02, :on 880521,gas Treatment Sys Actuated.Caused by Degradation of Resistor in 66 Ft Elevation Isolation Monitor Due to Aging.Resistor Replaced & Isolation Monitors Not Required Will Be Layed Up for Safstor Period1988-06-20020 June 1988
- on 880521,gas Treatment Sys Actuated.Caused by Degradation of Resistor in 66 Ft Elevation Isolation Monitor Due to Aging.Resistor Replaced & Isolation Monitors Not Required Will Be Layed Up for Safstor Period
ML20151P6951988-04-30030 April 1988 Pacific Gas & Electric Co,Humboldt Bay Power Plant,Unit 3 Safstor QA Plan 05000133/LER-1988-001-01, :on 880130,gas Treatment Sys Actuated.Caused by Personnel Error.Operator Did Not Exercise Proper Care While Cleaning Control Board.Operator Counseled.Protective Guard Will Be Placed Around Control Board Switches1988-02-24024 February 1988
- on 880130,gas Treatment Sys Actuated.Caused by Personnel Error.Operator Did Not Exercise Proper Care While Cleaning Control Board.Operator Counseled.Protective Guard Will Be Placed Around Control Board Switches
ML20196F3641988-01-31031 January 1988 Monthly Operating Rept for Jan 1988 ML20148Q3281987-12-31031 December 1987 PG&E 1987 Annual Rept HBL-87-086, Annual Rept of Design Changes,19861987-12-29029 December 1987 Annual Rept of Design Changes,1986 05000133/LER-1987-002-02, :on 871122,while Unit in Process of Being Decommissioned,Gas Treatment Sys Activated When Area Radiation Monitor in Refueling Bldg Spiked Transferring Ventilation Sys to Above Normal Radiation Mode1987-12-17017 December 1987
- on 871122,while Unit in Process of Being Decommissioned,Gas Treatment Sys Activated When Area Radiation Monitor in Refueling Bldg Spiked Transferring Ventilation Sys to Above Normal Radiation Mode
ML20236G8241987-07-31031 July 1987 QA Plan for Humboldt Bay Power Plant Unit 3 - Safstor ML20237H7861987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 ML20237K8471987-06-30030 June 1987 Monthly Operating Rept for June 1987 05000133/LER-1987-001-02, :on 870604,discovered That Surveillance Test Interval of Tech Spec for Stack Gas Monitoring Sys Exceeded. Caused by Personnel Error.Scheduling & Tracking Sys to Reduce Possibility of Recurrence Established1987-06-29029 June 1987
- on 870604,discovered That Surveillance Test Interval of Tech Spec for Stack Gas Monitoring Sys Exceeded. Caused by Personnel Error.Scheduling & Tracking Sys to Reduce Possibility of Recurrence Established
ML20235C9311987-06-23023 June 1987 Rept to ACRS Re Humboldt Bay Unit 3 - Core II ML20237K4221987-05-31031 May 1987 Monthly Operating Rept for May 1987 ML20210C5311987-04-30030 April 1987 SER Re Decommissioning of Facility ML20237K5311987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20211C5721987-02-11011 February 1987 Safety Evaluation Supporting Amend 22 to License DPR-7 ML20205C0891987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 05000133/LER-1986-003-02, :on 861222,spent Fuel Pool Liner Gap Level Exceeded Control Band.Caused by Corrosion of Tubing in Air Supply to Bubbler.Level Monitoring Sys Repaired & Water Pumped from Liner to Restore Proper Level1987-01-22022 January 1987
- on 861222,spent Fuel Pool Liner Gap Level Exceeded Control Band.Caused by Corrosion of Tubing in Air Supply to Bubbler.Level Monitoring Sys Repaired & Water Pumped from Liner to Restore Proper Level
ML20204H4331986-12-31031 December 1986 PG&E Annual Rept for 1986 ML20212P8841986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 05000133/LER-1986-002-01, :on 861030,surveillance Test Interval for Tech Spec VII.B.2 Exceeded When Stack Effluent Particulate Not Removed for Lab Counting.Caused by Personnel Error.Formal Schedule for Sample Interval Developed1986-12-0101 December 1986
- on 861030,surveillance Test Interval for Tech Spec VII.B.2 Exceeded When Stack Effluent Particulate Not Removed for Lab Counting.Caused by Personnel Error.Formal Schedule for Sample Interval Developed
ML20211Q0541986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20212L8991986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20211H3401986-10-31031 October 1986 PG&E Responses to Public Comments on Des for Decommissioning Humboldt Bay Unit 3 ML20207F8221986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20207D6041986-08-31031 August 1986 Monthly Operating Rept for Aug 1986 ML20212N4921986-08-26026 August 1986 Safety Evaluation Supporting Amend 21 to License DPR-7 ML20215D4281986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 ML20214L7861986-06-30030 June 1986 Monthly Operating Rept for June 1986 1998-08-28
[Table view] |
Text
.
OPERATING DATA REPORT DOCKET NO. 80~/83 DATE DEcErnREE 9,gqt i COSIPLETED BY Nmo K--
TELEPHONE 707/vvS-27Sy OPERATING STATUS I. Unit Name: Humsowr Bay Powex Piaar.t/mr3 Notes
- 2. Reporting Period: WVEm rec . t%G
- 3. Licensed Thermal Power (SIWr): 2 2. 0
- 4. Namepfate Rating (Gross alwe): 6s
- 5. Design Electrical Rating (Net SlWe): 66
- 6. Sf aximum Dependable Capacity (Gross 5tWe): 66
- 7. Staximum Dependable Capacity INet SlWe): 43
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
Af/A
- 9. Power Level To Which Restricted. lf Any (Net 31We): M!A
- 10. Reasons For Restrictions. If Any: M/A This 51onth Yr to.Date, Cumulatise II. Hours in Reporting Period 7'2_o 806 G to S'l4 l
- 12. Number Of Honr> Reactor Was Critical O O T817/
- 13. Reactor Resene ShutdowTi Hours O O O
- 14. Hours Generator On.Line 0 0 972S2.
- 15. Unit Resene Shutdown Hours O o O
- 16. Gross Thermal Energy Generated (N1WH) O M / C 6 / 8, '/54
- 17. Gross Electrical Energy Generated f %1WHi o . _ . o %739,732
- 18. Net Electrical Energy Generated (SIWH) o _
o 4 'h 2 7h l 19. Unit Service Factor O O 14 9.'7 %
l 20. Unit Availability Factor O o 447 #/,
- 21. Unit Capacity Factor IUsing 51DC Net) o O 8 (. 7 '%
- 22. Unit Capacity Factor IUning DER Nett O d s5.6 %
- 23. Unit Forced Outage Rate O d /. 9 / %
- 24. Shutdowns Scheduled Over Next 6 Slonths IType. Date.and Duration of Each t:
n/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: D #C 0 " ^1'5f/d d /^//s
- 16. Units in Test Status IPrior to Commercial Operation): Forecast Achieved INITI A L CRITICA LITY . . _
INITIAL ELECTRICITY __
CO.\tNIERCIAL OPER ATION 0602190154 851130 PDR ADOCK 0 % g 3 {yj77, R
=w M
~ m. . . n. . o,- z
,_ > ^
- c. ?
E q
- c. 7a C_ C. b a
" o a P O
N es C C 0 9 c: > p to Type l
- . n= = n. K.tn u u-
=z .
--e=
2 - i : c.E. R E s " 4
-55?)F9s n Duration
-[. ! ? ' 5 " N 3 0 (Hours) r= : r =, an
- ou O: .' i :- =
se sQ 2 ? #. F. E O e==
Reason ,
, c m b s w
-f- E ~3-
- : e. Method of n 3 %. ShuttmS c
-'- 2 u
Down Reactor 3 Q E
m a z -
C u m M
5 x r 6 e 4m[
- a o n
A O
OEg g 2
= a O "
2 >
- o
. O 9 9 Y -- K System t E O>KK2 l o m
- . c u u :r Code 4 e M 3 S E 5 E.
- E. 2. - h 2 M
m" m 2 C 4 E' O Component N' C EW
.= .se Code $
L. @
s g O
- 2
@ m W
0 N
k ep b O
"P O O n ommpm H
$ m 'g a
C
~
EXE-G o 2>N e
r r 26
& C E4 7F *CH
= :e m4 = D RE Q$eH5
" n
% =m zq i
- QT*O c ~o u . Ti e E;E C Uk 2mHgz y" ['o E=
I 2 M N M M *o O
-E
-r,e E o ~ $.-
m mr c % n q
= "~ nauco =. d b % Q%
- D u n %
\
2 23C3 h t g% Q la n i b g %
2 Q s C e M b 4': N
.~.
F q (A O 9 D
4 ,5 e
g
AVERAGE D AILY UNIT POWER LEVEL DOCKET NO. IO 'l 83 UNIT H BPP M3 DATE TA'EEAEE W Us COMPLETED BY (2'MQ)k-TELEPHONE 707!WS-27/7 MONTH MWEinD% ;id6 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (M We.Neti g yw,.3,g y i O i7 2 18 3 19 4 20 5 21 6 22 7 23 8 24 9 -
25 10 26 11 27 12 28 13 29 14
. _ . 30 II is 31 16 %f INSTRUCTIONS On this format. list the average daily urut power lesel in MWe Net for each day in the reporting inonth. Compute ta the nearest whole megawatt.
es '77 6
?*.
- PACIFIC OAS AND E LE C T RIC C O M PANY b@7'J6 l 1034 sixth STREET . EUREKA. C ALIFO R NI A 95501 . (707) 443 2787 E. O. WE E KS PLANT as ANAGER hVCLEAR PLANT OPER Afich5 - Muta BOLDT December 10, 1985 Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Docket No. 50-133 License No. DPR-7 Gentlemen:
Enclosed are the completed monthly report forms and the narrative of operating and major maintenance experience for Humboldt Bay Power Plant Unit No. 3 (HBPP-Unit 3) for November, 1985. These forms and the narrative are submitted in accordance with Section IX I.1.c of our Technical Specifications.
Sincerely, T
E. D. Weeks Plant Manager Humboldt Bay Power Plant 1034 Sixth Street Eureka, California 95501 (707-443-2787)
Enclosure cc: Mr. J. C. Carroll Mr. B. S. Lew Mr. J. D. Shiffer Mr. John B. Martin Regional Administrator U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 EDWeeks:ss
' I
~
- MONTHLY NARRATIVE REPORT OF OPERATING AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month of November, 1985. This report was prepared by the Plant Staff and is submitted in accordance with Section IX:1.1.c.-of the Tecnnical Specifications.
During the report period, the reactor has been in the cold shutdown mode with the core unloaded and the reactor vessel drained. During the month the following items were conducted:
- 1. Construction of the radwaste enclosure.
- 2. Completed processing the suppression chamber water.
- 3. Commenced vacuuming the spent fuci pool.
1 @-
i(