{{#Wiki_filter:___ x MONTHLY NARRATIVE REPORT OF OPERATING AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month of January, 1987. This report was prepared by the Plant Staff and is submitted in accordance with Section IX:1.1.c. of the Technical Specifications. During the report period, the reactor has been in the cold shutdown mode with the core unloaded and the reactor vessel drained. During the month the following activities were completed: 1. The modified spent fuel pool demineralizer was placed in service. This system utilizes a former condensate demineralizer for maintaining spent fuel pool water quality. 2. A new spent fuel pool level and liner gap level monitoring system was placed in service. The new system provides redundant level monitors for both the spent fuel pool and the spent fuel pool liner gap. Remote indication, recorders and alarms are included in the system. i 0703300100 B70131 PDR ADOCK 05000133 R YDR \\\\
s OPERATING DATA REPORT DOCKET NO. Id*/83 DATE FES.5.19 61 COMPLETED BY CcY W TELEPHONE 707/V v23 27 S 7 OPERATING STATUS
- i. Unit Name:
Huntdot.or Env ?ewtx. LMT-llmr3 Notc'
- 2. Reporting Period:
hMV ITA~I 3.- Licensed Thermal Power (MWt): 220
- 4. Nameplate Rating (Gross MWe):
6s
- 5. Design Electrical Rating (Net MWe):
Ss
- 6. Maximum Dependable Capacity (Gross MWe):
SS
- 7. Maximum Dependable Capacity INet MWe):
S3
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Give Reasons:
A//A
- 9. Power Level To Which Restricted. lf Any (Net MWe): -- N!A
- 10. Reasons For Restrictions. If Any:
A//A This Month Yr. to Date Cumulatise II. Hours In Reporting Period 744 W4-42.04,o3F/
- 12. Number Of Hours Reactor Was Critical O
o T EP l 7 l'
- 13. Reactor Reserve Shutdown Hours O
O O
- 14. Hours Generator On Line o
0 97252.
- 15. Unit Reserve Shutdown Hours O
n 0
- 16. Gross Thermal Energy Generated (MWH)
O M /C4/8,454
- 17. Gross Electrical Energy Generated (MWH)
O o % 779,732
- 18. Net Electrical Energy Generated (MWH)
O o 4.MC CVic;
- 19. Unit Service Factor O
o 47.2'L
- 20. Unit Availability Factor O
o 41.2 n
- 21. Unit Capacity Factor (Uning MDC Net) o O
MS%
- 22. Unit Capacity Factor IUsing DER Neti o
0 33 9T
- 23. Unit Forced Outage Rate 0
O /. 9/ %
- 24. Shutdowns Scheduled Over Nest 6 Months (Type.Date.and Duration of Eacht:
N/A
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
W 0*^f'5f/M /d6
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieted INITIAL CRITICALITY INITIAL ELECTRICI f Y COMMERCIAL OPER \\ TlON 14/77) +
i UNIT SHUTDOWN 5 AND FOWER REDUCTIONS DOCKET NO. 50-135 i UNIT NAME mm sa DATE F EIA. 4 34E'1 ggy0RTDNNiill m. iW D BY N '" K - TEN 7a7 /44927m7 J i .3 m3 "i. C es } -{ 2,e 5 7 {s x P. Cauw & Corretes,e Lioensee N.s. See 33 4 - E Ewat 3 1F y Agi,,, s, 1 o}. 4 5 ~ w gifi g RePura
- in u Eu x-i ac g
Prevent Recuirence l d ) 76 - 6 7&oTo2. S 7% H I 4/A ~ SAF6 tor hetsw wags l f I, I 1 i \\ t i I j I 2 3 4 1 F - F..rced Reason: Method: Exhibit G - Inseenctiims i S 5.hcJuled A Equipenent Fadere(Emplain) I4taneal for Preparasson of Data l B-Mainse-or Test 248asiaal Scram. Ensey Sheets for I.scensee C Refuelang 3-Autoenatic Scrarn. Event Repuis (LFR) Fde (NUREG-D-Regulasory Restrictiam 4Ohcr (Emplaan) 01611 F Operaine Training & lxense Emananasiin 1 F-AJnumstrative 5 G Operational Errue (E aplaan) E shebit I - Saniac S..urce I e8/77) ll Other (E uplano \\- i
t AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50'l33 UNIT N 888 #.3 DATE FEh 4 198 7 j COMPLETED BY Cc-W re, TELEPHONE 70 7,/WS-27/7 MONTH TAuuARY t98~J DAY AVERAGE I PO ER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Neti I 17 2 33 3 19 4 20 21 6 22 .4 7 23 8 24 25 10 26 II 27 12 28 33 29 14 30 15 3 y l 16 se t INSTRUCTIONS On this format. list the average daily unit power fe.el in MWe Net for ea:h da) in the reporting inonth. Coinpute to the nearest whole megawatt. Pil77 ) l
/,- s PACIFIC GAS AND E LE C T RIC C O M PANY @@9f3 l 1034 SIXTH STREET. EUREKA, C A LIFO R NI A 95501 (707) 443 2787 R.T. NELSON PLANT M ANAGE, NUCLEA, PLANf OPE. A780%1 MUW,OLat February 6, 1987 Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Docket No. 50-133 License No. DPR-7 Gentlemen: Enclosed are the completed monthly report forms and the narrative of operating and major maintenance experience for Humboldt Bay Power Plant Unit No. 3 (HBPP-Unit 3) for January, 1987. These forms and the narrative are submitted in accordance with Section IX I.1.c of our Technical Specifications. Sincerely, %W.1 R. T. Nelson Plant Manager Humboldt Bay Power Plant 1034 Sixth Street Eureka, California 95501 (707-443-2787) Enclosure cc: Mr. J. C. Carroll Mr. B. S. Lew Mr. J. D. Shiffer Mr. John B. Martin Regional Administrator U. S. Nucicar Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 RTNelson:ss $$Y}}