ML20054M007
| ML20054M007 | |
| Person / Time | |
|---|---|
| Site: | Humboldt Bay |
| Issue date: | 06/02/1982 |
| From: | Derks P PACIFIC GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20054M002 | List: |
| References | |
| NUDOCS 8207090146 | |
| Download: ML20054M007 (3) | |
Text
-
m-
_._...._,..-.,---.-...o__..
OPERATING DATA REPORT DOCKET NO. _SO -/3J_
DATE 6-2-62.
C051PLETED BY F.F. DER Ks TELEPHONE 707/4I-I?87 OPEILATING STATUS
- 1. Unit Name:
uMo otb7-Af Ec wr_[lva 3_
N !*5 MAY l%2-
- 2. Reporting Period:
2ZO
- 3. - Licensed Thermal Pow er (51Wt):
Sf
- 4. Nameplate Rating (Gross MWe):
$ 5'
- 5. Design Electrical Rating (Net MWe):
df-
- 6. Maximum Dependable Capacity (Gross MWe):
d3.-
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Gise Reasons:
N, N
- 9. Power Level To Which Restricted. If Any (Net MWe):
A/ /M
- 10. Reasons For Restrictions. If Any:
This Month Yr to.Date Cumulatise N
ND NNO I1. Ilours in Reporting Period
- 12. Number Of flours Reactor Was Critical O
O 9 8, /7 /
- 13. Reactor Resene Shutdown flours O
O O
- 14. Ilours Generator On.Line Q
O 97.262.
- 15. Unit Resene Shutdown flours O
o O
O O
/g g/8. #S-4
- 16. Gross Thermal Energy Generated (MWil)
O O
4 7.39.732
- 17. Gross Electrical Energy Generated (MWil)
O O
QSVO, 257-
- 18. Net Electrical Energy Generated (MWil)
.9F. 9"/o O
O
- 19. Unit Service Factor O
O 5 6. 7 "/a
- 20. Unit Availability Factor
'/3.7 %
O O
- 21. Unit Capacity Factor (Using MDC Net)
'/1.38/o O
O
- 22. Unit Capacity Factor IUsing DER Net)
O O
/.9/7.
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Ne. t 6 Months (Type. Date.and Duration of Each):
s ap IN#6T6##fl#A76
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICA LITY INITIA L ELECTRICITY COMMERCIAL OPERATION 8207090146 820602 (9/77i PDR ADOCK 05000133 R
DOCKET NO. #O -Q.f i
UNITSIIUTDOWNS AND POWER REDUCTIONS UNIT NAME 48 PP S 3 DATE 4 E 7.
l COMPLETED BY A3.BERRs REPORT MONTil mAv TELEPilONE 7a7/443
~2.'T87 "k
-ho
.$ ?
}
Yk Licensee E 3, Cause A Corrective No.
Date g
3g g
jg5 Event a?
o.1 Action to H
$E 5
j@
Report #
N0 0
Prevent Recurrence c
74 - 6 7 4 o ? o r.
S TW CH l
y/A Syg
'I I
2 3
4 F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scra m.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LElt) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E Operator Training & License Examination F-Administratise 5
l (i)/77)
G Operational Error (Explain)
Eshibit I Same Source li Other (Explain)
,,====2:------
casa. -x a: au1 --.. u : wu:1. a w::a.. : s.w n..
.n + w : _....
(
ld
- ,,3 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. go-W M 8 PP *3.
UNIT DATE 4-2-82 U #D COMPLETED BY TELEFHONE 707-*N3 -27d7 MONT11 MV DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net)
O O
i7 I
2 18 3
19 4
20 5
21 6
22 7
23 8
24 9
25 10 26 II 27 12 28 13 29 14 30 15 31 v
Y 16 INSTRUCTIONS On this format. list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9.1771
,