h MONTHLY NARRATIVE REPORT OF OPERATING AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month of October, 1978. This report was prepared by the Plant Staff and is submitted in accordance with Section IX.I.l.c. of the Technical Specifications.
During the report period the reactor remained in the cold shutdown mode of operation. There were no significant events associated with the operation of the Unit. There was no significant maintenance completed during the month.
i e
j i
78t tisDH9
1 1
OPERATING DATA REPORT DOCKET NO
.'I6 -13 3 DATE eoloha COSIPLETED BY 6.AE,bam TELEPfl0NE M Ws-ne?
OPERATING STATUS N
S
- 1. Unit Name:
HGPP No. 3
- 2. Reporting Period:
NTmf112 1Q7R
- 3. Licensed Thermal Power (51wel:
22n
- 4. Nameplate Rating (Gross 5thee:
AF G 8~
- 5. Design Electrical Rating (Net StWe):
M
- 6. Sf asimum Dependable Capacity (Gross 5thet:
A%
- 7. Stasimum Dependable Capacity (Net Slwel:
- 3. If Changet Occur in Capacity Ratings titems Number 3 Through 7)Since last Report.Give Reasons:
AllA
- 9. Power Level To which Restricted.lf Any INet 51Wel:
N/A
- 10. Reasons For Restrictions.lf Any:
N/A This Month Yr.-to.Date Cumulatise
- 11. Hours in Reporting Period
~14 <
729fa
- 13704
- 12. Number Of Hours Reactor was Critical o
2 9 B 171
- 13. Reactor Resene Shutdown Hours o
S U
- 14. Hours Generator On.Line o
O 97252.
- 15. Unit Resene Shutdown Hours o
O O
- 16. Gross Thermal Energy Generated 151WH) o O
I%# R4 %
- 17. Gross Electrical Energy Generated 15tWHi Q_..
n 4739732.
- 18. Net Electrical Energy Generated (SlWHI
- 203
- 22.0 0 44C19 r g ci
- 19. Unit Senice Factor o
O 72.7 %
~
- 20. Unit Availability Factor O
o 72.7 %
- 21. Unit Capacity Factor IUsing 51DC Neti o
O C 3,1 *A
- 22. Unit Capacity Factor (Using DER Nett O
O f f. 7 %
- 23. Unit Forced Outage Rate o
O f. M Y.
- 24. Shutdowns Scheduled Oser Nest 6 \\1onths aType. Date.and Duration of Eacht:
N,1 A
- 25. If Shut Down At End Of Report Period: Estimated Date of Startup:
mnavami umim l
- 26. Units in Test Status (Prior to Commercial Operationi: h/A Forecast Achieved l
l INITIAL CRITICALITY INITI A L ELECTRICITY COsl5tERCIA L OPER \\ TION I
DOCKET NO.56-633 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME HBPP No.3 DATE 11 81 M COMP!.ETED BY &A LNrUwm REPORT MONTil OCT n afb 978 TEl.I PilONE 70 7 '48J 3 -7 79 7 i
t-l r
3 c
ri 3 cm 5
c '-(
l.icensee g-t, c.,
Cauw & Corrective a
2 _e g
g 11 Atenm in g5 Event u?
No.
Date
~g 3g Repost sr fig
$L Pic cnt Recurrente c5 3 5
5 63 c
u y
6 6
3 g.
]
76 6 760702.
S 745" C,8 i
N/A ZZ Z227AZ s.;smic,, Mo<164t ext ions 1
J i
)
I 2
3 4
1 Fossed Reason:
Method:
Exhibit G-Instructions S S.heduled A. Equipment Failure (Explain)
- 1. Manual for Pieparatiim of Data 11 Maintenance ni Test 2 Manual Scram.
Entry Sheets fur I.icensee C Refueling
.LAutomatic Scram.
I' vent Repost 11.1:11) Filc INilRI G.
- D Rerulatoiy Resitiction 4-Othes I Esplaml Ultil l l Opciatm Isaining A Ikense I manon.ition l' Aihninistsative 5
i G Opciaisonal I inn 11:aplain)
I slutui 1 Same Sousce Ps/17) ll Ot hei ll.splam)
~
f
. - e i
L AVER 4GE D4ILY L* SIT POWER LEVEL DOCKET NO. 50 - t M UNIT HB PP Mo.3 DATE 8f,I 8 I7 8 COMPLETED BY 6.A.Eisrkavm _
TELEPHONE ?o7 44127ff i
1 MONTH ocroBER, ic478 V
@N w -7 %
.%.^, v,
DAY AVERAGE D AILY POKER LEVEL DAY AVERAGE D41LY POWER LEVEL l
IM%e Nett
~
(Mwe-Net)
O 17 0
I 2
O la a
o 3
0 19 4
0 20 0
~
i 0
21 O
5 6
0 22 O
7 0
23 0
8 O
24 0
~
9 O
25 O
10 0
26 0
II O
27 0
12 0
28 O
0 29 0
~
13 O,
O 30 I4 O
15 31 O
0 16 q,
INSTRUCTIONS
-h'6-On this format. list the aserage dain, unit power leselin MWe-Net for each day in the reportmg month. Compute to the nearest whole megawatt.
191771 gg _ __ __
_ _ _ _ _ _. - - _ - _ _ _ _ _ _ _ _ _ _ _ _ _