Forwards Fire Barrier Info Matrix,Per SER,NUREG-0853, Suppl 1 & in Response to NRC Request During 830216-17 Meeting.Test Repts for Oversized Fire Doors & HVAC Duct Wrap Anticipated by 830901
ML20072U921
Person / Time
Site: Clinton Constellation icon.png
Issue date: 04/04/1983
From: Wuller G
ILLINOIS POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0853, RTR-NUREG-853 U-0629, U-629, NUDOCS 8304110462
Download: ML20072U921 (2)


Text

- *

(p\

U-0 Illinois Power Company -

04-04)-L 500 SOUTH 27TH STREET, P. O. BOX 511, DECATUR, ILLINOIS 62525-1805 Docket No. 50-461 April 4, 1983 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Schwencer:

Subject:

Clinton Power Station Unit #1 SER Confirmatory Issue #58

Reference:

1) NUREG-0853, Supplement No. 1, " Safety Evaluation Report", dated July,1982
2) Meeting between IP and NRC on February 16-17, 1983;

" Status of CPS SER Outstanding and Confirmatory Issues" Pursuant to the requirements of Reference 1) and the request of Mr. John Stang during our meeting (Reference 2), a fire barrier information matrix was developed and attached for NRC review.

The matrix is complete with the exception of two outstanding fire tests which are expected to be done in mid-1983. The test reports for oversized fire doors and HVAC duct wrap are anticipated by 9/1/83.

We trust that the matrix is satisfactory and we plan to supply reports in September to close this issue.

Sincerely, OQNu't G. E. Wull'er Supervisor - Licensing Nuclear Station Engineering OV/lt cc: Dr. H. Abelson, NRC Clinton Project Manager Mr. J. E. Stang, Jr., NRC CEB Mr. H. H. Livermore, NRC Resident Inspector Illinois Department of Riclear Safety 8304110462 830404 i PDR ADOCK 05000461 \

E PDR

hr Fire Resistance Barriers.--

Applicable Code, Standard Minimum Design Minimum Item Construction Standard Requirements Requirements

. Walls - Concrete UBC VIII, 43 5 1/2"~ thickness 5 3/4" thickness Hollow Concrete Block 7 5/8" by UBC VIII, 43; ASTM-C90 *

  • 11 5/8"

' Floors Concrete UBC VIII, 43 5 1/2" thickness 5 3/4" thickness Ceilings Concrete UBC VIII, 43 5 1/2" thickness 5 3/4" thickness

' Doors Hollow Metal. NFPA-80; UL req's As indicated in As indicated in ,

NFPA-80 NFPA-80

' Frames Metal NFPA-80; UL req's 'As. indicated.in As indicated in NFPA-80 NFPA-80 HVAC Duct TSI Insulation **

Wrap Product

  • The National Concrete Masonary Association provides technical data which states that a 7 5/8" by 11 5/8" hollow concrete block will give an-estimated 3-hr fire-resistance rating.
    • A fire test will be conducted this year by Portland Cement Association to determine the insulation wrap fire resistance. capabilities. Results of test are expected by 9/1/83.

Some doors do not bear a UL fire rating label due to dimensional requirements. A fire test will be conducted this year to qualify these doors / frames to bear the UL Label "A". Report of test results is expected by 9/1/83.

Note: As a result of the seismic requirements being more stringent than

. fire protection. requirements for walls, floors, and ceilings, the smaller thickness'in these is found to be 12 inches with the exception for walls constructed with 7 5/8" by 11 5/8" hollow concrete blocks.

m