Updated LER 83-083/01T-1:on 830905,supply Valve 2-FP-V39 to Deluge Sys of Both Standby Gas Treatment Sys Discovered Shut.Caused by Operator Error.Valves Tagged for Identification.Auxiliary Operator Disciplined
ML20080L152
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 09/23/1983
From: Dietz C, Poulk R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
BSEP-83-3190, LER-83-083-01T, LER-83-83-1T, NUDOCS 8309300153
Download: ML20080L152 (4)


LER-2083-083, Updated LER 83-083/01T-1:on 830905,supply Valve 2-FP-V39 to Deluge Sys of Both Standby Gas Treatment Sys Discovered Shut.Caused by Operator Error.Valves Tagged for Identification.Auxiliary Operator Disciplined
Event date:
Report date:
3242083083R00 - NRC Website

text

- _ _ _ _ _ _ _ _ _ .. __ _ _ .- - _ _ . - -

(7 7H

, ,, LICENSEE EVENT REPORT Update Report

. Previous Report Date 9-16-83 lh CONTROL Block: l l l l l l (PLEASE PRIMT OR TYPE ALL REQUIRED IMFoRMAT1old I b l [0_[1_}

7 8 3 l N UCENSEE l C l BCODE l E l P14l 2 15l@l 0l 0l -l 0UCENSE l0l0 l 0 l 0 l - l 0 l 025 l@l26 4 l LICENSE NUMt30H 1 l1 l TYPE 1 l 1Jul@l57 CAT l l@

$8 l

con T l0lil 7 8

"$ ", R"'E l60L @l610l 5l 0lDOCK -l ET0lNUM8EH 3l 2 l 4 l@l 68 069 l 9 EVENTl 0 lDATE 5 l 8 l 31@l ol 9REPORT 14 7b l 2lDATE 3l 81380l@

) EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h l o 121 l While perforning a weekly fire protection operability periodic test, PT-35.1, it l

! Iol3l l was discovered that the supply valve, (2-FP-V39), to the deluge systems of both l 1

lo l4 l l SBGTs was shut. Further review indicated that the valve had a clearance tag on it l j o lsl l for the potable water valve 2-PWT-VS. The health and safety of the public were not l lo lo l l affected by this event. l l0l7ll l I

l 01a 1 l Technical Specifications 3.7.7.2, 6.9.1.8b l 7 8 0 80 I DE C DE SUBC E COMPONENT CODE SUSC O'E S E g l A lB ]@ ]@ l Bl@ l V l A l L lV lE l X l@ {@ @ @

, 1 8 9 10 11 12 13 18 19 20 j SE QUENTI AL OCCURRENCE REPORT RE VISION

,_ EVENT YE AH REPORT NO. CODE TYPE N O.

. L E R RO 4

@ ete4RT[8l3l 21 22 g23 l0l8l3l 24 '

.6 y

21 l0 l1 l 28 29 l Tl 30 l_l 31 y32 AKE AC O ON PL NT ET HOURS 22 SB IT FOR bub. UPPLI MANUFAC URER lXgl34 Xlg 32 l Z [g 35 l36Zl@

l0l0l0l 3/ 40 l g g 41 lNlg 42 l Zlg l3l9lgl9lg 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h l i l o l l The auxiliary operator ( AO) assigned to hang the tag on 2-PUT-V5 mistakenly closed l

[TTT 1 I and tar ged 2-FP-V39. Neither valve had valve identification and the A0 failed to I i

, 7 l follow procedures concerning operation of valves not positively identified. The l FTTil I A0 was appropriately disciplined and the associated valves were tagged for l

[i l4 g l identification. l 7 8 9 80 STA S  % POWE R OT H E R ST A TUS I OV RY DISCOVEHY DESCRIPTION l1 l5 l 1h l 0l 8l 7l@l NA l lBl@l Periodic Test l A TivlTY CO T[NT RELE ASED OF RE LE ASE AMOUN E OF ACTIVITY LOCATION OF RELEASE i G NA l NA 7 8 9 l E l @ 10l Zl@l ft 44 l

45 80 l

PE HSONNEL E XPOSURES NUV8F R TYPE DESCRIPTf 0N +

NA l' i l Tl I o 1010 l@l 2 l@l' l

" eEHsONNELiN;uliiES

*a

, . N Uuu H oESCniPnON@

NA l -li 1818 l9 o l o 101@l12 7 11 80 l

I L OSS OF OR DAMAGE TO FACILITY I

TYPE DESCHIPflON IiloILz_l@l 7 8 9 'o NA l

' . 8309300153 830923 NRC WE oNLY l DR ADOCK 05000324 ,

2 o IS[ SUE @DE CRIPTIOF l PDR NA l lllllllllllllj 7 8 9 10 68 09 80 E NAME of PREPAREn PHONE

. .I . _

LER NITACHMENT - RO #2-83-83 Facility: BSEP Unit No. 2 Event Date: September 5, 1983 While performing the weekly fire protection operability and valve alignment l test, Periodic Test 35.1, on September 5,1983, it was determined that 2-FP-V39 was shut and tagged with a clearance tag. This valve isolated water to both Unit No. 2 SBGT deluge systems. Further review of this clearance tag by the Operations personnel performing the test revealed that the clearance tag should have been hung on 2-PWT-V5, a potable water isolation valve. The Shift Operating Supervisor was immediately notified, the valve reopened, and an investigation initiated.

To support construction of the new Emergency Operations Facility (EOF), it was requested by plant Construction personriel on September 1, 1983, that potable water valve 2-PWT-V5 be shut and placed under clearance. A clearance tag was  !

made and an auxiliary operator proceded to locate, shut, and tag 2-PWT-V5. I When he arrived at the area where he expected the valve to be located, he i noted that the valve did not have a label tag to allow for positive  ;

identification. This valve, in addition to others located in the general area i between the Reactor Building and the Maintenance Shop, are underground valves with stems that are operated by a removable reach rod handle. Since the valve was not marked and the piping could not be traced, the auxiliary operator discussed the valve identification with the Construction personnel who would be accepting the clearance and with the Fire Protection Support Group as to i whether the vals , in question was 2-PVT-V5. Because the valve actuator extension was not painted red (indicating a fire protection valve) and was located where the auxiliary operator expected it to be, he shut and hung the cicarance tag on the valve. The potable water was actually secured to the EOF coincidental with closure of 2-FP-V39. This was accomplished as a result of a separate evolution which deenergized the potable water pumps and thereby secured the potable water system.

The subsequent incident investigation revealed the following problems which contributed, or potentially contributed, to this event:

1. The auxiliary operator failed to follow plant procedure OI-13. Operating Inst.ucti:n 13 (OI 13) ca devcicpad to establish iequirements for the operation of valves throughout the plant. This instruction requires that valves have positive identification attached (i.e., valve identification tags) prior to any manipulation except in an emergency situation.

Training on 01-13 had been provided to Operations personnel prior to this event.

2. The Piping and Instrument Diagram (P&ID) was incorrectly used as a reference. The P&ID was used to review the position of other valves on the associated line and to obtain piping orientation. Isometric drawings should have been used for this purpose and were availabic in the Control Room.

-.-ts;

3. The fire protection valve (2-FP-V39) was not painted red. Plant operating philosophy is to paint fire protection valves red so that they are readily identifiable. Had the valve actuator stem been painted red, the auxiliary operator would have recognized the association with fire protection rather than potable water.
4. The clearance was not expeditiously cancelled. Work on the EOF Potable Water System was completed and authorization to cancel the clearance was provided by the Construction personnel on September 2, i983. Due to i other work items and the noncriticality of restoring potable water to the

! EOF, the clearance was not removed until September 5,1983, after the valve mispositioning was identified by PT-35.1.

5. The addition of valve 2-PWT-V5 to an existing clearance was not properly performed. The controlling procedure requires that a new approval / cover sheet be established; however, in this case, this was not done and the valve was added to the existing clearance sheet.

In order to improve operator performance in handling clearances and to avoid the possibility of confusing fire protection valves with other plant systems, the following actions have been or will be taken:

1. The auxiliary operator associated with this event was appropriately disciplined as a result of his actions in not assuring by positive means (violating 01-13) that the valve he was shutting and placing under clearance was in fact 2-PWT-V5.
2. A special session of Real Time Training, conducted immediately following this event and continued over a four-day period, was provided to the Operating Shift personnel concerning OI-13 and its applicability to this event.
3. Real time training will be scheduled for additional training to Operations personnel on proper methods for valve identification and proper actions to take when a valve is found without proper identification. Administra-tion of clearance procedures, the proper use of P& ids, and an integrated revf ew of this event vill 21sc be addracred in this training. The next series of real time training is scheduled to start in October 1983 and will be conducted over approximately a five-week period (one shift per week).
4. A program has been initiated to assure that fire protection valves are properly labeled and painted red. Previous efforts by plant personnel resulted in the identification and painting of fire protection valves with handwheels. However, this effort failed to take into account those valves without handwheels requiring the use of remote actuators for i positioning. Operations personnel are working with Engineering to assure I underground valves (such as 2-PWT-V5 and 2-FP-V39) are identified, properly labeled, and painted as required. This project is expected to be completed in November 1983. Proper utilization of 01-13 will assure correct valve manipulations while this project is being completed.

1

, - . - - - - . , ~ .- . - , , - - ,- ,, , - . , , , . ,r - , , , . . ~. ,

. . ."+.

.. 6 -

~~

CD&F Carolina Power & Light,Cqmpany

"' 4/ /l g ,

Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 September 23, 1983 FILE: BU9-13510C SERIAL: BSEP/83-3190 Mr. James P. O'Reilly, Administrator U. S. Nuclear Regulatory Commission Region II, Suite 3100 101 Marietta Street N.W.

Atlanta, GA 30303 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-324 LICENSE NO. DPR-62 SUPPLEMENT TO LICENSEE EVENT REPORT 2-83-83

Dear Mr. O'Reilly:

In accordance with Section 6.9.1.8b of the Technical Specifications for Brunswick Steam Electric Plant, Unit No. 2, the enclosed supplemental Licensee Event Report is submitted. The original report fulfilled the requirement for a written report within fourteen (14) days of a reportable occurrence and both are in accordance with the format set forth in NUREG-0161, July 1977. This supplement is made to correct a typographical omission in the original submittal where it was incorrectly conveyed that the health and safety of the public was affected by this event. This statement should have read, "The health and safety of the public were not affected by this event."

Very truly yours, by C. R. Dietz, General Manager Brunswick Steam Electric Plant RMP/clh/LETSB2 Enclosure cc: Mr. R. C. DeYoung NRC Document Control Desk /

c, won e J(f' S Q