Surry Power Station - Notification Of Licensed Operator Initial Examination (05000280/2014301 And 05000281/2014301)
ML14038A409
Person / Time
Site: Surry  Dominion icon.png
Issue date: 02/06/2014
From: Guthrie E F
Division of Reactor Safety II
To: Heacock D A
Virginia Electric & Power Co (VEPCO)
References
IR-14-301
Download: ML14038A409 (5)


See also: IR 05000280/2014301

Text

February 6, 2014

Mr. David President and Chief Nuclear Officer Virginia Electric and Power Company Dominion Nuclear Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT: SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION (05000280/2014301 AND 05000281/2014301)

Dear Mr. Heacock:

In a telephone conversation on February 4, 2104, between Mr. Richard Philpot, Supervisor, Nuclear Training, and Ms. Amanda Toth, Operations Engineer, arrangements were made for the administration of licensing examinations at Surry Power Station. The operating test is scheduled to be administered during the weeks of July 21 and July 28, 2014. The written examination is scheduled to be administered the week of August 4, 2014. The on-site preparatory week is scheduled for the week of June 30, 2014.

As agreed during the telephone conversation, your staff will prepare both the operating test and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination. To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by May 7, 2014. Mr. Ken Schaaf provided the written examination outline to your staff in October 2013. The operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201 will be due by June 6, 2014. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Philpot has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Ms. Amanda Toth at (404) 997-4520, (Internet E-mail: Amanda.Toth@nrc.gov), or me at (404) 997-4662, (Internet E-mail: Eugene.Guthrie@nrc.gov).

Sincerely,/RA/ Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37

cc: Distribution via Listserv Thank you for your cooperation in this matter. Mr. Philpot has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Ms. Amanda Toth at (404) 997-4520, (Internet E-mail: Amanda.Toth@nrc.gov), or me at (404) 997-4662, (Internet E-mail: Eugene.Guthrie@nrc.gov).

Sincerely,/RA/ Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37

cc: Distribution via Listserv

Distribution: See Next Page

x PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE x NON-SENSITIVE ADAMS: x Yes ACCESSION NUMBER:__ML14038A409____________x SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE AXT6 GXG NAME JATOTH EFGUTHRIE DATE 2/5/2014 2/6/2014 2/ /2014 2/ /2014 2/ /2014 2/ /2014 2/ /2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\OLEXAMS\SURRY EXAMINATIONS\INITIAL EXAM 2014-301\CORRESPONDENCE\SURRY 2014-301 CORPORATE NOTIFICATION LETTER.DOCX

Letter to David from Eugene F. Guthrie February 6, 2014.

SUBJECT: SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION (05000280/2014301 AND 05000281/2014301)