Similar Documents at Surry |
---|
Category:Letter
MONTHYEARML24302A1762024-10-22022 October 2024 Core Operating Limits Report Surry 2 Cycle 33 Pattern Hot Revision 0 ML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code IR 05000280/20244032024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 And Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 2024-09-03
[Table view] Category:License-Operator
MONTHYEARML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A0362021-12-16016 December 2021 2B Exam Admin Items Surry 2021-301 (Normal Release) ML21350A0452021-12-16016 December 2021 2A-2 Final Exam Surry 2021-301(2 Yr Delay) ML21350A0502021-12-16016 December 2021 2A-3 Exam Admin Items Surry 2021-301 (2 Year Delay) ML21302A2142021-10-29029 October 2021 301 Post Exam Comments ML21302A2092021-10-29029 October 2021 301 Final RO Exam, Answer Key, References ML21302A2122021-10-29029 October 2021 301, Final SRO Exam, Answer Key, References ML21225A7452021-08-13013 August 2021 301 Exam Approval Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20322A4362020-11-16016 November 2020 Notification of Licensed Operator Initial Examination 05000280/2021301 and 05000281/2021301 ML20156A3122020-06-0404 June 2020 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19101A3582019-04-11011 April 2019 Operator Licensing Examination Approval 05000280/2019301 and 05000281/2019301 ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18137A4682018-05-17017 May 2018 301 Exam Final Items (ADAMS-2B) Delay Release 2 Years ML18137A4692018-05-17017 May 2018 301 Exam Administrative Items (ADAMS-2C) Delay Release 2 Years ML18137A4702018-05-17017 May 2018 301 Exam Administrative Items (ADAMS-2D) ML18128A3762018-04-25025 April 2018 Notification of Licensed Operator Initial Examination (05000280/2019301 and 05000281/2019301) ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ML17354B2872017-12-20020 December 2017 05000280/2017301 05000281/2017301 Final Exam - Post Exam Comments ML17354B2952017-12-20020 December 2017 281/2017-301 Final SRO Written Exam - Delay Release 2 Yrs ML17354B2892017-12-20020 December 2017 05000280/2017301, 05000281/2017301 Final RO Written Exam - Delay Release 2 Yrs ML17299A1112017-10-23023 October 2017 Operator Licensing Written Examination Approval 05000280/2017301 and 05000281/2017301 ML17188A4562017-07-0707 July 2017 Exam Final Items 2B - Delay Release 2 Yrs ML17188A4572017-07-0707 July 2017 Exam Administrative Items 2C - Delay Release 2 Yrs ML17142A2962017-05-17017 May 2017 Preparation and Scheduling of Operator Licensing Examinations ML17090A4562017-03-31031 March 2017 Notification of Licensed Operator Initial Examination (05000280/2017301 and 05000281/2017301) ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16190A4202016-07-0505 July 2016 June 2016 - Surry NRC Generic Fundamentals Examination Results Cover Letter ML16089A3972016-03-22022 March 2016 301 Section 13 ML16089A3862016-03-22022 March 2016 301 Section 6 ML16088A3942016-03-22022 March 2016 301 Section 1 ML16089A3882016-03-22022 March 2016 301Section 7 ML16089A3782016-03-22022 March 2016 301 Section 5 ML16089A3922016-03-22022 March 2016 301 Section 11 ML16089A3892016-03-22022 March 2016 301 Section 10 ML16089A2392016-03-22022 March 2016 301 Draft SRO Written Exam ML16089A3572016-03-22022 March 2016 301 Section 4 ML16089A2252016-03-22022 March 2016 301 Draft RO Written Examination ML16089A3942016-03-22022 March 2016 301 Section 12 ML16007A4892016-01-0707 January 2016 301 Final Scenarios ML16007A4592016-01-0707 January 2016 301 Draft Simulator Scenarios ML16007A4922016-01-0707 January 2016 301 Final Sim and in Plant JPMs ML16007A4712016-01-0707 January 2016 301 Draft Admin JPMs ML16007A4652016-01-0707 January 2016 301 Draft JPMs ML16007A5052016-01-0707 January 2016 301 Final Admin JPMs ML16007A4732016-01-0707 January 2016 301 Final Administrative Documents ML16007A4302016-01-0707 January 2016 301 Draft Administrative Documents 2023-05-31
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A0452021-12-16016 December 2021 2A-2 Final Exam Surry 2021-301(2 Yr Delay) ML21350A0502021-12-16016 December 2021 2A-3 Exam Admin Items Surry 2021-301 (2 Year Delay) ML21350A0362021-12-16016 December 2021 2B Exam Admin Items Surry 2021-301 (Normal Release) ML21302A2092021-10-29029 October 2021 301 Final RO Exam, Answer Key, References ML21302A2122021-10-29029 October 2021 301, Final SRO Exam, Answer Key, References ML21302A2142021-10-29029 October 2021 301 Post Exam Comments ML21225A7452021-08-13013 August 2021 301 Exam Approval Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20322A4362020-11-16016 November 2020 Notification of Licensed Operator Initial Examination 05000280/2021301 and 05000281/2021301 ML20156A3122020-06-0404 June 2020 Preparation and Scheduling of Operator Licensing Examinations ML19101A3582019-04-11011 April 2019 Operator Licensing Examination Approval 05000280/2019301 and 05000281/2019301 ML18137A4682018-05-17017 May 2018 301 Exam Final Items (ADAMS-2B) Delay Release 2 Years ML18137A4692018-05-17017 May 2018 301 Exam Administrative Items (ADAMS-2C) Delay Release 2 Years ML18137A4702018-05-17017 May 2018 301 Exam Administrative Items (ADAMS-2D) ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18128A3762018-04-25025 April 2018 Notification of Licensed Operator Initial Examination (05000280/2019301 and 05000281/2019301) ML17354B2872017-12-20020 December 2017 05000280/2017301 05000281/2017301 Final Exam - Post Exam Comments ML17354B2952017-12-20020 December 2017 281/2017-301 Final SRO Written Exam - Delay Release 2 Yrs ML17354B2892017-12-20020 December 2017 05000280/2017301, 05000281/2017301 Final RO Written Exam - Delay Release 2 Yrs ML17299A1112017-10-23023 October 2017 Operator Licensing Written Examination Approval 05000280/2017301 and 05000281/2017301 ML17188A4572017-07-0707 July 2017 Exam Administrative Items 2C - Delay Release 2 Yrs ML17188A4562017-07-0707 July 2017 Exam Final Items 2B - Delay Release 2 Yrs ML17142A2962017-05-17017 May 2017 Preparation and Scheduling of Operator Licensing Examinations ML17090A4562017-03-31031 March 2017 Notification of Licensed Operator Initial Examination (05000280/2017301 and 05000281/2017301) ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16089A3882016-03-22022 March 2016 301Section 7 ML16089A3782016-03-22022 March 2016 301 Section 5 ML16089A3922016-03-22022 March 2016 301 Section 11 ML16089A3892016-03-22022 March 2016 301 Section 10 ML16089A2392016-03-22022 March 2016 301 Draft SRO Written Exam ML16089A3572016-03-22022 March 2016 301 Section 4 ML16089A2252016-03-22022 March 2016 301 Draft RO Written Examination ML16089A3942016-03-22022 March 2016 301 Section 12 ML16089A3862016-03-22022 March 2016 301 Section 6 ML16088A3942016-03-22022 March 2016 301 Section 1 ML16089A3972016-03-22022 March 2016 301 Section 13 ML16007A4922016-01-0707 January 2016 301 Final Sim and in Plant JPMs ML16007A4382016-01-0707 January 2016 301 Draft RO Written Examination ML16007A4432016-01-0707 January 2016 301 Draft SRO Written Examination ML16007A5162016-01-0707 January 2016 301 Post Exam Comments ML16007A5182016-01-0707 January 2016 301 General Correspondence ML16007A4302016-01-0707 January 2016 301 Draft Administrative Documents ML16007A4732016-01-0707 January 2016 301 Final Administrative Documents ML16007A5052016-01-0707 January 2016 301 Final Admin JPMs ML16007A4592016-01-0707 January 2016 301 Draft Simulator Scenarios ML16007A4892016-01-0707 January 2016 301 Final Scenarios ML16007A4712016-01-0707 January 2016 301 Draft Admin JPMs ML15293A0722015-10-20020 October 2015 301 RO as Given Written Exam Answer Key Reference List 2023-05-31
[Table view] |
See also: IR 05000280/2014301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
February 6, 2014
Mr. David A. Heacock
President and Chief Nuclear Officer
Virginia Electric and Power Company
Dominion Nuclear
Innsbrook Technical Center
5000 Dominion Boulevard
Glen Allen, VA 23060-6711
SUBJECT: SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR
INITIAL EXAMINATION (05000280/2014301 AND 05000281/2014301)
Dear Mr. Heacock:
In a telephone conversation on February 4, 2104, between Mr. Richard Philpot, Supervisor,
Nuclear Training, and Ms. Amanda Toth, Operations Engineer, arrangements were made for the
administration of licensing examinations at Surry Power Station. The operating test is
scheduled to be administered during the weeks of July 21 and July 28, 2014. The written
examination is scheduled to be administered the week of August 4, 2014. The on-site
preparatory week is scheduled for the week of June 30, 2014.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by May 7, 2014. Mr. Ken Schaaf provided the written examination outline to your staff in
October 2013. The operating test, written examination, and the supporting reference materials
identified in Attachment 3 to ES-201 will be due by June 6, 2014. Pursuant to Title 10, Section
55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outline, examination, and test before
they are submitted to the NRC for review and approval. All materials shall be complete and
ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
D. Heacock 2
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 30 days before the first examination date. If the applications are not
received at least 30 days before the examination date, a postponement may be necessary.
Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget (OMB) under approval number 3150-0018, which expires on April 30,
2016. The public reporting burden for this collection of information is estimated to average 500
hours per response, including the time for reviewing instructions, gathering and maintaining the
data needed, writing the examinations, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet
electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs document system (ADAMS).
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the
Public Electronic Reading Room).
D. Heacock 3
Thank you for your cooperation in this matter. Mr. Philpot has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Ms. Amanda Toth at (404) 997-4520,
(Internet E-mail: Amanda.Toth@nrc.gov), or me at (404) 997-4662, (Internet E-mail:
Eugene.Guthrie@nrc.gov).
Sincerely,
/RA/
Eugene F. Guthrie, Chief
Operations Branch 2
Division of Reactor Safety
Docket Nos.: 50-280, 50-281
License Nos.: DPR-32, DPR-37
cc: Distribution via Listserv
__ML14038A409____________x SUNSI REVIEW COMPLETE FORM 665 ATTACHED
OFFICE RII:DRS RII:DRS
SIGNATURE AXT6 GXG
NAME JATOTH EFGUTHRIE
DATE 2/5/2014 2/6/2014 2/ /2014 2/ /2014 2/ /2014 2/ /2014 2/ /2014
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
Letter to David A. Heacock from Eugene F. Guthrie February 6, 2014.
SUBJECT: SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR
INITIAL EXAMINATION (05000280/2014301 AND 05000281/2014301)
Distribution:
RIDSNRRDIRS
PUBLIC
RidsNrrPMSurry Resource