Similar Documents at Surry |
---|
Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23277A1172023-10-0303 October 2023 Operator Licensing Examination Approval 05000280/2023301 and 05000281/2023301 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23220A1492023-08-0707 August 2023 Independent Spent Fuel Storage Installation - Submittal of Cask Registrations for Spent Fuel Storage ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23193A9382023-07-18018 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML23130A3742023-05-10010 May 2023 Request to Delay NRC Intial Licensing Examination 2024-02-06
[Table view] Category:License-Operator
MONTHYEARML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A0502021-12-16016 December 2021 2A-3 Exam Admin Items Surry 2021-301 (2 Year Delay) ML21350A0362021-12-16016 December 2021 2B Exam Admin Items Surry 2021-301 (Normal Release) ML21350A0452021-12-16016 December 2021 2A-2 Final Exam Surry 2021-301(2 Yr Delay) ML21302A2142021-10-29029 October 2021 301 Post Exam Comments ML21225A7452021-08-13013 August 2021 301 Exam Approval Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20322A4362020-11-16016 November 2020 Notification of Licensed Operator Initial Examination 05000280/2021301 and 05000281/2021301 ML20156A3122020-06-0404 June 2020 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19101A3582019-04-11011 April 2019 Operator Licensing Examination Approval 05000280/2019301 and 05000281/2019301 ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18137A4682018-05-17017 May 2018 301 Exam Final Items (ADAMS-2B) Delay Release 2 Years ML18137A4692018-05-17017 May 2018 301 Exam Administrative Items (ADAMS-2C) Delay Release 2 Years ML18137A4702018-05-17017 May 2018 301 Exam Administrative Items (ADAMS-2D) ML18128A3762018-04-25025 April 2018 Notification of Licensed Operator Initial Examination (05000280/2019301 and 05000281/2019301) ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ML17354B2872017-12-20020 December 2017 05000280/2017301 05000281/2017301 Final Exam - Post Exam Comments ML17354B2952017-12-20020 December 2017 281/2017-301 Final SRO Written Exam - Delay Release 2 Yrs ML17354B2892017-12-20020 December 2017 05000280/2017301, 05000281/2017301 Final RO Written Exam - Delay Release 2 Yrs ML17299A1112017-10-23023 October 2017 Operator Licensing Written Examination Approval 05000280/2017301 and 05000281/2017301 ML17188A4562017-07-0707 July 2017 Exam Final Items 2B - Delay Release 2 Yrs ML17188A4572017-07-0707 July 2017 Exam Administrative Items 2C - Delay Release 2 Yrs ML17142A2962017-05-17017 May 2017 Preparation and Scheduling of Operator Licensing Examinations ML17090A4562017-03-31031 March 2017 Notification of Licensed Operator Initial Examination (05000280/2017301 and 05000281/2017301) ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16190A4202016-07-0505 July 2016 June 2016 - Surry NRC Generic Fundamentals Examination Results Cover Letter ML16089A3972016-03-22022 March 2016 301 Section 13 ML16089A3942016-03-22022 March 2016 301 Section 12 ML16088A3942016-03-22022 March 2016 301 Section 1 ML16089A3882016-03-22022 March 2016 301Section 7 ML16089A3782016-03-22022 March 2016 301 Section 5 ML16089A3922016-03-22022 March 2016 301 Section 11 ML16089A3892016-03-22022 March 2016 301 Section 10 ML16089A2392016-03-22022 March 2016 301 Draft SRO Written Exam ML16089A3572016-03-22022 March 2016 301 Section 4 ML16089A2252016-03-22022 March 2016 301 Draft RO Written Examination ML16089A3862016-03-22022 March 2016 301 Section 6 ML16007A4892016-01-0707 January 2016 301 Final Scenarios ML16007A4592016-01-0707 January 2016 301 Draft Simulator Scenarios ML16007A4922016-01-0707 January 2016 301 Final Sim and in Plant JPMs ML16007A4712016-01-0707 January 2016 301 Draft Admin JPMs ML16007A4652016-01-0707 January 2016 301 Draft JPMs ML16007A5052016-01-0707 January 2016 301 Final Admin JPMs ML16007A4732016-01-0707 January 2016 301 Final Administrative Documents ML16007A4302016-01-0707 January 2016 301 Draft Administrative Documents ML16007A5182016-01-0707 January 2016 301 General Correspondence ML16007A5162016-01-0707 January 2016 301 Post Exam Comments 2023-05-31
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A0452021-12-16016 December 2021 2A-2 Final Exam Surry 2021-301(2 Yr Delay) ML21350A0362021-12-16016 December 2021 2B Exam Admin Items Surry 2021-301 (Normal Release) ML21350A0502021-12-16016 December 2021 2A-3 Exam Admin Items Surry 2021-301 (2 Year Delay) ML21302A2142021-10-29029 October 2021 301 Post Exam Comments ML21225A7452021-08-13013 August 2021 301 Exam Approval Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20322A4362020-11-16016 November 2020 Notification of Licensed Operator Initial Examination 05000280/2021301 and 05000281/2021301 ML20156A3122020-06-0404 June 2020 Preparation and Scheduling of Operator Licensing Examinations ML19101A3582019-04-11011 April 2019 Operator Licensing Examination Approval 05000280/2019301 and 05000281/2019301 ML18137A4682018-05-17017 May 2018 301 Exam Final Items (ADAMS-2B) Delay Release 2 Years ML18137A4692018-05-17017 May 2018 301 Exam Administrative Items (ADAMS-2C) Delay Release 2 Years ML18137A4702018-05-17017 May 2018 301 Exam Administrative Items (ADAMS-2D) ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18128A3762018-04-25025 April 2018 Notification of Licensed Operator Initial Examination (05000280/2019301 and 05000281/2019301) ML17354B2872017-12-20020 December 2017 05000280/2017301 05000281/2017301 Final Exam - Post Exam Comments ML17354B2952017-12-20020 December 2017 281/2017-301 Final SRO Written Exam - Delay Release 2 Yrs ML17354B2892017-12-20020 December 2017 05000280/2017301, 05000281/2017301 Final RO Written Exam - Delay Release 2 Yrs ML17299A1112017-10-23023 October 2017 Operator Licensing Written Examination Approval 05000280/2017301 and 05000281/2017301 ML17188A4572017-07-0707 July 2017 Exam Administrative Items 2C - Delay Release 2 Yrs ML17188A4562017-07-0707 July 2017 Exam Final Items 2B - Delay Release 2 Yrs ML17142A2962017-05-17017 May 2017 Preparation and Scheduling of Operator Licensing Examinations ML17090A4562017-03-31031 March 2017 Notification of Licensed Operator Initial Examination (05000280/2017301 and 05000281/2017301) ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16089A3882016-03-22022 March 2016 301Section 7 ML16089A3782016-03-22022 March 2016 301 Section 5 ML16089A3922016-03-22022 March 2016 301 Section 11 ML16089A3892016-03-22022 March 2016 301 Section 10 ML16089A2392016-03-22022 March 2016 301 Draft SRO Written Exam ML16089A3572016-03-22022 March 2016 301 Section 4 ML16089A2252016-03-22022 March 2016 301 Draft RO Written Examination ML16089A3942016-03-22022 March 2016 301 Section 12 ML16089A3862016-03-22022 March 2016 301 Section 6 ML16088A3942016-03-22022 March 2016 301 Section 1 ML16089A3972016-03-22022 March 2016 301 Section 13 ML16007A4712016-01-0707 January 2016 301 Draft Admin JPMs ML16007A4382016-01-0707 January 2016 301 Draft RO Written Examination ML16007A4432016-01-0707 January 2016 301 Draft SRO Written Examination ML16007A5162016-01-0707 January 2016 301 Post Exam Comments ML16007A5182016-01-0707 January 2016 301 General Correspondence ML16007A4302016-01-0707 January 2016 301 Draft Administrative Documents ML16007A4732016-01-0707 January 2016 301 Final Administrative Documents ML16007A4592016-01-0707 January 2016 301 Draft Simulator Scenarios ML16007A4892016-01-0707 January 2016 301 Final Scenarios ML16007A4922016-01-0707 January 2016 301 Final Sim and in Plant JPMs ML16007A5052016-01-0707 January 2016 301 Final Admin JPMs ML15293A0722015-10-20020 October 2015 301 RO as Given Written Exam Answer Key Reference List ML15293A0752015-10-20020 October 2015 301 SRO as Given Written Exam Answer Key Reference List ML14224A6302014-08-12012 August 2014 301 Final RO Exam with Key 2023-05-31
[Table view] |
See also: IR 05000280/2021301
Text
November 16, 2020
Mr. Doug E. Lawrence
Site Vice President
Surry Power Station
Virginia Electric & Power Company
5570 Hog Island Road
Surry, VA 23883-0315
SUBJECT: SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR
INITIAL EXAMINATION 05000280/2021301 AND 05000281/2021301
Dear Mr. Lawrence:
During a telephone conversation on November 10, 2020, between Mr. Joe Ford, Lead Exam
Writer, and Mr. Bruno Caballero, Senior Operations Engineer, arrangements were made for the
administration of licensing examinations at the Surry Power Station. The on-site preparatory
week is scheduled for the week of July 19, 2021. The operating test is scheduled to be
administered during the weeks of August 23 and August 30, 2021. The written examination is
scheduled to be administered on September 8, 2021.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 11 of NUREG-1021, "Operator
Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline and the supporting reference materials identified in ES-201 Attachment 3 by March 15,
2021. Mr. Bruno Caballero provided a written examination outline to your staff in August 2020.
The written examination will be due by May 3, 2021 and the operating test will be due by June
11, 2021. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
outline, examination, and test before they are submitted to the NRC for review and approval. All
materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
D. Lawrence 2
temperatures, and levels) generated during the dynamic operating tests until the NRC takes
licensing action on all the applications and any adjudicatory actions on any hearing demands
are complete.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator waiver and/or excusal requests (Office of Management and
Budget (OMB) approval number 3150-0090) at least 60 days before the first examination date (if
possible). Contact Mr. Bruno Caballero to determine the method for submission of the waiver or
excusal requests. Preliminary reactor operator and senior reactor operator license applications
(OMB approval number 3150-0090) and medical certifications (OMB approval number 3150-
0024) should be submitted at least 30 days before the first examination date. If the applications
are not received at least 30 days before the examination date, a postponement may be
necessary. Final signed applications certifying that all training has been completed and
requesting any waivers or excusals, as applicable, should be submitted at least 14 days before
the first examination date.
Although the guidelines for receiving waiver or excusal requests call for at least 30 days before
the first examination date (preliminary) and 14 days before the first examination date (final), the
requests should be submitted as early as possible in the process (see the 60-day guideline
above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.
Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form
398, Personal Qualifications StatementLicensee, or as directed by Mr. Bruno Caballero).
The NRC will document its final decision on whether to grant a waiver or excusal on the final
(not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its
decision until the final application is submitted to the agency.
Paperwork Reduction Act Statement
This letter contains information collection requirements that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved
by the Office of Management and Budget, approval number 3150-0018.
The burden to the public for these mandatory information collections is estimated to average
2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination, including the time for reviewing instructions, searching existing
data sources, gathering and maintaining the data needed, and completing and reviewing the
information collections. You may submit comments on any aspect of the information collections,
including suggestions for reducing the burden, to FOIA, Privacy and Information Collections
Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by
electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.
Public Protection Notification
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information, unless the document requesting or requiring the collection displays a currently
valid OMB control number.
D. Lawrence 3
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
of the agencys Rules of Practice, a copy of this letter and its enclosures will be available
electronically for public inspection through the Agencywide Documents Access and
Management System (ADAMS). ADAMS is accessible from the NRC Website at
http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Joe Ford has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Bruno Caballero at (404) 997-4608,
(Internet E-mail: bruno.caballero@nrc.gov), or me at (404) 997-4551, (Internet E-mail:
gerald.mccoy@nrc.gov).
Sincerely,
/RA/
Gerald J. McCoy, Chief
Operations Branch 1
Division of Reactor Safety
Docket Nos.: 50-280, 50-281
License Nos.: DPR-32, DPR-37
ML 20322A436 SUNSI REVIEW COMPLETE FORM 665 ATTACHED
OFFICE RII/DRS/OB1 RII/DRS/OB2 RII/DRS/OB1
NAME DEgelstad BCaballero GMcCoy
DATE 11/12/2020 11/ 13 /2020 11/ 16 /2020