Dominion Energy Services, Inc.
5000 Dominion Blvd.
Glen Allen, VA 23060 DominionEnergy.com Attn: Document Control Desk June 4, 2020 United States Nuclear Regulatory Commission Washington, DC 20555-0001
- l"* Dominion
'#,# Energy<<
Serial No.:
20-214 NRNKHB Docket Nos.: 50-338/339 50-280/281 License Nos.: NPF-4/7 DPR-32/37 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION ENERGY VIRGINIA)
NORTH ANNA POWER STATION UNITS 1 AND 2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULA TORY ISSUE
SUMMARY
2020-01 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2020-01, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).
No new commitments are intended by this letter.
If you have any questions concerning this information, please contact Mr. Craig Sly at (804) 273-2784.
Sincerely, ~-
Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support Dominion Energy Services, Inc.
Enclosures:
- 1. NRC Form 536 for North Anna
- 2. NRC Form 536 for Surry Commitments made by this letter: None
SN 20-214 Scheduling of Operator Licensing Examinations Page2 of2 cc:
U. S. Nuclear Regulatory Commission Region I ATTN: Operations Branch 2100 Renaissance Boulevard Suite 100 King of Prussia, Pennsylvania 19406-2713 U. S. Nuclear Regulatory Commission Region II ATTN: Operations Branch Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. G. Edward Miller NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 E-3 11555 Rockville Pike Rockville, MD 20852-2738 Vaughn Thomas NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail.Stop 04 F-12 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station
Serial No 20-214 NRC Form 536 for North Anna Power Station
NRC FDRll 538 U.S. NUCLEAR ltEGULATOltY COMMISSION APMCM!D IIY 019: NO. 31504131 ll!lCPUIR;11'3fl2020 (11-2011),,
OPERATOR LICENSING
__ Plf_........,..,,til-..Yirt--~1-- lllil F.,
i-- -lo,Pllr!lulgllsllll-fortpOA!ar<<a-I lo111t._ ___ U-2Rll.Wl.llxlw
\\
EXAMINATION DATA
~eo.iialanW..-~.art,f.,...lo-~91'(
,..... ~
Dlllcmi:o( Cllad-...SlllfiayMD. NEllll-lllll'l. plS)Ol3tlClla idMngt-'Mlllulgo!.Wllltdon,DC 2llll!.
r ---lo-*-
~--nll'1ilpllly1Cllldf_OIIS_,....lbtNIC-,nll_.,_
...i,_,;,no1.....,1o,_,i1o,hi11'-colelon.
FACILITY NflCREGION I
II I
Nol"th.Anna Power Station Units l & 2 Regionll A. PROPOSED EXAMINATION PREPARATION SCHEDULE
!'PIOl"OSED NUMBER CY 22 CY.23 CY* 24 CY 25 ESTIMATED NUMBER OF I
I i.l~=:EQ ESTIMATED NUMBER OF NR_c-"PREPAllEO 1:)(1\\MINATIONS
- 8. INITIAL OPERATOR LICENSE EXAMINATIONS CY22 '
PR91;'0SED NUMBER CY.23 CY24 CY 25 i'!l.!MB.ER.O.F REACTOR 4
6 Of'ERATORS NUMBER OF SENIOR.R~C'TOR 3
2 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR
. OPERATORS-~ l.!PGRAflE 2
2 NUMBER OF SENIO~ REACTQ~
OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 06/06/22 06/10/24 AL'ft:Ri',jATE DATE 06/13/22 06/17/24 NRC F.ORM 536 (11~7)
SN 20-214 NRC Form 536 for Surry Power Station
NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3151M1131 EXPIRES: 11l3012020 (11-2017)
~-"<.
I~
OPERA TOR LICENSING Eslimaled burden per response ID corqily will !Ills valtmlaiy !nfonnalfan collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This inlillmation collection Is used ID plan budgets and l8SGIJIC8S fur operator exanilatians. Send comments ~
bun1en estimate ID the lrdanllatioll Seiw:es Brandl (T-2 F43), U.S. Nudear I;
EXAMINATION DATA l
Regulalaiy Ccmmlsslon, washlnglDD, llC211555-0001, er by e-mail ta lnfocollecls.Rerrc.gc,,,
and ID the Desk Officer, Ollice of lnfamlallon and Regulalnly Alralis, NEOB-10202, (3150,0131), Office
""~.........
of Management and Budget, Washington, DC 20503.
If a means used lo inpose an inbmalion coUeclion does not display a CU!18nltt valid OMll conlrol l'IJlllber, Ille NRC ffl8'/ notCllllductcr sponsor, aula pelSOl'I lsnotreq11redta 1'SPOIKI la, the infClmallon colec1i0n.
FACILITY NRCREGION
~urry Power Station
,~
I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2022 CY 2023 cv2024 CY2025 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
1 0
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS
- 8. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2022 CY2023 CY2034 CY2025 NUMBER OF REACTOR 11 11 OPERATORS NUMBER OF SENIOR REACTOR 3
3 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 2
2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 8/21/2023 8/18/2025 ALTERNATE DATE 8/28/2023 8/25/2025 NRC FORM 536 (11*2017)