MONTHYEARML24302A2402024-10-28028 October 2024 CFR 21 Report 1-BY-BC-1-LV Battery Charger IR 05000338/20240032024-10-28028 October 2024 – Integrated Inspection Report 05000338-2024003 and 05000339-2024003 ML24302A2342024-10-23023 October 2024 Request for Project Number Related to Dominion Energy Services New Nuclear Program at North Anna Power Station ML24302A1762024-10-22022 October 2024 Core Operating Limits Report Surry 2 Cycle 33 Pattern Hot Revision 0 ML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML24281A1372024-10-0707 October 2024 ISFSI - Submittal of Cask Registration for Spent Fuel Storage ML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) 05000338/LER-2024-001-01, Automatic Reactor Trip Due to Prni High Negative Rate2024-09-24024 September 2024 Automatic Reactor Trip Due to Prni High Negative Rate IR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter ML24243A0872024-09-20020 September 2024 Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2 IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers ML24215A2622024-08-28028 August 2024 Transmittal Letter for Subsequent Renewed License IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance 05000339/LER-2024-001-01, Loss of Generator Field for 2J Eog During 2-PT-82.282024-08-20020 August 2024 Loss of Generator Field for 2J Eog During 2-PT-82.28 ML24234A0742024-08-15015 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) ML24221A1932024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Upper Mattaponi Tribe ML24221A1922024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Tuscarora Nation of New York ML24221A1902024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Pamunkey Indian Tribe ML24221A1892024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Nansemond Indian Nation ML24221A1912024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Rappahannock Tribe, Inc ML24221A1862024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Band of Cherokee Indians ML24221A1882024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Monacan Indian Nation ML24221A1872024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Shawnee Tribe of Oklahoma ML24221A1852024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Tribe of Indians ML24221A1842024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Nation, Oklahoma ML24221A1832024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Chickahominy Indian Tribe-Eastern Division ML24221A1822024-08-0808 August 2024 Tribal Section 106 Letters - North Anna - Chickahominy Indian Tribe ML24221A1812024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Catawba Indian Nation ML24208A0142024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-Absentee-Shawnee Tribe of Indians of Oklahoma ML24206A0062024-08-0808 August 2024 Notice of Availability of the Final Environmental Impact Statement for the North Anna Nuclear Power Station Unit Numbers 1 and 2 Subsequent License Renewal (Docket Numbers: 50-338 and 50-339) ML24206A0052024-08-0808 August 2024 SLR Final EIS Letter to Achp ML24163A3002024-08-0808 August 2024 Request for Relief Request N1-I5-NDE-007 Inservice Inspection Alternative ML24221A1942024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-United Keetoowah Band of Cherokee Indians in Oklahoma ML24241A0692024-08-0606 August 2024 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000338/20240022024-08-0202 August 2024 Integrated Inspection Report 05000338/2024002 and 05000339/2024002 IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24206A0432024-07-26026 July 2024 Feis - Letter to the Applicant 05000338/LER-2024-001, Automatic Reactor Trip Due to Prni High Negative Rate2024-07-25025 July 2024 Automatic Reactor Trip Due to Prni High Negative Rate ML24206A0902024-07-24024 July 2024 Owners Activity Report ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection 2024-09-03
[Table view] Category:License-Operator
MONTHYEARML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML22241A0232022-08-29029 August 2022 Adams 2B Na Exam Administrative Items ML22147A0162022-05-26026 May 2022 2022-301 Exam Approval Letter ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A0452021-12-16016 December 2021 2A-2 Final Exam Surry 2021-301(2 Yr Delay) ML21350A0502021-12-16016 December 2021 2A-3 Exam Admin Items Surry 2021-301 (2 Year Delay) ML21350A0362021-12-16016 December 2021 2B Exam Admin Items Surry 2021-301 (Normal Release) ML21313A2632021-11-0808 November 2021 301 Corporate Notification Letter (210-day Ltr) ML21302A2142021-10-29029 October 2021 301 Post Exam Comments ML21225A7452021-08-13013 August 2021 301 Exam Approval Letter ML21111A3412021-04-16016 April 2021 March 2021 GFE ML21011A0312021-01-11011 January 2021 301 2A-2 Exam Final Items ML21011A0552021-01-11011 January 2021 301 2A-3, Exam Administrative Items ML21011A0082021-01-11011 January 2021 301-2B Normal Release - Exam Administrative Items ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20322A4362020-11-16016 November 2020 Notification of Licensed Operator Initial Examination 05000280/2021301 and 05000281/2021301 ML20156A3122020-06-0404 June 2020 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19101A3582019-04-11011 April 2019 Operator Licensing Examination Approval 05000280/2019301 and 05000281/2019301 ML19100A2012019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for North Anna Power Station ML19045A3712019-02-12012 February 2019 March 2019 GFE Cover Letter Rii ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 IR 05000338/20183012018-08-29029 August 2018 05000338/2018301 and 05000339/2018301 Post Exam Comments ML18137A4692018-05-17017 May 2018 301 Exam Administrative Items (ADAMS-2C) Delay Release 2 Years ML18137A4682018-05-17017 May 2018 301 Exam Final Items (ADAMS-2B) Delay Release 2 Years ML18137A4702018-05-17017 May 2018 301 Exam Administrative Items (ADAMS-2D) ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18128A3762018-04-25025 April 2018 Notification of Licensed Operator Initial Examination (05000280/2019301 and 05000281/2019301) ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ML17354B2892017-12-20020 December 2017 05000280/2017301, 05000281/2017301 Final RO Written Exam - Delay Release 2 Yrs ML17354B2952017-12-20020 December 2017 281/2017-301 Final SRO Written Exam - Delay Release 2 Yrs ML17354B2872017-12-20020 December 2017 05000280/2017301 05000281/2017301 Final Exam - Post Exam Comments ML17331A7042017-11-21021 November 2017 Notification of Licensed Operator Initial Examination 05000338/2018301 and 05000339/2018301 ML17299A1112017-10-23023 October 2017 Operator Licensing Written Examination Approval 05000280/2017301 and 05000281/2017301 ML17188A4572017-07-0707 July 2017 Exam Administrative Items 2C - Delay Release 2 Yrs ML17188A4562017-07-0707 July 2017 Exam Final Items 2B - Delay Release 2 Yrs ML17172A6922017-06-22022 June 2017 Section 1 - Draft Administrative Documents ML17172A7262017-06-21021 June 2017 Section 12 - Final Administrative JPMs - North Anna Power Station ML17172A7082017-06-21021 June 2017 Section 4 - North Anna 2016301 - Draft Simulator Scenarios ML17172A7142017-06-21021 June 2017 Section 6 - Draft Administrative JPMs ML17172A7012017-06-21021 June 2017 Section 2 - North Anna 2016301 RO Written Draft - Delay Release 2 Years ML17172A7032017-06-21021 June 2017 Section 3 - North Anna 2016301 SRO Written Draft - Delay Release 2 Yrs ML17172A7112017-06-21021 June 2017 Section 5 - Draft Sim and in Plant JPMs ML17172A7272017-06-21021 June 2017 Section 14 - General Correspondence ML17172A7202017-06-21021 June 2017 Section 10 - Final Simulator Scenarios - North Anna Power Station ML17172A7182017-06-21021 June 2017 Section 7 - Final Admin Docs - North Anna ML17172A7252017-06-21021 June 2017 Section 11 - Final Sim in Plant JPMs ML17142A2962017-05-17017 May 2017 Preparation and Scheduling of Operator Licensing Examinations ML17116A6362017-04-24024 April 2017 March 2017 - North Anna NRC Generic Fundamentals Examination Results ML17090A4562017-03-31031 March 2017 Notification of Licensed Operator Initial Examination (05000280/2017301 and 05000281/2017301) 2023-05-31
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML22241A0232022-08-29029 August 2022 Adams 2B Na Exam Administrative Items ML22147A0162022-05-26026 May 2022 2022-301 Exam Approval Letter ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A0452021-12-16016 December 2021 2A-2 Final Exam Surry 2021-301(2 Yr Delay) ML21350A0502021-12-16016 December 2021 2A-3 Exam Admin Items Surry 2021-301 (2 Year Delay) ML21350A0362021-12-16016 December 2021 2B Exam Admin Items Surry 2021-301 (Normal Release) ML21313A2632021-11-0808 November 2021 301 Corporate Notification Letter (210-day Ltr) ML21302A2142021-10-29029 October 2021 301 Post Exam Comments ML21225A7452021-08-13013 August 2021 301 Exam Approval Letter ML21011A0312021-01-11011 January 2021 301 2A-2 Exam Final Items ML21011A0552021-01-11011 January 2021 301 2A-3, Exam Administrative Items ML21011A0082021-01-11011 January 2021 301-2B Normal Release - Exam Administrative Items ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20322A4362020-11-16016 November 2020 Notification of Licensed Operator Initial Examination 05000280/2021301 and 05000281/2021301 ML20156A3122020-06-0404 June 2020 Preparation and Scheduling of Operator Licensing Examinations ML19101A3582019-04-11011 April 2019 Operator Licensing Examination Approval 05000280/2019301 and 05000281/2019301 ML19100A2012019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for North Anna Power Station IR 05000338/20183012018-08-29029 August 2018 05000338/2018301 and 05000339/2018301 Post Exam Comments ML18137A4692018-05-17017 May 2018 301 Exam Administrative Items (ADAMS-2C) Delay Release 2 Years ML18137A4682018-05-17017 May 2018 301 Exam Final Items (ADAMS-2B) Delay Release 2 Years ML18137A4702018-05-17017 May 2018 301 Exam Administrative Items (ADAMS-2D) ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18128A3762018-04-25025 April 2018 Notification of Licensed Operator Initial Examination (05000280/2019301 and 05000281/2019301) ML17354B2892017-12-20020 December 2017 05000280/2017301, 05000281/2017301 Final RO Written Exam - Delay Release 2 Yrs ML17354B2952017-12-20020 December 2017 281/2017-301 Final SRO Written Exam - Delay Release 2 Yrs ML17354B2872017-12-20020 December 2017 05000280/2017301 05000281/2017301 Final Exam - Post Exam Comments ML17331A7042017-11-21021 November 2017 Notification of Licensed Operator Initial Examination 05000338/2018301 and 05000339/2018301 ML17299A1112017-10-23023 October 2017 Operator Licensing Written Examination Approval 05000280/2017301 and 05000281/2017301 ML17188A4572017-07-0707 July 2017 Exam Administrative Items 2C - Delay Release 2 Yrs ML17188A4562017-07-0707 July 2017 Exam Final Items 2B - Delay Release 2 Yrs ML17172A6922017-06-22022 June 2017 Section 1 - Draft Administrative Documents ML17172A7142017-06-21021 June 2017 Section 6 - Draft Administrative JPMs ML17172A7082017-06-21021 June 2017 Section 4 - North Anna 2016301 - Draft Simulator Scenarios ML17172A7262017-06-21021 June 2017 Section 12 - Final Administrative JPMs - North Anna Power Station ML17172A7252017-06-21021 June 2017 Section 11 - Final Sim in Plant JPMs ML17172A7182017-06-21021 June 2017 Section 7 - Final Admin Docs - North Anna ML17172A7202017-06-21021 June 2017 Section 10 - Final Simulator Scenarios - North Anna Power Station ML17172A7012017-06-21021 June 2017 Section 2 - North Anna 2016301 RO Written Draft - Delay Release 2 Years ML17172A7032017-06-21021 June 2017 Section 3 - North Anna 2016301 SRO Written Draft - Delay Release 2 Yrs ML17172A7112017-06-21021 June 2017 Section 5 - Draft Sim and in Plant JPMs ML17172A7272017-06-21021 June 2017 Section 14 - General Correspondence ML17142A2962017-05-17017 May 2017 Preparation and Scheduling of Operator Licensing Examinations ML17090A4562017-03-31031 March 2017 Notification of Licensed Operator Initial Examination (05000280/2017301 and 05000281/2017301) ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16214A3042016-08-0101 August 2016 0500033i8/2016301 and 05000339/20163001 Final SRO Written Exam - Delay Release ML16214A3022016-08-0101 August 2016 05000338/2016301 and 05000339/2016301 Final RO Written Exam - Delay Release ML16214A3012016-07-14014 July 2016 05000338/2016301 and 05000339/2016301 Post Exam Comments ML16173A1522016-06-16016 June 2016 Operator Licensing Written Examination Approval 050000338/2016301 and 050000339/2016301 ML16089A3882016-03-22022 March 2016 301Section 7 2023-05-31
[Table view] |
Text
Dominion Energy Services , Inc.
- l"* Dominion 5000 Dominion Blvd.
Glen Allen, VA 23060 DominionEnergy.com
'#,# Energy<<
June 4, 2020 Attn: Document Control Desk Serial No.: 20-214 United States Nuclear Regulatory Commission NRNKHB Washington, DC 20555-0001 Docket Nos.: 50-338/339 50-280/281 License Nos.: NPF-4/7 DPR-32/37 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION ENERGY VIRGINIA)
NORTH ANNA POWER STATION UNITS 1 AND 2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULA TORY ISSUE
SUMMARY
2020-01 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2020-01, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs) .
No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. Craig Sly at (804) 273-2784.
Sincerely,
~-
Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support Dominion Energy Services, Inc.
Enclosures:
- 1. NRC Form 536 for North Anna
- 2. NRC Form 536 for Surry Commitments made by this letter: None
SN 20-214 Scheduling of Operator Licensing Examinations Page2 of2 cc: U. S. Nuclear Regulatory Commission Region I ATTN: Operations Branch 2100 Renaissance Boulevard Suite 100 King of Prussia, Pennsylvania 19406-2713 U. S. Nuclear Regulatory Commission Region II ATTN: Operations Branch Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. G. Edward Miller NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 E-3 11555 Rockville Pike Rockville, MD 20852-2738 Vaughn Thomas NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail.Stop 04 F-12 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station
Serial No 20-214 Enclosure 1 NRC Form 536 for North Anna Power Station
(11-2011)
F.,.....
NRC FDRll 538
\
, ~
I U.S. NUCLEAR ltEGULATOltY COMMISSION OPERATOR LICENSING EXAMINATION DATA APMCM!D IIY 019: NO. 31504131 ll!lCPUIR;11'3fl2020
_ _ Plf_........,..,,til-..Yirt--~1-- lllil
_i-- _.,. _ -lo,Pllr!lulgllsllll-fortpOA!ar<<a-
_ lo111t._ _ _ _ U-2Rll.Wl.llxlw
~eo.iialanW..-~.art,f.,...lo-~91'(
Dlllcmi:o( Cllad-...SlllfiayMD. NEllll-lllll'l. plS)Ol3tlClla idMngt-'Mlllulgo!.Wllltdon,DC 2llll!. r ---lo-*-
~--nll'1ilpllly1Cllldf_OIIS_,....lbtNIC-,nll_.,_
...i,_,;,no1.....,1o,_,i1o,hi11'-colelon.
FACILITY NflCREGION I Nol"th.Anna Power Station Units l & 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE II Regionll I
!'PIOl"OSED NUMBER ESTIMATED NUMBER OF I
CY 22 CY .23 CY* 24
-- CY 25 i.l~=:EQ I ESTIMATED NUMBER OF NR_c-"PREPAllEO 1:)(1\MINATIONS
- 8. INITIAL OPERATOR LICENSE EXAMINATIONS CY22 '
PR91;'0SED NUMBER CY .23 CY24 CY 25 i'!l.!MB.ER.O.F REACTOR Of'ERATORS 4 6 NUMBER OF SENIOR.R~C'TOR OPERATORS- INSTANT 3 2 NUMBER OF SENIOR REACTOR
. OPERATORS-~ l.!PGRAflE 2 2 NUMBER OF SENIO~ REACTQ~
OPERATORS- LIMITED PROPOSED DATES PRIMARY DATE 06/06/22 06/10/24 AL'ft:Ri',jATE DATE 06/13/22 06/17/24 NRC F.ORM 536 (11~7)
Enclosure 1
SN 20-214 Enclosure 2 NRC Form 536 for Surry Power Station
NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3151M1131 EXPIRES: 11l3012020 (11-2017)
~-"<. Eslimaled burden per response ID corqily will !Ills valtmlaiy !nfonnalfan collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This OPERATOR LICENSING
.I ~'
inlillmation collection Is used ID plan budgets and l8SGIJIC8S fur operator exanilatians. Send I; .. comments ~ bun1en estimate ID the lrdanllatioll Seiw:es Brandl (T-2 F43), U.S. Nudear EXAMINATION DATA Regulalaiy Ccmmlsslon, washlnglDD, llC211555-0001, er by e-mail ta lnfocollecls.Rerrc.gc,,,
"""~.........l and ID the Desk Officer, Ollice of lnfamlallon and Regulalnly Alralis, NEOB-10202, (3150,0131), Office of Management and Budget, Washington, DC 20503. If a means used lo inpose an inbmalion coUeclion does not display a CU!18nltt valid OMll conlrol l'IJlllber, Ille NRC ffl8'/ notCllllductcr sponsor, aula pelSOl'I lsnotreq11redta 1'SPOIKI la, the infClmallon colec1i0n.
FACILITY
~urry Power Station A. PROPOSED EXAMINATION PREPARATION SCHEDULE
,~ NRCREGION I
PROPOSED NUMBER CY2022 CY 2023 cv2024 CY2025 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS
- 8. INITIAL OPERATOR LICENSE EXAMINATIONS CY2023 CY2034 CY2025 PROPOSED NUMBER CY2022 NUMBER OF REACTOR OPERATORS 11 11 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 3 3 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 PROPOSED DATES PRIMARY DATE 8/21/2023 8/18/2025 ALTERNATE DATE 8/28/2023 8/25/2025 NRC FORM 536 (11*2017)