ML16007A492
ML16007A492 | |
Person / Time | |
---|---|
Site: | Surry |
Issue date: | 01/07/2016 |
From: | Division of Reactor Safety II |
To: | Virginia Electric & Power Co (VEPCO) |
References | |
Download: ML16007A492 (152) | |
Text
Final JPM A Surry 2015-301 Emergency Borate AP-3.00 U.S. Nuclear Regulatory Commission Surry Power Station SR15301 Simulator Job Performance Measure [KA: 024AA1.17 3.9/3.9]
[Alternate Path]
Applicant________________________________ Start Time___________________
Examiner_______________________________
Date ___________________________________ Stop Time___________________
Title Emergency Borate the RCS in accordance with 1-AP-3.00, Emergency Boration K/A: 024AA1.17, Ability to operate and / or monitor the following as they apply to Emergency Boration:
Emergency borate control valve and indicators (3.9 / 3.9).
Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 10 Minutes ___ Minutes Conditions
- Task is to be PERFORMED in the simulator.
Standards
- 1-AP-3.00, Emergency Boration, Rev 5.
Initiating Cues
- 1-AP-3.00, Emergency Boration.
- Shift Manager Direction.
Terminating Cues
- Emergency Boration, Step 2 b) RNO completed.
Procedures
- 1-AP-3.00, Emergency Boration, Revision 5.
Tools and Equipment Safety Considerations
- None
- None Page 1 of 8
Surry 2015-301 Emergency Borate AP-3.00 Simulator Setup
- Recall 100% power IC and initialize or recall IC-261. Place simulator in RUN.
- Set 1-CH-MOV-1350 to thermal on auto trigger when .001 open. CH73 Trigger 1, Auto Trigger Event CHMOV350
.ge. 0.0001.
- Insert meter Override CHFI110, EMRG BORATE FLOW, 0, ACTIVE.
- Trip Reactor and Stabilize at Hot Shutdown.
- Adjust CH flow using 1-CH-LC-1459G to 50 gpm and return to Auto.
Directions to be read to the Operator:
Initiating Conditions
- You are the Unit 1 RO and I am the Shift Manager. Unit 1 tripped approximately 10 minutes ago. The STA just informed the Team that we have a potential challenge to our shutdown margin requirements and has recommended a two (2) minute emergency boration.
Initiating Cues
- Here is a copy of 1-AP-3.00, Emergency Borate. I need you to Emergency Borate for two (2) minutes in accordance with 1-AP-3.00.
- When you finish the actions necessary to accomplish this, please inform me.
Notes Page 2 of 8
Surry 2015-301 Emergency Borate AP-3.00 PERFORMANCE CHECKLIST Notes to the Evaluator
- Task critical elements are bolded and denoted as a CRITICAL STEP.
- An additional instructor may be needed to silence alarms for the examinee.
- START TIME_______:
STEP 1, 1-AP-3.00:
_______ SAT STEP 1, NOTES Prior to Step 1
_______ UNSAT STANDARD:
a) Acknowledges Note 1: If a Reactor Trip occurs or is required, 1-E-0, REACTOR TRIP OR SAFETY INJECTION, should be implemented.
b) When the Reactor is shutdown with the Shutdown Banks withdrawn, tripping the Shutdown Banks may eliminate the need for emergency boration.
EVALUATORS NOTE:
NONE COMMENTS:
STEP 1, 1-AP-3.00:
_______ SAT STEP 2, CHECK CHARGING FLOW - GREATER THAN 75 GPM
_______ UNSAT STANDARD:
a) Checks CHG Line Flow on 1-CH-FI-1122A and identifies flow < 75 gpm.
b) Goes to Step 1 RNO c) Manually adjusts charging flow to greater than 75 gpm.
- Using 1-CH-LC-1459G, PRZR LEVEL CNTRL, in Manual -OR-
- Using 1-CH-FCV-1122, CHG FLOW CNTRL in Manual EVALUATORS NOTE:
NONE.
COMMENTS:
Page 3 of 8
Surry 2015-301 Emergency Borate AP-3.00 STEP 2 a) , 1-AP-3.00:
_______ SAT STEP 3 START EMERGENCY BORATION
_______ UNSAT STANDARD:
a) Transfer the in-service BATP to FAST.
- Places control switch for 1-CH-P-2A, Boric Acid Transfer Pump to FAST.
- Identifies RED Slow Light - OUT; RED FAST light - LIT
- Acknowledges Annunciator 1D-C5, BA XFER PPS NON-AUTO CONT.
EVALUATORS NOTE:
NONE.
COMMENTS:
STEP 2 b), 1-AP-3.00:
_______ SAT STEP 4 START EMERGENCY BORATE
_______ UNSAT STANDARD:
a) Open 1-CH-MOV-1350.
- Removes Brass Cap on 1-CH-MOV-1350 control switch and places in OPEN position.
- Identifies RED and GREEN MOV Indicating lights extinguish.
- Identifies 0 indicated flow on 1-CH-FI-1110, EMRG BORATE FLOW indicator.
- Reports trip indication for 1-CH-MOV-1350 to Evaluator.
EVALUATORS NOTE:
When Notified: Acknowledge 1-CH-MOV-1350 indication report.
IF asked: Will direct electricians to investigate MCC 1H1-2S 7C breaker status.
BOOTH OPERATOR:
IF Asked: Report that a time compression has occurred and 1-CH-P-2A breaker MCC-1H1-2S 7C Thermal Overload is tripped.
COMMENTS:
Page 4 of 8
Surry 2015-301 Emergency Borate AP-3.00 STEP 2 b) RNO, 1-AP-3.00:
_______ SAT STEP 5 START EMERGENCY BORATION
_______ UNSAT STANDARD:
a) Directs Auxiliary Building Operator to locally open 1-CH-MOV-1350, Emergency Borate MOV.
b) Acknowledges Statement IF 1-CH-MOV-1350 can NOT be opened, then do the following:
c) Manually open 1-CH-FCV-1113A.
- Checks 1-CH-FCV-1113A indicates open.
- Places 1-CH-FCV-1113A control switch in OPEN.
d) Directs Auxiliary Building Operator to Open 1-CH-228.
e) Monitors for Boric Acid flow on FR-1-1113 (red trace).
f) Acknowledge Statement IF neither valve can be opened, THEN manually align CHG pump suction to the RWST AND GO TO Step 5.
g) Opens 1-CH-MOV-1115B AND 1-CH-MOV-1115D, CH Pump Suction from RWST; and Closes 1-CH-MOV-1115C AND 1-CH-MOV1115E, CH Pump Suction From VCT. CRITICAL STEP: Either 1-CH-MOV-1115B OR 1-CH-MOV-1115D OPEN will provide the necessary flowpath to the CH Pump; 1-CH-MOV-1115C OR 1-CH-MOV-1115E CLOSED will isolate the CH pump suction from the VCT.
h) Goes to Step 5.
EVALUATORS NOTE:
Acknowledge Candidate Reports.
If asked: substep b): STA will recalculate time of boration, please continue.
If asked: substep f): STA will recalculate time of boration, please continue.
BOOTH OPERATOR:
If Directed: Report that a Time Compression has occurred and MCC 1H1-2S 7C breaker is open.
When Directed: Report that a Time Compression has occurred and 1-CH-MOV-1350 motor will not disengage, and the handwheel will not move.
When Directed: Report that a Time Compression has occurred and 1-CH-228 handwheel spins without changing valve stem position.
COMMENTS:
Page 5 of 8
Surry 2015-301 Emergency Borate AP-3.00 STEP 6 _______ SAT STANDARD: _______ UNSAT a) Reports to Supervisor (Evaluator) that Charging has been aligned to the RWST in accordance with 1-AP-3.00.
EVALUATORS NOTE:
Wait two (2) minutes with flow from the RWST to see if the Candidate secures boration.
The following Steps of 1-AP-3.00, through Step 9, can be used to assess if the Candidate shifts charging pump suction back to the VCT on Step 9 of 1-AP-3.00.
COMMENTS:
-- END OF JPM --
Step 5, 1-AP-3.00
_______ SAT STEP 7
_______ UNSAT STANDARD:
a) Checks Unit - At power. (No).
b) Goes to Step 8.
EVALUATORS NOTE:
None COMMENTS:
Page 6 of 8
Surry 2015-301 Emergency Borate AP-3.00 Step 8, 1-AP-3.00 STEP 8 STANDARD:
a) Acknowledges note prior to Step 8: concerning boration has raised the boric acid concentration to the RCP seals.
b) Charging flow control - in AUTO.
Candidate may place charging flow in AUTO.
c) Charging Flow Stable.
Candidate monitors Charging flow and returns to manual if required.
EVALUATORS NOTE:
NONE.
COMMENTS:
Step 9, 1-AP-9.00
_______ SAT Step 9
_______ UNSAT STANDARD:
a) Check Charging pump suction aligned to the VCT Candidate may align charging pump suction to the VCT.
Opens 1-CH-MOV-1115C and E.
Closes 1-CH-MOV1115B and D.
EVALUATORS NOTE:
Wait two (2) minutes with flow from the RWST to see if the Candidate secures boration.
A follow-up question may be required if Candidate secures boration.
COMMENTS:
STOP TIME:
Page 7 of 8
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Task
- Task is to be performed in the simulator.
- Emergency Borate the RCS in accordance with 1-AP-3.00, Emergency Boration.
Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.
Initiating Conditions
- You are the Unit 1 RO and I am the Shift Manager. Unit 1 tripped approximately 10 minutes ago. The STA just informed the Team that we have a potential challenge to our shutdown margin requirements and has recommended a two (2) minute emergency boration.
Initiating Cues
- Here is a copy of 1-AP-3.00, Emergency Borate. I need you to Emergency Borate for two (2) minutes in accordance with 1-AP-3.00.
- When you finish the actions necessary to accomplish this, please inform me.
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initiating Conditions
- You are the Unit 1 RO and I am the Shift Manager. Unit 1 tripped approximately 10 minutes ago. The STA just informed the Team that we have a potential challenge to our shutdown margin requirements and has recommended a two (2) minute emergency boration.
Initiating Cues
- Here is a copy of 1-AP-3.00, Emergency Borate. I need you to Emergency Borate for two (2) minutes in accordance with 1-AP-3.00.
- When you finish the actions necessary to accomplish this, please inform me.
Final JPM B Surry 2015-301 JPM b, M/U to RWST U.S. Nuclear Regulatory Commission Surry Power Station SR15301 Simulator Job Performance Measure SYS004.A2.13 (3.6/3.9)
Applicant________________________________ Start Time___________________
Examiner_______________________________
Date ___________________________________ Stop Time___________________
Title MAKEUP TO RWST FROM BLENDER K/A: SYS004A2.13, Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Low RWST. (3.6 / 3.9)
Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 10 Minutes ___ Minutes Conditions
- Task is to be PERFORMED in the simulator.
- Restore RWST to clear low level alarm in accordance with 1-OP-CS-004, Refueling Water Storage Tank Makeup.
Initiating Cues
- I am the Shift Manager and you are the Unit RO.
- I need you to makeup 5000 gal. to the RWST, using the blender in accordance with 1-OP-CS-004, Refueling Water Storage Tank Makeup, steps 5.1.5 through 5.1.29.
- Blender settings for makeup to RWST have been determined to be: 80 gpm for PG (POT setting of 5.4), and 16.9 gpm for Boric Acid (POT setting of 7.6).
- When you finish the actions necessary to accomplish this task, please inform me.
Terminating Cues
Procedures
- 1-OP-CS-004, Refueling Water Storage Tank Makeup, Rev. 16.
Page 1 of 20
Surry 2015-301 JPM b, M/U to RWST Simulator Setup
- After alarm set CS-10 to 0.
- SET BA and PG integrators to 0 before each JPM.
Initial Conditions
- Unit 1 is operating at 100%.
- BAST A is at 8.0 % concentration.
Initiating Cues
- I am the Shift Manager and you are the Unit RO.
- I need you to makeup 5000 gal. to the RWST, using the blender in accordance with 1-OP-CS-004, Refueling Water Storage Tank Makeup, steps 5.1.5 through 5.1.29.
- Blender settings for makeup to RWST have been determined to be: 80 gpm for PG (POT setting of 5.4), and 16.88 gpm for Boric Acid (POT setting of 7.6).
- When you finish the actions necessary to accomplish this task, please inform me.
Page 2 of 20
Surry 2015-301 JPM b, M/U to RWST PERFORMANCE CHECKLIST Notes to the Evaluator
- Task critical elements are bolded and denoted as CRITICAL STEP.
- An additional instructor may be needed to silence and acknowledge alarms for the examinee.
- START TIME_______:
STEP 1:
_______ SAT Record the following blender setpoints for a return to service reference. BA FLOW CONTR_____ PRI WTR FLOW CONTR (Step 5.1.5) _______ UNSAT STANDARD:
a) Operator records current POT settings for BA and PG controllers; 1-CH-FC-1113A, and 1-CH-FC-1114.
EVALUATORS NOTE:
COMMENTS:
STEP 2:
_______ SAT Place the MAKE-UP MODE CONTR switch to STOP to prevent automatic actuation of blender. (Step 5.1.6) _______ UNSAT STANDARD:
b) Operator places Makeup Mode Control switch to STOP.
EVALUATORS NOTE:
COMMENTS:
Page 3 of 20
Surry 2015-301 JPM b, M/U to RWST STEP 3:
_______ SAT Place or check the following control switches for the following valves in CLOSE. (Step 5.1.7)
_______ UNSAT
- a. 1-CH-FCV-1113A, Boric Acid to Blender.
- b. 1-CH-FCV-1113B, Blender to Chg Pump.
- c. 1-CH-FCV-1114B, Blender to VCT.
STANDARD:
- Closes 1-CH-FCV-1113A, Boric Acid to Blender.
- Closes 1-CH-FCV-1113B, Blender to Chg Pump. CRITICAL STEP.
- Closes 1-CH-FCV-1114B, Blender to VCT. CRITICAL STEP.
EVALUATORS NOTE:
Closing 1-CH-FCV-1113B, and 1-CH-FCV-1114B are critical steps to ensure flow is not directed to the VCT.
COMMENTS:
STEP 4:
_______ SAT Open or check open 1-CH-208, Boric Acid Blender 1 Outlet Isol. (Step 5.1.8)
Open or check open 1-CH-210, Boric Acid Blender 1 Outlet Hdr. Isol. (Step 5.1.9) _______ UNSAT Open or check open 1-CH-391, Boric Acid Blender 1 Outlet to RWST. (Step 5.1.10)
Close or check closed 1-FC-71, U1 RWST Retun Isol. (Step 5.1.11)
STANDARD:
a) Operator contacts NLO on gaitronics and directs opening 1-CH-208, 1-CH-210, and 1-CH-391. Directing the NLO to open 1-CH-208, 1-CH-210, and 1-CH-391 is a critical step. CRITICAL STEP.
EVALUATORS NOTE:
- This step is critical in order to establish a flow path to the RWST. 1-FC-71 is not critical because it is normally closed and that is desired position.
BOOTH OPERATORS NOTE:
Insert Trigger 1 to open valves to establish flow path to RWST after receiving direction to open 1-CH-208, 1-CH-210, and 1-CH-391. Use time compression, and report completion of valve manipulations to the operator.
COMMENTS:
Page 4 of 20
Surry 2015-301 JPM b, M/U to RWST STEP 5:
_______ SAT Set the BA SUP BATCH INTEGRATOR and the PRI WTR BATCH INTEGRATOR for the required amount of makeup. If the integrators will NOT be used, THEN enter N/A _______ UNSAT (Step 5.1.12 )
STANDARD:
a) Operator sets BA BATCH INTEGRATOR and the PRI WTR BATCH INTEGRATOR high enough to add approximately 5000 gal.
EVALUATORS NOTE:
This operator should set both integrators to approx. 5000 gal or out of the way to allow 5,000 gal of blended flow to be added.
COMMENTS:
STEP 6:
_______ SAT Set the BA FLOW CONTR and the PRI WTR FLOW CONTR for the required concentration of makeup. (Step 5.1.13) _______ UNSAT STANDARD:
a) Operator sets the PRI WTR FLOW CONTR (PG) to 80 gpm on 1-CH-FC-1114; Dial setting 5.4 (5.3-5.5). CRITICAL STEP.
b) Operator sets BA FLOW CONTR for 16.88 gpm; Dial setting 7.6 (7.5 to 7.7).
CRITICAL STEP.
EVALUATORS NOTE:
BOOTH NOTE: Record POT setting for BA and PG. BA____, PG____.
COMMENTS:
Page 5 of 20
Surry 2015-301 JPM b, M/U to RWST STEP 7:
_______ SAT Place the MAKE-UP MODE SEL switch to the MANUAL position (Step 5.1.14)
_______ UNSAT STANDARD:
a) Operator places the MAKE-UP MODE SEL switch to the MANUAL position.
CRITICAL STEP.
EVALUATORS NOTE:
- This step is necessary to ensure the proper flow path from the blender to the RWST.
COMMENTS:
STEP 8:
_______ SAT Place the control switch for 1-CH-FVC-1113A, BORIC ACID TO BLENDER, to AUTO. (Step 5.1.16) _______ UNSAT STANDARD:
a) Operator places 1-CH-FVC-1113A, BORIC ACID TO BLENDER, to AUTO.
CRITICAL STEP.
EVALUATORS NOTE:
- This step is necessary to ensure 1-CH-FCV-1113A modulates at the set flow rate.
- After CH-FCV-1113A is placed in AUTO, the integrator will begin to count and Boric Acid will begin to flow. This is because a flow path has been established.
COMMENTS:
Page 6 of 20
Surry 2015-301 JPM b, M/U to RWST STEP 9:
_______ SAT Start the makeup by placing the MAKE-UP MODE CONTR switch to the START position.
(Step 5.1.17) _______ UNSAT STANDARD:
a) Operator places the MAKE-UP MODE CONTR switch to the START position.
CRITICAL STEP.
EVALUATORS NOTE:
- This step is necessary to initiate the blended flow to the RWST.
COMMENTS:
STOP TIME __________:
Page 7 of 20
Surry 2015-301 JPM b, M/U to RWST Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Initial Conditions
- Unit 1 is operating at 100%.
- BAST A is at 8.0 % concentration.
Initiating Cues
- I am the Shift Manager and you are the Unit RO.
- I need you to makeup 5000 gal. to the RWST, using the blender in accordance with 1-OP-CS-004, Refueling Water Storage Tank Makeup, steps 5.1.5 through 5.1.29.
- Blender settings for makeup to RWST have been determined to be: 80 gpm for PG (POT setting of 5.4), and 16.88 gpm for Boric Acid (POT setting of 7.6).
- When you finish the actions necessary to accomplish this task, please inform me.
Page 8 of 20
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions
- Unit 1 is operating at 100%.
- BAST A is at 8.0 % concentration.
Initiating Cues
- I am the Shift Manager and you are the Unit RO.
- I need you to makeup 5000 gal. to the RWST, using the blender in accordance with 1-OP-CS-004, Refueling Water Storage Tank Makeup, steps 5.1.5 through 5.1.29.
- Blender settings for makeup to RWST have been determined to be: 80 gpm for PG (POT setting of 5.4), and 16.88 gpm for Boric Acid (POT setting of 7.6).
- When you finish the actions necessary to accomplish this task, please inform me.
Final JPM C Surry 2015-301 Spurious CS Actuation U.S. Nuclear Regulatory Commission Surry Power Station SR10301 Simulator Job Performance Measure EPEE02EA1.3 (3.8/4.0)
Applicant________________________________ Start Time___________________
Examiner_______________________________
Date ___________________________________ Stop Time___________________
Title RESPOND TO A SPURIOUS CS ACTUATION.
K/A: EPEE02EA1.3, Ability to operate and / or monitor the following as they apply to the (SI Termination),
Desired operating results during abnormal and emergency situations. (3.8 / 4.0).
Applicability Estimated Time Actual Time RO/SRO(I) 10 minutes Initial Conditions
- Task is to be PERFORMED in the simulator.
- Spurious CS actuation has occurred at HSD.
Standards
- Applicant directs actions to secure 1-CS-P-1B, close discharge MOVs 1-CS-MOV-101C, D from field / MCR.
Initiating Cues
- I am the Shift Manager and you are the Unit RO.
- Unit 1 is at Hot Shutdown.
- There are NO personnel in Unit 1 containment.
- An inadvertent CS actuation occurred and we have received annunciators 1B-A6 and 1B-B6.
- Heres a copy of annunciator response 1B-A6. I need you to perform Attachment 1 of ARP 1B-A6, steps 1 - 6 only.
- When you finish the actions necessary to complete steps 1-6 of Attachment 1, please inform me.
Page 1 of 9
Surry 2015-301 Spurious CS Actuation Terminating Cues
- 1B-A6 Attachment 1, steps 1-6 complete.
Procedures
Tools and Equipment Safety Considerations
- None
- None Page 2 of 9
Surry 2015-301 Spurious CS Actuation Simulator Setup
- Recall IC-263 OR
- Call up HSD IC and initialize.
- Start 1-CS-P-1A/1B, freeze simulator, green flag both pumps and then place simulator in run.
- Open 1-CS-MOV-101A-D.
- Implement the following overrides to prevent 1-CS-P-1B from being secured from MCR and 1-CS-MOV-101C/D from closing with control switch: MOVCS101C_OPEN & MOVCS101D_OPEN to ON, CSP1B_STOP &
CSP1B_LOCK to OFF.
- Place the following Remotes on triggers: CSMOV101C & CSMOV101D to rack-out, CSMOV101C & CSMOV101D manual valves to 0% (closed).
Initial Conditions
- Spurious CS actuation has occurred at HSD.
Initiating Cues
- I am the Shift Manager and you are the Unit RO.
- Unit 1 is at Hot Shutdown.
- There are NO personnel in Unit 1 containment.
- An inadvertent CS actuation occurred and we have received annunciators 1B-A6 and 1B-B6.
- Heres a copy of annunciator response 1B-A6. I need you to perform Attachment 1 of ARP 1B-A6, steps 1 - 6 only.
- When you finish the actions necessary to complete steps 1-6 of attachment 1, please inform me.
Page 3 of 9
Surry 2015-301 Spurious CS Actuation PERFORMANCE CHECKLIST Notes to the Evaluator
- Task critical elements are bolded and noted as CRITICAL STEP.
- An additional instructor may be needed to silence alarms for the examinee.
- START TIME:
STEP 1:
_______ SAT STEP 1 - Check reset or reset HI HI CLS signal.
_______ UNSAT STANDARD:
- Checks annunciators 1B-C4 (CLS HI HI TR A) and 1B-C5 (CLS HI HI TR B) are not lit.
EVALUATORS NOTE:
Candidate May depress CLS Reset Pushbuttons, Annunciator 1B-A4, CLS SYS COIL FAILURE will be received.
COMMENTS:
STEP 2:
_______ SAT STEP 2 - Place control switch(es) for running CS pump(s) in PTL.
_______ UNSAT
- 1-CS-P-1A
- 1-CS-P-1B STANDARD:
- Places control switch 1-CS-P-1A in PTL and verifies zero amps. CRITICAL STEP.
- Places control switch for 1-CS-P-1B in PTL.
- Recognizes 1-CS-P-1B did NOT stop by observing red light on and amps indicated.
EVALUATORS NOTE: N/A COMMENTS:
Page 4 of 9
Surry 2015-301 Spurious CS Actuation STEP 3:
_______ SAT Step 3 - IF CS pump(s) will NOT stop from the MCR, THEN locally open supply breaker(s): _______ UNSAT
- 1-CS-P-1A, 14H-5
- 1-CS-P-1B, 14J-5 STANDARD:
- Directs Operator to locally open supply breaker 1-CS-P-1B supply breaker 14J-5.
CRITICAL STEP.
- When local operator reports 14J-5 is open, recognizes breaker for 1-CS-P-1B is open (red light off).
EVALUATORS NOTE: N/A BOOTH OPERATORS NOTE: Trigger 1, locally opens 1-CS-P-1B breaker. When directed to locally open 14J-5, inform the candidate that a time compression has occurred and 14J-5 is open.
COMMENTS:
STEP 4:
_______ SAT Note prior to Step 4
_______ UNSAT NOTE: The CS Pump Discharge MOVs will not close if the HI HI CLS signal is present.
STANDARD:
- Acknowledges note.
EVALUATORS NOTE: N/A COMMENTS:
Page 5 of 9
Surry 2015-301 Spurious CS Actuation STEP 5:
_______ SAT Step 4 - Verify closed or close CS PUMP DISCH MOV(s):
_______ UNSAT
- 1-CS-MOV-101A
- 1-CS-MOV-101B
- 1-CS-MOV-101C
- 1-CS-MOV-101D STANDARD:
- Closes 1-CS-MOV-101A (red light off, green light on). CRITICAL STEP
- Closes 1-CS-MOV-101B (red light off, green light on). CRITICAL STEP
- Closes 1-CS-MOV-101C (red light off, green light on)
- Recognizes 1-CS-MOV-101C did NOT close
- Closes 1-CS-MOV-101D (red light off, green light on)
- Recognizes 1-CS-MOV-101D did NOT close EVALUATORS NOTE: N/A COMMENTS:
Page 6 of 9
Surry 2015-301 Spurious CS Actuation STEP 6:
_______ SAT Step 5 - IF CS PUMP DISCH MOV(s) will NOT close, THEN do the following:
_______ UNSAT
- a. Send an Operator to Unit 1 Cable Vault and an Operator to Unit 1 Safeguards.
- b. Direct Operator in Unit 1 Cable Vault to open MOV supply breaker(s) for MOV(s) which will not close.
- 1-CS-MOV-101A, 1H1-2S-1A
- 1-CS-MOV-101B, 1J1-2W-5A
- 1-CS-MOV-101C, 1H1-2S-2B
- 1-CS-MOV-101D, 1J1-2W-4A
- c. WHEN breaker(s) open, THEN have Operator in Safeguards locally close affected MOV(s).
STANDARD:
- Directs Operator to locally open breaker for 1-CS-MOV-101C, 1H1-2S-2B.
- Directs Operator to locally open breaker for 1-CS-MOV-101D, 1J1-2W-4A.
- Once breakers reported open, directs local closure of 1-CS-MOV-101C and 1-CS-MOV-101D. CRITICAL STEP.
EVALUATORS NOTE:
Follow-up question is warranted if Candidate directs 1-CS-MOV-101C and 1-CS-MOV-101D are directed to be closed without power supply breaker opened (bullet 1 and 2 above).
Booth Operator: When called to locally open 1-EP-BKR-1H1-2S-2B & 1-EP-BKR-1J1-2W-4A, implement Triggers 3 & 5 and inform the candidate that a time compression has occurred and 1-EP-BKR-1H1-2S-2B & 1-EP-BKR-1J1-2W-4A are open.
Repeat direction if incorrect breaker mark number is given to field operator; IF incorrect, DO NOT implement Trigger 3 & 5.
Booth Operator: When called to locally close 1-CS-MOV-101C & 1-CS-MOV-101D, implement trigger 7 and inform the candidate that a time compression has occurred and 1-CS-MOV-101C & 1-CS-MOV-101D are closed. Repeat direction if incorrect valve mark number is given to field operator; IF incorrect, DO NOT implement Trigger 7.
COMMENTS:
Page 7 of 9
Surry 2015-301 Spurious CS Actuation STEP 7:
_______ SAT Step 6 - Verify closed or close CHEM ADD TK OUTLET MOVs:
_______ UNSAT
- 1-CS-MOV-102A
- 1-CS-MOV-102B STANDARD:
- Verifies 1-CS-MOV-102A and 1-CS-MOV-102B closed by observing red light off and green light on.
EVALUATORS NOTE: N/A COMMENTS:
STEP 8:
_______ SAT REPORT TO SHIFT SUPERVISOR (EVALUATOR).
_______ UNSAT STANDARD:
Verbal status report that Attachment 1 of Annunciator response 1B-A6, steps 1-6 are complete.
EVALUATORS NOTE: N/A COMMENTS:
STOP TIME:
Page 8 of 9
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Task
- Task is to be performed in the simulator.
Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task Initial Conditions
- Spurious CS actuation has occurred at HSD.
Initiating Cues
- I am the Shift Manager and you are the Unit RO.
- Unit 1 is at Hot Shutdown.
- There are NO personnel in Unit 1 containment.
- An inadvertent CS actuation occurred and we have received annunciators 1B-A6 and 1B-B6.
- Heres a copy of annunciator response 1B-A6. I need you to perform Attachment 1 of ARP 1B-A6, steps 1-6 only.
- When you finish the actions necessary to complete steps 1-6 of Attachment 1, please inform me.
Operator Directions Handout
(TO BE GIVEN TO APPLICANT)
Initial Conditions
- Spurious CS actuation has occurred at HSD.
Initiating Cues
- I am the Shift Manager and you are the Unit RO.
- Unit 1 is at Hot Shutdown.
- There are NO personnel in Unit 1 containment.
- An inadvertent CS actuation occurred and we have received annunciators 1B-A6 and 1B-B6.
- Heres a copy of annunciator response 1B-A6. I need you to perform Attachment 1 of ARP 1B-A6, steps 1 - 6 only.
- When you finish the actions necessary to complete steps 1-6 of Attachment 1, please inform me.
Final JPM D Surry 2015-301 JPM d, Bleed & Feed U.S. Nuclear Regulatory Commission Surry Power Station SR15301 Simulator Job Performance Measure [WE05EA1.1 4.1/4.0 ]
[Alternate Path]
Applicant________________________________ Start Time___________________
Examiner_______________________________
Date ___________________________________ Stop Time___________________
Title INITIATE RCS BLEED AND FEED HEAT REMOVAL (Faulted)
K/A: WE05EA1.1: Ability to operate and / or monitor the following as they apply to the Loss of Secondary Heat Sink: Components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features. (4.1/4.0)
Applicability Estimated Time Actual Time RO/SRO(I) 10 Minutes ___ Minutes Conditions
- Task is to be PERFORMED in the simulator.
- A loss of all FW has occurred from 100% power. 1-FR-H.1 has been implemented and 3 of 3 SG WR levels are less than 12%.
Standards
Initiating Cues
- Shift Manager direction.
Terminating Cues
- Report received that RCS bleed & feed established (1-FR-H.1 Step 19 completed).
Procedures
- 1-FR-H.1, Response to Loss of Secondary Heat Sink, Rev. 37.
Tools and Equipment Safety Considerations
- None
- None Page 1 of 15
Surry 2015-301 JPM d, Bleed & Feed Simulator Setup
- Insert the following malfunctions:
o Trigger 1: CN1201, CN1202, CN1203; Condensate Pump trips.
o Trigger 1: FW0701, FW0701; Aux FW pump trips.
o Trigger 1: FW1101, 100% deg.; Aux FW P-2 Impellor crack.
o After CN pump trips: FW3601, FW3602, FW3603, FW3604; Feedwater pump spurious trips.
o Override both Przr PORVs Fail to Open.
- Trip all 3 CN pumps, lockout 1-FW-P-3A and 3B, implement 100% degradation (impeller crack) for 1-FW-P-2, trip both MFW pumps, let the S/G levels decrease to < 10% WR, trip all 3 RCPs. Place simulator in Freeze.
Initial Conditions
- You are the Unit RO & I am the Shift Manager. There is a loss of secondary heat sink in progress on Unit 1 (MFW and AFW/AFW X-tie is unavailable).
- The Condensate System is unavailable and Unit 1 Safeguards is inaccessible so no low pressure makeup water source is available.
- Current conditions are 3 SG Wide Range levels less than 12% thereby meeting the criteria for performing RCS bleed and feed heat removal.
Initiating Cues
- Here's a copy of 1-FR-H.1, Steps 10 through 19. You are to initiate RCS bleed and feed heat removal IAW Steps 11 through 19 ONLY.
- When you finish the actions necessary to initiate RCS bleed and feed, please inform me.
Notes
- Operator is given copy of 1-FR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK, steps 10-19 during directions.
Page 2 of 15
Surry 2015-301 JPM d, Bleed & Feed PERFORMANCE CHECKLIST Notes to the Evaluator
- Task critical elements are bolded and denoted as a CRITICAL STEP.
- This is a Faulted JPM.
- Critical step sequencing requirements: Step 1 first, then 2.
- An additional instructor may be needed to silence and acknowledge alarms for the examinee.
- START TIME_______:
STEP 1:
_______ SAT CHECK FOR LOSS OF SECONDARY HEAT SINK. (Step 11)
_______ UNSAT STANDARD:
a) Confirms that Wide range level in at least 2 SGs are less than 12%. Proceeds to step 12.
EVALUATORS NOTE:
COMMENTS:
STEP 2:
_______ SAT CHECK STOPPED OR STOP ALL RCPS. (Step 12)
_______ UNSAT STANDARD:
a) Observes CAUTION prior to Step 12 regarding fact that Steps 12 - 19 must be performed quickly.
b) Notes that RCPs were previously secured.
EVALUATORS NOTE:
COMMENTS:
Page 3 of 15
Surry 2015-301 JPM d, Bleed & Feed STEP 3:
_______ SAT INITIATES SI. (Step 13)
_______ UNSAT STANDARD:
(a) Depresses SI Train A and/or Train B actuation pushbutton(s). CRITICAL STEP.
(b) Identifies annunciator 1A-F3/1A-F4, SI TRAIN A/B INITIATED [ ].
EVALUATORS NOTE:
- This step is sequence critical**
COMMENTS:
STEP 4:
_______ SAT CHECK RCS FEED PATH. (Step 14)
_______ UNSAT STANDARD:
a) Verifies HHSI flow to the cold legs indicated by observing the following instrumentation:
- FI-1961, FI-1962, and FI-1963 (individual loop FTs) and
- FI-1943 and FI-1943A (header flow) b) Checks all three Charging pumps are running by observing breaker indication (red light on & green off) and amps indicated EVALUATORS NOTE:
COMMENTS:
Page 4 of 15
Surry 2015-301 JPM d, Bleed & Feed STEP 5:
_______ SAT RESET BOTH TRAINS OF SI (TIME DELAY) (Step 15)
_______ UNSAT STANDARD:
a) Observes NOTE prior to Step 15 regarding reset of SI if actuation occurs after Step 15.
b) Depresses both SI RESET pushbuttons (after 60 seconds).
EVALUATORS NOTE:
COMMENTS:
STEP 6:
_______ SAT CHECK IF CLS CAN BE RESET. (Step 16)
_______ UNSAT STANDARD:
a) Checks CTMT pressure has not exceeded 17.7 psia, and proceeds to step 17.
EVALUATORS NOTE:
- If asked: Inform candidate that containment pressure has not exceeded 17.7 psia.
COMMENTS:
Page 5 of 15
Surry 2015-301 JPM d, Bleed & Feed STEP 7:
_______ SAT CHECK INSTRUMENT AIR AVAILABLE. (Step 17)
_______ UNSAT STANDARD:
a) Checks annunciator 1B-E6, IA LO HDR PRESS/IA COMPR 1 TRBL, not lit.
b) Checks at least one CTMT IA compressor running by observing running indication (red light on & green off) on either:
- 1-IA-C-4A or
- 1-IA-C-4B.
c) Checks 1-IA-TV-100 OPEN.
EVALUATORS NOTE:
COMMENTS:
Page 6 of 15
Surry 2015-301 JPM d, Bleed & Feed STEP 8:
_______ SAT ESTABLISH RCS BLEED PATH: (Step 18)
_______ UNSAT STANDARD:
a) Checks power available to PRZR PORV block valves by observing indicating lights lit for the following MOVs:
- 1-RC-MOV-1535 (red light on & green off).
- 1-RC-MOV-1536 (red light on & green off).
b) Verifies PRZR PORV block valves - BOTH OPEN (red light on & green off).
c) Opens PRZR PORV 1-RC-PCV-1455C by placing control switch to the OPEN position.
1-RC-PCV-1455C WILL NOT OPEN.
d) Checks 1-RC-PCV-1455C open indication received (red light on & green off).
Determines that 1-RC-PCV-1455C did not open.
e) Opens PRZR PORV 1-RC-PCV-1456 by placing control switch into the OPEN position.
1-RC-PCV-1456 WILL NOT OPEN.
f) Checks 1-RC-PCV-1456 open indication received (red light on & green off). Determines that 1-RC-PCV-1456 did not open.
EVALUATORS NOTE:
- Acknowledge that both Pressurizer PORVs did not open and indicate that you will dispatch operators and an electrician to investigate and that the operator should continue on in the procedure.
- **This step is sequence critical**
- If asked; provide OPMS keys.
COMMENTS:
Page 7 of 15
Surry 2015-301 JPM d, Bleed & Feed STEP 9:
_______ SAT CHECK ADEQUATE RCS BLEED PATH: (Step 19)
_______ UNSAT STANDARD:
a) Checks PRZR PORVs- BOTH OPEN (Note: If 1-RC-PCV-1456 was not opened in the previous step, the operator should open the PORV IAW the RNO). Operator determines that neither PORV will OPEN.
b) Performs STEP 19 RNO. Checks both PRZR block valves open.
c) Operator opens PRZR and Rx Head Vents.
d) Opens 1-RC-SOV-100A-2 by placing control switch to the OPEN position.
CRITICAL STEP.
e) Checks 1-RC-SOV-100A-2 open indication received (red light on & green off).
f) Opens 1-RC-SOV-100A-1 by placing control switch to the OPEN position.
CRITICAL STEP.
g) Checks 1-RC-SOV-100A-1 open indication received (red light on & green off).
h) Opens 1-RC-SOV-101A-2 by placing control switch to the OPEN position.
CRITICAL STEP. Checks 1-RC-SOV-101A-2 open indication received (red light on &
green off).
i) Opens 1-RC-SOV-101A-1 by placing control switch to the OPEN position.
CRITICAL STEP. Checks 1-RC-SOV-101A-1 open indication received (red light on &
green off).0 j) Recalls from directions that there are no low pressure water sources available and safeguards in inaccessible and goes to step 20.
EVALUATORS NOTE:
- If asked: Unit 1 Safeguards is inaccessible and no low pressure water source is available.
- The breakers for the B Train Head vents are Danger tagged OFF. Therefore only the A Train Head vents should be opened.
- When the operator goes to step 20, indicate that the BOP will perform Attachment 3.
COMMENTS:
Page 8 of 15
Surry 2015-301 JPM d, Bleed & Feed STEP 10:
_______ SAT REPORTS TO SHIFT MANAGER.
_______ UNSAT STANDARD:
a) Verbal status report made that RCS bleed and feed established.
EVALUATORS NOTE:
COMMENTS:
STOP TIME________________:
Page 9 of 15
Surry 2015-301 JPM d, Bleed & Feed Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Initial Conditions
- You are the Unit RO & I am the Shift Manager. There is a loss of secondary heat sink in progress on Unit 1 (MFW and AFW/AFW X-tie is unavailable).
- The Condensate System is unavailable and Unit 1 Safeguards is inaccessible so no low pressure makeup water source is available.
- Current conditions are 3 SG Wide Range levels less than 12% thereby meeting the criteria for performing RCS bleed and feed heat removal.
Initiating Cues
- Here's a copy of 1-FR-H.1, Steps 10 through 19. You are to initiate RCS bleed and feed heat removal IAW Steps 11 through 19 ONLY.
- When you finish the actions necessary to initiate RCS bleed and feed, please inform me.
Page 10 of 15
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions
- You are the Unit RO & I am the Shift Manager. There is a loss of secondary heat sink in progress on Unit 1 (MFW and AFW/AFW X-tie is unavailable).
- The Condensate System is unavailable and Unit 1 Safeguards is inaccessible so no low pressure makeup water source is available.
- Current conditions are 3 SG Wide Range levels less than 12% thereby meeting the criteria for performing RCS bleed and feed heat removal.
Initiating Cues
- Here's a copy of 1-FR-H.1, Steps 10 through 19. You are to initiate RCS bleed and feed heat removal IAW Steps 11 through 19 ONLY.
- When you finish the actions necessary to initiate RCS bleed and feed, please inform me.
Final JPM E Surry 2015-301 Secondary Transient U.S. Nuclear Regulatory Commission Surry Power Station SR15301 Simulator Job Performance Measure]
[Alternate Path]
Applicant________________________________ Start Time___________________
Examiner_______________________________
Date ___________________________________ Stop Time___________________
Title RESPOND TO A SECONDARY SYSTEM TRANSIENT.
K/A: SYS016A2.01, Detector Failure, 3.0/3.1.
Applicability Estimated Time Actual Time RO/SRO(I) 5 Minutes ___ Minutes Conditions
- Task is to be PERFORMED in the simulator.
- Unit is operating at 100% power with all systems normal and in automatic.
Standards
- 0-AP-53.00, Loss of Vital Instrumentation / Controls, Revision 21.
Initiating Cues
- Shift Manager direction.
Terminating Cues
- Report received that unit is stabilized and 0-AP-53.00 is completed.
Procedures
- 0-AP-53.00, Loss of Vital Instrumentation / Controls, Revision 21.
Tools and Equipment Safety Considerations
- None
- None Page 1 of 13
Surry 2015-301 Secondary Transient Simulator Setup
- Recall IC-265 or recall 100% power IC and initialize. Place simulator in RUN.
- Enter malfunction, FW1303, Ch III, A SG Fail Low, -1 Deg, 0 Sec Ramp, Trigger 1.
- Enter Switch Override, FW, FWFCV478_MANUAL, OFF, Active.
- Enter Switch Override, FW, FWFCV478_AUTO, ON, Active.
- Freeze Simulator until ready.
Initial Conditions
- You are the Unit 1 RO and I am the Shift Manager. The unit is operating at 100% power with all systems in automatic.
Initiating Cues
- You are to respond to a plant transient.
- When you finish the actions necessary to accomplish this task, please inform me.
Notes This failure will cause A SG Channel III NR level to fail low. A FRV will open, causing A SG NR on the two operable channels to rise. The A FRV will fail to shift to manual control, requiring the operator to throttle flow with the Feedwater isolation MOV to prevent a turbine trip/reactor trip on SG NR high high level.
Page 2 of 13
Surry 2015-301 Secondary Transient PERFORMANCE CHECKLIST Notes to the Evaluator
- Task critical elements are bolded and demoted as CRITICAL STEP.
- An additional instructor may be needed to silence alarms for the examinee.
- START TIME_______:
0-AP-53.00, Step 1
_______ SAT STEP 1: CHECK REDUNDANT INSTRUMENT CHANNEL(S) INDICATION - NORMAL.
_______ UNSAT STANDARD:
a) Identifies the affected SG using Steam Flow/Feed Flow mismatch annunciators, A SG Level trend, and/or A FRV demand.
b) Identifies Channel I and II A SG Normal; Channel III failed low.
EVALUATORS NOTE:
COMMENTS:
0-AP-53.00, Step 2
_______ SAT Step 2: PLACE AFFECTED CONTROL(S)/COMPONENT(S) IN MANUAL CONTROL AND STABILIZE PARAMETER USING REDUNDANT INDICATION _______ UNSAT STANDARD:
a) Attempts to place A FRV in manual.
c) Continues to hold control switch in close until A SG Feed flow is less than Steam flow, and A SG Level begins to trend towards 44%.
EVALUATORS NOTE:
JPM Failure Criteria. An automatic Turbine/Reactor trip due to untimely Candidate response to the event is considered a JPM Failure.
COMMENTS:
Page 3 of 13
Surry 2015-301 Secondary Transient Step 3 Reports completion of Immediate Steps of 0-AP-53.00 to Shift manager (Evaluator). _______ SAT STANDARD: _______ UNSAT a) Reports completion of Immediate Action Steps of 0-AP-53.00.
b) Reports A SG Feed flow is less than Steam Flow and NR level trending to Normal.
EVALUATORS NOTE:
None COMMENTS:
END OF JPM STOP TIME:
Page 4 of 13
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Task
- Task is to be performed in the simulator.
Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.
Initial Conditions
- You are the Unit 1 RO and I am the Shift Manager. The unit is operating at 100% power with all systems in automatic.
Initiating Cues
- You are to respond to a plant transient.
- When you finish the actions necessary to accomplish this task, please inform me.
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions
- You are the Unit 1 RO and I am the Shift Manager. The unit is operating at 100% power with all systems in automatic.
Initiating Cues
- You are to respond to a plant transient.
- When you finish the actions necessary to accomplish this task, please inform me.
Final JPM F Surry 2015-301 JPM f, Manual start CS U.S. Nuclear Regulatory Commission Surry Power Station SR15301 Simulator Job Performance Measure [WE14EA1.1 3.7/3.7]
Applicant________________________________ Start Time___________________
Examiner_______________________________
Date ___________________________________ Stop Time___________________
Title MANUALLY START CS PUMPS PER ATTACHMENT 1 OF E-0 K/A: WE14EA1.1: Ability to operate and / or monitor the following as they apply to the (High Containment Pressure): Components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features. [3.7/3.7]
Applicability Estimated Time Actual Time RO/SRO(I) 18 Minutes ___ Minutes Conditions
- Task is to be PERFORMED in the simulator.
- A Safety Injection has occurred from 100% power due to a LBLOCA.
Standards
- 1-E-0, Reactor Trip or Safety Injection, Attachment 1 completed.
Initiating Cues
- 1-E-0, Reactor Trip or Safety Injection, Attachment 1
- Shift Manager direction.
Terminating Cues
- 1-E-0, Reactor Trip or Safety Injection, Attachment 1 completed.
Procedures
- 1-E-0, Reactor Trip or Safety Injection, Attachment 1. Rev # 71.
Tools and Equipment Safety Considerations
- None
- None Page 1 of 19
Surry 2015-301 JPM f, Manual start CS Simulator Setup
- Call up saved IC (266) or
- Call up 100% power IC and initialize. Place simulator in RUN.
- Implement malfunction for failure of both CS pumps to auto start; CS1601, 1602.
- Implement malfunction for failure of 1-FW-MOV-150A to CLOSE; FW5501.
- Implement malfunction for failure of Aux FW pump P-3B to auto start; FW-49.
- Apply MINIFLOW RECIRC CRITERIA shut the charging mini-flow recircs (1-CH-MOV-1275A, B, C)
- Place simulator in freeze until JPM performance.
- VERIFY BRASS CAPS INSTALLED OVER HI-HI CLS ACTUATION PUSHBUTTONS AFTER EACH RESET.
- ENSURE ALL PCS SCREENS ARE RESET TO DISPLAY.
Initial Conditions
- I am the Shift Manager. A Safety Injection has occurred from 100% power due to a LBLOCA. The Immediate Actions of 1-E-0 have been performed.
- MINIFLOW RECIRC CRITERIA has been applied and the Team has closed the charging mini-flow recircs.
Initiating Cues
- Here is a copy of 1-E-0, Attachment 1. I need you to perform Attachment 1 of 1-E-0.
- When you finish the actions necessary to accomplish this, please inform me.
Notes
- Operator is given copy of 1-E-0, REACTOR TRIP OR SAFETY INJECTION, ATTACHMENT 1 during directions.
Page 2 of 19
Surry 2015-301 JPM f, Manual start CS PERFORMANCE CHECKLIST Notes to the Evaluator
- Task critical elements are bolded and denoted as CRITICAL STEP.
- An additional instructor may be needed to silence and acknowledge alarms for the examinee.
- START TIME_______:
STEP 1:
_______ SAT CHECK FW ISOLATION (Step 1)
_______ UNSAT STANDARD:
a) Verifies Feed Pump discharge MOVs - CLOSED. 1-FW-MOV-150A, and 1-FW-MOV-150B. 1-FW-MOV-150A red light lit, 1-FW-MOV-150B green light lit.
b) Operator finds that 1-FW-MOV-150A is still OPEN, and manually closes 1-FW-MOV-150A. CRITICAL STEP.
c) Verifies MFW pumps tripped.
d) Verifies Feed Reg valves CLOSED.
e) Verifies FW Bypass valves are CLOSED.
f) Verifies SG blowdown TVs are CLOSED.
EVALUATORS NOTE:
If operator reports that 1-FW-MOV-150A did not close then acknowledge report.
COMMENTS:
STEP 2:
_______ SAT VERFIES CTMT ISOLATION PHASE I. (Step 2)
_______ UNSAT STANDARD:
a) Verifies Phase I TVs closed.
b) Verifies 1-CH-MOV-1381 and 1-SV-TV-102A closed.
c) Verifies PAM isolations 1-DA-TV-103A and B closed.
EVALUATORS NOTE:
COMMENTS:
Page 3 of 19
Surry 2015-301 JPM f, Manual start CS STEP 3:
_______ SAT CHECK AFW PUMPS RUNNING. (Step 3)
_______ UNSAT STANDARD:
a) Verifies MD AFW pumps are running (1-FW-P-3A, 1-FW-P-3B), by observing pump breaker closed lights and ammeter indication.
b) Operator determines that 1-FW-P-3B is NOT running and manually starts 1-FW-P-3B. CRITICAL STEP.
c) Verifies TD AFW pump running, by observing pump pressure switch lights and steam flow indication (1-MS-FI-100).
EVALUATORS NOTE:
If operator reports that 1-FW-P-3B did not auto start, then acknowledge report.
COMMENTS:
STEP 4:
_______ SAT CHECK SI PUMPS RUNNING. (Step 4)
_______ UNSAT STANDARD:
a) Verifies CHG pumps running; 1-CH-P-1A, 1-CH-P-1B, and 1-CH-P-1C, by observing pump breaker closed lights and ammeter indication.
b) Verifies LHSI pumps running; 1-SI-P-1A, and 1-SI-P-1B, by observing pump breaker closed lights and ammeter indication.
EVALUATORS NOTE:
COMMENTS:
Page 4 of 19
Surry 2015-301 JPM f, Manual start CS STEP 5:
_______ SAT CHECK CHARGING PUMP AUXILIARIES. (Step 5)
_______ UNSAT STANDARD:
a) Verifies 1-CC-P-2A, or 1-CC-P-2B running by observing pump run lights lit.
b) Verifies 1-SW-P-10A, or 1-SW-P-10B running by observing pump run lights lit.
EVALUATORS NOTE:
All pumps running as required.
COMMENTS:
STEP 6:
_______ SAT CHECK INTAKE CANAL. (Step 6)
_______ UNSAT STANDARD:
a) Verifies canal level > 24 feet.
b) Verifies Circ Water pumps maintaining level.
EVALUATORS NOTE:
CW pumps maintaining level.
COMMENTS:
Page 5 of 19
Surry 2015-301 JPM f, Manual start CS STEP 7:
_______ SAT CHECK IF MAIN STEAMLINES SHOULD BE ISOLATED. (Step 7)
_______ UNSAT STANDARD:
a) Verifies 1E-F10 (Hi Steam Flow), 1B-C4 (Hi Hi CLS Train A) and 1B-C5 (Hi Hi CLS Train B) are lit. 1E-F10 is NOT lit.
b) Checks MSTVs shut.
c) Checks high steam flow or header to line SI actuated.
d) Verifies Unit 1 and Unit 2 RWST crosstie valves open; 1-SI-TV-102A, 1-SI-TV-102B, 2-SI-TV-202A, 2-SI-TV-202B. Contacts U2 to verify U2 RWST crosstie valves are open.
e) Checks RCS pressure < 185 psig.
EVALUATORS NOTE:
o If asked: Hi steam flow SI did not actuate (1E-F10).
o If asked: Report that U2 RWST crosstie valves; 2-SI-TV-202A, and 2-SI-TV-202B are open.
COMMENTS:
STEP 8:
_______ SAT CHECK IF CS REQUIRED. (Step 8)
_______ UNSAT STANDARD:
a) Verifies CTMT pressure > 23 psia.
b) Manually initiates (backs up) HI HI CLS.
c) Verifies all RCPs are tripped.
d) Checks CS pumps - RUNNING.
e) Notes both CS pumps are not running and applies RNO and manually starts CS pumps. CRITICAL STEP.
f) Initiates Attachment 4.
EVALUATORS NOTE:
- If report given for failure of CS pumps to start, then acknowledge report.
- Another operator will perform attachment 4.
COMMENTS:
Page 6 of 19
Surry 2015-301 JPM f, Manual start CS STEP 9:
_______ SAT CHECK IF RS REQUIRED. (Step 9)
_______ UNSAT STANDARD:
a) Verifies RWST > 60%.
b) Applies RNO, continue to monitor RWST level and go to step 10.
EVALUATORS NOTE:
Acknowledge continue to monitor RWST level.
COMMENTS:
STEP 10:
_______ SAT BLOCK LOW PRZR PRESS SI SIGNAL. (Step 10)
_______ UNSAT STANDARD:
a) Verifies RCS pressure is < 2000 psig.
b) Turns both Lo PRZR Press and Stm HDR/line Delta P switches to block.
c) Verifies Permissive Status Light C-2 is Lit.
EVALUATORS NOTE:
COMMENTS:
Page 7 of 19
Surry 2015-301 JPM f, Manual start CS STEP 11:
_______ SAT BLOCKS LOW TAVE SIGNAL. (Step 11)
_______ UNSAT STANDARD:
a) Checks Tave < 543°F.
b) Blocks both trains of HI STM FLOW & LO TAVG OR LP switches to block.
c) Verifies Permissive status light F-1 is lit.
EVALUATORS NOTE:
COMMENTS:
STEP 12:
_______ SAT VERIFIES SI FLOW. (Step 12)
_______ UNSAT STANDARD:
a) Reviews notes prior to step 12.
b) Checks HHSI flow indicated on all channels: 1-SI-FI-1961, 1-SI-FI-1962, 1-SI-FI-1963, 1-SI-FI-1943, or 1-SI-FI-1943A.
c) Checks 3 Charging pumps running.
d) Resets SI. CRITICAL STEP.
e) Stops a Charging pump (1-CH-P-1A or 1-CH-P-1B) and places in Auto. CRITICAL STEP.
f) Verifies RCS pressure is < 185 psig.
g) Verifies LHSI flow.
EVALUATORS NOTE:
- If report given for securing a Charging pump, then acknowledge report.
- Note: There is no fault in this step. It is expected that 3 Charging pumps will be running and the operator will secure one charging pump. Per the note prior to step 12 the pump that should be secured is 1-CH-P-1A.
COMMENTS:
Page 8 of 19
Surry 2015-301 JPM f, Manual start CS STEP 13:
_______ SAT CHECK TOTAL AFW FLOW - GREATER THAN 350 GPM [450 GPM] (Step 13)
_______ UNSAT STANDARD:
a) Verifies total AFW flow is > 350 gpm [450 gpm].
EVALUATORS NOTE:
- If asked; AFW flow is as indicated.
- If Containment still adverse (Containment press. > 20 psia) then 450 gpm is the correct amount of AFW flow.
COMMENTS:
STEP 14:
_______ SAT CHECK AFW MOVs - OPEN. (Step 14)
_______ UNSAT STANDARD:
a) Checks all AFW MOVs open and notes that they are throttled; 1-FW-MOV-151A, 1-FW-MOV-151B, 1-FW-MOV-151C, 1-FW-MOV-151D, 1-FW-MOV-151E, and 1-FW-MOV-151F.
b) Performs RNO and verifies valves are manually aligned as necessary.
EVALUATORS NOTE:
- NOTE: AFW throttled to avoid excessive cooldown.
COMMENTS:
Page 9 of 19
Surry 2015-301 JPM f, Manual start CS STEP 15:
_______ SAT INITIATES SI VALVE ALIGNMENT IAW ATTACHMENT 2. INITIATE VENTILATION, AC POWER, AND SFP STATUS CHECKS IAW ATTACHMENT 3. (Step 15, 16) _______ UNSAT STANDARD:
a) Initiates Attachments 2 and 3.
EVALUATORS NOTE:
Inform RO another Operator will perform Attachments 2 and 3.
COMMENTS:
STEP 16:
_______ SAT REPORTS TO SHIFT MANAGER
_______ UNSAT STANDARD:
a) Verbal status report made of task completion.
EVALUATORS NOTE:
COMMENTS:
STOP TIME___________:
Page 10 of 19
Surry 2015-301 JPM f, Manual start CS Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Initial Conditions
- I am the Shift Manager. A Safety Injection has occurred from 100% power due to a LBLOCA. The Immediate Actions of 1-E-0 have been performed.
- MINIFLOW RECIRC CRITERIA has been applied and the Team has closed the charging mini-flow recircs.
Initiating Cues
- Here is a copy of 1-E-0, Attachment 1. I need you to perform Attachment 1 of 1-E-0.
- When you finish the actions necessary to accomplish this, please inform me.
Page 11 of 19
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions
- I am the Shift Manager. A Safety Injection has occurred from 100% power due to a LBLOCA. The Immediate Actions of 1-E-0 have been performed.
- MINIFLOW RECIRC CRITERIA has been applied and the Team has closed the charging mini-flow recircs.
Initiating Cues
- Here is a copy of 1-E-0, Attachment 1. I need you to perform Attachment 1 of 1-E-0.
- When you finish the actions necessary to accomplish this, please inform me.
Final JPM G Surry 2015-301 JPM h, Waste Gas Release U.S. Nuclear Regulatory Commission Surry Power Station SR15301 Simulator Job Performance Measure [APE060AA2.05 3.7, 4.2]
[Alternate Path]
Applicant________________________________ Start Time___________________
Examiner_______________________________
Date ___________________________________ Stop Time___________________
Title WASTE GAS DECAY TANK RELEASE ISOLATION (FAULTED)
K/A: APE060AA2.05: Ability to determine and interpret the following as they apply to the Accidental Gaseous Radwaste: That the automatic safety actions have occurred as a result of a high ARM system signal.
Applicability Estimated Time Actual Time RO 10 Minutes ___ Minutes Conditions
- Task is to be PERFORMED in the simulator.
- Release of B Waste Gas Decay Tank is ready to commence.
Standards
- Release isolated. 1-GW-FCV-101 closed, 1-GW-FCV-160 closed, and 1-GW-FCV-260 closed IAW 0-RMA-C6 and/or 0-RMA-C7.
Initiating Cues
- ARP 0-RMA-C6 and/or 0-RMA-C7
- Shift Manager Direction.
Terminating Cues
- Steps 1-5 of RMA-C6 and/or RMA-C7 completed.
Procedures
- OP-23.2.4, RELEASE OF WASTE GAS DECAY TANK 1B, REV. 19
- 0-RMA-C6, PROCESS VENT PART ALERT/HI, REV. 3
- 0-RMA-C7, PROCESS VENT NORMAL RANGE GAS ALERT/HI, REV. 3 Page 1 of 23
Surry 2015-301 JPM h, Waste Gas Release Tools and Equipment Safety Considerations
- None
- None Simulator Setup
- Call up Saved IC (268) or
- Call up 100% power IC and initialize. Place simulator in RUN.
- Enter malfunctions to Disable AUTO CLOSURE for 1-GW-FCV-101, 1-GW-FCV-160, 1-GW-FCV-260: GW-01, GW-02, GW-03.
- Enter overrides for Process Vent Particulate and Gas RMs: RM0601 to 40% and RM0602 to 60% and place on trigger 1.
Initial Conditions
- I am the Shift Manager. You are the Unit 1 Reactor Operator. The Unit is at 100% power and stable.
- Waste Gas Decay Tank 1B has just been aligned for Release.
- Waste Gas Decay Tank 1B Hydrogen concentration is 34.4%, the maximum allowable release rate is 7.5 scfm per the release permit.
Initiating Cues
- I need you to perform a release of Waste Gas Decay Tank 1B in accordance with OP-23.2.4, Release of Waste Gas Decay Tank 1B, section 5.4.
- When you finish the actions necessary to accomplish this task, please inform me.
Notes
- Operator is given copy of OP-23.2.4, Release of Waste Gas Decay Tank 1B during directions. This evolution may be pre-briefed.
- Annunciators 0-RMA-C6, PROCESS VENT PART ALERT/HI, and 0-RMA-C7, PROCESS VENT NORMAL RANGE GAS ALERT/HI will alarm. Performing either ARP will satisfy performance of the JPM. Steps 1-6 of either ARP are identical.
- Booth Instructor Note: After WGDT Effluent flow is established in step 5.4.2 initiate RM malfunction.
Page 2 of 23
Surry 2015-301 JPM h, Waste Gas Release PERFORMANCE CHECKLIST Notes to the Evaluator
- Task critical elements are bolded and denoted as a CRITICAL STEP.
- An additional instructor may be needed to silence and acknowledge alarms for the examinee.
- START TIME_______:
STEP 1:
_______ SAT Turn 1-GW-FCV-101, DECAY TK BLEED ISOL switch to OPEN. (OP-23.2.4; Step 5.4.1)
_______ UNSAT STANDARD:
a) Operator places switch for 1-GW-FCV-101, DECAY TK BLEED ISOL to OPEN position.
EVALUATORS NOTE:
- 1-GW-FCV-101, DECAY TK BLEED ISOL will not fully open until next step (operation of Flow Controller).
COMMENTS:
STEP 2:
_______ SAT Slowly open 1-GW-FCV-101 (Auto/Man station) and check that 1-GW-FI-101, WGDT EFFLUENT FLOW, does not indicate more than 0.5 scfm. (Step 2) _______ UNSAT STANDARD:
a) Operator acknowledges NOTE regarding pressure and flow are slow to stabilize after opening 1-GW-FCV-101.
b) Operator slowly opens 1-GW-FCV-101 to establish approximately 0.5 scfm on 1-GW-FI-101, WGDT Effluent flow.
EVALUATORS NOTE:
- After completion of this step malfunction will be entered causing alarms 0-RMA-C6, and 0-RMA-C7 to annunciate.
- If asked, direct operator to perform actions of the ARP.
BOOTH OPERATORS NOTE:
- Monitor 1-GW-AR-150 A&B Recorder ON 1-GW-FR-101. After flow is established (approx. 0.5 scfm) insert Trigger 1.
COMMENTS:
Page 3 of 23
Surry 2015-301 JPM h, Waste Gas Release START OF ARP STEP 3:
_______ SAT CHECK ALARM-READING ON MONITOR OR CHART RECORDER GREATER THAN OR EQUAL TO ALERT SETPOINT. (0-RMA-C6/C7, Step 1) _______ UNSAT
- 1-GW-RI-130A
- 1-RM-RR-132, Ch1
- 1-RR-132, Ch4 STANDARD:
a) Acknowledges notes prior to step 1 regarding silencing the alarm.
b) Checks readings on radiation monitors greater than alert setpoint or checks that chart recorder indication is greater than alert setpoint.
EVALUATORS NOTE:
COMMENTS:
STEP 4:
_______ SAT CHECK PROCESS VENT FLOW RATE DEVICE 1-GW-FI-100 - OPERABLE. (0-RMA-C6/C7, Step2) _______ UNSAT STANDARD:
a) Checks that one process vent blower is in service by checking red light on and green light off for either 1-GW-F-1A or 1-GW-F-1B.
EVALUATORS NOTE:
COMMENTS:
Page 4 of 23
Surry 2015-301 JPM h, Waste Gas Release STEP 5:
_______ SAT CONSULTS SHIFT SUPERVISION TO DETERMINE IF GW SHOULD BE ISOLATED. (0-RMA-C6/C7, Step3) _______ UNSAT STANDARD:
a) Asks SM if GW should be isolated.
EVALUATORS NOTE:
If asked: Respond by saying I need you to perform the actions for a high radiation alarm.
COMMENTS:
STEP 6:
_______ SAT CHECKS AUTOMATIC ACTIONS. (0-RMA-C6/C7, Step4)
_______ UNSAT STANDARD:
a) Acknowledges CAUTION regarding securing of the associated Vacuum Pumps.
b) Acknowledges Note regarding High alarm auto functions.
c) Checks Decay Tank Bleed Isolation valve 1-GW-FCV-101 CLOSED. Determines that valve did not close. Goes to step 4a RNO.
d) Closes 1-GW-FCV-101 by taking control switch to close and observing green light on and red light off OR by pressing the auto/manual station close arrow to close the valve. CRITICAL STEP.
e) Checks CTMT Vacuum Pump Discharge Isolation valve 1-GW-FCV-160 CLOSED.
Determines that the valve did not close.
f) Checks CTMT Vacuum Pump Discharge Isolation valve 1-GW-FCV-260 CLOSED.
Determines that the valve did not close. Goes to step 4b RNO.
g) Places control switches to the off position for 1-CV-P-1A and 1-CV-P-1B.
CRITICAL STEP.
h) Directs Unit 2 to place control switches for 2-CV-P-1A and 2-CV-P-1B to the off position. CRITICAL STEP.
i) Closes 1-GW-FCV-160 by taking control switch to close and observing green light on and red light off. CRITICAL STEP.
j) Closes 1-GW-FCV-260 by taking control switch to close and observing green light on and red light off. CRITICAL STEP.
k) Go to step 6.
EVALUATORS NOTE:
Acknowledge reports as given.
BOOTH OPERATORS NOTE:
- After Operator closes 1-GW-FCV-101, Ramp malfunctions RM0601, and RM0602 to 0 over 2 minutes.
COMMENTS:
Page 5 of 23
Surry 2015-301 JPM h, Waste Gas Release STEP 7:
_______ SAT NOTIFIES HP TO DO THE FOLLOWING: (0-RMA-C6/C7, Step6) a) Check area evacuated as necessary. _______ UNSAT b) Control access as necessary.
c) Sample d) Contact HP to check activity within limits.
e) Investigate cause STANDARD:
a) Operator picks up phone or gaitronics to make notifications.
EVALUATORS NOTE:
When candidate picks up phone or gaitronics to make notifications, inform the candidate that another RO will perform that action and complete the ARP. This JPM is complete.
COMMENTS:
STOP TIME____________:
Page 6 of 23
Surry 2015-301 JPM h, Waste Gas Release Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Initial Conditions
- I am the Shift Manager. You are the Unit 1 Reactor Operator. The Unit is at 100% power and stable.
- Waste Gas Decay Tank 1B has just been aligned for Release.
- Waste Gas Decay Tank 1B Hydrogen concentration is 34.4%, the maximum allowable release rate is 7.5 scfm per the release permit.
Initiating Cues
- I need you to perform a release of Waste Gas Decay Tank 1B in accordance with OP-23.2.4, Release of Waste Gas Decay Tank 1B, section 5.4.
- When you finish the actions necessary to accomplish this task, please inform me.
Page 7 of 23
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions
- I am the Shift Manager. You are the Unit 1 Reactor Operator. The Unit is at 100% power and stable.
- Waste Gas Decay Tank 1B has just been aligned for Release.
- Waste Gas Decay Tank 1B Hydrogen concentration is 34.4%, the maximum allowable release rate is 7.5 scfm per the release permit.
Initiating Cues
- I need you to perform a release of Waste Gas Decay Tank 1B in accordance with OP-23.2.4, Release of Waste Gas Decay Tank 1B, section 5.4.
- When you finish the actions necessary to accomplish this task, please inform me.
Final JPM H Surry 2015-301 AP-10.07, Att. 4 U.S. Nuclear Regulatory Commission Surry Power Station SR15301 Simulator Job Performance Measure APE056AA2.49 (3.0 / 3.4)
Applicant________________________________ Start Time___________________
Examiner_______________________________
Date ___________________________________ Stop Time___________________
Title ALIGN THE EMERGENCY BUS IN ACCORDANCE WITH AP-10.07 ATTACHMENT 4.
K/A: APE056AA2.49 Ability to determine and interpret the following as they apply to the Loss of Offsite Power: Nonessential equipment to be secured to avoid overload of ED/Gs (3.0 / 3.4)
Applicability Estimated Time Actual Time RO/SRO(I) 9 Minutes ___ Minutes Conditions
- Task is to be PERFORMED in the simulator.
- Breaker 15J8 spuriously opened and #3 EDG is supplying Unit 1 J Bus Loads.
Standards
- 1-AP-10.07, Attachment 4 completed.
Initiating Cues
- 1-AP-10.07, Step 43.
- Shift Manager Direction.
Terminating Cues
- Attachment 4 of 1-AP-10.07 completed.
Procedures
- 1-AP-10.07, Loss of Unit 1 Power, Attachment 4, Emergency Bus Load Alignment, Revision 73.
Tools and Equipment Safety Considerations
- None
- None Page 1 of 9
Surry 2015-301 AP-10.07, Att. 4 Simulator Setup
- Recall IC-267, or perform the following:
- Recall 100% power IC and initialize. Place 1-CH-P-1C and 1-CH-P-1A in service and 1-CH-P-1B in Auto after Stop.
- Turn on all Pzr heaters.
- Insert Malfunction, EL4902, BKR 15J8 Spurious Trip.
- Set Meter Override, EDG3_MW = 0.32, Trigger 1, Auto Trigger chp1b_52 .eq. 1. (EDG3 MW 1600 kW when 1-CH-P-1B started).
- Meter Override (IOR), EDG3_MW = 0.265, Trigger3, Auto Trigger PRZ_HTRA_GREEN; to change EDG3 meter override to lower value when A PZR heater group secured.
- Reset the Stub bus breaker and start 1-CC-P-1B.
Initial Conditions
- I am the Shift Manager and you are the Unit 1 BOP.
- 1-EP-BKR-15J8 spuriously opened and we are performing 1-AP-10.07. #3 EDG is the sole power supply to the 1J Bus.
Initiating Cues
- Here is a copy of Attachment 4 of 1-AP-10.07 (EMERGENCY BUS LOAD ALIGNMENT). I need you to perform this attachment in its entirety
- When you finish the actions necessary to accomplish this, please inform me.
Page 2 of 9
Surry 2015-301 AP-10.07, Att. 4 PERFORMANCE CHECKLIST Notes to the Evaluator
- Task critical elements are bolded and denoted as a CRITICAL STEP.
- An additional instructor may be needed to silence and acknowledge alarms for the examinee.
- START TIME_______:
1-AP-10.07, Att. 4, Step 1
_______ SAT STEP 1 CAUTIONS and NOTES Prior to Step 1.
_______ UNSAT STANDARD:
a) Acknowledges the CAUTION stating that an EDG can not initially be loaded to greater than 1300 kW prior to an SI or HI-HI CLS, with the exception of loads that will trip when a HI-HI CLS occurs, or loads which are running yet assumed to start on a HI-HI CLS.
b) Acknowledges the CAUTION stating the total EDG load shall not exceed 2750 kW.
c) Reads the following notes:
- The purpose of this Attachment is to limit EDG loading so that a subsequent HI-HI CLS actuation will not overload the EDG.
- EDG load must be monitored closely during pump operations
- One CHG pump must be running on each Emergency Bus solely supplied from an EDG. The other CHG pump supplied from that Emergency Bus must remain in PTL.
- A 6/30 hour TS LCO is in effect until one CHG pump is running on an Emergency Bus supplied by an EDG, AND the non-running CHG pump is in PTL.
d) The Candidate may inform the Shift Manager (Evaluator) of the 6/30 TS LCO.
EVALUATORS NOTE:
If notified of 6/30 clock: Acknowledge entry into 6/30 clock.
COMMENTS:
Page 3 of 9
Surry 2015-301 AP-10.07, Att. 4 1-AP-10.07, Att. 4, Step 1
_______ SAT Step 2 IF EDG 1 is the sole source of power to Emergency Bus 1H, THEN do the following to limit the amount of instantaneous loading that could occur in the event of a HI HI CLS. _______ UNSAT STANDARD:
a) Identifies 1H bus powered by off-site power.
b) N/As substep a.
c) N/As substep b. 1. and 2.
d) Initials substep b. 3. and Goes To Step 2 of Attachment 4.
EVALUATORS NOTE:
NONE COMMENTS:
1-AP-10.07, Att. 4, Step 2
_______ SAT Step 3 NOTE prior to Step 2
_______ UNSAT STANDARD:
Acknowledges NOTE: A 6/30 hour TS 3.0.1 LCO is in effect until one CHG pump is running on an Emergency Bus supplied by an EDG, AND the non-running CHG pump is incapable of auto-start (locked-out or in PTL). This Tech Spec LCO is entered due to an inoperable Emergency Bus due to EDG loading.
EVALUATORS NOTE:
If notified of 6/30 clock: Acknowledge entry into 6/30 clock.
COMMENTS:
Page 4 of 9
Surry 2015-301 AP-10.07, Att. 4 1-AP-10.07, Att. 4, Step 2, substeps a., c., and d.
_______ SAT Step 4 IF EDG 3 is the sole source of power to Emergency Bus 1J, THEN do the following to limit the amount of instantaneous loading that could occur in the event of a HI HI CLS. _______ UNSAT STANDARD:
(a) Determines from either breaker position (15J3 closed) or energized components combined with the EDG running that #3 EDG is supplying the 1J Emergency Bus.
OR b) Recalls from initial conditions that #3 EDG is the sole power supply for the 1J Bus.
- c) Starts 1-CH-P-1B - CRITICAL STEP.
d) Checks 1-CH-P-1C Alternate Source Breaker in PTL.
e) Consults Shift Manager, Secures 1-CH-P-1C and 1-CH-P-1A.
EVALUATORS NOTE:
When Consulted State: Stop 1-CH-P-1A and 1-CH-P-1C.
NOTE: Candidate may announce the start of 1-CH-P-1B using Gai-tronics, and dispatch Aux Bldg Operator to monitor the CH Pumps(s).
COMMENTS:
1-AP-10.07, Att. 4, Step 2, substep e., and f.
_______ SAT Step 5 Determine Emergency Bus 1J load limit IAW the following equation, where (x) equals the total of the KW ratings of all RUNNING equipment from the table below. _______ UNSAT STANDARD:
a) Identifies that 1-VS-F-1B is running. CRITICAL STEP.
b) Identifies 1-VS-F-58B (CTMT Reirc Air Fan) and 1-FW-P-3B (B AFW Pump) are NOT running.
c) Places 100 kW on the line in step 1.e. above the letter x.
d) Determines that the load limit is 100 kW + 1300 kW = 1400kW. CRITICAL STEP.
e) Identifies existing load of approximately 1550 to 1600 kW is in excess of calculated load limit and Notifies the Shift Manager.
f) Identifies EDG 3 Load greater than allowed limit.
g) Secures A PZR heaters. CRITICAL STEP.
h) Checks EDG 3 load, and reports value less than 1400 kW limit.
EVALUATORS NOTE:
When Notified of Excess EDG Load: Direct Candidate to secure the A group pressurizer heaters.
When A PZR Heater secured: Acknowledge EDG 3 Load lowered to 1300 - 1350 kW.
COMMENTS:
Page 5 of 9
Surry 2015-301 AP-10.07, Att. 4 1-AP-10.07, Att. 4, Step 3.
_______ SAT Step 6 Notify Auxiliary Building Operator to perform additional monitoring of CHG pump lube oil temperature. _______ UNSAT STANDARD:
a) Contacts Auxiliary Building Operator and directs monitoring of CHG pump lube oil temperature.
EVALUATORS NOTE:
NONE Booth Operator:
When directed: Acknowledge direction to monitor CHG pump lube oil temperatures.
COMMENTS:
1-AP-10.07, Att. 4, Step 4.
_______ SAT Step 7 Notify Auxiliary Building Operator to perform additional monitoring of CHG pump lube oil temperature. _______ UNSAT STANDARD:
a) Calls up CH Pump screen on PCS to monitor bearing temperatures.
EVALUATORS NOTE:
None COMMENTS:
Step 8 _______ SAT Notifies Shift Manager (Evaluator) 1-AP-10.7, Attachment is complete. _______ UNSAT EVALUATORS NOTE:
None COMMENTS:
END OF JPM Page 6 of 9
Surry 2015-301 AP-10.07, Att. 4 STOP TIME:
Page 7 of 9
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Task
- Task is to be performed in the simulator.
- Perform 1-AP-10.07, Loss of Unit 1 Power, Attachment 4.
Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the Evaluator when you understand your assigned task.
Initial Conditions
- I am the Shift Manager and you are the Unit 1 BOP.
- 1-EP-BKR-15J8 spuriously opened and we are performing 1-AP-10.07. #3 EDG is the sole power supply to the 1J Bus.
Initiating Cues
- Here is a copy of Attachment 4 of 1-AP-10.07 (EMERGENCY BUS LOAD ALIGNMENT). I need you to perform this attachment in its entirety
- When you finish the actions necessary to accomplish this, please inform me.
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions
- I am the Shift Manager and you are the Unit 1 BOP.
- 1-EP-BKR-15J8 spuriously opened and we are performing 1-AP-10.07. #3 EDG is the sole power supply to the 1J Bus.
Initiating Cues
- Here is a copy of Attachment 4 of 1-AP-10.07 (EMERGENCY BUS LOAD ALIGNMENT). I need you to perform this attachment in its entirety
- When you finish the actions necessary to accomplish this, please inform me.
Final JPM I Surry 2015-301 Make-up to SFP U.S. Nuclear Regulatory Commission Surry Power Station SR15301 In Plant Job Performance Measure KA Number SYS033A2.03 Applicant________________________________ Start Time___________________
Examiner_______________________________
Date ___________________________________ Stop Time___________________
Title Full Title K/A: 033A2.03: Ablity to predict the impacts of the following malfunctions or operations on the Spent Fuel Pool Cooling system; and based on those procedures, use procedures to correct, control, or mitigate the consequences of those malfunction or operation: Abnormal Spent Fuel pool water level. 3.1 / 3.5 Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 12 Minutes ___ Minutes Conditions
- Task is to be SIMULATED in the Plant.
- A loss of spent fuel pit level requiring local actions is in progress.
Standards
- 0-AP-22.02, Loss of Spent Fuel Pit Level, Revision 13.
Initiating Cues
- Shift Manager Direction.
- 0-AP-22.02, Loss of Spent Fuel Pit Level, Step 9.
Terminating Cues
- 0-AP-22.02, Loss of Spent Fuel Pit Level, Step 10 complete.
Procedures
- 0-AP-22.02, Loss of Spent Fuel Pit Level, Revision 13 Tools and Equipment Safety Considerations
- None
- Standard Personal Safety Equipment Surry SR 2015 - 301 Page 1 of 7
Surry 2015-301 Make-up to SFP Initial Conditions
- This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
- Unit 1 is performing, due to lowering Spent Fuel Pit level.
- Fuel handling activities are NOT in progress.
Initiating Cues
- I am the Nuclear Shift Manager and you are an extra operator on shift.
- Here is a copy of 0-AP-22.02, Loss of Spent Fuel Pit Level, Step 9. I need you to locally open 1-PG-54, PG makeup to the Spent Fuel Pit.
- When you finish the actions necessary to accomplish this Task, please inform me.
Notes
- This task is to be SIMULATED. Do NOT allow the Candidate to manipulate controls, operate switches or reposition valves.
Surry SR 2015 - 301 Page 2 of 7
Surry 2015-301 Make-up to SFP PERFORMANCE CHECKLIST Notes to the Evaluator
- Task critical elements are bolded and denoted as CRITICAL STEP.
- START TIME:
0-AP-22.02, STEP 9
_______ SAT Step 1 Acknowledges CAUTION and NOTES Prior to Step 9.
_______ UNSAT STANDARD:
a) Reviews CAUTION: Use of Firemain or PG water will dilute the Boron concentration in the SFP. Tech Spec 5.3, Fuel Storage, should be reviewed as time permits.
b) Reviews NOTE: One inch of SFP level is approximately equal to 1182 gallons.
c) Reviews NOTE: SFP level should be monitored remotely by using the Fuel BLDG video monitors in the MCR, or locally if radiation level permits.
EVALUATORS NOTE:
If asked: Tech Spec 5.3, Fuel Storage, has been reviewed.
COMMENTS:
0-AP-22.02, STEP 9
_______ SAT Step 2 Using Guidance of Step 9 RNO, Attempts to open 1-PG-54.
_______ UNSAT STANDARD:
(a) Goes to the 27 foot level of the Fuel Building and Locates 1-PG-54, PG Makeup to the SFP.
(b) Attempts to open 1-PG-54 by turning handwheel counter-clockwise.
EVALUATORS NOTE:
If Candidate attempts to enter the Fuel Building from the 48 foot level of the Auxiliary Building inform them that the door is posted as non-functional, do not enter.
When 1-PG-54 Attempted: Notify Candidate that valve handwheel will not move.
COMMENTS:
Surry SR 2015 - 301 Page 3 of 7
Surry 2015-301 Make-up to SFP 0-AP-22.02, STEP 9
_______ SAT Step 3 Notifies the Shift Manager (Evaluator) inability to operate 1-PG-54.
_______ UNSAT STANDARD:
a) Simulates contacting the Shift Manager of inability to operate 1-PG-54.
b) Acknowledge change in task.
EVALUATORS NOTE:
When Notified: Hand the Candidate 0-AP-22.02, Step 10.
State: The level drop in the SFP appears to have risen, perform Step 10 of 0-AP-22.02 and align Fire Protection make-up to the Spent Fuel Pit. The Motor Driven Fire Pump has been started.
NOTE: Alternate Path Starts Here.
COMMENTS:
0-AP-22.02, STEP 10
_______ SAT Step 4 Acknowledges NOTES Prior to Step 10.
_______ UNSAT STANDARD:
Reviews NOTE: LFFG1, Operations Response, is a guideline and may be implemented before the TSC is fully activated.
Reviews NOTE: Sharing resources should be considered if using the Firemain for fire fighting and for filling / spraying the SFP.
a) Contacts the MCR and directs starting the Motor Driven Fire Pump. CRITICAL STEP.
EVALUATORS NOTE:
When MCR Contacted: Notify Candidate that the Motor Driven Fire Pump has been started.
COMMENTS:
Surry SR 2015 - 301 Page 4 of 7
Surry 2015-301 Make-up to SFP 0-AP-22.02, STEP 10 (Continued)
_______ SAT Step 5 Initiate Fire Main Makeup.
_______ UNSAT STANDARD:
a) Locally open Post Indicator Valve 1-FP-75. CRITICAL STEP
- Locates 1-FP-75 in yard outside Fuel Building and Simulates opening the valve.
b) Simulates operation of Deluge Station. CRITICAL STEP
- Pull Station Fuel Building 6 Foot 10 Inch Level by SFP Cooling Pumps.
d) Locates to Fuel Building 47 Foot level and simulates checking blow-out plug free of pipe and water spraying into Fuel Pool.
EVALUATORS NOTE:
NONE COMMENTS:
Step 6 Report Completion of Task _______ SAT STANDARD: _______ UNSAT Reports to Shift Manager (Evaluator) that Firemain makeup to the SFP has been initiated.
EVALUATORS NOTE:
NONE.
COMMENTS:
END OF JPM STOP TIME:
Surry SR 2015 - 301 Page 5 of 7
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Task
- Task is to be SIMULATED in the Plant.
- Perform 0-AP-22.02, Loss of Spent Fuel Pit Level, Step 9.
Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.
Initial Conditions
- This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
- Unit 1 is performing 0-AP-22.02, Loss of Spent Fuel Pit Level, due to lowering Spent Fuel Pit level.
- Fuel handling activities are NOT in progress.
Initiating Cues
- I am the Nuclear Shift Manager and you are an extra operator on shift.
- Here is a copy of 0-AP-22.02, Loss of Spent Fuel Pit Level, Step 9. I need you to locally open 1-PG-54, PG makeup to the Spent Fuel Pit.
- When you finish the actions necessary to accomplish this Task, please inform me.
Notes
- This task is to be SIMULATED. Do NOT allow the Candidate to manipulate controls, operate switches or reposition valves.
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions
- This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
- Unit 1 is performing 0-AP-22.02, Loss of Spent Fuel Pit Level, due to lowering Spent Fuel Pit level.
- Fuel handling activities are NOT in progress.
Initiating Cues
- I am the Nuclear Shift Manager and you are an extra operator on shift.
- Here is a copy of 0-AP-22.02, Loss of Spent Fuel Pit Level, Step 9. I need you to locally open 1-PG-54, PG makeup to the Spent Fuel Pit.
- When you finish the actions necessary to accomplish this Task, please inform me.
Final JPM J Surry 2015-301 Locally Trip U2 Reactor U.S. Nuclear Regulatory Commission Surry Power Station SR15301 Simulator Job Performance Measure [EPE029.EA1.12]
Applicant________________________________ Start Time___________________
Examiner_______________________________
Date ___________________________________ Stop Time___________________
Title LOCALLY TRIP THE UNIT 2 REACTOR TRIP BREAKERS K/A: EPE029.EA1.12: Ability to operate and monitor the following as they apply to a ATWS: M/G set power supply and reactor trip breakers. 4.1/4.0 Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 10 Minutes ___ Minutes Conditions
- Task is to simulated in the Plant.
- A simulated ATWS is in progress with a coincident failure of both benchboard reactor trip pushbuttons.
Standards
- 2-FR-S.1, Response to Nuclear Power Generation/ATWS, step 8a RNO.
- Unit 2 MG Set output or input breakers open.
Initiating Cues
- 2-FR-S.1, Response to Nuclear Power Generation/ATWS, step 8a RNO.
- Shift Manager direction.
Terminating Cues
- Report received that MG Set Output Breakers are open.
Procedures
- 2-FR-S.1, RESPONSE TO NUCLEAR POWER GENERATION/ATWS Tools and Equipment Safety Considerations
- None
- None Page 1 of 6
Surry 2015-301 Locally Trip U2 Reactor Initial Conditions
- I am the Nuclear Shift Manager. Unit 2 is currently experiencing an ATWS and the control room reactor trip buttons wont work.
Initiating Cues
- This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
- I need you to locally open the Unit 2 reactor trip breakers and bypass breakers.
- When you finish the actions necessary to accomplish this, please inform me.
Notes
- After the attempt to open the Reactor Trip Breakers have failed, the Candidate will proceed to the Switchgear room and open the Rod Drive MG Set output or input breakers.
Page 2 of 6
Surry 2015-301 Locally Trip U2 Reactor PERFORMANCE CHECKLIST Notes to the Evaluator
- This task is to be SIMULATED. Do NOT allow the operator to manipulate controls, operate switches or reposition valves.
- When the operator attempts to open the Reactor Trip Bkrs, they will not open and the MG set output or input breakers must be opened.
- Task critical elements are bolded and denoted as CRITICAL STEP.
- START TIME_______:
STEP 1:
_______ SAT OPENS UNIT 2 REACTOR TRIP BREAKER A (RTB A). (2-FR-S.1, step 8aRNO)
_______ UNSAT STANDARD:
a) Proceeds to Unit 2 Cable Spreading Area and enters the Reactor Trip Breaker cubicle (located in back of room behind cable trays).
b) Actuates breaker trip mechanism by pressing TRIP button.
c) Checks for OPEN indication received.
EVALUATORS NOTE:
- Tell operator: NO breaker noise is heard.
- If asked: CLOSED indication showing prior to and AFTER trip mechanism pushed.
- The operator should inform the Shift Manager that the breaker would not open. If they do, inform them to continue as directed.
COMMENTS:
STEP 2:
_______ SAT OPENS UNIT 2 REACTOR TRIP BREAKER B (RTB B). (2-FR-S.1, step 8aRNO)
_______ UNSAT STANDARD:
- Actuates breaker trip mechanism by pressing TRIP button.
- Checks for OPEN indication received.
EVALUATORS NOTE:
- Tell operator: NO breaker noise is heard.
- When the operator informs the Shift Manager that they are unable to open Unit 2 Reactor Trip Breakers, direct opening the MG Set output breakers.
- The operator may bypass checking the Bypass Breakers Open at this point and proceed to the MG Set output Breakers COMMENTS:
Page 3 of 6
Surry 2015-301 Locally Trip U2 Reactor STEP 3:
_______ SAT CHECKS REACTOR TRIP BYPASS BREAKERS OPEN (2-FR-S.1, step 8aRNO)
_______ UNSAT STANDARD:
a) Verifies OPEN indication showing for both bypass breakers.
EVALUATORS NOTE:
- If asked: OPEN indication showing for both Bypass breakers.
COMMENTS:
STEP 4:
_______ SAT OPENS UNIT 2 MG SET GEN NO. 1 OUTPUT BREAKER (2-FR-S.1, step 8aRNO)
_______ UNSAT STANDARD:
a) Proceeds to the Unit 2 Normal Switchgear Room and locates Unit 2 MG Sets.
b) Actuates breaker trip mechanism for Unit 2 MG Set NO.1 by pressing TRIP button, or operating breaker control switch to TRIP. CRITICAL STEP.
c) Checks for OPEN indication received.
EVALUATORS NOTE:
- Fastest way to U2 Normal Switchgear room is from stairwell in U2 Cable Spreading room UP to the Normal Switchgear room.
- Tell operator: Breaker banging noise heard after the TRIP button is depressed or control switch is place in trip; and breaker green OPEN flag on breaker indicated.
- Either Unit 2 MG Set No. 1 or No. 2 may be operated at this step. Sequence is not critical.
- Note: If operator trips Rod MG Set Input breakers (located on MCC) then this satisfies the intent of the step per the FR-S.1 Background document.
COMMENTS:
Page 4 of 6
Surry 2015-301 Locally Trip U2 Reactor STEP 5:
_______ SAT OPENS UNIT 2 MG SET GEN NO. 2 OUTPUT BREAKER (2-FR-S.1, step 8aRNO)
_______ UNSAT STANDARD:
a) Actuates breaker trip mechanism for Unit 2 MG Set NO.2 by pressing TRIP button or placing control switch in trip. CRITICAL STEP.
b) Checks for OPEN indication received EVALUATORS NOTE:
- Tell operator: : Breaker banging noise heard after the TRIP button is depressed or control switch is place in trip; and breaker green OPEN flag on breaker indicated.
- Either Unit 2 MG Set No. 1 or No. 2 may be operated at this step. Sequence is not critical COMMENTS:
STEP 6:
_______ SAT REPORTS TO SHIFT MANAGER
_______ UNSAT STANDARD:
a) Verbal status report made that Unit 2 Reactor is tripped by operation of the Unit 2 MG Set output breakers.
b) The Unit 2 Reactor trip breakers could not be tripped.
EVALUATORS NOTE:
- Acknowledge report.
COMMENTS:
END OF JPM STOP TIME_____:
Page 5 of 6
Surry 2015-301 Locally Trip U2 Reactor Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Initial Conditions
- I am the Nuclear Shift Manager. Unit 2 is currently experiencing an ATWS and the control room reactor trip buttons wont work.
Initiating Cues
- This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
- I need you to locally open the Unit 2 reactor trip breakers and bypass breakers.
- When you finish the actions necessary to accomplish this, please inform me.
Page 6 of 6
FOR INFORMATION ONLY DO NOT GIVE TO CANDIDATE
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions
- I am the Nuclear Shift Manager. Unit 2 is currently experiencing an ATWS and the control room reactor trip buttons wont work.
Initiating Cues
- This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
- I need you to locally open the Unit 2 reactor trip breakers and bypass breakers.
- When you finish the actions necessary to accomplish this, please inform me.
Final JPM K Surry 2015-301 Transfer SVB Power U.S. Nuclear Regulatory Commission Surry Power Station SR15301 In Plant Job Performance Measure KA Number SYS062A2.05 2.9/3.3 Applicant________________________________ Start Time___________________
Examiner_______________________________
Date ___________________________________ Stop Time___________________
Title Full Title K/A: SYS062A2.05, Methods for energizing a dead bus, 2.9/3.3 Applicability Estimated Time Actual Time RO/SRO(I) 12 Minutes ___ Minutes Conditions
- Task is to be SIMULATED in the Plant.
- A loss of Unit 1 480v Bus supplying the SVB has occurred.
- 1-AP-10.05, Loss of Semi-Vital Bus, has been performed through Step 10.
Standards
- 1-AP-10.05, Loss of Semi-Vital Bus, Step 11 - 13, Revision 33.
Initiating Cues
- Shift Manager Direction.
- 1-AP-10.05, Loss of Semi-Vital Bus, Step 11 - 13.
Terminating Cues
- 1-AP-10.05, Loss of Semi-Vital Bus, Step 11 d) complete.
Procedures
- 1-AP-10.05, Loss of Semi-Vital Bus, Revision 33.
Tools and Equipment Safety Considerations
- None
- Standard Personal Safety Equipment Surry SR 2015 - 301 Page 1 of 8
Surry 2015-301 Transfer SVB Power Initial Conditions
- This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
- A loss of Unit 1's Semi-Vital Bus has occurred.
Initiating Cues
- I am the Shift Manager and you are the Unit 2 BOP.
- Here is a copy of 1-AP-10.05, completed up to Step 11. I need you to transfer the Unit 1 Semi-Vital Bus to the 1J Bus power supply. When you inform me that the bus has been re-energized, I will have the Unit RO perform the required instrumentation evaluation.
- When you finish the actions necessary to accomplish this Task, please inform me.
Notes
- This task is to be SIMULATED. Do NOT allow the Candidate to manipulate controls, operate switches or reposition valves Surry SR 2015 - 301 Page 2 of 8
Surry 2015-301 Transfer SVB Power PERFORMANCE CHECKLIST Notes to the Evaluator
- Task critical elements are bolded and denoted as CRITICAL STEP.
- START TIME:
1-AP-10.07, Step 11
_______ SAT STEP 1: Acknowledge NOTE Prior to Step 11.
_______ UNSAT STANDARD:
a) Reviews NOTE: If the Semi-Vital Bus has been deenergized for greater than 30 minutes, the SG PORV controllers will return to Remote/Manual control when power is restored.
EVALUATORS NOTE:
If asked: Unit 1 SVB has been deenergized for 15 minutes.
If asked: Unit 1 SVB powered from the 1H bus supply prior to the power loss.
COMMENTS:
1-AP-10.07, Step 11
_______ SAT Step 2 Locally open Semi-Vital Bus feeder breakers.
_______ UNSAT STANDARD:
(a) Locates to Unit 1 ESGR and Locates breaker 1H1-1-2A1 on MCC 1H1-1.
(b) Simulates placing 1H1-1-2A1 breaker switch in the OPEN position -
CRITICAL STEP.
c) Locates breaker 1J1-1-7D1 on MCC 1J1-1.
d) Checks breaker 1J1-1-7D1 in open position.
EVALUATORS NOTE:
If asked: Point to Closed position on breaker 1H1-1-2A1.
If asked: Point to the Open position on breaker 1J1-1-7D1.
COMMENTS:
Surry SR 2015 - 301 Page 3 of 8
Surry 2015-301 Transfer SVB Power 1-AP-10.07, Step 11
_______ SAT Step 3: Operate manual transfer switch to the desired power supply.
_______ UNSAT STANDARD:
a) Contacts MCR (Evaluator) and requests Unit 1 SVB manual transfer switch to be placed in the 1J1 position. CRITICAL STEP.
EVALUATORS NOTE:
When asked to transfer state: A time compression has occurred, the SVB manual transfer switch has been swapped to the 1J1 position.
Acceptable for the Candidate to request the MCR to place the manual transfer switch in the 1J position.
COMMENTS:
1-AP-10.07, Step 11
_______ SAT Step 4: Locally close the selected Semi-Vital Bus feeder breaker.
_______ UNSAT STANDARD:
a) Locates to breaker 1J1-1-7D1 on MCC 1J1-1.
b) Simulates closing 1J1-1-7D1 breaker. CRITICAL STEP.
c) Checks Semi-Vital Bus Energized by contacting MCR (Evaluator) to determine if SVB is energized.
EVALUATORS NOTE:
If asked: Inform Candidate that Unit 1 SVB has been reenergized.
COMMENTS:
Surry SR 2015 - 301 Page 4 of 8
Surry 2015-301 Transfer SVB Power Step 5: Inform Shift Manager (Evaluator) of Task Completion. _______ SAT STANDARD: _______ UNSAT Informs Evaluator task has been completed, EVALUATORS NOTE:
NONE COMMENTS:
END OF JPM STOP TIME:
Surry SR 2015 - 301 Page 5 of 8
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Task
- Task is to be SIMULATED in the Plant.
- 1-AP-10.05, Loss of Unit 1 Semi-Vital Bus, Step 11.
Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.
Initial Conditions
- This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
- A loss of Unit 1's Semi-Vital Bus has occurred.
Initiating Cues
- I am the Shift Manager and you are the Unit 2 BOP.
- Here is a copy of 1-AP-10.05, completed up to Step 11. I need you to transfer the Unit 1 Semi-Vital Bus to the 1J Bus power supply. When you inform me that the bus has been re-energized, I will have the Unit RO perform the required instrumentation evaluation.
- When you finish the actions necessary to accomplish this Task, please inform me.
Notes
- This task is to be SIMULATED. Do NOT allow the Candidate to manipulate controls, operate switches or reposition valves
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions
- This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
- A loss of Unit 1's Semi-Vital Bus has occurred.
Initiating Cues
- I am the Shift Manager and you are the Unit 2 BOP.
- Here is a copy of 1-AP-10.05, completed up to Step 11. I need you to transfer the Unit 1 Semi-Vital Bus to the 1J Bus power supply. When you inform me that the bus has been re-energized, I will have the Unit RO perform the required instrumentation evaluation.
- When you finish the actions necessary to accomplish this Task, please inform me.
Final JPM A Surry 2015-301 Emergency Borate AP-3.00 U.S. Nuclear Regulatory Commission Surry Power Station SR15301 Simulator Job Performance Measure [KA: 024AA1.17 3.9/3.9]
[Alternate Path]
Applicant________________________________ Start Time___________________
Examiner_______________________________
Date ___________________________________ Stop Time___________________
Title Emergency Borate the RCS in accordance with 1-AP-3.00, Emergency Boration K/A: 024AA1.17, Ability to operate and / or monitor the following as they apply to Emergency Boration:
Emergency borate control valve and indicators (3.9 / 3.9).
Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 10 Minutes ___ Minutes Conditions
- Task is to be PERFORMED in the simulator.
Standards
- 1-AP-3.00, Emergency Boration, Rev 5.
Initiating Cues
- 1-AP-3.00, Emergency Boration.
- Shift Manager Direction.
Terminating Cues
- Emergency Boration, Step 2 b) RNO completed.
Procedures
- 1-AP-3.00, Emergency Boration, Revision 5.
Tools and Equipment Safety Considerations
- None
- None Page 1 of 8
Surry 2015-301 Emergency Borate AP-3.00 Simulator Setup
- Recall 100% power IC and initialize or recall IC-261. Place simulator in RUN.
- Set 1-CH-MOV-1350 to thermal on auto trigger when .001 open. CH73 Trigger 1, Auto Trigger Event CHMOV350
.ge. 0.0001.
- Insert meter Override CHFI110, EMRG BORATE FLOW, 0, ACTIVE.
- Trip Reactor and Stabilize at Hot Shutdown.
- Adjust CH flow using 1-CH-LC-1459G to 50 gpm and return to Auto.
Directions to be read to the Operator:
Initiating Conditions
- You are the Unit 1 RO and I am the Shift Manager. Unit 1 tripped approximately 10 minutes ago. The STA just informed the Team that we have a potential challenge to our shutdown margin requirements and has recommended a two (2) minute emergency boration.
Initiating Cues
- Here is a copy of 1-AP-3.00, Emergency Borate. I need you to Emergency Borate for two (2) minutes in accordance with 1-AP-3.00.
- When you finish the actions necessary to accomplish this, please inform me.
Notes Page 2 of 8
Surry 2015-301 Emergency Borate AP-3.00 PERFORMANCE CHECKLIST Notes to the Evaluator
- Task critical elements are bolded and denoted as a CRITICAL STEP.
- An additional instructor may be needed to silence alarms for the examinee.
- START TIME_______:
STEP 1, 1-AP-3.00:
_______ SAT STEP 1, NOTES Prior to Step 1
_______ UNSAT STANDARD:
a) Acknowledges Note 1: If a Reactor Trip occurs or is required, 1-E-0, REACTOR TRIP OR SAFETY INJECTION, should be implemented.
b) When the Reactor is shutdown with the Shutdown Banks withdrawn, tripping the Shutdown Banks may eliminate the need for emergency boration.
EVALUATORS NOTE:
NONE COMMENTS:
STEP 1, 1-AP-3.00:
_______ SAT STEP 2, CHECK CHARGING FLOW - GREATER THAN 75 GPM
_______ UNSAT STANDARD:
a) Checks CHG Line Flow on 1-CH-FI-1122A and identifies flow < 75 gpm.
b) Goes to Step 1 RNO c) Manually adjusts charging flow to greater than 75 gpm.
- Using 1-CH-LC-1459G, PRZR LEVEL CNTRL, in Manual -OR-
- Using 1-CH-FCV-1122, CHG FLOW CNTRL in Manual EVALUATORS NOTE:
NONE.
COMMENTS:
Page 3 of 8
Surry 2015-301 Emergency Borate AP-3.00 STEP 2 a) , 1-AP-3.00:
_______ SAT STEP 3 START EMERGENCY BORATION
_______ UNSAT STANDARD:
a) Transfer the in-service BATP to FAST.
- Places control switch for 1-CH-P-2A, Boric Acid Transfer Pump to FAST.
- Identifies RED Slow Light - OUT; RED FAST light - LIT
- Acknowledges Annunciator 1D-C5, BA XFER PPS NON-AUTO CONT.
EVALUATORS NOTE:
NONE.
COMMENTS:
STEP 2 b), 1-AP-3.00:
_______ SAT STEP 4 START EMERGENCY BORATE
_______ UNSAT STANDARD:
a) Open 1-CH-MOV-1350.
- Removes Brass Cap on 1-CH-MOV-1350 control switch and places in OPEN position.
- Identifies RED and GREEN MOV Indicating lights extinguish.
- Identifies 0 indicated flow on 1-CH-FI-1110, EMRG BORATE FLOW indicator.
- Reports trip indication for 1-CH-MOV-1350 to Evaluator.
EVALUATORS NOTE:
When Notified: Acknowledge 1-CH-MOV-1350 indication report.
IF asked: Will direct electricians to investigate MCC 1H1-2S 7C breaker status.
BOOTH OPERATOR:
IF Asked: Report that a time compression has occurred and 1-CH-P-2A breaker MCC-1H1-2S 7C Thermal Overload is tripped.
COMMENTS:
Page 4 of 8
Surry 2015-301 Emergency Borate AP-3.00 STEP 2 b) RNO, 1-AP-3.00:
_______ SAT STEP 5 START EMERGENCY BORATION
_______ UNSAT STANDARD:
a) Directs Auxiliary Building Operator to locally open 1-CH-MOV-1350, Emergency Borate MOV.
b) Acknowledges Statement IF 1-CH-MOV-1350 can NOT be opened, then do the following:
c) Manually open 1-CH-FCV-1113A.
- Checks 1-CH-FCV-1113A indicates open.
- Places 1-CH-FCV-1113A control switch in OPEN.
d) Directs Auxiliary Building Operator to Open 1-CH-228.
e) Monitors for Boric Acid flow on FR-1-1113 (red trace).
f) Acknowledge Statement IF neither valve can be opened, THEN manually align CHG pump suction to the RWST AND GO TO Step 5.
g) Opens 1-CH-MOV-1115B AND 1-CH-MOV-1115D, CH Pump Suction from RWST; and Closes 1-CH-MOV-1115C AND 1-CH-MOV1115E, CH Pump Suction From VCT. CRITICAL STEP: Either 1-CH-MOV-1115B OR 1-CH-MOV-1115D OPEN will provide the necessary flowpath to the CH Pump; 1-CH-MOV-1115C OR 1-CH-MOV-1115E CLOSED will isolate the CH pump suction from the VCT.
h) Goes to Step 5.
EVALUATORS NOTE:
Acknowledge Candidate Reports.
If asked: substep b): STA will recalculate time of boration, please continue.
If asked: substep f): STA will recalculate time of boration, please continue.
BOOTH OPERATOR:
If Directed: Report that a Time Compression has occurred and MCC 1H1-2S 7C breaker is open.
When Directed: Report that a Time Compression has occurred and 1-CH-MOV-1350 motor will not disengage, and the handwheel will not move.
When Directed: Report that a Time Compression has occurred and 1-CH-228 handwheel spins without changing valve stem position.
COMMENTS:
Page 5 of 8
Surry 2015-301 Emergency Borate AP-3.00 STEP 6 _______ SAT STANDARD: _______ UNSAT a) Reports to Supervisor (Evaluator) that Charging has been aligned to the RWST in accordance with 1-AP-3.00.
EVALUATORS NOTE:
Wait two (2) minutes with flow from the RWST to see if the Candidate secures boration.
The following Steps of 1-AP-3.00, through Step 9, can be used to assess if the Candidate shifts charging pump suction back to the VCT on Step 9 of 1-AP-3.00.
COMMENTS:
-- END OF JPM --
Step 5, 1-AP-3.00
_______ SAT STEP 7
_______ UNSAT STANDARD:
a) Checks Unit - At power. (No).
b) Goes to Step 8.
EVALUATORS NOTE:
None COMMENTS:
Page 6 of 8
Surry 2015-301 Emergency Borate AP-3.00 Step 8, 1-AP-3.00 STEP 8 STANDARD:
a) Acknowledges note prior to Step 8: concerning boration has raised the boric acid concentration to the RCP seals.
b) Charging flow control - in AUTO.
Candidate may place charging flow in AUTO.
c) Charging Flow Stable.
Candidate monitors Charging flow and returns to manual if required.
EVALUATORS NOTE:
NONE.
COMMENTS:
Step 9, 1-AP-9.00
_______ SAT Step 9
_______ UNSAT STANDARD:
a) Check Charging pump suction aligned to the VCT Candidate may align charging pump suction to the VCT.
Opens 1-CH-MOV-1115C and E.
Closes 1-CH-MOV1115B and D.
EVALUATORS NOTE:
Wait two (2) minutes with flow from the RWST to see if the Candidate secures boration.
A follow-up question may be required if Candidate secures boration.
COMMENTS:
STOP TIME:
Page 7 of 8
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Task
- Task is to be performed in the simulator.
- Emergency Borate the RCS in accordance with 1-AP-3.00, Emergency Boration.
Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.
Initiating Conditions
- You are the Unit 1 RO and I am the Shift Manager. Unit 1 tripped approximately 10 minutes ago. The STA just informed the Team that we have a potential challenge to our shutdown margin requirements and has recommended a two (2) minute emergency boration.
Initiating Cues
- Here is a copy of 1-AP-3.00, Emergency Borate. I need you to Emergency Borate for two (2) minutes in accordance with 1-AP-3.00.
- When you finish the actions necessary to accomplish this, please inform me.
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initiating Conditions
- You are the Unit 1 RO and I am the Shift Manager. Unit 1 tripped approximately 10 minutes ago. The STA just informed the Team that we have a potential challenge to our shutdown margin requirements and has recommended a two (2) minute emergency boration.
Initiating Cues
- Here is a copy of 1-AP-3.00, Emergency Borate. I need you to Emergency Borate for two (2) minutes in accordance with 1-AP-3.00.
- When you finish the actions necessary to accomplish this, please inform me.
Final JPM B Surry 2015-301 JPM b, M/U to RWST U.S. Nuclear Regulatory Commission Surry Power Station SR15301 Simulator Job Performance Measure SYS004.A2.13 (3.6/3.9)
Applicant________________________________ Start Time___________________
Examiner_______________________________
Date ___________________________________ Stop Time___________________
Title MAKEUP TO RWST FROM BLENDER K/A: SYS004A2.13, Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Low RWST. (3.6 / 3.9)
Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 10 Minutes ___ Minutes Conditions
- Task is to be PERFORMED in the simulator.
- Restore RWST to clear low level alarm in accordance with 1-OP-CS-004, Refueling Water Storage Tank Makeup.
Initiating Cues
- I am the Shift Manager and you are the Unit RO.
- I need you to makeup 5000 gal. to the RWST, using the blender in accordance with 1-OP-CS-004, Refueling Water Storage Tank Makeup, steps 5.1.5 through 5.1.29.
- Blender settings for makeup to RWST have been determined to be: 80 gpm for PG (POT setting of 5.4), and 16.9 gpm for Boric Acid (POT setting of 7.6).
- When you finish the actions necessary to accomplish this task, please inform me.
Terminating Cues
Procedures
- 1-OP-CS-004, Refueling Water Storage Tank Makeup, Rev. 16.
Page 1 of 20
Surry 2015-301 JPM b, M/U to RWST Simulator Setup
- After alarm set CS-10 to 0.
- SET BA and PG integrators to 0 before each JPM.
Initial Conditions
- Unit 1 is operating at 100%.
- BAST A is at 8.0 % concentration.
Initiating Cues
- I am the Shift Manager and you are the Unit RO.
- I need you to makeup 5000 gal. to the RWST, using the blender in accordance with 1-OP-CS-004, Refueling Water Storage Tank Makeup, steps 5.1.5 through 5.1.29.
- Blender settings for makeup to RWST have been determined to be: 80 gpm for PG (POT setting of 5.4), and 16.88 gpm for Boric Acid (POT setting of 7.6).
- When you finish the actions necessary to accomplish this task, please inform me.
Page 2 of 20
Surry 2015-301 JPM b, M/U to RWST PERFORMANCE CHECKLIST Notes to the Evaluator
- Task critical elements are bolded and denoted as CRITICAL STEP.
- An additional instructor may be needed to silence and acknowledge alarms for the examinee.
- START TIME_______:
STEP 1:
_______ SAT Record the following blender setpoints for a return to service reference. BA FLOW CONTR_____ PRI WTR FLOW CONTR (Step 5.1.5) _______ UNSAT STANDARD:
a) Operator records current POT settings for BA and PG controllers; 1-CH-FC-1113A, and 1-CH-FC-1114.
EVALUATORS NOTE:
COMMENTS:
STEP 2:
_______ SAT Place the MAKE-UP MODE CONTR switch to STOP to prevent automatic actuation of blender. (Step 5.1.6) _______ UNSAT STANDARD:
b) Operator places Makeup Mode Control switch to STOP.
EVALUATORS NOTE:
COMMENTS:
Page 3 of 20
Surry 2015-301 JPM b, M/U to RWST STEP 3:
_______ SAT Place or check the following control switches for the following valves in CLOSE. (Step 5.1.7)
_______ UNSAT
- a. 1-CH-FCV-1113A, Boric Acid to Blender.
- b. 1-CH-FCV-1113B, Blender to Chg Pump.
- c. 1-CH-FCV-1114B, Blender to VCT.
STANDARD:
- Closes 1-CH-FCV-1113A, Boric Acid to Blender.
- Closes 1-CH-FCV-1113B, Blender to Chg Pump. CRITICAL STEP.
- Closes 1-CH-FCV-1114B, Blender to VCT. CRITICAL STEP.
EVALUATORS NOTE:
Closing 1-CH-FCV-1113B, and 1-CH-FCV-1114B are critical steps to ensure flow is not directed to the VCT.
COMMENTS:
STEP 4:
_______ SAT Open or check open 1-CH-208, Boric Acid Blender 1 Outlet Isol. (Step 5.1.8)
Open or check open 1-CH-210, Boric Acid Blender 1 Outlet Hdr. Isol. (Step 5.1.9) _______ UNSAT Open or check open 1-CH-391, Boric Acid Blender 1 Outlet to RWST. (Step 5.1.10)
Close or check closed 1-FC-71, U1 RWST Retun Isol. (Step 5.1.11)
STANDARD:
a) Operator contacts NLO on gaitronics and directs opening 1-CH-208, 1-CH-210, and 1-CH-391. Directing the NLO to open 1-CH-208, 1-CH-210, and 1-CH-391 is a critical step. CRITICAL STEP.
EVALUATORS NOTE:
- This step is critical in order to establish a flow path to the RWST. 1-FC-71 is not critical because it is normally closed and that is desired position.
BOOTH OPERATORS NOTE:
Insert Trigger 1 to open valves to establish flow path to RWST after receiving direction to open 1-CH-208, 1-CH-210, and 1-CH-391. Use time compression, and report completion of valve manipulations to the operator.
COMMENTS:
Page 4 of 20
Surry 2015-301 JPM b, M/U to RWST STEP 5:
_______ SAT Set the BA SUP BATCH INTEGRATOR and the PRI WTR BATCH INTEGRATOR for the required amount of makeup. If the integrators will NOT be used, THEN enter N/A _______ UNSAT (Step 5.1.12 )
STANDARD:
a) Operator sets BA BATCH INTEGRATOR and the PRI WTR BATCH INTEGRATOR high enough to add approximately 5000 gal.
EVALUATORS NOTE:
This operator should set both integrators to approx. 5000 gal or out of the way to allow 5,000 gal of blended flow to be added.
COMMENTS:
STEP 6:
_______ SAT Set the BA FLOW CONTR and the PRI WTR FLOW CONTR for the required concentration of makeup. (Step 5.1.13) _______ UNSAT STANDARD:
a) Operator sets the PRI WTR FLOW CONTR (PG) to 80 gpm on 1-CH-FC-1114; Dial setting 5.4 (5.3-5.5). CRITICAL STEP.
b) Operator sets BA FLOW CONTR for 16.88 gpm; Dial setting 7.6 (7.5 to 7.7).
CRITICAL STEP.
EVALUATORS NOTE:
BOOTH NOTE: Record POT setting for BA and PG. BA____, PG____.
COMMENTS:
Page 5 of 20
Surry 2015-301 JPM b, M/U to RWST STEP 7:
_______ SAT Place the MAKE-UP MODE SEL switch to the MANUAL position (Step 5.1.14)
_______ UNSAT STANDARD:
a) Operator places the MAKE-UP MODE SEL switch to the MANUAL position.
CRITICAL STEP.
EVALUATORS NOTE:
- This step is necessary to ensure the proper flow path from the blender to the RWST.
COMMENTS:
STEP 8:
_______ SAT Place the control switch for 1-CH-FVC-1113A, BORIC ACID TO BLENDER, to AUTO. (Step 5.1.16) _______ UNSAT STANDARD:
a) Operator places 1-CH-FVC-1113A, BORIC ACID TO BLENDER, to AUTO.
CRITICAL STEP.
EVALUATORS NOTE:
- This step is necessary to ensure 1-CH-FCV-1113A modulates at the set flow rate.
- After CH-FCV-1113A is placed in AUTO, the integrator will begin to count and Boric Acid will begin to flow. This is because a flow path has been established.
COMMENTS:
Page 6 of 20
Surry 2015-301 JPM b, M/U to RWST STEP 9:
_______ SAT Start the makeup by placing the MAKE-UP MODE CONTR switch to the START position.
(Step 5.1.17) _______ UNSAT STANDARD:
a) Operator places the MAKE-UP MODE CONTR switch to the START position.
CRITICAL STEP.
EVALUATORS NOTE:
- This step is necessary to initiate the blended flow to the RWST.
COMMENTS:
STOP TIME __________:
Page 7 of 20
Surry 2015-301 JPM b, M/U to RWST Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Initial Conditions
- Unit 1 is operating at 100%.
- BAST A is at 8.0 % concentration.
Initiating Cues
- I am the Shift Manager and you are the Unit RO.
- I need you to makeup 5000 gal. to the RWST, using the blender in accordance with 1-OP-CS-004, Refueling Water Storage Tank Makeup, steps 5.1.5 through 5.1.29.
- Blender settings for makeup to RWST have been determined to be: 80 gpm for PG (POT setting of 5.4), and 16.88 gpm for Boric Acid (POT setting of 7.6).
- When you finish the actions necessary to accomplish this task, please inform me.
Page 8 of 20
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions
- Unit 1 is operating at 100%.
- BAST A is at 8.0 % concentration.
Initiating Cues
- I am the Shift Manager and you are the Unit RO.
- I need you to makeup 5000 gal. to the RWST, using the blender in accordance with 1-OP-CS-004, Refueling Water Storage Tank Makeup, steps 5.1.5 through 5.1.29.
- Blender settings for makeup to RWST have been determined to be: 80 gpm for PG (POT setting of 5.4), and 16.88 gpm for Boric Acid (POT setting of 7.6).
- When you finish the actions necessary to accomplish this task, please inform me.
Final JPM C Surry 2015-301 Spurious CS Actuation U.S. Nuclear Regulatory Commission Surry Power Station SR10301 Simulator Job Performance Measure EPEE02EA1.3 (3.8/4.0)
Applicant________________________________ Start Time___________________
Examiner_______________________________
Date ___________________________________ Stop Time___________________
Title RESPOND TO A SPURIOUS CS ACTUATION.
K/A: EPEE02EA1.3, Ability to operate and / or monitor the following as they apply to the (SI Termination),
Desired operating results during abnormal and emergency situations. (3.8 / 4.0).
Applicability Estimated Time Actual Time RO/SRO(I) 10 minutes Initial Conditions
- Task is to be PERFORMED in the simulator.
- Spurious CS actuation has occurred at HSD.
Standards
- Applicant directs actions to secure 1-CS-P-1B, close discharge MOVs 1-CS-MOV-101C, D from field / MCR.
Initiating Cues
- I am the Shift Manager and you are the Unit RO.
- Unit 1 is at Hot Shutdown.
- There are NO personnel in Unit 1 containment.
- An inadvertent CS actuation occurred and we have received annunciators 1B-A6 and 1B-B6.
- Heres a copy of annunciator response 1B-A6. I need you to perform Attachment 1 of ARP 1B-A6, steps 1 - 6 only.
- When you finish the actions necessary to complete steps 1-6 of Attachment 1, please inform me.
Page 1 of 9
Surry 2015-301 Spurious CS Actuation Terminating Cues
- 1B-A6 Attachment 1, steps 1-6 complete.
Procedures
Tools and Equipment Safety Considerations
- None
- None Page 2 of 9
Surry 2015-301 Spurious CS Actuation Simulator Setup
- Recall IC-263 OR
- Call up HSD IC and initialize.
- Start 1-CS-P-1A/1B, freeze simulator, green flag both pumps and then place simulator in run.
- Open 1-CS-MOV-101A-D.
- Implement the following overrides to prevent 1-CS-P-1B from being secured from MCR and 1-CS-MOV-101C/D from closing with control switch: MOVCS101C_OPEN & MOVCS101D_OPEN to ON, CSP1B_STOP &
CSP1B_LOCK to OFF.
- Place the following Remotes on triggers: CSMOV101C & CSMOV101D to rack-out, CSMOV101C & CSMOV101D manual valves to 0% (closed).
Initial Conditions
- Spurious CS actuation has occurred at HSD.
Initiating Cues
- I am the Shift Manager and you are the Unit RO.
- Unit 1 is at Hot Shutdown.
- There are NO personnel in Unit 1 containment.
- An inadvertent CS actuation occurred and we have received annunciators 1B-A6 and 1B-B6.
- Heres a copy of annunciator response 1B-A6. I need you to perform Attachment 1 of ARP 1B-A6, steps 1 - 6 only.
- When you finish the actions necessary to complete steps 1-6 of attachment 1, please inform me.
Page 3 of 9
Surry 2015-301 Spurious CS Actuation PERFORMANCE CHECKLIST Notes to the Evaluator
- Task critical elements are bolded and noted as CRITICAL STEP.
- An additional instructor may be needed to silence alarms for the examinee.
- START TIME:
STEP 1:
_______ SAT STEP 1 - Check reset or reset HI HI CLS signal.
_______ UNSAT STANDARD:
- Checks annunciators 1B-C4 (CLS HI HI TR A) and 1B-C5 (CLS HI HI TR B) are not lit.
EVALUATORS NOTE:
Candidate May depress CLS Reset Pushbuttons, Annunciator 1B-A4, CLS SYS COIL FAILURE will be received.
COMMENTS:
STEP 2:
_______ SAT STEP 2 - Place control switch(es) for running CS pump(s) in PTL.
_______ UNSAT
- 1-CS-P-1A
- 1-CS-P-1B STANDARD:
- Places control switch 1-CS-P-1A in PTL and verifies zero amps. CRITICAL STEP.
- Places control switch for 1-CS-P-1B in PTL.
- Recognizes 1-CS-P-1B did NOT stop by observing red light on and amps indicated.
EVALUATORS NOTE: N/A COMMENTS:
Page 4 of 9
Surry 2015-301 Spurious CS Actuation STEP 3:
_______ SAT Step 3 - IF CS pump(s) will NOT stop from the MCR, THEN locally open supply breaker(s): _______ UNSAT
- 1-CS-P-1A, 14H-5
- 1-CS-P-1B, 14J-5 STANDARD:
- Directs Operator to locally open supply breaker 1-CS-P-1B supply breaker 14J-5.
CRITICAL STEP.
- When local operator reports 14J-5 is open, recognizes breaker for 1-CS-P-1B is open (red light off).
EVALUATORS NOTE: N/A BOOTH OPERATORS NOTE: Trigger 1, locally opens 1-CS-P-1B breaker. When directed to locally open 14J-5, inform the candidate that a time compression has occurred and 14J-5 is open.
COMMENTS:
STEP 4:
_______ SAT Note prior to Step 4
_______ UNSAT NOTE: The CS Pump Discharge MOVs will not close if the HI HI CLS signal is present.
STANDARD:
- Acknowledges note.
EVALUATORS NOTE: N/A COMMENTS:
Page 5 of 9
Surry 2015-301 Spurious CS Actuation STEP 5:
_______ SAT Step 4 - Verify closed or close CS PUMP DISCH MOV(s):
_______ UNSAT
- 1-CS-MOV-101A
- 1-CS-MOV-101B
- 1-CS-MOV-101C
- 1-CS-MOV-101D STANDARD:
- Closes 1-CS-MOV-101A (red light off, green light on). CRITICAL STEP
- Closes 1-CS-MOV-101B (red light off, green light on). CRITICAL STEP
- Closes 1-CS-MOV-101C (red light off, green light on)
- Recognizes 1-CS-MOV-101C did NOT close
- Closes 1-CS-MOV-101D (red light off, green light on)
- Recognizes 1-CS-MOV-101D did NOT close EVALUATORS NOTE: N/A COMMENTS:
Page 6 of 9
Surry 2015-301 Spurious CS Actuation STEP 6:
_______ SAT Step 5 - IF CS PUMP DISCH MOV(s) will NOT close, THEN do the following:
_______ UNSAT
- a. Send an Operator to Unit 1 Cable Vault and an Operator to Unit 1 Safeguards.
- b. Direct Operator in Unit 1 Cable Vault to open MOV supply breaker(s) for MOV(s) which will not close.
- 1-CS-MOV-101A, 1H1-2S-1A
- 1-CS-MOV-101B, 1J1-2W-5A
- 1-CS-MOV-101C, 1H1-2S-2B
- 1-CS-MOV-101D, 1J1-2W-4A
- c. WHEN breaker(s) open, THEN have Operator in Safeguards locally close affected MOV(s).
STANDARD:
- Directs Operator to locally open breaker for 1-CS-MOV-101C, 1H1-2S-2B.
- Directs Operator to locally open breaker for 1-CS-MOV-101D, 1J1-2W-4A.
- Once breakers reported open, directs local closure of 1-CS-MOV-101C and 1-CS-MOV-101D. CRITICAL STEP.
EVALUATORS NOTE:
Follow-up question is warranted if Candidate directs 1-CS-MOV-101C and 1-CS-MOV-101D are directed to be closed without power supply breaker opened (bullet 1 and 2 above).
Booth Operator: When called to locally open 1-EP-BKR-1H1-2S-2B & 1-EP-BKR-1J1-2W-4A, implement Triggers 3 & 5 and inform the candidate that a time compression has occurred and 1-EP-BKR-1H1-2S-2B & 1-EP-BKR-1J1-2W-4A are open.
Repeat direction if incorrect breaker mark number is given to field operator; IF incorrect, DO NOT implement Trigger 3 & 5.
Booth Operator: When called to locally close 1-CS-MOV-101C & 1-CS-MOV-101D, implement trigger 7 and inform the candidate that a time compression has occurred and 1-CS-MOV-101C & 1-CS-MOV-101D are closed. Repeat direction if incorrect valve mark number is given to field operator; IF incorrect, DO NOT implement Trigger 7.
COMMENTS:
Page 7 of 9
Surry 2015-301 Spurious CS Actuation STEP 7:
_______ SAT Step 6 - Verify closed or close CHEM ADD TK OUTLET MOVs:
_______ UNSAT
- 1-CS-MOV-102A
- 1-CS-MOV-102B STANDARD:
- Verifies 1-CS-MOV-102A and 1-CS-MOV-102B closed by observing red light off and green light on.
EVALUATORS NOTE: N/A COMMENTS:
STEP 8:
_______ SAT REPORT TO SHIFT SUPERVISOR (EVALUATOR).
_______ UNSAT STANDARD:
Verbal status report that Attachment 1 of Annunciator response 1B-A6, steps 1-6 are complete.
EVALUATORS NOTE: N/A COMMENTS:
STOP TIME:
Page 8 of 9
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Task
- Task is to be performed in the simulator.
Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task Initial Conditions
- Spurious CS actuation has occurred at HSD.
Initiating Cues
- I am the Shift Manager and you are the Unit RO.
- Unit 1 is at Hot Shutdown.
- There are NO personnel in Unit 1 containment.
- An inadvertent CS actuation occurred and we have received annunciators 1B-A6 and 1B-B6.
- Heres a copy of annunciator response 1B-A6. I need you to perform Attachment 1 of ARP 1B-A6, steps 1-6 only.
- When you finish the actions necessary to complete steps 1-6 of Attachment 1, please inform me.
Operator Directions Handout
(TO BE GIVEN TO APPLICANT)
Initial Conditions
- Spurious CS actuation has occurred at HSD.
Initiating Cues
- I am the Shift Manager and you are the Unit RO.
- Unit 1 is at Hot Shutdown.
- There are NO personnel in Unit 1 containment.
- An inadvertent CS actuation occurred and we have received annunciators 1B-A6 and 1B-B6.
- Heres a copy of annunciator response 1B-A6. I need you to perform Attachment 1 of ARP 1B-A6, steps 1 - 6 only.
- When you finish the actions necessary to complete steps 1-6 of Attachment 1, please inform me.
Final JPM D Surry 2015-301 JPM d, Bleed & Feed U.S. Nuclear Regulatory Commission Surry Power Station SR15301 Simulator Job Performance Measure [WE05EA1.1 4.1/4.0 ]
[Alternate Path]
Applicant________________________________ Start Time___________________
Examiner_______________________________
Date ___________________________________ Stop Time___________________
Title INITIATE RCS BLEED AND FEED HEAT REMOVAL (Faulted)
K/A: WE05EA1.1: Ability to operate and / or monitor the following as they apply to the Loss of Secondary Heat Sink: Components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features. (4.1/4.0)
Applicability Estimated Time Actual Time RO/SRO(I) 10 Minutes ___ Minutes Conditions
- Task is to be PERFORMED in the simulator.
- A loss of all FW has occurred from 100% power. 1-FR-H.1 has been implemented and 3 of 3 SG WR levels are less than 12%.
Standards
Initiating Cues
- Shift Manager direction.
Terminating Cues
- Report received that RCS bleed & feed established (1-FR-H.1 Step 19 completed).
Procedures
- 1-FR-H.1, Response to Loss of Secondary Heat Sink, Rev. 37.
Tools and Equipment Safety Considerations
- None
- None Page 1 of 15
Surry 2015-301 JPM d, Bleed & Feed Simulator Setup
- Insert the following malfunctions:
o Trigger 1: CN1201, CN1202, CN1203; Condensate Pump trips.
o Trigger 1: FW0701, FW0701; Aux FW pump trips.
o Trigger 1: FW1101, 100% deg.; Aux FW P-2 Impellor crack.
o After CN pump trips: FW3601, FW3602, FW3603, FW3604; Feedwater pump spurious trips.
o Override both Przr PORVs Fail to Open.
- Trip all 3 CN pumps, lockout 1-FW-P-3A and 3B, implement 100% degradation (impeller crack) for 1-FW-P-2, trip both MFW pumps, let the S/G levels decrease to < 10% WR, trip all 3 RCPs. Place simulator in Freeze.
Initial Conditions
- You are the Unit RO & I am the Shift Manager. There is a loss of secondary heat sink in progress on Unit 1 (MFW and AFW/AFW X-tie is unavailable).
- The Condensate System is unavailable and Unit 1 Safeguards is inaccessible so no low pressure makeup water source is available.
- Current conditions are 3 SG Wide Range levels less than 12% thereby meeting the criteria for performing RCS bleed and feed heat removal.
Initiating Cues
- Here's a copy of 1-FR-H.1, Steps 10 through 19. You are to initiate RCS bleed and feed heat removal IAW Steps 11 through 19 ONLY.
- When you finish the actions necessary to initiate RCS bleed and feed, please inform me.
Notes
- Operator is given copy of 1-FR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK, steps 10-19 during directions.
Page 2 of 15
Surry 2015-301 JPM d, Bleed & Feed PERFORMANCE CHECKLIST Notes to the Evaluator
- Task critical elements are bolded and denoted as a CRITICAL STEP.
- This is a Faulted JPM.
- Critical step sequencing requirements: Step 1 first, then 2.
- An additional instructor may be needed to silence and acknowledge alarms for the examinee.
- START TIME_______:
STEP 1:
_______ SAT CHECK FOR LOSS OF SECONDARY HEAT SINK. (Step 11)
_______ UNSAT STANDARD:
a) Confirms that Wide range level in at least 2 SGs are less than 12%. Proceeds to step 12.
EVALUATORS NOTE:
COMMENTS:
STEP 2:
_______ SAT CHECK STOPPED OR STOP ALL RCPS. (Step 12)
_______ UNSAT STANDARD:
a) Observes CAUTION prior to Step 12 regarding fact that Steps 12 - 19 must be performed quickly.
b) Notes that RCPs were previously secured.
EVALUATORS NOTE:
COMMENTS:
Page 3 of 15
Surry 2015-301 JPM d, Bleed & Feed STEP 3:
_______ SAT INITIATES SI. (Step 13)
_______ UNSAT STANDARD:
(a) Depresses SI Train A and/or Train B actuation pushbutton(s). CRITICAL STEP.
(b) Identifies annunciator 1A-F3/1A-F4, SI TRAIN A/B INITIATED [ ].
EVALUATORS NOTE:
- This step is sequence critical**
COMMENTS:
STEP 4:
_______ SAT CHECK RCS FEED PATH. (Step 14)
_______ UNSAT STANDARD:
a) Verifies HHSI flow to the cold legs indicated by observing the following instrumentation:
- FI-1961, FI-1962, and FI-1963 (individual loop FTs) and
- FI-1943 and FI-1943A (header flow) b) Checks all three Charging pumps are running by observing breaker indication (red light on & green off) and amps indicated EVALUATORS NOTE:
COMMENTS:
Page 4 of 15
Surry 2015-301 JPM d, Bleed & Feed STEP 5:
_______ SAT RESET BOTH TRAINS OF SI (TIME DELAY) (Step 15)
_______ UNSAT STANDARD:
a) Observes NOTE prior to Step 15 regarding reset of SI if actuation occurs after Step 15.
b) Depresses both SI RESET pushbuttons (after 60 seconds).
EVALUATORS NOTE:
COMMENTS:
STEP 6:
_______ SAT CHECK IF CLS CAN BE RESET. (Step 16)
_______ UNSAT STANDARD:
a) Checks CTMT pressure has not exceeded 17.7 psia, and proceeds to step 17.
EVALUATORS NOTE:
- If asked: Inform candidate that containment pressure has not exceeded 17.7 psia.
COMMENTS:
Page 5 of 15
Surry 2015-301 JPM d, Bleed & Feed STEP 7:
_______ SAT CHECK INSTRUMENT AIR AVAILABLE. (Step 17)
_______ UNSAT STANDARD:
a) Checks annunciator 1B-E6, IA LO HDR PRESS/IA COMPR 1 TRBL, not lit.
b) Checks at least one CTMT IA compressor running by observing running indication (red light on & green off) on either:
- 1-IA-C-4A or
- 1-IA-C-4B.
c) Checks 1-IA-TV-100 OPEN.
EVALUATORS NOTE:
COMMENTS:
Page 6 of 15
Surry 2015-301 JPM d, Bleed & Feed STEP 8:
_______ SAT ESTABLISH RCS BLEED PATH: (Step 18)
_______ UNSAT STANDARD:
a) Checks power available to PRZR PORV block valves by observing indicating lights lit for the following MOVs:
- 1-RC-MOV-1535 (red light on & green off).
- 1-RC-MOV-1536 (red light on & green off).
b) Verifies PRZR PORV block valves - BOTH OPEN (red light on & green off).
c) Opens PRZR PORV 1-RC-PCV-1455C by placing control switch to the OPEN position.
1-RC-PCV-1455C WILL NOT OPEN.
d) Checks 1-RC-PCV-1455C open indication received (red light on & green off).
Determines that 1-RC-PCV-1455C did not open.
e) Opens PRZR PORV 1-RC-PCV-1456 by placing control switch into the OPEN position.
1-RC-PCV-1456 WILL NOT OPEN.
f) Checks 1-RC-PCV-1456 open indication received (red light on & green off). Determines that 1-RC-PCV-1456 did not open.
EVALUATORS NOTE:
- Acknowledge that both Pressurizer PORVs did not open and indicate that you will dispatch operators and an electrician to investigate and that the operator should continue on in the procedure.
- **This step is sequence critical**
- If asked; provide OPMS keys.
COMMENTS:
Page 7 of 15
Surry 2015-301 JPM d, Bleed & Feed STEP 9:
_______ SAT CHECK ADEQUATE RCS BLEED PATH: (Step 19)
_______ UNSAT STANDARD:
a) Checks PRZR PORVs- BOTH OPEN (Note: If 1-RC-PCV-1456 was not opened in the previous step, the operator should open the PORV IAW the RNO). Operator determines that neither PORV will OPEN.
b) Performs STEP 19 RNO. Checks both PRZR block valves open.
c) Operator opens PRZR and Rx Head Vents.
d) Opens 1-RC-SOV-100A-2 by placing control switch to the OPEN position.
CRITICAL STEP.
e) Checks 1-RC-SOV-100A-2 open indication received (red light on & green off).
f) Opens 1-RC-SOV-100A-1 by placing control switch to the OPEN position.
CRITICAL STEP.
g) Checks 1-RC-SOV-100A-1 open indication received (red light on & green off).
h) Opens 1-RC-SOV-101A-2 by placing control switch to the OPEN position.
CRITICAL STEP. Checks 1-RC-SOV-101A-2 open indication received (red light on &
green off).
i) Opens 1-RC-SOV-101A-1 by placing control switch to the OPEN position.
CRITICAL STEP. Checks 1-RC-SOV-101A-1 open indication received (red light on &
green off).0 j) Recalls from directions that there are no low pressure water sources available and safeguards in inaccessible and goes to step 20.
EVALUATORS NOTE:
- If asked: Unit 1 Safeguards is inaccessible and no low pressure water source is available.
- The breakers for the B Train Head vents are Danger tagged OFF. Therefore only the A Train Head vents should be opened.
- When the operator goes to step 20, indicate that the BOP will perform Attachment 3.
COMMENTS:
Page 8 of 15
Surry 2015-301 JPM d, Bleed & Feed STEP 10:
_______ SAT REPORTS TO SHIFT MANAGER.
_______ UNSAT STANDARD:
a) Verbal status report made that RCS bleed and feed established.
EVALUATORS NOTE:
COMMENTS:
STOP TIME________________:
Page 9 of 15
Surry 2015-301 JPM d, Bleed & Feed Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Initial Conditions
- You are the Unit RO & I am the Shift Manager. There is a loss of secondary heat sink in progress on Unit 1 (MFW and AFW/AFW X-tie is unavailable).
- The Condensate System is unavailable and Unit 1 Safeguards is inaccessible so no low pressure makeup water source is available.
- Current conditions are 3 SG Wide Range levels less than 12% thereby meeting the criteria for performing RCS bleed and feed heat removal.
Initiating Cues
- Here's a copy of 1-FR-H.1, Steps 10 through 19. You are to initiate RCS bleed and feed heat removal IAW Steps 11 through 19 ONLY.
- When you finish the actions necessary to initiate RCS bleed and feed, please inform me.
Page 10 of 15
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions
- You are the Unit RO & I am the Shift Manager. There is a loss of secondary heat sink in progress on Unit 1 (MFW and AFW/AFW X-tie is unavailable).
- The Condensate System is unavailable and Unit 1 Safeguards is inaccessible so no low pressure makeup water source is available.
- Current conditions are 3 SG Wide Range levels less than 12% thereby meeting the criteria for performing RCS bleed and feed heat removal.
Initiating Cues
- Here's a copy of 1-FR-H.1, Steps 10 through 19. You are to initiate RCS bleed and feed heat removal IAW Steps 11 through 19 ONLY.
- When you finish the actions necessary to initiate RCS bleed and feed, please inform me.
Final JPM E Surry 2015-301 Secondary Transient U.S. Nuclear Regulatory Commission Surry Power Station SR15301 Simulator Job Performance Measure]
[Alternate Path]
Applicant________________________________ Start Time___________________
Examiner_______________________________
Date ___________________________________ Stop Time___________________
Title RESPOND TO A SECONDARY SYSTEM TRANSIENT.
K/A: SYS016A2.01, Detector Failure, 3.0/3.1.
Applicability Estimated Time Actual Time RO/SRO(I) 5 Minutes ___ Minutes Conditions
- Task is to be PERFORMED in the simulator.
- Unit is operating at 100% power with all systems normal and in automatic.
Standards
- 0-AP-53.00, Loss of Vital Instrumentation / Controls, Revision 21.
Initiating Cues
- Shift Manager direction.
Terminating Cues
- Report received that unit is stabilized and 0-AP-53.00 is completed.
Procedures
- 0-AP-53.00, Loss of Vital Instrumentation / Controls, Revision 21.
Tools and Equipment Safety Considerations
- None
- None Page 1 of 13
Surry 2015-301 Secondary Transient Simulator Setup
- Recall IC-265 or recall 100% power IC and initialize. Place simulator in RUN.
- Enter malfunction, FW1303, Ch III, A SG Fail Low, -1 Deg, 0 Sec Ramp, Trigger 1.
- Enter Switch Override, FW, FWFCV478_MANUAL, OFF, Active.
- Enter Switch Override, FW, FWFCV478_AUTO, ON, Active.
- Freeze Simulator until ready.
Initial Conditions
- You are the Unit 1 RO and I am the Shift Manager. The unit is operating at 100% power with all systems in automatic.
Initiating Cues
- You are to respond to a plant transient.
- When you finish the actions necessary to accomplish this task, please inform me.
Notes This failure will cause A SG Channel III NR level to fail low. A FRV will open, causing A SG NR on the two operable channels to rise. The A FRV will fail to shift to manual control, requiring the operator to throttle flow with the Feedwater isolation MOV to prevent a turbine trip/reactor trip on SG NR high high level.
Page 2 of 13
Surry 2015-301 Secondary Transient PERFORMANCE CHECKLIST Notes to the Evaluator
- Task critical elements are bolded and demoted as CRITICAL STEP.
- An additional instructor may be needed to silence alarms for the examinee.
- START TIME_______:
0-AP-53.00, Step 1
_______ SAT STEP 1: CHECK REDUNDANT INSTRUMENT CHANNEL(S) INDICATION - NORMAL.
_______ UNSAT STANDARD:
a) Identifies the affected SG using Steam Flow/Feed Flow mismatch annunciators, A SG Level trend, and/or A FRV demand.
b) Identifies Channel I and II A SG Normal; Channel III failed low.
EVALUATORS NOTE:
COMMENTS:
0-AP-53.00, Step 2
_______ SAT Step 2: PLACE AFFECTED CONTROL(S)/COMPONENT(S) IN MANUAL CONTROL AND STABILIZE PARAMETER USING REDUNDANT INDICATION _______ UNSAT STANDARD:
a) Attempts to place A FRV in manual.
c) Continues to hold control switch in close until A SG Feed flow is less than Steam flow, and A SG Level begins to trend towards 44%.
EVALUATORS NOTE:
JPM Failure Criteria. An automatic Turbine/Reactor trip due to untimely Candidate response to the event is considered a JPM Failure.
COMMENTS:
Page 3 of 13
Surry 2015-301 Secondary Transient Step 3 Reports completion of Immediate Steps of 0-AP-53.00 to Shift manager (Evaluator). _______ SAT STANDARD: _______ UNSAT a) Reports completion of Immediate Action Steps of 0-AP-53.00.
b) Reports A SG Feed flow is less than Steam Flow and NR level trending to Normal.
EVALUATORS NOTE:
None COMMENTS:
END OF JPM STOP TIME:
Page 4 of 13
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Task
- Task is to be performed in the simulator.
Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.
Initial Conditions
- You are the Unit 1 RO and I am the Shift Manager. The unit is operating at 100% power with all systems in automatic.
Initiating Cues
- You are to respond to a plant transient.
- When you finish the actions necessary to accomplish this task, please inform me.
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions
- You are the Unit 1 RO and I am the Shift Manager. The unit is operating at 100% power with all systems in automatic.
Initiating Cues
- You are to respond to a plant transient.
- When you finish the actions necessary to accomplish this task, please inform me.
Final JPM F Surry 2015-301 JPM f, Manual start CS U.S. Nuclear Regulatory Commission Surry Power Station SR15301 Simulator Job Performance Measure [WE14EA1.1 3.7/3.7]
Applicant________________________________ Start Time___________________
Examiner_______________________________
Date ___________________________________ Stop Time___________________
Title MANUALLY START CS PUMPS PER ATTACHMENT 1 OF E-0 K/A: WE14EA1.1: Ability to operate and / or monitor the following as they apply to the (High Containment Pressure): Components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features. [3.7/3.7]
Applicability Estimated Time Actual Time RO/SRO(I) 18 Minutes ___ Minutes Conditions
- Task is to be PERFORMED in the simulator.
- A Safety Injection has occurred from 100% power due to a LBLOCA.
Standards
- 1-E-0, Reactor Trip or Safety Injection, Attachment 1 completed.
Initiating Cues
- 1-E-0, Reactor Trip or Safety Injection, Attachment 1
- Shift Manager direction.
Terminating Cues
- 1-E-0, Reactor Trip or Safety Injection, Attachment 1 completed.
Procedures
- 1-E-0, Reactor Trip or Safety Injection, Attachment 1. Rev # 71.
Tools and Equipment Safety Considerations
- None
- None Page 1 of 19
Surry 2015-301 JPM f, Manual start CS Simulator Setup
- Call up saved IC (266) or
- Call up 100% power IC and initialize. Place simulator in RUN.
- Implement malfunction for failure of both CS pumps to auto start; CS1601, 1602.
- Implement malfunction for failure of 1-FW-MOV-150A to CLOSE; FW5501.
- Implement malfunction for failure of Aux FW pump P-3B to auto start; FW-49.
- Apply MINIFLOW RECIRC CRITERIA shut the charging mini-flow recircs (1-CH-MOV-1275A, B, C)
- Place simulator in freeze until JPM performance.
- VERIFY BRASS CAPS INSTALLED OVER HI-HI CLS ACTUATION PUSHBUTTONS AFTER EACH RESET.
- ENSURE ALL PCS SCREENS ARE RESET TO DISPLAY.
Initial Conditions
- I am the Shift Manager. A Safety Injection has occurred from 100% power due to a LBLOCA. The Immediate Actions of 1-E-0 have been performed.
- MINIFLOW RECIRC CRITERIA has been applied and the Team has closed the charging mini-flow recircs.
Initiating Cues
- Here is a copy of 1-E-0, Attachment 1. I need you to perform Attachment 1 of 1-E-0.
- When you finish the actions necessary to accomplish this, please inform me.
Notes
- Operator is given copy of 1-E-0, REACTOR TRIP OR SAFETY INJECTION, ATTACHMENT 1 during directions.
Page 2 of 19
Surry 2015-301 JPM f, Manual start CS PERFORMANCE CHECKLIST Notes to the Evaluator
- Task critical elements are bolded and denoted as CRITICAL STEP.
- An additional instructor may be needed to silence and acknowledge alarms for the examinee.
- START TIME_______:
STEP 1:
_______ SAT CHECK FW ISOLATION (Step 1)
_______ UNSAT STANDARD:
a) Verifies Feed Pump discharge MOVs - CLOSED. 1-FW-MOV-150A, and 1-FW-MOV-150B. 1-FW-MOV-150A red light lit, 1-FW-MOV-150B green light lit.
b) Operator finds that 1-FW-MOV-150A is still OPEN, and manually closes 1-FW-MOV-150A. CRITICAL STEP.
c) Verifies MFW pumps tripped.
d) Verifies Feed Reg valves CLOSED.
e) Verifies FW Bypass valves are CLOSED.
f) Verifies SG blowdown TVs are CLOSED.
EVALUATORS NOTE:
If operator reports that 1-FW-MOV-150A did not close then acknowledge report.
COMMENTS:
STEP 2:
_______ SAT VERFIES CTMT ISOLATION PHASE I. (Step 2)
_______ UNSAT STANDARD:
a) Verifies Phase I TVs closed.
b) Verifies 1-CH-MOV-1381 and 1-SV-TV-102A closed.
c) Verifies PAM isolations 1-DA-TV-103A and B closed.
EVALUATORS NOTE:
COMMENTS:
Page 3 of 19
Surry 2015-301 JPM f, Manual start CS STEP 3:
_______ SAT CHECK AFW PUMPS RUNNING. (Step 3)
_______ UNSAT STANDARD:
a) Verifies MD AFW pumps are running (1-FW-P-3A, 1-FW-P-3B), by observing pump breaker closed lights and ammeter indication.
b) Operator determines that 1-FW-P-3B is NOT running and manually starts 1-FW-P-3B. CRITICAL STEP.
c) Verifies TD AFW pump running, by observing pump pressure switch lights and steam flow indication (1-MS-FI-100).
EVALUATORS NOTE:
If operator reports that 1-FW-P-3B did not auto start, then acknowledge report.
COMMENTS:
STEP 4:
_______ SAT CHECK SI PUMPS RUNNING. (Step 4)
_______ UNSAT STANDARD:
a) Verifies CHG pumps running; 1-CH-P-1A, 1-CH-P-1B, and 1-CH-P-1C, by observing pump breaker closed lights and ammeter indication.
b) Verifies LHSI pumps running; 1-SI-P-1A, and 1-SI-P-1B, by observing pump breaker closed lights and ammeter indication.
EVALUATORS NOTE:
COMMENTS:
Page 4 of 19
Surry 2015-301 JPM f, Manual start CS STEP 5:
_______ SAT CHECK CHARGING PUMP AUXILIARIES. (Step 5)
_______ UNSAT STANDARD:
a) Verifies 1-CC-P-2A, or 1-CC-P-2B running by observing pump run lights lit.
b) Verifies 1-SW-P-10A, or 1-SW-P-10B running by observing pump run lights lit.
EVALUATORS NOTE:
All pumps running as required.
COMMENTS:
STEP 6:
_______ SAT CHECK INTAKE CANAL. (Step 6)
_______ UNSAT STANDARD:
a) Verifies canal level > 24 feet.
b) Verifies Circ Water pumps maintaining level.
EVALUATORS NOTE:
CW pumps maintaining level.
COMMENTS:
Page 5 of 19
Surry 2015-301 JPM f, Manual start CS STEP 7:
_______ SAT CHECK IF MAIN STEAMLINES SHOULD BE ISOLATED. (Step 7)
_______ UNSAT STANDARD:
a) Verifies 1E-F10 (Hi Steam Flow), 1B-C4 (Hi Hi CLS Train A) and 1B-C5 (Hi Hi CLS Train B) are lit. 1E-F10 is NOT lit.
b) Checks MSTVs shut.
c) Checks high steam flow or header to line SI actuated.
d) Verifies Unit 1 and Unit 2 RWST crosstie valves open; 1-SI-TV-102A, 1-SI-TV-102B, 2-SI-TV-202A, 2-SI-TV-202B. Contacts U2 to verify U2 RWST crosstie valves are open.
e) Checks RCS pressure < 185 psig.
EVALUATORS NOTE:
o If asked: Hi steam flow SI did not actuate (1E-F10).
o If asked: Report that U2 RWST crosstie valves; 2-SI-TV-202A, and 2-SI-TV-202B are open.
COMMENTS:
STEP 8:
_______ SAT CHECK IF CS REQUIRED. (Step 8)
_______ UNSAT STANDARD:
a) Verifies CTMT pressure > 23 psia.
b) Manually initiates (backs up) HI HI CLS.
c) Verifies all RCPs are tripped.
d) Checks CS pumps - RUNNING.
e) Notes both CS pumps are not running and applies RNO and manually starts CS pumps. CRITICAL STEP.
f) Initiates Attachment 4.
EVALUATORS NOTE:
- If report given for failure of CS pumps to start, then acknowledge report.
- Another operator will perform attachment 4.
COMMENTS:
Page 6 of 19
Surry 2015-301 JPM f, Manual start CS STEP 9:
_______ SAT CHECK IF RS REQUIRED. (Step 9)
_______ UNSAT STANDARD:
a) Verifies RWST > 60%.
b) Applies RNO, continue to monitor RWST level and go to step 10.
EVALUATORS NOTE:
Acknowledge continue to monitor RWST level.
COMMENTS:
STEP 10:
_______ SAT BLOCK LOW PRZR PRESS SI SIGNAL. (Step 10)
_______ UNSAT STANDARD:
a) Verifies RCS pressure is < 2000 psig.
b) Turns both Lo PRZR Press and Stm HDR/line Delta P switches to block.
c) Verifies Permissive Status Light C-2 is Lit.
EVALUATORS NOTE:
COMMENTS:
Page 7 of 19
Surry 2015-301 JPM f, Manual start CS STEP 11:
_______ SAT BLOCKS LOW TAVE SIGNAL. (Step 11)
_______ UNSAT STANDARD:
a) Checks Tave < 543°F.
b) Blocks both trains of HI STM FLOW & LO TAVG OR LP switches to block.
c) Verifies Permissive status light F-1 is lit.
EVALUATORS NOTE:
COMMENTS:
STEP 12:
_______ SAT VERIFIES SI FLOW. (Step 12)
_______ UNSAT STANDARD:
a) Reviews notes prior to step 12.
b) Checks HHSI flow indicated on all channels: 1-SI-FI-1961, 1-SI-FI-1962, 1-SI-FI-1963, 1-SI-FI-1943, or 1-SI-FI-1943A.
c) Checks 3 Charging pumps running.
d) Resets SI. CRITICAL STEP.
e) Stops a Charging pump (1-CH-P-1A or 1-CH-P-1B) and places in Auto. CRITICAL STEP.
f) Verifies RCS pressure is < 185 psig.
g) Verifies LHSI flow.
EVALUATORS NOTE:
- If report given for securing a Charging pump, then acknowledge report.
- Note: There is no fault in this step. It is expected that 3 Charging pumps will be running and the operator will secure one charging pump. Per the note prior to step 12 the pump that should be secured is 1-CH-P-1A.
COMMENTS:
Page 8 of 19
Surry 2015-301 JPM f, Manual start CS STEP 13:
_______ SAT CHECK TOTAL AFW FLOW - GREATER THAN 350 GPM [450 GPM] (Step 13)
_______ UNSAT STANDARD:
a) Verifies total AFW flow is > 350 gpm [450 gpm].
EVALUATORS NOTE:
- If asked; AFW flow is as indicated.
- If Containment still adverse (Containment press. > 20 psia) then 450 gpm is the correct amount of AFW flow.
COMMENTS:
STEP 14:
_______ SAT CHECK AFW MOVs - OPEN. (Step 14)
_______ UNSAT STANDARD:
a) Checks all AFW MOVs open and notes that they are throttled; 1-FW-MOV-151A, 1-FW-MOV-151B, 1-FW-MOV-151C, 1-FW-MOV-151D, 1-FW-MOV-151E, and 1-FW-MOV-151F.
b) Performs RNO and verifies valves are manually aligned as necessary.
EVALUATORS NOTE:
- NOTE: AFW throttled to avoid excessive cooldown.
COMMENTS:
Page 9 of 19
Surry 2015-301 JPM f, Manual start CS STEP 15:
_______ SAT INITIATES SI VALVE ALIGNMENT IAW ATTACHMENT 2. INITIATE VENTILATION, AC POWER, AND SFP STATUS CHECKS IAW ATTACHMENT 3. (Step 15, 16) _______ UNSAT STANDARD:
a) Initiates Attachments 2 and 3.
EVALUATORS NOTE:
Inform RO another Operator will perform Attachments 2 and 3.
COMMENTS:
STEP 16:
_______ SAT REPORTS TO SHIFT MANAGER
_______ UNSAT STANDARD:
a) Verbal status report made of task completion.
EVALUATORS NOTE:
COMMENTS:
STOP TIME___________:
Page 10 of 19
Surry 2015-301 JPM f, Manual start CS Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Initial Conditions
- I am the Shift Manager. A Safety Injection has occurred from 100% power due to a LBLOCA. The Immediate Actions of 1-E-0 have been performed.
- MINIFLOW RECIRC CRITERIA has been applied and the Team has closed the charging mini-flow recircs.
Initiating Cues
- Here is a copy of 1-E-0, Attachment 1. I need you to perform Attachment 1 of 1-E-0.
- When you finish the actions necessary to accomplish this, please inform me.
Page 11 of 19
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions
- I am the Shift Manager. A Safety Injection has occurred from 100% power due to a LBLOCA. The Immediate Actions of 1-E-0 have been performed.
- MINIFLOW RECIRC CRITERIA has been applied and the Team has closed the charging mini-flow recircs.
Initiating Cues
- Here is a copy of 1-E-0, Attachment 1. I need you to perform Attachment 1 of 1-E-0.
- When you finish the actions necessary to accomplish this, please inform me.
Final JPM G Surry 2015-301 JPM h, Waste Gas Release U.S. Nuclear Regulatory Commission Surry Power Station SR15301 Simulator Job Performance Measure [APE060AA2.05 3.7, 4.2]
[Alternate Path]
Applicant________________________________ Start Time___________________
Examiner_______________________________
Date ___________________________________ Stop Time___________________
Title WASTE GAS DECAY TANK RELEASE ISOLATION (FAULTED)
K/A: APE060AA2.05: Ability to determine and interpret the following as they apply to the Accidental Gaseous Radwaste: That the automatic safety actions have occurred as a result of a high ARM system signal.
Applicability Estimated Time Actual Time RO 10 Minutes ___ Minutes Conditions
- Task is to be PERFORMED in the simulator.
- Release of B Waste Gas Decay Tank is ready to commence.
Standards
- Release isolated. 1-GW-FCV-101 closed, 1-GW-FCV-160 closed, and 1-GW-FCV-260 closed IAW 0-RMA-C6 and/or 0-RMA-C7.
Initiating Cues
- ARP 0-RMA-C6 and/or 0-RMA-C7
- Shift Manager Direction.
Terminating Cues
- Steps 1-5 of RMA-C6 and/or RMA-C7 completed.
Procedures
- OP-23.2.4, RELEASE OF WASTE GAS DECAY TANK 1B, REV. 19
- 0-RMA-C6, PROCESS VENT PART ALERT/HI, REV. 3
- 0-RMA-C7, PROCESS VENT NORMAL RANGE GAS ALERT/HI, REV. 3 Page 1 of 23
Surry 2015-301 JPM h, Waste Gas Release Tools and Equipment Safety Considerations
- None
- None Simulator Setup
- Call up Saved IC (268) or
- Call up 100% power IC and initialize. Place simulator in RUN.
- Enter malfunctions to Disable AUTO CLOSURE for 1-GW-FCV-101, 1-GW-FCV-160, 1-GW-FCV-260: GW-01, GW-02, GW-03.
- Enter overrides for Process Vent Particulate and Gas RMs: RM0601 to 40% and RM0602 to 60% and place on trigger 1.
Initial Conditions
- I am the Shift Manager. You are the Unit 1 Reactor Operator. The Unit is at 100% power and stable.
- Waste Gas Decay Tank 1B has just been aligned for Release.
- Waste Gas Decay Tank 1B Hydrogen concentration is 34.4%, the maximum allowable release rate is 7.5 scfm per the release permit.
Initiating Cues
- I need you to perform a release of Waste Gas Decay Tank 1B in accordance with OP-23.2.4, Release of Waste Gas Decay Tank 1B, section 5.4.
- When you finish the actions necessary to accomplish this task, please inform me.
Notes
- Operator is given copy of OP-23.2.4, Release of Waste Gas Decay Tank 1B during directions. This evolution may be pre-briefed.
- Annunciators 0-RMA-C6, PROCESS VENT PART ALERT/HI, and 0-RMA-C7, PROCESS VENT NORMAL RANGE GAS ALERT/HI will alarm. Performing either ARP will satisfy performance of the JPM. Steps 1-6 of either ARP are identical.
- Booth Instructor Note: After WGDT Effluent flow is established in step 5.4.2 initiate RM malfunction.
Page 2 of 23
Surry 2015-301 JPM h, Waste Gas Release PERFORMANCE CHECKLIST Notes to the Evaluator
- Task critical elements are bolded and denoted as a CRITICAL STEP.
- An additional instructor may be needed to silence and acknowledge alarms for the examinee.
- START TIME_______:
STEP 1:
_______ SAT Turn 1-GW-FCV-101, DECAY TK BLEED ISOL switch to OPEN. (OP-23.2.4; Step 5.4.1)
_______ UNSAT STANDARD:
a) Operator places switch for 1-GW-FCV-101, DECAY TK BLEED ISOL to OPEN position.
EVALUATORS NOTE:
- 1-GW-FCV-101, DECAY TK BLEED ISOL will not fully open until next step (operation of Flow Controller).
COMMENTS:
STEP 2:
_______ SAT Slowly open 1-GW-FCV-101 (Auto/Man station) and check that 1-GW-FI-101, WGDT EFFLUENT FLOW, does not indicate more than 0.5 scfm. (Step 2) _______ UNSAT STANDARD:
a) Operator acknowledges NOTE regarding pressure and flow are slow to stabilize after opening 1-GW-FCV-101.
b) Operator slowly opens 1-GW-FCV-101 to establish approximately 0.5 scfm on 1-GW-FI-101, WGDT Effluent flow.
EVALUATORS NOTE:
- After completion of this step malfunction will be entered causing alarms 0-RMA-C6, and 0-RMA-C7 to annunciate.
- If asked, direct operator to perform actions of the ARP.
BOOTH OPERATORS NOTE:
- Monitor 1-GW-AR-150 A&B Recorder ON 1-GW-FR-101. After flow is established (approx. 0.5 scfm) insert Trigger 1.
COMMENTS:
Page 3 of 23
Surry 2015-301 JPM h, Waste Gas Release START OF ARP STEP 3:
_______ SAT CHECK ALARM-READING ON MONITOR OR CHART RECORDER GREATER THAN OR EQUAL TO ALERT SETPOINT. (0-RMA-C6/C7, Step 1) _______ UNSAT
- 1-GW-RI-130A
- 1-RM-RR-132, Ch1
- 1-RR-132, Ch4 STANDARD:
a) Acknowledges notes prior to step 1 regarding silencing the alarm.
b) Checks readings on radiation monitors greater than alert setpoint or checks that chart recorder indication is greater than alert setpoint.
EVALUATORS NOTE:
COMMENTS:
STEP 4:
_______ SAT CHECK PROCESS VENT FLOW RATE DEVICE 1-GW-FI-100 - OPERABLE. (0-RMA-C6/C7, Step2) _______ UNSAT STANDARD:
a) Checks that one process vent blower is in service by checking red light on and green light off for either 1-GW-F-1A or 1-GW-F-1B.
EVALUATORS NOTE:
COMMENTS:
Page 4 of 23
Surry 2015-301 JPM h, Waste Gas Release STEP 5:
_______ SAT CONSULTS SHIFT SUPERVISION TO DETERMINE IF GW SHOULD BE ISOLATED. (0-RMA-C6/C7, Step3) _______ UNSAT STANDARD:
a) Asks SM if GW should be isolated.
EVALUATORS NOTE:
If asked: Respond by saying I need you to perform the actions for a high radiation alarm.
COMMENTS:
STEP 6:
_______ SAT CHECKS AUTOMATIC ACTIONS. (0-RMA-C6/C7, Step4)
_______ UNSAT STANDARD:
a) Acknowledges CAUTION regarding securing of the associated Vacuum Pumps.
b) Acknowledges Note regarding High alarm auto functions.
c) Checks Decay Tank Bleed Isolation valve 1-GW-FCV-101 CLOSED. Determines that valve did not close. Goes to step 4a RNO.
d) Closes 1-GW-FCV-101 by taking control switch to close and observing green light on and red light off OR by pressing the auto/manual station close arrow to close the valve. CRITICAL STEP.
e) Checks CTMT Vacuum Pump Discharge Isolation valve 1-GW-FCV-160 CLOSED.
Determines that the valve did not close.
f) Checks CTMT Vacuum Pump Discharge Isolation valve 1-GW-FCV-260 CLOSED.
Determines that the valve did not close. Goes to step 4b RNO.
g) Places control switches to the off position for 1-CV-P-1A and 1-CV-P-1B.
CRITICAL STEP.
h) Directs Unit 2 to place control switches for 2-CV-P-1A and 2-CV-P-1B to the off position. CRITICAL STEP.
i) Closes 1-GW-FCV-160 by taking control switch to close and observing green light on and red light off. CRITICAL STEP.
j) Closes 1-GW-FCV-260 by taking control switch to close and observing green light on and red light off. CRITICAL STEP.
k) Go to step 6.
EVALUATORS NOTE:
Acknowledge reports as given.
BOOTH OPERATORS NOTE:
- After Operator closes 1-GW-FCV-101, Ramp malfunctions RM0601, and RM0602 to 0 over 2 minutes.
COMMENTS:
Page 5 of 23
Surry 2015-301 JPM h, Waste Gas Release STEP 7:
_______ SAT NOTIFIES HP TO DO THE FOLLOWING: (0-RMA-C6/C7, Step6) a) Check area evacuated as necessary. _______ UNSAT b) Control access as necessary.
c) Sample d) Contact HP to check activity within limits.
e) Investigate cause STANDARD:
a) Operator picks up phone or gaitronics to make notifications.
EVALUATORS NOTE:
When candidate picks up phone or gaitronics to make notifications, inform the candidate that another RO will perform that action and complete the ARP. This JPM is complete.
COMMENTS:
STOP TIME____________:
Page 6 of 23
Surry 2015-301 JPM h, Waste Gas Release Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Initial Conditions
- I am the Shift Manager. You are the Unit 1 Reactor Operator. The Unit is at 100% power and stable.
- Waste Gas Decay Tank 1B has just been aligned for Release.
- Waste Gas Decay Tank 1B Hydrogen concentration is 34.4%, the maximum allowable release rate is 7.5 scfm per the release permit.
Initiating Cues
- I need you to perform a release of Waste Gas Decay Tank 1B in accordance with OP-23.2.4, Release of Waste Gas Decay Tank 1B, section 5.4.
- When you finish the actions necessary to accomplish this task, please inform me.
Page 7 of 23
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions
- I am the Shift Manager. You are the Unit 1 Reactor Operator. The Unit is at 100% power and stable.
- Waste Gas Decay Tank 1B has just been aligned for Release.
- Waste Gas Decay Tank 1B Hydrogen concentration is 34.4%, the maximum allowable release rate is 7.5 scfm per the release permit.
Initiating Cues
- I need you to perform a release of Waste Gas Decay Tank 1B in accordance with OP-23.2.4, Release of Waste Gas Decay Tank 1B, section 5.4.
- When you finish the actions necessary to accomplish this task, please inform me.
Final JPM H Surry 2015-301 AP-10.07, Att. 4 U.S. Nuclear Regulatory Commission Surry Power Station SR15301 Simulator Job Performance Measure APE056AA2.49 (3.0 / 3.4)
Applicant________________________________ Start Time___________________
Examiner_______________________________
Date ___________________________________ Stop Time___________________
Title ALIGN THE EMERGENCY BUS IN ACCORDANCE WITH AP-10.07 ATTACHMENT 4.
K/A: APE056AA2.49 Ability to determine and interpret the following as they apply to the Loss of Offsite Power: Nonessential equipment to be secured to avoid overload of ED/Gs (3.0 / 3.4)
Applicability Estimated Time Actual Time RO/SRO(I) 9 Minutes ___ Minutes Conditions
- Task is to be PERFORMED in the simulator.
- Breaker 15J8 spuriously opened and #3 EDG is supplying Unit 1 J Bus Loads.
Standards
- 1-AP-10.07, Attachment 4 completed.
Initiating Cues
- 1-AP-10.07, Step 43.
- Shift Manager Direction.
Terminating Cues
- Attachment 4 of 1-AP-10.07 completed.
Procedures
- 1-AP-10.07, Loss of Unit 1 Power, Attachment 4, Emergency Bus Load Alignment, Revision 73.
Tools and Equipment Safety Considerations
- None
- None Page 1 of 9
Surry 2015-301 AP-10.07, Att. 4 Simulator Setup
- Recall IC-267, or perform the following:
- Recall 100% power IC and initialize. Place 1-CH-P-1C and 1-CH-P-1A in service and 1-CH-P-1B in Auto after Stop.
- Turn on all Pzr heaters.
- Insert Malfunction, EL4902, BKR 15J8 Spurious Trip.
- Set Meter Override, EDG3_MW = 0.32, Trigger 1, Auto Trigger chp1b_52 .eq. 1. (EDG3 MW 1600 kW when 1-CH-P-1B started).
- Meter Override (IOR), EDG3_MW = 0.265, Trigger3, Auto Trigger PRZ_HTRA_GREEN; to change EDG3 meter override to lower value when A PZR heater group secured.
- Reset the Stub bus breaker and start 1-CC-P-1B.
Initial Conditions
- I am the Shift Manager and you are the Unit 1 BOP.
- 1-EP-BKR-15J8 spuriously opened and we are performing 1-AP-10.07. #3 EDG is the sole power supply to the 1J Bus.
Initiating Cues
- Here is a copy of Attachment 4 of 1-AP-10.07 (EMERGENCY BUS LOAD ALIGNMENT). I need you to perform this attachment in its entirety
- When you finish the actions necessary to accomplish this, please inform me.
Page 2 of 9
Surry 2015-301 AP-10.07, Att. 4 PERFORMANCE CHECKLIST Notes to the Evaluator
- Task critical elements are bolded and denoted as a CRITICAL STEP.
- An additional instructor may be needed to silence and acknowledge alarms for the examinee.
- START TIME_______:
1-AP-10.07, Att. 4, Step 1
_______ SAT STEP 1 CAUTIONS and NOTES Prior to Step 1.
_______ UNSAT STANDARD:
a) Acknowledges the CAUTION stating that an EDG can not initially be loaded to greater than 1300 kW prior to an SI or HI-HI CLS, with the exception of loads that will trip when a HI-HI CLS occurs, or loads which are running yet assumed to start on a HI-HI CLS.
b) Acknowledges the CAUTION stating the total EDG load shall not exceed 2750 kW.
c) Reads the following notes:
- The purpose of this Attachment is to limit EDG loading so that a subsequent HI-HI CLS actuation will not overload the EDG.
- EDG load must be monitored closely during pump operations
- One CHG pump must be running on each Emergency Bus solely supplied from an EDG. The other CHG pump supplied from that Emergency Bus must remain in PTL.
- A 6/30 hour TS LCO is in effect until one CHG pump is running on an Emergency Bus supplied by an EDG, AND the non-running CHG pump is in PTL.
d) The Candidate may inform the Shift Manager (Evaluator) of the 6/30 TS LCO.
EVALUATORS NOTE:
If notified of 6/30 clock: Acknowledge entry into 6/30 clock.
COMMENTS:
Page 3 of 9
Surry 2015-301 AP-10.07, Att. 4 1-AP-10.07, Att. 4, Step 1
_______ SAT Step 2 IF EDG 1 is the sole source of power to Emergency Bus 1H, THEN do the following to limit the amount of instantaneous loading that could occur in the event of a HI HI CLS. _______ UNSAT STANDARD:
a) Identifies 1H bus powered by off-site power.
b) N/As substep a.
c) N/As substep b. 1. and 2.
d) Initials substep b. 3. and Goes To Step 2 of Attachment 4.
EVALUATORS NOTE:
NONE COMMENTS:
1-AP-10.07, Att. 4, Step 2
_______ SAT Step 3 NOTE prior to Step 2
_______ UNSAT STANDARD:
Acknowledges NOTE: A 6/30 hour TS 3.0.1 LCO is in effect until one CHG pump is running on an Emergency Bus supplied by an EDG, AND the non-running CHG pump is incapable of auto-start (locked-out or in PTL). This Tech Spec LCO is entered due to an inoperable Emergency Bus due to EDG loading.
EVALUATORS NOTE:
If notified of 6/30 clock: Acknowledge entry into 6/30 clock.
COMMENTS:
Page 4 of 9
Surry 2015-301 AP-10.07, Att. 4 1-AP-10.07, Att. 4, Step 2, substeps a., c., and d.
_______ SAT Step 4 IF EDG 3 is the sole source of power to Emergency Bus 1J, THEN do the following to limit the amount of instantaneous loading that could occur in the event of a HI HI CLS. _______ UNSAT STANDARD:
(a) Determines from either breaker position (15J3 closed) or energized components combined with the EDG running that #3 EDG is supplying the 1J Emergency Bus.
OR b) Recalls from initial conditions that #3 EDG is the sole power supply for the 1J Bus.
- c) Starts 1-CH-P-1B - CRITICAL STEP.
d) Checks 1-CH-P-1C Alternate Source Breaker in PTL.
e) Consults Shift Manager, Secures 1-CH-P-1C and 1-CH-P-1A.
EVALUATORS NOTE:
When Consulted State: Stop 1-CH-P-1A and 1-CH-P-1C.
NOTE: Candidate may announce the start of 1-CH-P-1B using Gai-tronics, and dispatch Aux Bldg Operator to monitor the CH Pumps(s).
COMMENTS:
1-AP-10.07, Att. 4, Step 2, substep e., and f.
_______ SAT Step 5 Determine Emergency Bus 1J load limit IAW the following equation, where (x) equals the total of the KW ratings of all RUNNING equipment from the table below. _______ UNSAT STANDARD:
a) Identifies that 1-VS-F-1B is running. CRITICAL STEP.
b) Identifies 1-VS-F-58B (CTMT Reirc Air Fan) and 1-FW-P-3B (B AFW Pump) are NOT running.
c) Places 100 kW on the line in step 1.e. above the letter x.
d) Determines that the load limit is 100 kW + 1300 kW = 1400kW. CRITICAL STEP.
e) Identifies existing load of approximately 1550 to 1600 kW is in excess of calculated load limit and Notifies the Shift Manager.
f) Identifies EDG 3 Load greater than allowed limit.
g) Secures A PZR heaters. CRITICAL STEP.
h) Checks EDG 3 load, and reports value less than 1400 kW limit.
EVALUATORS NOTE:
When Notified of Excess EDG Load: Direct Candidate to secure the A group pressurizer heaters.
When A PZR Heater secured: Acknowledge EDG 3 Load lowered to 1300 - 1350 kW.
COMMENTS:
Page 5 of 9
Surry 2015-301 AP-10.07, Att. 4 1-AP-10.07, Att. 4, Step 3.
_______ SAT Step 6 Notify Auxiliary Building Operator to perform additional monitoring of CHG pump lube oil temperature. _______ UNSAT STANDARD:
a) Contacts Auxiliary Building Operator and directs monitoring of CHG pump lube oil temperature.
EVALUATORS NOTE:
NONE Booth Operator:
When directed: Acknowledge direction to monitor CHG pump lube oil temperatures.
COMMENTS:
1-AP-10.07, Att. 4, Step 4.
_______ SAT Step 7 Notify Auxiliary Building Operator to perform additional monitoring of CHG pump lube oil temperature. _______ UNSAT STANDARD:
a) Calls up CH Pump screen on PCS to monitor bearing temperatures.
EVALUATORS NOTE:
None COMMENTS:
Step 8 _______ SAT Notifies Shift Manager (Evaluator) 1-AP-10.7, Attachment is complete. _______ UNSAT EVALUATORS NOTE:
None COMMENTS:
END OF JPM Page 6 of 9
Surry 2015-301 AP-10.07, Att. 4 STOP TIME:
Page 7 of 9
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Task
- Task is to be performed in the simulator.
- Perform 1-AP-10.07, Loss of Unit 1 Power, Attachment 4.
Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the Evaluator when you understand your assigned task.
Initial Conditions
- I am the Shift Manager and you are the Unit 1 BOP.
- 1-EP-BKR-15J8 spuriously opened and we are performing 1-AP-10.07. #3 EDG is the sole power supply to the 1J Bus.
Initiating Cues
- Here is a copy of Attachment 4 of 1-AP-10.07 (EMERGENCY BUS LOAD ALIGNMENT). I need you to perform this attachment in its entirety
- When you finish the actions necessary to accomplish this, please inform me.
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions
- I am the Shift Manager and you are the Unit 1 BOP.
- 1-EP-BKR-15J8 spuriously opened and we are performing 1-AP-10.07. #3 EDG is the sole power supply to the 1J Bus.
Initiating Cues
- Here is a copy of Attachment 4 of 1-AP-10.07 (EMERGENCY BUS LOAD ALIGNMENT). I need you to perform this attachment in its entirety
- When you finish the actions necessary to accomplish this, please inform me.
Final JPM I Surry 2015-301 Make-up to SFP U.S. Nuclear Regulatory Commission Surry Power Station SR15301 In Plant Job Performance Measure KA Number SYS033A2.03 Applicant________________________________ Start Time___________________
Examiner_______________________________
Date ___________________________________ Stop Time___________________
Title Full Title K/A: 033A2.03: Ablity to predict the impacts of the following malfunctions or operations on the Spent Fuel Pool Cooling system; and based on those procedures, use procedures to correct, control, or mitigate the consequences of those malfunction or operation: Abnormal Spent Fuel pool water level. 3.1 / 3.5 Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 12 Minutes ___ Minutes Conditions
- Task is to be SIMULATED in the Plant.
- A loss of spent fuel pit level requiring local actions is in progress.
Standards
- 0-AP-22.02, Loss of Spent Fuel Pit Level, Revision 13.
Initiating Cues
- Shift Manager Direction.
- 0-AP-22.02, Loss of Spent Fuel Pit Level, Step 9.
Terminating Cues
- 0-AP-22.02, Loss of Spent Fuel Pit Level, Step 10 complete.
Procedures
- 0-AP-22.02, Loss of Spent Fuel Pit Level, Revision 13 Tools and Equipment Safety Considerations
- None
- Standard Personal Safety Equipment Surry SR 2015 - 301 Page 1 of 7
Surry 2015-301 Make-up to SFP Initial Conditions
- This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
- Unit 1 is performing, due to lowering Spent Fuel Pit level.
- Fuel handling activities are NOT in progress.
Initiating Cues
- I am the Nuclear Shift Manager and you are an extra operator on shift.
- Here is a copy of 0-AP-22.02, Loss of Spent Fuel Pit Level, Step 9. I need you to locally open 1-PG-54, PG makeup to the Spent Fuel Pit.
- When you finish the actions necessary to accomplish this Task, please inform me.
Notes
- This task is to be SIMULATED. Do NOT allow the Candidate to manipulate controls, operate switches or reposition valves.
Surry SR 2015 - 301 Page 2 of 7
Surry 2015-301 Make-up to SFP PERFORMANCE CHECKLIST Notes to the Evaluator
- Task critical elements are bolded and denoted as CRITICAL STEP.
- START TIME:
0-AP-22.02, STEP 9
_______ SAT Step 1 Acknowledges CAUTION and NOTES Prior to Step 9.
_______ UNSAT STANDARD:
a) Reviews CAUTION: Use of Firemain or PG water will dilute the Boron concentration in the SFP. Tech Spec 5.3, Fuel Storage, should be reviewed as time permits.
b) Reviews NOTE: One inch of SFP level is approximately equal to 1182 gallons.
c) Reviews NOTE: SFP level should be monitored remotely by using the Fuel BLDG video monitors in the MCR, or locally if radiation level permits.
EVALUATORS NOTE:
If asked: Tech Spec 5.3, Fuel Storage, has been reviewed.
COMMENTS:
0-AP-22.02, STEP 9
_______ SAT Step 2 Using Guidance of Step 9 RNO, Attempts to open 1-PG-54.
_______ UNSAT STANDARD:
(a) Goes to the 27 foot level of the Fuel Building and Locates 1-PG-54, PG Makeup to the SFP.
(b) Attempts to open 1-PG-54 by turning handwheel counter-clockwise.
EVALUATORS NOTE:
If Candidate attempts to enter the Fuel Building from the 48 foot level of the Auxiliary Building inform them that the door is posted as non-functional, do not enter.
When 1-PG-54 Attempted: Notify Candidate that valve handwheel will not move.
COMMENTS:
Surry SR 2015 - 301 Page 3 of 7
Surry 2015-301 Make-up to SFP 0-AP-22.02, STEP 9
_______ SAT Step 3 Notifies the Shift Manager (Evaluator) inability to operate 1-PG-54.
_______ UNSAT STANDARD:
a) Simulates contacting the Shift Manager of inability to operate 1-PG-54.
b) Acknowledge change in task.
EVALUATORS NOTE:
When Notified: Hand the Candidate 0-AP-22.02, Step 10.
State: The level drop in the SFP appears to have risen, perform Step 10 of 0-AP-22.02 and align Fire Protection make-up to the Spent Fuel Pit. The Motor Driven Fire Pump has been started.
NOTE: Alternate Path Starts Here.
COMMENTS:
0-AP-22.02, STEP 10
_______ SAT Step 4 Acknowledges NOTES Prior to Step 10.
_______ UNSAT STANDARD:
Reviews NOTE: LFFG1, Operations Response, is a guideline and may be implemented before the TSC is fully activated.
Reviews NOTE: Sharing resources should be considered if using the Firemain for fire fighting and for filling / spraying the SFP.
a) Contacts the MCR and directs starting the Motor Driven Fire Pump. CRITICAL STEP.
EVALUATORS NOTE:
When MCR Contacted: Notify Candidate that the Motor Driven Fire Pump has been started.
COMMENTS:
Surry SR 2015 - 301 Page 4 of 7
Surry 2015-301 Make-up to SFP 0-AP-22.02, STEP 10 (Continued)
_______ SAT Step 5 Initiate Fire Main Makeup.
_______ UNSAT STANDARD:
a) Locally open Post Indicator Valve 1-FP-75. CRITICAL STEP
- Locates 1-FP-75 in yard outside Fuel Building and Simulates opening the valve.
b) Simulates operation of Deluge Station. CRITICAL STEP
- Pull Station Fuel Building 6 Foot 10 Inch Level by SFP Cooling Pumps.
d) Locates to Fuel Building 47 Foot level and simulates checking blow-out plug free of pipe and water spraying into Fuel Pool.
EVALUATORS NOTE:
NONE COMMENTS:
Step 6 Report Completion of Task _______ SAT STANDARD: _______ UNSAT Reports to Shift Manager (Evaluator) that Firemain makeup to the SFP has been initiated.
EVALUATORS NOTE:
NONE.
COMMENTS:
END OF JPM STOP TIME:
Surry SR 2015 - 301 Page 5 of 7
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Task
- Task is to be SIMULATED in the Plant.
- Perform 0-AP-22.02, Loss of Spent Fuel Pit Level, Step 9.
Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.
Initial Conditions
- This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
- Unit 1 is performing 0-AP-22.02, Loss of Spent Fuel Pit Level, due to lowering Spent Fuel Pit level.
- Fuel handling activities are NOT in progress.
Initiating Cues
- I am the Nuclear Shift Manager and you are an extra operator on shift.
- Here is a copy of 0-AP-22.02, Loss of Spent Fuel Pit Level, Step 9. I need you to locally open 1-PG-54, PG makeup to the Spent Fuel Pit.
- When you finish the actions necessary to accomplish this Task, please inform me.
Notes
- This task is to be SIMULATED. Do NOT allow the Candidate to manipulate controls, operate switches or reposition valves.
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions
- This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
- Unit 1 is performing 0-AP-22.02, Loss of Spent Fuel Pit Level, due to lowering Spent Fuel Pit level.
- Fuel handling activities are NOT in progress.
Initiating Cues
- I am the Nuclear Shift Manager and you are an extra operator on shift.
- Here is a copy of 0-AP-22.02, Loss of Spent Fuel Pit Level, Step 9. I need you to locally open 1-PG-54, PG makeup to the Spent Fuel Pit.
- When you finish the actions necessary to accomplish this Task, please inform me.
Final JPM J Surry 2015-301 Locally Trip U2 Reactor U.S. Nuclear Regulatory Commission Surry Power Station SR15301 Simulator Job Performance Measure [EPE029.EA1.12]
Applicant________________________________ Start Time___________________
Examiner_______________________________
Date ___________________________________ Stop Time___________________
Title LOCALLY TRIP THE UNIT 2 REACTOR TRIP BREAKERS K/A: EPE029.EA1.12: Ability to operate and monitor the following as they apply to a ATWS: M/G set power supply and reactor trip breakers. 4.1/4.0 Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 10 Minutes ___ Minutes Conditions
- Task is to simulated in the Plant.
- A simulated ATWS is in progress with a coincident failure of both benchboard reactor trip pushbuttons.
Standards
- 2-FR-S.1, Response to Nuclear Power Generation/ATWS, step 8a RNO.
- Unit 2 MG Set output or input breakers open.
Initiating Cues
- 2-FR-S.1, Response to Nuclear Power Generation/ATWS, step 8a RNO.
- Shift Manager direction.
Terminating Cues
- Report received that MG Set Output Breakers are open.
Procedures
- 2-FR-S.1, RESPONSE TO NUCLEAR POWER GENERATION/ATWS Tools and Equipment Safety Considerations
- None
- None Page 1 of 6
Surry 2015-301 Locally Trip U2 Reactor Initial Conditions
- I am the Nuclear Shift Manager. Unit 2 is currently experiencing an ATWS and the control room reactor trip buttons wont work.
Initiating Cues
- This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
- I need you to locally open the Unit 2 reactor trip breakers and bypass breakers.
- When you finish the actions necessary to accomplish this, please inform me.
Notes
- After the attempt to open the Reactor Trip Breakers have failed, the Candidate will proceed to the Switchgear room and open the Rod Drive MG Set output or input breakers.
Page 2 of 6
Surry 2015-301 Locally Trip U2 Reactor PERFORMANCE CHECKLIST Notes to the Evaluator
- This task is to be SIMULATED. Do NOT allow the operator to manipulate controls, operate switches or reposition valves.
- When the operator attempts to open the Reactor Trip Bkrs, they will not open and the MG set output or input breakers must be opened.
- Task critical elements are bolded and denoted as CRITICAL STEP.
- START TIME_______:
STEP 1:
_______ SAT OPENS UNIT 2 REACTOR TRIP BREAKER A (RTB A). (2-FR-S.1, step 8aRNO)
_______ UNSAT STANDARD:
a) Proceeds to Unit 2 Cable Spreading Area and enters the Reactor Trip Breaker cubicle (located in back of room behind cable trays).
b) Actuates breaker trip mechanism by pressing TRIP button.
c) Checks for OPEN indication received.
EVALUATORS NOTE:
- Tell operator: NO breaker noise is heard.
- If asked: CLOSED indication showing prior to and AFTER trip mechanism pushed.
- The operator should inform the Shift Manager that the breaker would not open. If they do, inform them to continue as directed.
COMMENTS:
STEP 2:
_______ SAT OPENS UNIT 2 REACTOR TRIP BREAKER B (RTB B). (2-FR-S.1, step 8aRNO)
_______ UNSAT STANDARD:
- Actuates breaker trip mechanism by pressing TRIP button.
- Checks for OPEN indication received.
EVALUATORS NOTE:
- Tell operator: NO breaker noise is heard.
- When the operator informs the Shift Manager that they are unable to open Unit 2 Reactor Trip Breakers, direct opening the MG Set output breakers.
- The operator may bypass checking the Bypass Breakers Open at this point and proceed to the MG Set output Breakers COMMENTS:
Page 3 of 6
Surry 2015-301 Locally Trip U2 Reactor STEP 3:
_______ SAT CHECKS REACTOR TRIP BYPASS BREAKERS OPEN (2-FR-S.1, step 8aRNO)
_______ UNSAT STANDARD:
a) Verifies OPEN indication showing for both bypass breakers.
EVALUATORS NOTE:
- If asked: OPEN indication showing for both Bypass breakers.
COMMENTS:
STEP 4:
_______ SAT OPENS UNIT 2 MG SET GEN NO. 1 OUTPUT BREAKER (2-FR-S.1, step 8aRNO)
_______ UNSAT STANDARD:
a) Proceeds to the Unit 2 Normal Switchgear Room and locates Unit 2 MG Sets.
b) Actuates breaker trip mechanism for Unit 2 MG Set NO.1 by pressing TRIP button, or operating breaker control switch to TRIP. CRITICAL STEP.
c) Checks for OPEN indication received.
EVALUATORS NOTE:
- Fastest way to U2 Normal Switchgear room is from stairwell in U2 Cable Spreading room UP to the Normal Switchgear room.
- Tell operator: Breaker banging noise heard after the TRIP button is depressed or control switch is place in trip; and breaker green OPEN flag on breaker indicated.
- Either Unit 2 MG Set No. 1 or No. 2 may be operated at this step. Sequence is not critical.
- Note: If operator trips Rod MG Set Input breakers (located on MCC) then this satisfies the intent of the step per the FR-S.1 Background document.
COMMENTS:
Page 4 of 6
Surry 2015-301 Locally Trip U2 Reactor STEP 5:
_______ SAT OPENS UNIT 2 MG SET GEN NO. 2 OUTPUT BREAKER (2-FR-S.1, step 8aRNO)
_______ UNSAT STANDARD:
a) Actuates breaker trip mechanism for Unit 2 MG Set NO.2 by pressing TRIP button or placing control switch in trip. CRITICAL STEP.
b) Checks for OPEN indication received EVALUATORS NOTE:
- Tell operator: : Breaker banging noise heard after the TRIP button is depressed or control switch is place in trip; and breaker green OPEN flag on breaker indicated.
- Either Unit 2 MG Set No. 1 or No. 2 may be operated at this step. Sequence is not critical COMMENTS:
STEP 6:
_______ SAT REPORTS TO SHIFT MANAGER
_______ UNSAT STANDARD:
a) Verbal status report made that Unit 2 Reactor is tripped by operation of the Unit 2 MG Set output breakers.
b) The Unit 2 Reactor trip breakers could not be tripped.
EVALUATORS NOTE:
- Acknowledge report.
COMMENTS:
END OF JPM STOP TIME_____:
Page 5 of 6
Surry 2015-301 Locally Trip U2 Reactor Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Initial Conditions
- I am the Nuclear Shift Manager. Unit 2 is currently experiencing an ATWS and the control room reactor trip buttons wont work.
Initiating Cues
- This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
- I need you to locally open the Unit 2 reactor trip breakers and bypass breakers.
- When you finish the actions necessary to accomplish this, please inform me.
Page 6 of 6
FOR INFORMATION ONLY DO NOT GIVE TO CANDIDATE
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions
- I am the Nuclear Shift Manager. Unit 2 is currently experiencing an ATWS and the control room reactor trip buttons wont work.
Initiating Cues
- This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
- I need you to locally open the Unit 2 reactor trip breakers and bypass breakers.
- When you finish the actions necessary to accomplish this, please inform me.
Final JPM K Surry 2015-301 Transfer SVB Power U.S. Nuclear Regulatory Commission Surry Power Station SR15301 In Plant Job Performance Measure KA Number SYS062A2.05 2.9/3.3 Applicant________________________________ Start Time___________________
Examiner_______________________________
Date ___________________________________ Stop Time___________________
Title Full Title K/A: SYS062A2.05, Methods for energizing a dead bus, 2.9/3.3 Applicability Estimated Time Actual Time RO/SRO(I) 12 Minutes ___ Minutes Conditions
- Task is to be SIMULATED in the Plant.
- A loss of Unit 1 480v Bus supplying the SVB has occurred.
- 1-AP-10.05, Loss of Semi-Vital Bus, has been performed through Step 10.
Standards
- 1-AP-10.05, Loss of Semi-Vital Bus, Step 11 - 13, Revision 33.
Initiating Cues
- Shift Manager Direction.
- 1-AP-10.05, Loss of Semi-Vital Bus, Step 11 - 13.
Terminating Cues
- 1-AP-10.05, Loss of Semi-Vital Bus, Step 11 d) complete.
Procedures
- 1-AP-10.05, Loss of Semi-Vital Bus, Revision 33.
Tools and Equipment Safety Considerations
- None
- Standard Personal Safety Equipment Surry SR 2015 - 301 Page 1 of 8
Surry 2015-301 Transfer SVB Power Initial Conditions
- This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
- A loss of Unit 1's Semi-Vital Bus has occurred.
Initiating Cues
- I am the Shift Manager and you are the Unit 2 BOP.
- Here is a copy of 1-AP-10.05, completed up to Step 11. I need you to transfer the Unit 1 Semi-Vital Bus to the 1J Bus power supply. When you inform me that the bus has been re-energized, I will have the Unit RO perform the required instrumentation evaluation.
- When you finish the actions necessary to accomplish this Task, please inform me.
Notes
- This task is to be SIMULATED. Do NOT allow the Candidate to manipulate controls, operate switches or reposition valves Surry SR 2015 - 301 Page 2 of 8
Surry 2015-301 Transfer SVB Power PERFORMANCE CHECKLIST Notes to the Evaluator
- Task critical elements are bolded and denoted as CRITICAL STEP.
- START TIME:
1-AP-10.07, Step 11
_______ SAT STEP 1: Acknowledge NOTE Prior to Step 11.
_______ UNSAT STANDARD:
a) Reviews NOTE: If the Semi-Vital Bus has been deenergized for greater than 30 minutes, the SG PORV controllers will return to Remote/Manual control when power is restored.
EVALUATORS NOTE:
If asked: Unit 1 SVB has been deenergized for 15 minutes.
If asked: Unit 1 SVB powered from the 1H bus supply prior to the power loss.
COMMENTS:
1-AP-10.07, Step 11
_______ SAT Step 2 Locally open Semi-Vital Bus feeder breakers.
_______ UNSAT STANDARD:
(a) Locates to Unit 1 ESGR and Locates breaker 1H1-1-2A1 on MCC 1H1-1.
(b) Simulates placing 1H1-1-2A1 breaker switch in the OPEN position -
CRITICAL STEP.
c) Locates breaker 1J1-1-7D1 on MCC 1J1-1.
d) Checks breaker 1J1-1-7D1 in open position.
EVALUATORS NOTE:
If asked: Point to Closed position on breaker 1H1-1-2A1.
If asked: Point to the Open position on breaker 1J1-1-7D1.
COMMENTS:
Surry SR 2015 - 301 Page 3 of 8
Surry 2015-301 Transfer SVB Power 1-AP-10.07, Step 11
_______ SAT Step 3: Operate manual transfer switch to the desired power supply.
_______ UNSAT STANDARD:
a) Contacts MCR (Evaluator) and requests Unit 1 SVB manual transfer switch to be placed in the 1J1 position. CRITICAL STEP.
EVALUATORS NOTE:
When asked to transfer state: A time compression has occurred, the SVB manual transfer switch has been swapped to the 1J1 position.
Acceptable for the Candidate to request the MCR to place the manual transfer switch in the 1J position.
COMMENTS:
1-AP-10.07, Step 11
_______ SAT Step 4: Locally close the selected Semi-Vital Bus feeder breaker.
_______ UNSAT STANDARD:
a) Locates to breaker 1J1-1-7D1 on MCC 1J1-1.
b) Simulates closing 1J1-1-7D1 breaker. CRITICAL STEP.
c) Checks Semi-Vital Bus Energized by contacting MCR (Evaluator) to determine if SVB is energized.
EVALUATORS NOTE:
If asked: Inform Candidate that Unit 1 SVB has been reenergized.
COMMENTS:
Surry SR 2015 - 301 Page 4 of 8
Surry 2015-301 Transfer SVB Power Step 5: Inform Shift Manager (Evaluator) of Task Completion. _______ SAT STANDARD: _______ UNSAT Informs Evaluator task has been completed, EVALUATORS NOTE:
NONE COMMENTS:
END OF JPM STOP TIME:
Surry SR 2015 - 301 Page 5 of 8
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Task
- Task is to be SIMULATED in the Plant.
- 1-AP-10.05, Loss of Unit 1 Semi-Vital Bus, Step 11.
Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.
Initial Conditions
- This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
- A loss of Unit 1's Semi-Vital Bus has occurred.
Initiating Cues
- I am the Shift Manager and you are the Unit 2 BOP.
- Here is a copy of 1-AP-10.05, completed up to Step 11. I need you to transfer the Unit 1 Semi-Vital Bus to the 1J Bus power supply. When you inform me that the bus has been re-energized, I will have the Unit RO perform the required instrumentation evaluation.
- When you finish the actions necessary to accomplish this Task, please inform me.
Notes
- This task is to be SIMULATED. Do NOT allow the Candidate to manipulate controls, operate switches or reposition valves
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions
- This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
- A loss of Unit 1's Semi-Vital Bus has occurred.
Initiating Cues
- I am the Shift Manager and you are the Unit 2 BOP.
- Here is a copy of 1-AP-10.05, completed up to Step 11. I need you to transfer the Unit 1 Semi-Vital Bus to the 1J Bus power supply. When you inform me that the bus has been re-energized, I will have the Unit RO perform the required instrumentation evaluation.
- When you finish the actions necessary to accomplish this Task, please inform me.