Proposed Tech Specs,Allowing Next Type a Test to Be Rescheduled
ML20098C147
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 10/02/1995
From:
GEORGIA POWER CO.
To:
Shared Package
ML20098C143 List:
References
NUDOCS 9510060296
Download: ML20098C147 (1)


Text

1

.I . ,

i

. T CONTAINMENT SYSTEMS CONTAINMENT LEAKAGE LIMITING CONofTf0W FORJPERATION

~

& N8W.

3.6.1.2 Containment leakage rates shall be limited to:

a. An overall integrated leakage rate of less than or equal to L ,

0.205 by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at a pressure not less' than P., 37 psig, or- l t

b. A combined leakage ~ rate of less than 0.60 L for all penetrations and valves subject to Type 8 and C tests, wk pressurized to a pressure not less than P , 37 psig. l APPLICABILITY: MODES 1, 2, 3, and 4.

EllQt[:

With either the measured overall integrated containment leakage rate exceeding 0.75 L or-the measured combined leakage rate for all penetrations and valves

subjecl to Types B and C tests exceeding 0.60 L,, restore the overall i integrated leakage rate to less than 0.75 L  ;

i all penetrations subject to Type B and sts C teto, less and than the combined leakage 0.60 L, prior to rate fo j increasing the Reactor Coolant System temperature above 200*F.

! l

, SURVEILLANCE REQUIREMENTS l

Enceft as med* died by illlC 0Lfyrond cxetnfti'cq

! 4.6.1.2 Jhe containment leakage rates shall be demonstrated at the following j

test schedule and shall be determined in conformance with the criteria speci-j fied in Appendix J of 10 CFR Part 50 using the methods and provisions of ANSI

N45.4-1972
a. Three Type A tests (Overall Integrated Con i t Leakage Rate) i shall be conducted at 40 i 10 month interval ring shutdown at
a pressure not less than P , 37 psig, during each 10-year service l

! period. The third test of each set-shall be conducted during the F shutdown for the 10-year plant inservice inspection;  !

1

  • The Ty pe A selecla/ed .fo,- vf 6 P t/nl} l dariny LAG iviW At rescke hulecl h - th e jfq7 {, gg,}g g, 7

V0GTLE UNITS - 1 & 2 3/4 6-2 Amendment No. 63 (Unit 1)

, Amendment No. 42 (Unit 2) 9510060296 951002

! PDR ADOCK 05000424

_P_ PDR

. ..