Submits Addl Info Re Util Request for Exemption from 10CFR50,App J Type a Test Schedule for Unit 1 & Associated TS
ML20098C141
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 10/02/1995
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20098C143 List:
References
TAC-M92321, NUDOCS 9510060291
Download: ML20098C141 (2)


Text

Georg>a Power Company

@- 40 inverness Center Parkway 8

. Post Office Box 1295 Birmingham. A!abama 35201 Telephone 205 877 7122

$IPfesfde t, Nuclear October 2, 1995 o@ Pom vogte Proiect L C E-0"6 T S E " "

  • Docket No. 50-424 TAC No. M92321 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk j Washington, D. C. 20555 VOGTLE ELECTRIC GENERATINGPLANT ADDITIONAL INFORMATION RELATIVE TO GEORGIA POWER COMPANY REQUEST FOR EXEMPTION FROM 10 CFR 50, APPENDIX J TYPE A TEST SCHEDULE FOR UNIT 1 AND ASSOCIATED )

TECHNICAL SPECIFICATIONS CHANGE l l

1 Gentlemen:

By letter LCV-0610, dated May 12,1995, Georgia Power Company (GPC) requested an i

exemption from 10 CFR 50, Appendix J schedule requirements and an associated change to Technical Specification 4.6.1.2 for Vogtle Electric Generating Plant (VEGP), Unit 1. The l request will allow the next Type A test, which is currently scheduled to be performed during the IR6 refueling outage in March and April,1996 to be rescheduled in accordance with the

' new criteria (Option B) of the 10 CFR 50, Appendix J. The exemption was approved by the

NRC on August 29,1995, and the associated Technical Specification change is currently being reviewed by NRC.

Georgia Power Company proposes to amend the requested Technical Specification change by

> the addition of a footnote to specification 4.6.1.2.a, stating "The Type A test scheduled for VEGP Unit I during 1R6 will be rescheduled to the 1997 refueling outage." This change is reflected in the attached mark up of Technical Specification page 3/4 6-2 which should replace the marked up page that was contained in our letter LCV-0610. The conclusions of the significant hazards evaluation in accordance with 50.92, which was attached to LCV-0610 is /

unaffected by the addition of this footnote.

If additional information is required, please advise.

Sincerely, -

l b

. A Hf ^

. K. McCoy i.

o80oao 9510060291 951002 4 -

PDR ADOCK 0500 4

i .

r 4

l U. S.' Nuclear Regulatory Commission Page 2 I Attaciunent l

CKM/HWM j c(w):Geornia Power Company Mr. J. B, Beasley, Jr.

Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. L. L. Wheeler, Licensing Project Manager I Mr. C. R. Ogle, Senior Resident Inspector, Vogtle i

k 4

i

, i

?

LCV-0610-E