ML20083M073

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Revising SR 4.1.6.2 to Support Exemption from 10CFR50,App J Type a Test Schedule
ML20083M073
Person / Time
Site: Vogtle 
Issue date: 05/12/1995
From:
GEORGIA POWER CO.
To:
Shared Package
ML20083M059 List:
References
NUDOCS 9505190100
Download: ML20083M073 (1)


Text

. _.

1 CONTAINMENT SYSTEMS l

i.

CONTAINMENT LEAKAGE LIMITING CONDITION FOR OPERATION 4

3.6.1.2 Containment leakage rates shall be limited to:-

a.

An overall integrated leakage rate of less than or equal to L,,

0.20% by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at a pressure not less than P, 37 psig, or l

]

l b.

A combined leakage rate of less than 0.60 L fo and valves subject to Type B and C tests, when r all penetrations pressurized to a pressure not less than P,, 37 psig.

l APPLICABILITY: MODES 1, 2, 3, and 4.

j ACTION:

With either the measured overall integrated containment leakage rate exceeding 0.75 L or the measured combined leakage rate for all penetrations and valves subjecI to Types B and C tests exceeding 0.60 L d the combined leakage

, restore the overall l

integrated leakage rate to less than 0.75 L, an all penetrations subject to Type B and C tests to less than 0.60 L, prior to increasing the Reactor Coolant System temperature above 200aF.

SURVEILLANCE RE0VIREMENTS ExcepY a.s medif{ed by nRC $ppoved exetn/h' cots 4.6.1.2 Jhe containment leakage rates shall be demonstrated at the following test schedule and shall be determined in conformance with the criteria speci-fied in Appendix J of 10 CFR Part 50 using the methods and provisions of ANSI N45.4-1972:

a.

Three Type A tests (Overall Integrated Containment Leakage Rate) shall be conducted at 40110 month intervals during shutdown at a pressure not less than P,, 37 psig, during each 10-year service l

period. The third test of each set shall be conducted during the shutdown for the 10-year plant inservice inspection; 1

V0GTLE UNITS - 1 & 2 3/4 6-2 Amendment No. 63 (Unit 1)

Amendment No. 42 (Unit 2) ff$

f P