Proposed Tech Specs Pages Re Accident Montoring Instrumentation
ML20080N245
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/28/1995
From:
GEORGIA POWER CO.
To:
Shared Package
ML20080N234 List:
References
NUDOCS 9503060200
Download: ML20080N245 (2)


Text

.. ._ _- _ -

~..

b TABLE 3.3-8 (Centinued) ,

o

. y _,, El ACCIDENT MONITORING INSTRUMENTATION ED 03 % E.LS *

=

28 c 10TAL 9HANNEtt-J$ {0.OF -9pERA9tF ACTION oo d INSTRUMENT RANNELS 80 i .3]M xo - 12. Condensate Storage Tank Level 2/ tank Z#/tahk

  • l-o4 e. (Loop 5101, 5111, 5104 & 5116) um 88 " 13. Auxiliary Feedwater Flow feed 1 e ft/feedline. 31M l

$2M (Loop 5152, 15152, 5153, 15153, 5151, 15151, 5150 & 15150)

o w
14. Containment Radiation Level (High Range) 2 2A' 34M l 3 (Loop 0005 & 0006)
15. Steamline Radiation Monitor 1/s . line 1/sta. line' $M- l.

(Loop 13119, 13120, 13121 & 13122)

16. Core Er.it Thermocouples 4/qu / train 2/ quad / train 31 l h 17. Reactor Coolant System Subcooling 2 Zh 31 2 l-
18. Neutron Flux (Extended Range) 2 '2 4 3f-E l (Loop 13135A & 131358)

MM

~([ 19. RVLis 2 1+ l

20. Containment Hydrogen Concentration 7.-t 33 l ,

gg (Loop 12979 & 12980)

EE

21. Containment Pressure (Extended Range) 2+ 31*- l (Loop 10942 & 10943)

. 22. Containment Isolation Valve Position Indication

  • 1/ valve 1/.; M . . Jde l-1 yy 9ff/"&""31 1 33 .

t ~~

i ~

  • Applicable for containment isolation valve position indication designated as post-accident monitoring instrumentation I

(containment isolation valves which receive containment isolation Phase A or containment ventilation isolation l 4a.se os.soein/ed l

s1gna1s). AMnymdAria:lobineksyis awsoratte vatre, eAvednews/ro sitedflene, pesefrafion ar&ck is iseJehd.byafbdcire fo//c.wi/4 chrea'em/Gia*r'fiYokd -

/s4a Mia4 g de..secd

/is tegusad/drpenefrafjo,7 ,%poff wjsg ;j ,,( _ ,Q,,7g ce,go/ no,_,,

c lY)'P y indWim Ante

-- - - _ - _ = _ = - - _ _ _ - - - _ - _ _ __-

.?  ::

l

a. .-

INSERT FOR TABLE 3.3-8 ACTION STATEMENTS

, . ACTION 31 - a. With one required channel inoperable, restore the inoperable channel to  ;

OPERABLE status within 30 days. Otherwise, prepare and submit a Special i
Report to the Commission, pursuant to Specification 6.8.2, within 14 days i j- outlining the actions taken (including the preplanned alternate method of  :

monitoring), the cause 'of the inoperability, and the plans and schedule for restoring the inoperable channel to OPERABLE status.

L b. With two required channels inoperable, restore at least one channel to OPERABLE status within 7 days, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

l. -

! c.The provisions of Specification 3.0.4 are not applicable.

' ACTION 32 - Not used.

J q

.i ACTION 33 - a. With one required channel inoperable, restore the inoperable channel to  !

{ OPERABLE status within 30 days. Otherwise, prepare and submit a Special Report to the Commission, pwsuant to Specification 6.8.2, within 14 days outlining the actions taken (including the preplanned alternate method of ,

monitoring), the cause of the inoperability, and the plans and schedule for >

restoring the inoperable channel to OPERABLE status.

. b. With two required channels inoperable, restore at least one channel to ,

i. OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

t

c. The provisions of Specification 3.0.4 are not applicable.
ACTION 34 - a.With one required channel inoperable, restore the inoperable channel to i OPERABLE status within 30 days. Otherwise, prepare and submit a Special j Report to the Commission, pursuant to Specification 6.8.2, within 14 days ' -

outlining the actions taken (including the preplanned alternate method of monitoring), the cause of the inoperability, and the plans and schedule for .

restoring the inoperable channel to OPERABLE status. l 4

j b. With two required channels inoperable, restore at least one channel to OPERABLE status within 7 days. Otherwise, prepare and submit a Special:

1 Report to the Commission, pursuant to Specification 6.8.2, within 14 days outlining the actions taken (including any preplanned altemate methods of .

i monitoring), the cause of the inoperability, and the plans for restoring the  ;

l- inoperable channels to OPERABLE status.-