Proposed Tech Specs Pages Re Accident Montoring Instrumentation
ML20080N245
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/28/1995
From:
GEORGIA POWER CO.
To:
Shared Package
ML20080N234 List:
References
NUDOCS 9503060200
Download: ML20080N245 (2)


Text

..

~..

b TABLE 3.3-8 (Centinued)

  • o

. y _,, El ACCIDENT MONITORING INSTRUMENTATION ED 03 %

E.LS

=

28 c 10TAL J$

{0.OF 9HANNEtt-oo d INSTRUMENT RANNELS

-9pERA9tF ACTION 80 i xo -

12.

Condensate Storage Tank Level 2/ tank Z#/tahk

.3]M l-o4 e.

(Loop 5101, 5111, 5104 & 5116) um 88 "

13. Auxiliary Feedwater Flow feed 1 e

ft/feedline.

31M l

$2M (Loop 5152, 15152, 5153, 15153, 5151, 15151, 5150 & 15150)

o w
14. Containment Radiation Level (High Range) 2 2A' 34M l

(Loop 0005 & 0006) 3

15. Steamline Radiation Monitor 1/s

. line 1/sta. line'

$M-l.

(Loop 13119, 13120, 13121 & 13122)

16. Core Er.it Thermocouples 4/qu / train 2/ quad / train 31 l

h

17. Reactor Coolant System Subcooling 2

Zh 31 2 l-

18. Neutron Flux (Extended Range) 2

'2 4 3f-E l

(Loop 13135A & 131358)

~([

19. RVLis 2

1+

MM l

20. Containment Hydrogen Concentration 7.-t 33 l

gg (Loop 12979 & 12980)

EE

21. Containment Pressure (Extended Range) 2+

31*-

l (Loop 10942 & 10943)

22. Containment Isolation Valve Position Indication
  • 1/ valve 1/.; M..

Jde l-1 yy 9ff/"&""31 1

33 t

~~

i

~

  • Applicable for containment isolation valve position indication designated as post-accident monitoring instrumentation (containment isolation valves which receive containment isolation Phase A or containment ventilation isolation I

l s1gna1s). AMnymdAria:lobineksyis sitedflene, pesefrafion is iseJehd.byafbdcire chrea'em/Gia*r'fiYokd -

4a.se os.soein/ed awsoratte vatre, eAvednews/ro ar&ck fo//c.wi/4 /s4a Mia4 g de..secd l

y indWim Ante /is tegusad/drpenefrafjo,7,%poff wjsg ;j,,( _,Q,,7g ce,go/ no,_,,

lY)'P c

=

= - -

.?

a.

INSERT FOR TABLE 3.3-8 ACTION STATEMENTS

. ACTION 31 - a. With one required channel inoperable, restore the inoperable channel to OPERABLE status within 30 days. Otherwise, prepare and submit a Special i

Report to the Commission, pursuant to Specification 6.8.2, within 14 days i

j-outlining the actions taken (including the preplanned alternate method of monitoring), the cause 'of the inoperability, and the plans and schedule for restoring the inoperable channel to OPERABLE status.

L

b. With two required channels inoperable, restore at least one channel to OPERABLE status within 7 days, or be in at least HOT SHUTDOWN within l.

the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

c.The provisions of Specification 3.0.4 are not applicable.

' ACTION 32 - Not used.

J q

.i ACTION 33 - a. With one required channel inoperable, restore the inoperable channel to

{

OPERABLE status within 30 days. Otherwise, prepare and submit a Special Report to the Commission, pwsuant to Specification 6.8.2, within 14 days outlining the actions taken (including the preplanned alternate method of monitoring), the cause of the inoperability, and the plans and schedule for restoring the inoperable channel to OPERABLE status.

b. With two required channels inoperable, restore at least one channel to i.

OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

t

c. The provisions of Specification 3.0.4 are not applicable.

ACTION 34 - a.With one required channel inoperable, restore the inoperable channel to i

OPERABLE status within 30 days. Otherwise, prepare and submit a Special j

Report to the Commission, pursuant to Specification 6.8.2, within 14 days '

outlining the actions taken (including the preplanned alternate method of monitoring), the cause of the inoperability, and the plans and schedule for restoring the inoperable channel to OPERABLE status.

4 j

b. With two required channels inoperable, restore at least one channel to OPERABLE status within 7 days. Otherwise, prepare and submit a Special:

1 Report to the Commission, pursuant to Specification 6.8.2, within 14 days outlining the actions taken (including any preplanned altemate methods of.

i monitoring), the cause of the inoperability, and the plans for restoring the l-inoperable channels to OPERABLE status.-

1 4

3

=,

.-