ML20073G840

From kanterella
Revision as of 14:23, 27 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Reworded Contention 1.D.2 Re Testing of Manual Reactor Trip Actuation Function at Full Power
ML20073G840
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 04/13/1983
From: Curran D, Jordan W
HARMON & WEISS, NEW ENGLAND COALITION ON NUCLEAR POLLUTION
To:
Atomic Safety and Licensing Board Panel
Shared Package
ML20073G843 List:
References
NUDOCS 8304180400
Download: ML20073G840 (1)


Text

f UNITED STATES OF AMERICA

^

NUCLEAR REGULATORY COMMISSION U^

t BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

~ '

g3 pR 13 A11:15

) -

In the Matter of ) e ,

)

L m ;: lU ' '

PUBLIC SERVICE COMPANY OF ) Docket Nosi"50-443 NEW HAMPSHIRE, et al. ) 50-444

)

(Seabrook Station, Units 1 . )

and 2)

~~

).

)

=. -

NECNP REWORDED CONTENTION I.D.2, TESTING AT POWER OF MANUAL REACTOR TRIP ACTIUATION FUNCTION The Applicants do not comply with Reg. Guide 1.22 by _

~~

virture of their failure to provide for-'Ihe testing of the manual reactor trip actuation f unction at f ull power,, justify that omission, or provide for other reliable means.of testing it. Therefore Applicants violate GDC 21.

Respectfully submitted, f Q>?lQ William . ordan, III 1

i Diane Curran HARMON & WEISS

  • 1725 I Street, N.W.

Suite 506 Washington, D.C. 20006 (202) 833-9070

- April 13, 1983 N

w B304180400 830413 PDR ADOCK 05000443 4

.