MONTHYEARML20212H5071999-09-27027 September 1999 Application for Amends to Licenses DPR-44 & DPR-56,change Application ECR 96-01511,to Revise TS Re Loss of Power Setpoints for 4 Kv Emergency Buses ML20211M7081999-09-0101 September 1999 Suppl License Change Application ECR 99-01497 for Licenses DPR-44 & DPR-56,correcting Minor Discrepancies Discovered in Pages of Attachment 2 ML20210P8811999-08-11011 August 1999 Application for Amends to Licenses DPR-44 & DPR-56 in Order to Clarify PBAPS Licensing Basis to Include Specific Info Re Allowed Containment Overpressure Credit Needed to Ensure Adequate NPSH Available for ECCS Pumps.Ufsar Changes,Encl ML20210N0711999-08-0606 August 1999 Exigent License Change Application ECR 99-01727 for Licenses DPR-44 & DPR-56,incorporating Note Into TS Which Will Permit one-time Exemption Until 990930,from 90 F Limit Stated in SR 3.7.2.2 ML20209F7641999-07-12012 July 1999 License Change Application ECR 99-01255,revising TS Sections 2.1.1.2 & 5.6.5 by Incorporating Revised SLMCPR & Deleting Previously Added footnotes.Non-proprietary & Proprietary Info Re Slmcpr,Encl.Proprietary Info Withheld ML20209B9141999-07-0101 July 1999 Application ECR 99-01497 for Amend to Licenses DPR-44 & DPR-56,reflecting Change in Corporate Structure ML20205F6221999-03-29029 March 1999 Application for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20207E2421999-03-0101 March 1999 License Amend Request ECR 98-01802 for Licenses DPR-44 & DPR-56,proposing Changes to Support PBAPS Mod P00507 Which Will Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term T/H Stability Solution Hardware ML20198N2471998-12-24024 December 1998 License Change Application ECR 96-01511,revising Setpoints & Limits of Allowable Values for LOP Instrumentation for 4kV Emergency Buses Contained in TS Table 3.3.8.1-1, LOP Instrumentation ML20236R3011998-07-10010 July 1998 Application for License Change ECR 98-01403,requesting Change to License DPR-44 Revising TS Section 2.0 & non-proprietary & Proprietary Versions of 980609 Addl Info Re 1.10 Cycle Specific Slmcpr.Proprietary Version Withheld ML20247C2481998-05-0101 May 1998 License Change Application ECR 98-00499 for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirements for Functional Testing of SRVs During Each Unit Startup ML20217G7481998-03-20020 March 1998 License Change Application ECR 97-02809,revising Tech Specs to Incorporate end-of-cycle Recirculation Pump Trip Sys at Units 1 & 2 ML20217Q4631998-03-0202 March 1998 Application for Amend to License DPR-12,adding Requirements to TS to Achieve Compliance w/10CFR50.36a, TS on Effluents from Nuclear Power Reactors ML20202F4151998-02-0404 February 1998 Application for Amends to Licenses DPR-44 & DPR-56,revising SR 3.6.4.1.2 & Associated Bases to Reflect Changes in Requirements for Secondary Containment Doors ML20211H9171997-09-26026 September 1997 Application for Amend to License DPR-56,deleting Submitted Page 2.0-1 to Be Replaced W/Encl Page 2.0-1 & Adding Page 5.0-21 for Unit 3 ML20141G4821997-06-30030 June 1997 License Change Request ECR 96-03620,revising TS Section 2.0, Safety Limits to Incorporate Revised SLMCPRs Due to Use of GE13 Fuel Product Line & cycle-specific Analysis Performed by GE ML20140D8501997-06-0404 June 1997 License Change Application ECR 97-00086,revising TS Section 3.8.2.1 to Eliminate Inconsistency Between Requirements for ECCS Operability & auto-start & Trip Bypass of EDGs on ECCS Initiation During Listed Events ML20141L0081997-05-23023 May 1997 License Change Application ECR 96-02324,revising Section 5.5.12 to Exclude Measured Main Steam Isolation Valves Leakage from Total Type B & C Local Leak Rate Test Results ML20141E0721997-05-0909 May 1997 License Change Application ECR 96-00982,revising TS SR 3.6.1.3.16 Re Replacement Frequency of Primary Containment Purge & Exhaust Valve Inflatable Seals ML20141A7861997-05-0505 May 1997 Application for Amend to Licenses DPR-44 & DPR-56,requesting Approval for Implementation of Plant Mod to ECCS Pumps in Order to Satisfy Recommendations Stipulated in NRC Bulletin 96-003 ML18102B0071997-04-30030 April 1997 Application for Amends to Licenses DPR-40,DPR-56,DPR-70 & DPR-75,requesting Consent of NRC for Indirect Transfer of Control of Interest in Plants That Will Occur Under Proposed Merger ML20137P7511997-03-31031 March 1997 License Change Request ECR 96-00627,extending Surveillance Interval for Calibr of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months ML20134F6091996-10-30030 October 1996 Application for Amend to License DPR-56,revising Slmcprs,Ts Section 2.0,by Incorporating Rev Due to GE Determination That Previous Calculation Is non-conservative ML20117L2821996-09-0606 September 1996 Application for Amends to Licenses DPR-44 & DPR-56 Adding Notes to Allow Core Spray & LPCI Pumps to Start out-of- Sequence Under Certain Conditions & Adding Notes to Selected Surveillance Requirements ML20117F9321996-08-27027 August 1996 Application for Amends to Licenses DPR-44 & DPR-56, Correcting Administrative Error in TS Re CRD Charging Water Header Pressure for Shutdown Margin Test ML20117H6711996-08-23023 August 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits to Incorporate New Safety Limit Min Critical Power Ratios,Due to Use of GE13 Fuel Product Line ML20117M6981996-06-13013 June 1996 License Change Request ECR 96-02011 to License DPR-44, Permitting One Time Performance of SR 3.3.1.1.12 for APRM Flow Biased High Scram Function,W/Delayed Entry Into Associated TS Conditions & Required Actions for Up to Six H ML20101K7961996-03-25025 March 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits ML20100J7361996-02-15015 February 1996 License Change Request 95-11 to Licenses DPR-44 & DPR-56, Reflecting Implementation of 10CFR50,App J,Option B ML20095J1251995-12-21021 December 1995 TS Change Request 95-08,eliminating Outdated Matl from FOLs & Making FOL for Unit 2 Consistent W/Fol for Unit 3 ML20095J6971995-12-19019 December 1995 TS Change Request 95-13 to Licenses DPR-44 & DPR-56, Correcting Administrative Error in Improved Tech Specs Re Ventilation Filter Testing Program ML20095A1621995-11-30030 November 1995 Application for Amends to Licenses DPR-44 & DPR-56, Consisting of Change Request 95-12,changing Minimum Allowable Control Rod Scram Accumulator Pressure & Charging Water Header Pressure from Value of 955 Psig to 940 Psig ML20094Q6541995-11-21021 November 1995 Application for Amends to Licenses DPR-44 & DPR-56,changing SR for High Pressure Test of the HPCI & RCIC Sys. Administrative Change Proposed to Eliminate Ref to Section Previously Eliminated ML20092L6251995-09-22022 September 1995 Informs of Change to Pbaps,Units 2 & 3 TS Bases,Figure 1.1-1.Change Allows PBAPS Units 2 & 3 to Maximize Generation Throughout Entire Fuel Cycle ML20092A2071995-09-0101 September 1995 Application for Amend to License DPR-56,consisting of Change Request 95-07,deleting License Condition 2.C ML20092B9361995-08-28028 August 1995 Rev E to TS Change Request (Tscr) 93-16 to Licenses DPR-44 & DPR-56 Re Implementation of Improved Ts.Rev E to Tscr 93-16 Redesignates Change Control Mechanism from 10CFR50.59,as Indicated Previously,To 10CFR50.54(a) for Six Listed Items ML20086Q4271995-07-21021 July 1995 Application for Amends to Licenses DPR-44 & DPR-56,proposing Overall Conversion of Current PBAPS TS to Improved TS as Contained in NUREG-1433, Std Ts,Ge Plants,BWR/4 ML20083Q7341995-05-16016 May 1995 Rev a to Tscr 93-16 Re Conversion to Improved TSs as Contained in NUREG-1433 ML20083K8581995-05-0909 May 1995 Application for Amend to Licenses DPR-44 & DPR-56,consisting of Change Request 93-16 Re Conversion of Current PBAPS TS to Improved TS ML20082M3191995-04-12012 April 1995 Suppl 2 to License Change Request 94-08,supporting Mod P00068-3,which Upgrades Major Components of TIP Sys to Correct Typo.Revised TS Page 186 Encl ML20087H0411995-04-10010 April 1995 Application for Amends to Licenses DPR-44 & DPR-56, Consisting of Change Requests 94-11,94-12 & 94-13,relocating Certain Review & Audit Requirements to Plant UFSAR ML20082B2121995-03-23023 March 1995 Revised Page 4 to TS Change Request 90-03 ML20082B0491995-03-22022 March 1995 License Change Request 95-04 to Licenses DPR-44 & DPR-56, Reducing Local Leak Rate Test Hold Time Duration from One H to 20 Minutes ML20081H1261995-03-16016 March 1995 Application for Amends to Licenses DPR-44 & DPR-56 Re Requirements for SRMs While in Refueling Condition ML20080H0401995-02-10010 February 1995 Application for Amends to Licenses DPR-44 & DPR-56, Correcting Administrative Errors Made During Past TS Changes ML20078A0531995-01-17017 January 1995 Application for Amends to Licenses DPR-44 & DPR-56,proposing to Change Source Range Monitor to Range Neutron Monotors & Delete Intermediate Range Monitors ML20077S6191995-01-13013 January 1995 License Change Request 94-07 to Licenses DPR-44 & DPR-56, Revising Allowed Time Between Signal Calibrs of LPRM from Every 6 Wks (Approx 1,000 EFPH) to Every 2,000 Megawatt Days Per Std Ton ML20077S4691995-01-13013 January 1995 License Change Request 94-08 to Licenses DPR-44 & DPR-56, Revising TS Tables 3.7.1 & 3.7.4 to Reflect Reduction in Number of Primary Containment Power Operated Outboard Valves for TIP Probes,Per PBAPS Mod P00068 ML20078L7541994-11-21021 November 1994 TS Change Request 94-14 to License DPR-56,re One Time Schedular Exemption from 10CFR50,App J,Section III.D.1(a) Concerning 10CFR50,App J Type a Test Intervals ML20078K7601994-11-17017 November 1994 License Change Request 93-13 to Licenses DPR-44 & DPR-56, Revising TS to Support Mods 5384 & 5386,upgrading Main Stack & Vent Stack Radiation Monitoring Sys 1999-09-27
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217K9761999-10-14014 October 1999 Amend 234 to License DPR-56,changing TS in Response to 990301 Application & Suppls ,1001 & 06,to Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Monitoring Sys ML20217B4261999-10-0505 October 1999 Amend 233 to License DPR-56,changing Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Repts ML20212H5071999-09-27027 September 1999 Application for Amends to Licenses DPR-44 & DPR-56,change Application ECR 96-01511,to Revise TS Re Loss of Power Setpoints for 4 Kv Emergency Buses ML20216H6891999-09-24024 September 1999 Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively, Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by TSs SR 3.9.1.1 ML20211M7081999-09-0101 September 1999 Suppl License Change Application ECR 99-01497 for Licenses DPR-44 & DPR-56,correcting Minor Discrepancies Discovered in Pages of Attachment 2 ML20211D5471999-08-23023 August 1999 Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively, Revising TSs to Correct Typo & Editorial Errors Introduced in TSs by Previous Amends ML20210P8811999-08-11011 August 1999 Application for Amends to Licenses DPR-44 & DPR-56 in Order to Clarify PBAPS Licensing Basis to Include Specific Info Re Allowed Containment Overpressure Credit Needed to Ensure Adequate NPSH Available for ECCS Pumps.Ufsar Changes,Encl ML20210N0711999-08-0606 August 1999 Exigent License Change Application ECR 99-01727 for Licenses DPR-44 & DPR-56,incorporating Note Into TS Which Will Permit one-time Exemption Until 990930,from 90 F Limit Stated in SR 3.7.2.2 ML20209F7641999-07-12012 July 1999 License Change Application ECR 99-01255,revising TS Sections 2.1.1.2 & 5.6.5 by Incorporating Revised SLMCPR & Deleting Previously Added footnotes.Non-proprietary & Proprietary Info Re Slmcpr,Encl.Proprietary Info Withheld ML20209B9141999-07-0101 July 1999 Application ECR 99-01497 for Amend to Licenses DPR-44 & DPR-56,reflecting Change in Corporate Structure ML20205K7371999-04-0707 April 1999 Amends 227 & 230 to Licenses DPR-44 & DPR-56,respectively, Consisting of Changes to TS SRs Re Secondary Containment Doors in Response to 980204 Application,As Revised by ML20205F6221999-03-29029 March 1999 Application for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20207E2421999-03-0101 March 1999 License Amend Request ECR 98-01802 for Licenses DPR-44 & DPR-56,proposing Changes to Support PBAPS Mod P00507 Which Will Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term T/H Stability Solution Hardware ML20198N2471998-12-24024 December 1998 License Change Application ECR 96-01511,revising Setpoints & Limits of Allowable Values for LOP Instrumentation for 4kV Emergency Buses Contained in TS Table 3.3.8.1-1, LOP Instrumentation ML20155C6011998-10-26026 October 1998 Amend 226 to License DPR-44,revising TSs for Safety Limit MCPR from Current Value of 1.11 to 1.10 for Two Recirculation Loop Operation & from 1.13 to 1.12 for Single Recirculation Loop Operation ML20154H4691998-10-0505 October 1998 Amends 225 & 229 to Licenses DPR-44 & DPR-56,respectively, Revising TSs to Permit Incorporation of EOC-RPT Sys at Plant,Units 2 & 3 ML20154J2261998-10-0505 October 1998 Amends 224 & 228 to Licenses DPR-44 & DPR-56,respectively, Revising TSs to Delete Requirements for Functional Testing of SRVs During Each Unit Startup ML20154G6551998-10-0101 October 1998 Amends 223 & 227 to Licenses DPR-44 & DPR-56,respectively, Revising Plant,Units 2 & 3 TSs to Exclude MSIV Leakage from Total Type B & Type C Local Leak Rate Test Results ML20153B9581998-09-14014 September 1998 Amend 9 to License DPR-12,adding Requirements for Control of Effluents & Annual Reporting Per 10CFR50.36a ML20238F2611998-08-24024 August 1998 Amend 222 to License DPR-44,revising Pbaps,Unit 2 TSs to Support Mod P00271,which Would Replace SRMs & IRMs W/Wrnms, During Forthcoming Outage 2R12,scheduled for Early Oct 1998 ML20236R3011998-07-10010 July 1998 Application for License Change ECR 98-01403,requesting Change to License DPR-44 Revising TS Section 2.0 & non-proprietary & Proprietary Versions of 980609 Addl Info Re 1.10 Cycle Specific Slmcpr.Proprietary Version Withheld ML20247C2481998-05-0101 May 1998 License Change Application ECR 98-00499 for Amends to Licenses DPR-44 & DPR-56,revising TS to Delete Requirements for Functional Testing of SRVs During Each Unit Startup ML20217G7481998-03-20020 March 1998 License Change Application ECR 97-02809,revising Tech Specs to Incorporate end-of-cycle Recirculation Pump Trip Sys at Units 1 & 2 ML20217Q4631998-03-0202 March 1998 Application for Amend to License DPR-12,adding Requirements to TS to Achieve Compliance w/10CFR50.36a, TS on Effluents from Nuclear Power Reactors ML20202F4151998-02-0404 February 1998 Application for Amends to Licenses DPR-44 & DPR-56,revising SR 3.6.4.1.2 & Associated Bases to Reflect Changes in Requirements for Secondary Containment Doors ML20212G8261997-10-24024 October 1997 Amends 221 & 226 to Licenses DPR-44 & DPR-56,respectively, Changing TSs to Eliminate Inconsistency Between ECCS Operability Requirements & Autostart & Protective Trip Bypass of EDGs on ECCS Initiation Signal ML20217J5571997-10-0909 October 1997 Amend 225 to License DPR-56,revising MCPR Safety Limit in Section 2.1 of TSs from 1.07 to 1.11 for Two Recirculation Loops in Operation ML20217D8101997-09-30030 September 1997 Amend 224 to License DPR-56,revises TS to Support PBAPS Mod P00271,which Would Replace Source Range & Intermediate Range Monitors W/Wide Range Neutron Monitoring System ML20211H9171997-09-26026 September 1997 Application for Amend to License DPR-56,deleting Submitted Page 2.0-1 to Be Replaced W/Encl Page 2.0-1 & Adding Page 5.0-21 for Unit 3 ML20216G5321997-09-0404 September 1997 Amends 220 & 223 to Licenses DPR-44 & DPR-56,respectively, Revising TS to Extend Replacement Frequency for Inflatable Seat Seals for Primary Containment Purge & Vent Valves to 96 Months ML20217M7961997-08-19019 August 1997 Amends 219 & 222 to Licenses DPR-44 & DPR-56,respectively, Extending APRM Flow Bias Instrumentation Surveillance Interval from 18 Months to 24 Months ML20141G4821997-06-30030 June 1997 License Change Request ECR 96-03620,revising TS Section 2.0, Safety Limits to Incorporate Revised SLMCPRs Due to Use of GE13 Fuel Product Line & cycle-specific Analysis Performed by GE ML20140D8501997-06-0404 June 1997 License Change Application ECR 97-00086,revising TS Section 3.8.2.1 to Eliminate Inconsistency Between Requirements for ECCS Operability & auto-start & Trip Bypass of EDGs on ECCS Initiation During Listed Events ML20141L0081997-05-23023 May 1997 License Change Application ECR 96-02324,revising Section 5.5.12 to Exclude Measured Main Steam Isolation Valves Leakage from Total Type B & C Local Leak Rate Test Results ML20141E0721997-05-0909 May 1997 License Change Application ECR 96-00982,revising TS SR 3.6.1.3.16 Re Replacement Frequency of Primary Containment Purge & Exhaust Valve Inflatable Seals ML20141A7861997-05-0505 May 1997 Application for Amend to Licenses DPR-44 & DPR-56,requesting Approval for Implementation of Plant Mod to ECCS Pumps in Order to Satisfy Recommendations Stipulated in NRC Bulletin 96-003 ML18102B0071997-04-30030 April 1997 Application for Amends to Licenses DPR-40,DPR-56,DPR-70 & DPR-75,requesting Consent of NRC for Indirect Transfer of Control of Interest in Plants That Will Occur Under Proposed Merger ML20137P7511997-03-31031 March 1997 License Change Request ECR 96-00627,extending Surveillance Interval for Calibr of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months ML20135B3851997-02-19019 February 1997 Amends 218 & 221 to Licenses DPR-44 & DPR-56,respectively, Changing Min Allowable Charging Water Header Pressure from Value 955 Psig to Value of 940 Psig in TS 3.10.8 ML20134F6091996-10-30030 October 1996 Application for Amend to License DPR-56,revising Slmcprs,Ts Section 2.0,by Incorporating Rev Due to GE Determination That Previous Calculation Is non-conservative ML20117L2821996-09-0606 September 1996 Application for Amends to Licenses DPR-44 & DPR-56 Adding Notes to Allow Core Spray & LPCI Pumps to Start out-of- Sequence Under Certain Conditions & Adding Notes to Selected Surveillance Requirements ML20117F9321996-08-27027 August 1996 Application for Amends to Licenses DPR-44 & DPR-56, Correcting Administrative Error in TS Re CRD Charging Water Header Pressure for Shutdown Margin Test ML20117H6711996-08-23023 August 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits to Incorporate New Safety Limit Min Critical Power Ratios,Due to Use of GE13 Fuel Product Line ML20117M6981996-06-13013 June 1996 License Change Request ECR 96-02011 to License DPR-44, Permitting One Time Performance of SR 3.3.1.1.12 for APRM Flow Biased High Scram Function,W/Delayed Entry Into Associated TS Conditions & Required Actions for Up to Six H ML20101K7961996-03-25025 March 1996 License Change Request 96-01 to Licenses DPR-44 & DPR-56, Revising TS Section 2.0, Safety Limits ML20100J7361996-02-15015 February 1996 License Change Request 95-11 to Licenses DPR-44 & DPR-56, Reflecting Implementation of 10CFR50,App J,Option B ML20095J1251995-12-21021 December 1995 TS Change Request 95-08,eliminating Outdated Matl from FOLs & Making FOL for Unit 2 Consistent W/Fol for Unit 3 ML20095J6971995-12-19019 December 1995 TS Change Request 95-13 to Licenses DPR-44 & DPR-56, Correcting Administrative Error in Improved Tech Specs Re Ventilation Filter Testing Program ML20095A1621995-11-30030 November 1995 Application for Amends to Licenses DPR-44 & DPR-56, Consisting of Change Request 95-12,changing Minimum Allowable Control Rod Scram Accumulator Pressure & Charging Water Header Pressure from Value of 955 Psig to 940 Psig ML20094Q6541995-11-21021 November 1995 Application for Amends to Licenses DPR-44 & DPR-56,changing SR for High Pressure Test of the HPCI & RCIC Sys. Administrative Change Proposed to Eliminate Ref to Section Previously Eliminated 1999-09-27
[Table view] |
Text
.. _- .~ .- ~- .- . , . . - - ~. .. . ~ . . - . .
Station Support DeptrtmInt
' 10 CFR 50.90
. .. d PECO ENERGY if Mr3="L,
- 965 Chesterbrook Doulevard Wayne, PA 19087-5691 March 16,1995 Docket Nos. 50-277 50-278 ,
License Nos. DPR-44 DPR-56 !
i
.l U. S. Nuclear Regulatory Commission !'
Attn: Document Control Desk Washington, DC 20555 l
&W Peach Bottom Atomic Power Station, Units 2 and 3 Technical Specifications Change Request 94-18
Dear Sir:
PECO Energy Company hereby submits Technical Specifications Change Request (l'SCR) No. ,
94-18, in accordance with 10 CFR 50.90, requesting a change to Appendix A.of the Peach i Bottom Atomic Power Station, Units 2 and 3 Factity Opera;ing Liconess The proposed changes !
involve the requirements for the Source Range Monitors (SRMs) whBe in the refueling condition. l The proposed changes are based on the improved Technical Specifications (ITS) contained in !
NUREG-1433, " Standard Technical Specifications General Electric Plants, BWR/4." Byletter i dated September 29,1994, PECO Energy submitted TSCR No. 93-16 requesting an overaR j
, conversion to the ITS. The SRM changes contained in this TSCR are consistent with our j l September 29,1994 submittal PECO Energy is submitting TSCR No. 94-18 so that the ;
l enhancements to the SRM requirements can be implemented in advance of the overaR !
conversion, in support of the gei.a PBAPS, w Unit 3 refueling outage scheduled for fan of 1995. Therefore, we request that the proposed changes be issued on or before August 1,1995 for PBAPS, Units 2 and 3, and the changes be made effective immediately. !
Attachment I to this letter describes the proposed changes, and provides justification for the changes. Attachment 2 contains the revised Technical Specification pages.
If you have any questions cere,,iaq this matter, please do not hesitate to contact us. i Very truly yours, G. A. Hunger, Jr.,
Director - Licensing j
i
Enclosures:
Affidavit, Attachment 1, Attachment 2 cc: T. T. Martin, Administrator, Region I, USNRC j .- W. L Schmidt, USNRC Senior Resident inspector, PBAPS l R. R. Janati, Commonwealth of Pannsylvania 9503240101 950316 fA D
{8 l; . -- . . _ - . _ . , , _ . . _ . _ - . - . _ _ . . . . .
l
COMMONWEALTH OF PENNSYLVANIA :
- as.
COUNTY OF YORK :
G. R. Rainey, being first duly swom, deposes and says: ,
t l
That he is Vice President of PECO Energy Company; the Applicant herein; that he haa read the l attached Technical Specifications Change Request (Number 94-18) for Peach Bottom Faculty Operating l Licenses OPR-44 and DPR-56, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief. I i
. !1.A ;
i Subscribed and swom to before me this 15th day of March . 1995.
3//5l15
. Ondk'Me>-
Notary Public NoterialSeel .
JanetL NotaryPutic Peach WrkCounty hlyCommiselon June 13,1996 Morntw,Pennspania Wof Notense
.- y- - -
4 f
l t
i i
! I 5
l l
r l
I l
l I
l ATTACHMENT 1 .;
i PEACH BOTTOM ATOMIC POWER STATION I I UNITS 2 AND 3 i l 1 l
Docket Nos. 50-277 50-278 Ucense Nos. DPR-44 i DPR-56 TECHNICAL SPECIFICATION CHANGE REQUEST l 94-18 i
" incorporation of improved Technical Specifications
, Source Range Monitor Mode 5 Requirements" l
Supporting Information for Changes 4 Pages l
l l
i I
L l
l I
l
[
t . . -. - . _ . . - . . - - . --
1 l DoclC3 Nos. 50-277 I
. 50-278 :
License Nos. DPR-44 '
4 DPR-56 I
Introduction i
PECO Energy Company (PECO Energy), Licensee under Faculty Operating Licenses DPR-44 and DPR-
- 56 for the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, requests that the Technical 1 Specifications (TS) contained in Appendix A of Operating Licenses Nos. DPR-44 and DPR-56 be amended. The proposed changes involve the requirements for the Source Range Monitors (SRMs) in 4 the refuel mode. Proposed changes to the TS are shown in Attachment 2 for PBAPS, Units 2 and 3. ;
. The proposed change pages are: 103,227,228,231 and 232. j l
In order to support the upcoming PBAPS, Unit 3 refueling outage, we request that the proposed j
- changes be issued on or before August 1,1995 for PBAPS, Units 2 and 3, and the changes be made '
effective immediately. i This TS change request provides a discussion and description of the proposed TS change, a safety l
, discussion of the proposed TS change, information supporting a finding of No Significant Hazards ,
j Consideration, and information supporting an Environmental Assessment.
I Discussion
] j l
. Current TS SurveR!ance Requirement (SR) 4.10.B.1 requires a daHy neutron response test wh8e
! performing core alterations. Performance of this response test requires the suspension of core alterations for a period of approximately one to one-andone-half hours per day. Core alterations is a critical path activity, and any delay in it results in additional cost due to an extended refueling outage.
1 Radiation exposure is also incurred in the preparation of the neutron response test. In lieu of the daRy 4
neutron response test, PECO Energy proposes to replace the TS requirements for the SRMs, in the 4 l refuel mode, with the requirements of the PBAPS, Units 2 and 3 (Improved Technical Specifications) ITS j
. for the SRMs in the Mode 5 condition. The Mode 5 SRM requirements of the iTS wNI provide an j adequate level of testing and verification to ensure the operabRity of the SRMs in the refuel mode whRe :
avoiding core alteration delays.
The proposed ITS for PBAPS, Units 2 and 3 were submitted to the U. S. Nuclear Regulatory Commission
- (USNRC) for approval in a letter from G. A. Hunger, Jr. to USNRC, dated September 29,1994 (Technical Specifications Change Request No. 93-16). This submittal to revise the PBAPS, Units 2 and 3 TS, in their entirety, was based on NUREG-1433, " Standard Technical Specifications General Electric Plants, BWR/4." The conversion to the ITS included both technically justified deviations from the NUREG, and technically justified changes from the PBAPS current TS.
i
- The changes proposed in this Technical Specitications Change Request (TSCR) are consistent with the September 29,1994 ITS submittal.
i Discussion of the Prooosed Chanaes i
The discussion of changes is as follows:
- 1. Current TS Limiting Condition for Operations (LCO) 3.3.B.4 and Survellance Requirement (SR) 4.3.B.4 are being revised to remove the refuel mode requirements. These re'uel mode
- requirements are being relocated to new TS SR 4.10.B.3. The revised TS SR 4.10.B.3 wHl allow use of the signal-to-noise ratio curve, but requires verification of 3 cps per operable channel. SR 4.10.B.3 is required to be performed prior to entering the refuel mode, and daRy whle in the
! refuel mode, and prior to core alterations, and every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during core alterations.
. 1 J
Docket Nos. 50-277
. 50-278
. License Nos. DPR-44
< DPR-56
- 2. Current TS LCO 3.10.B.1 is being revised such that while in the refueling mode, two SRMs are required to be operable (now TS LCO 3.10.B.1) except as stated in TS LCOs 3.10.B.2,3.10.B.4 and 3.10.B.5. Exceptions identified in the current TS LCO 3.10.B.1 are being revised or deleted.
- 3. The existing portion of TS LCO 3.10.B.1, which provides the requirements for determining an operable SRM, is being maintained and renumbered 3.10.B.3. A reference to the signal-to-noise ratio of Figure 3.3.1 is being relocated to TS LCO 3.10.B.3.b.
1
- 4. New TS LCO 3.10.B.2 is being added to allow only one SRM channel wh5e performing spiral ofRoad or reload.
- 5. The SRM count rate requirements of the current TS LCOs 3.10.B.2 and 3.10.B.3 are being relocated to new TS SR 4.10.8.3. The revised TS SR 4.10.B.3 wul continue to allow use of the signal-to-noise ratio curve.
l
- 6. Current TS LCO 3.10.B.2 is being deleted and replaced with spiral unloading requirements of new SR 4.10.B.3.
l I
i 7. Current TS LCOs 3.10.B.3 and 3,10.B.5 are being replaced with the requirements of new TS SR 4.10.B.3.
(
- 8. New TS LCO 3.10.B.4 is being added to require that if one or more SRMs are inoperable while in the refuel mode: 1) core alterations are to be immediately suspended, except for control rod insertion, and 2) actions are to be immediately initiated to fury insert aH insertable control rods in core cens containing one or more fuel assemblies.
- 9. Current TS SR 4.10.B.1 requires a functional test and a check for neutron response prior to making any core alterations. Additionally, whle required to be operable, the current TS require that SRMs will be checked daly for response This TS is being deleted and replaced with new TS SR 4.10.B.1 which requires that, prior to entering the refuel mode and every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter whBe in the refuel mode, a channel check shall be performed for each required SRM.
- 10. Current TS SR 4.10.B.2 is being deleted and replaced with a channel functional test and determination of signal-to-noise ratio every 7 days, prior to, and whIe in the refuel mode (now SR 4.10.B.4) and a channel check every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, prior to, and whue in the refuel mode (now SR 4.10.B.1).
- 11. New TS SR 4.10.B.2 is being added to replace existing TS LCO 3.10.B.1 and 3.10.B.5 requirements for the location of operable SRMs during core alterations and during core unloading and reloading. This TS wil also add a requirement to verify the location of the operable SRMs prior to performing core alterations, and every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter during core alterations.
- 12. Two additional testing requirements are being added which include: 1) (now TS SR 4.10.B.4) prior to entering the refuel mode and every seven days thereafter whle in the refuel mode, perform a channel functional test and determination of signal-to-noise ratio, and 2) (now TS SR i 4.10.B.5) prior to entering the refuel mode and every 184 days thereafter whle in the refuel mode, a channel calibration shaR be performed for each required SRM.
- 13. Current Bases 3.10 and 4.10 are also being revised to reRect the incorporation of the new testing requirements.
2
Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 l
l As a part of the comparison between the current PBAPS, Units 2 and 3 TS and the ITS submittal of September 29,1994, definitions have been reviewed. In particular, the definition of Core Alterations and Refueling Mode were reviewed. Also reviewed were the current TS Section 3.0 and the proposed ITS Section 3.0. These were reviewed to ensure that application of the current " motherhood rules" would not result in an interpretation of the proposed changes which is different from that intended by the proposed ITS.
The proposed changes addressed above are consistent with the proposed ITS submittal to the NRC on September 29,1994. Accordingly, they include various deviations from NUREG-1433. These deviations are included in the ITS submittal of September 29,1994, Volume 13, which provides justification for the proposed deviations from NUREG-1433 for ITS Section 3.3.1.2.
Safety Discussion The purpose of the SRMs, which is a subsystem of the neutron monitoring system, is to detect and monitor low flux conditions in the core and provide operator indication on the state of criticality within the reactor.
The SRMs provide neutron flux information during core alterations, the refuel mode, reactor startup, and I low flux operations. The SRMs are capable of generating a trip signal to block control rod withdrawai if I
the count rate exceeds a preset value or if the SRMs are not operating property. There are four SRM channels, each of which includes one detector that can be positioned in the core from the control room.
Any one SRM channel can initiate a rod block. During a reactor startup, the detectors may be withdrawn after neutron flux is indicated on the intermed! ate range monitors.
PECO Energy proposes to replace the current TS requirements for the SRMs, in the refuel mode, with the requirements of the proposed PBAPS, Units 2 and 3 ITS for the SRMs in the Mode 5 condition. The SRM requirements proposed herein will provide an adequate level of testing and verification to ensure the operability of the SRMs in the refuel mode. All other modes will maintain the current TS requirements for the SRMs.
l l The SRMs are not assumed to function during any analyzed UFSAR design basis accident or transient.
l Implementation of the proposed changes will not involve any physical changes to plant structures, I systems, or components. Additionally, this TS change will not alter any safety limits which ensure the integrity of fuel barriers.
Information Succortina a Findina of No Sianificant Hazards Consideration We have concluded that the proposed changes to the PBAPS, Units 2 and 3 TS do not constitute a Significant Hazards Consideration. In support of this determination, an evaluation of each of the three (3) standards set forth in 10 CFR 50.92 is provided below.
- 1) The crocosed chance does not involve a slanificant increase in the orobability or conseauences of any accident oreviousiv evaluated.
l The proposed changes to the SRM requirements will not increase the probability or i consequences of an accident previously evaluated. The SRMs are not assumed to function I
during any UFSAR design basis accident or transient analysis. This TS change will not alter any safety limits which ensure the integrity of fuel barriers, and will not result In any increase to onsite or offsite dose. Additionally, continued availability of the SRMs in the refuel mode is ensured through additional testing requirements being added by this TS change. The changes to the SRM requirements will not alter the operation of equipment assumed to be available for the mitigation of accidents or transients.
3
Docket Nos. 50-277 50-278
. License Nos. DPR-44
. DPR-56 The prapnand changes are based on NUREG-1433, " Standard Technical Specifications General Electric Plares, BWR/4,* and are consistent with the PECO Energy submittal of September 29, 1994, requesting an overal conversion, based on NUREG 1433. The overall conversion to the j ITS included both technically justNied deviations from the NUREG, and technicely justified I changes from the PBAPS current TS. l q
- 2) The oracomed change does not create the possibilty of a now or different idnd d accident from any oreviousiv evaluated.
The proposed changes to the SRM requirements wIl not create the imMlly of a new or j dligerent type of accident from any previously evaluated. The SRMs are not assumed to function ,
during any analyzed UFSAR design basis accident or transient analysis. Additionsby, the changes wIl not involve any changes to plant systems, structures or components (SCCs) which .
could act as new accident initiators. Implementation of the proposed changes wIl ellect the j manner in which these SSCs are tested; however,-TS requirements that govem routine testing )
and verification of plant components and variables are not assumed to be initiators of any l analyzed event.
1
- 3) The oronosed change does not result Irl a significant reduction in the maroin of asletv. i No margins of safety are reduced as a result of the proposed TS changes. No salsty limits wil ..I be changed as a result of this TS change. The proposed change does not involve a reduction in the margin of safety because SRMs are not credited in any safety analysis. At least one SRM wil remain operable during rod withdrawal during core alterations and rod withdrawal wil not occur if no SRMs are operable Excessive reactivky additions wIl be quicidy identNied and -
mitigated by the Intermediate Range Monitors and associated rod blocks. The Average Power Range Monitor Flux scram, and not any SRM function, is credkod for mitigating a rod withdrawal or reactivity addklon accident.
Use of a spiral offload or reload pattom wul provide assurance that the SRM wIl be in the optimum position for monitoring changes in neutron flux levels during core alterations.
The changes proposed in this TS change do not introduce any hardware changes, and wIl not
, alter the intended operation of plant structures, systems or components utilized in the mitigation
! of accidents or transients. Additionaby, these changes wil not introduce any new falure modes of plant equipment not previously evaluated.
Information Suocorting an Environmental Assessment An environmental assessment is not required for the changes proposed by this TSCR since the l requested changes conform to the crkeria for " actions eliglble for categorical exclusion' as specllied in i 10 CFR 51.22(c)(9). The requested changes wul have no impact on the environment. The proposed I changes do not involve a significant hazards consideration as discussed in the preceding section. The proposed changes do not involve a significant change in the types or significant increase in the amounts of any effluents that may be released offsite. In addklon, the propoemd changes do not involve a significant increase in individual or cumulative occupational radiation exposure. l Conclusion l
, The Plant Operations Review Committee and the Nuclear Review Board have reviewed these proposed changes to the PBAPS, Units 2 and 3 TS and have concluded that the changes do not involve an unreviewed safety question and will not endanger the health and safety of the public.