AO 73-22:on 730730,source Calibr of Radiation Monitors Associated W/Reactor Bldg Vent Exhaust Duct & Refueling Floor Zone Found Not Performed Since 720408.Monitors Calibr Upon Discovery of Omission
ML20086E015
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 07/31/1973
From: Riley B
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086E013 List:
References
AO-73-22, VYV-2910, NUDOCS 8312060020
Download: ML20086E015 (3)


Text

. _ _ . .

O g* : VERMONT YANKElc NUCLEAR POWER CORPOR ATION O

scVENTV UcVCfJ ORove GTncer RUTLAND, Vautorr os70r MPLY TOs VYV-2910 e. o. sox 157 VERNON, VEHMONr 05354 July 31, 1973 United States Atonic Energy Commionion Directorate'of Regulatory Operations, Region I 970 Broad Street Newark, New Jersey 07102

REFERENCE:

Operating Liconoe DPR-28 Docket No. 50-2't1 Abnorcal Occurrence No. A0-73-22 Conticeent As defined by Technical Specifications for the Vermont Yankee Nuclear Power Station, Section 6.7.3.1, we are reporting the following Abnornal occurrence na A0-73-22 and confirming our telephone conversation with your office.

During a tianagement review of the Surveillance Testing Schedule on July 30, 1973, it was noted that source calibretion of the radiation monitore associated with the Reactor Building Vent Er.haust Duct and the Refueling Floor Zone had not been perforred since April 8,1972. This constitutes a violation of Table 4.2.3 of Technical Specifications which requires a calibration frequency of every three months. Functionally ,

the circuitry nosociated with thene monitors provides initiating signals to the Standby Cas Treatment System and the Reactor Building Ventilaticn Inolation System. During thio period of time, the circuitry was functionally tested on a monthly ba910 and the detector indicating unito voro c1cceronically calibrated every three months. All referenced tests and calibrations verified that the devices actuated at the Technical Specification trip oettinga required in Table 3.2.3 and that either one upacale trip or tvo downscale trips would have performed the intended system operation.

The monitors were source calibrated incediately upon discovery of the ominston. Both Refueling Floor Zone monitora vore found to be within the 110% acceptance critoria required by the test procedure. One of the Rnactor Building Vent Exhaust Duct monitors was found to be 8312060020 730807 -

PDR ADOCK 05000271 f

S PDR (* s 1

VEf1M ONT YANKE NUCLEAR POWEf1 CortPOTtAYlON Directorate of P.cgulatory Operations July 31, 1973 Page 2 indicating approxicately 31% Icuor than the utandard source and was readjunted to the proper tolerance. The occond Exhauct Duct monitor was indicating approxitately 6% higher than the standard source and it too was readjusted. Thin monitor would have caused a proper systeci operation sooner then the required trip netting icpoced by Technical Specification, Tchle 3.2.3.

, Sincerely, VERMONT YANKEE NUC! EAR PO'JER CORPORATION Bradford W. Riley* * ' O Plant Superintendent UFC/kbd Y

9

v u m a n.o o,.. .,.o ia.us-n .s- - , -

/r Licensec: Vermont- Yankee Nuc1 car Power Corporatic I i

11. D
  • Thornburr,, cf Docket No.: 50- ..

t, Chief' FSLEB A0-73-22 Abnormal Occurrence: I *i.

6

TO (tiemo and unet) smat Ats at amas 4 -

l RO:1!Q (5) ~

DR Central Files (1) omit The attached report from the subject licensee is Regulatory Standards :3)

, Dir. of Licensina (131 foruarded in accordance with RO Manual Chapter 1r" i o ed.m. .no .,,,.i i,.a .,os n .us RO Files Central 1la'1 i & Files The action taken by the licencec is considered cut i

}

the nc>:t inspection a's annronriate. conien of f HOM U4anie and un.t) e Hn4Anns

. - / ,

the report have been foruarded to the PDR, Locci

,7/. / ;_ ,.,

f- ,

x ,. .

. R. T. Carlson, Chief PDR, NSIC, DTIE and State representatives. The facility Operations Branch licensee will cubmit a 10 day written report to PHONE NOL DATE 8/3/73 Licensing.

USE cintR $8C'E FOR AOL11 peal MM Angs

. CIO t 1978 C . 445

.- 4 * - -. - - - - - - - -

v. - -

, ..,.,73.,,

r. ::j::- .*

____=-

.. l. . .t; e. . .,. ..

.*E~ ~

.C. ' ' ' ' i,

(

9;

.. .a. ,

i~-: .

..&' . . v. -

, .,.2

' ,.m

.sq-w. .2.-;. :)- .'.. .: .

y . ::

nt .

?e - - . . ..

a. .

.a .

m:

. .. , c .

, 'e . , ..v.. _ . o (- '%

gc. .. -

p' .. &: ,,.

3,  :+ .'

w'..

..A -

+. O s.> .. q..

- e 4'

. :,. .,. :1. : .!

.c.-. '

.? -

.. . V d

-'.f..ystnauo3a"@9$E m.A06N3 W ..

. ~*' ..

,w.,.

. . ~ .. . .

.~

~ '

M,;..;.... , . ' ~

' ..ff 6 Nd 6 OfF.H6k -.

. 03M3338 -

.