ML20087P854

From kanterella
Revision as of 03:06, 13 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Answer Opposing Joint Intervenors Motion for Extension of Time.Intervenors Have Had Two Chances to Present Adequate Motion to Open Record on QA Allegations.Certificate of Svc Encl
ML20087P854
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/06/1984
From: Churchill B
LOUISIANA POWER & LIGHT CO., SHAW, PITTMAN, POTTS & TROWBRIDGE
To:
NRC ATOMIC SAFETY & LICENSING APPEAL PANEL (ASLAP)
References
OL, NUDOCS 8404090433
Download: ML20087P854 (7)


Text

__ _ _ _ - _ _ _

  • N$ Y$ o i y DOCKETED i April 6, 1984 C T4 APR -9 All :11 UNITED STATES OF AMERICA UFFul gr g g.g, NUCLEAR REGULATORY COMMISSION U0CrUU4G & sch; DFa.NCH Before the Atomic Safety and Licensing Apr+ 'rd In the Matter of )

)

LOUISIANA POWER & LIGHT COMPANY ) Docket No. 50-382 OL

)

(Waterford Steam Electric Station, )

Unit 3) )

APPLICANT'S ANSWER OPPOSING JOINT INTERVENORS' MOTION FOR EXTENSION OF TIME On February 22, 1984, Joint Intervenors filed a " Motion to Open Quality Assurance Contention" which inter alia sought a re-opening of the record on a new, undefined quality assurance con-tention. That request, which consisted of little more than photocopies of newspaper articles stapled to a perfunctory motion, was dismissed as " wholly unacceptable" by the Appeal Board. As a matter of discretion, however, the Appeal Board granted leave to file "a properly documented motion in compliance with Commission requirements by March 30, 1984." Memorandum and Order, February 28, 1S-84 at 5 (" Order") (emphasis in original).

The deadline is now past and Joint Intervenors have_done nothing toward perfecting their motion. Instead, they have filed, on the last day allowable to properly document their motion and without good cause, a request for a six-month extension of time 8404090433 840406 PDR ADOCK 05000382 G pop - .

l l

L in which to perfect the motion. The Appeal Board's course of action is clear; the motion for extension should be denied.

As justification for their request, the Joint Intervenors l

l state that: (1) co-counsel Luke Fontana is currently inactive in the intervention; l! 2/

(2) other present counsel is inexperienced and has been afflicted with eye problems; (3) they have been unable, as of yet, to associate more experienced counsel; _3/

and (4) they were faced with an " untenable" choice of filing an incomplete motion on time or a complete motion that wot ld be untimely, in contravention of the general legislative intent be-4/

hind the Atomic Energy Act."-

l 1/ Mr. Fontana has been counsel of record for Joint Intervenors since 1979 and has filed no withdrawal of appearance.

2/ Carole H. Burstein, co-counsel for Joint Intervenors, has been formally associated as counsel since July 7, 1983 and has signed on behalf of Joint Intervenors three motions to reopen in this proceeding prior to the motion at issue here. See Motion to Reopen Contention, dated July 22, 1983; Mction to Reopen Contention, dated November 7, 1983; Amended and Supplemental Motion to Reopen Contention 22, dated December 12, 1983. As the Appeal Board observed, she is now well acquainted with NRC adjudicatory pro-ceedings, and particularly with motions to reopen. Order, fn. 1.

_3/ ' Joint Intervenors' participation in this proceeding spans more than five years, during which the entire case has been tried and appeals processed. Little, if any, weight should be accorded to a representation now, on the literal eve of fuel loading, that they need more time to obtain still other counsel for this proceeding.

_4/ This " reason" is spurious. The Intervenors' dilemma is one that every party must face when it has a deadline to meet. Almost by definition a complete but untimely motion is one that vould (Continued Next Page)

4 Y

)

)

Applicant respectfully submits that under the circumstances the Joint Intervenors' reasons are totally inadequate to justify giving them additional time in which to perfec*. their motion.

Applicant has stated in its letter to the Appeal Board of February 28, 1984, that it expects to begin loading fuel at the Waterford 3 plant by April 30, 1984. On present information and belief, Applicant intends to file with NRC by mid-April a request that NRC issue the license to allow fuel loading of Waterford 3 within thirty days of the request. On the other side of the coin, we have been given no indication whatsoever that Joint Intervenors will be able to support their motion, either now or at the end of the six-month extension.

The Appeal Board has specifically directed Joint Intervenors' 5/

counsel to the standards applicable to motions to reopen.- - '

Counsel and the Joint Intervenors should by now be fully aware of these requirements, having previously filed such motions and having been treated in Applicant's and Staff's responses to a (Continued) have been incomplete if submitted before the deadline. Further-more, the Joint Intervenors' " untenable choice" is'one of its'own making; if they had put together an adequate motion at the outset, tha Appeal Board would not have dismissed it with 30 days to perfect, and the Joint

_ prejudice for Intervenors would not now be faced with dismissal with missing the deadline. Their vague reference without specifics to support in the Atomic Energy Act is.itself untenable.

_5/ Order, at 2.

n

v catalogue of the applicable law. Even inexperienced counsel and laymen could be expected to have made an effort to comply with these requirements initially, and certainly within the 30-day grace period allowed by the Appeal Board.

Joint Intervenors have not shown good cause here and the potential prejudice to Applicant is considerable. Joint Intervenors have now had two chances to present an adequate motion to open the record on the basis of the quality assurance allegations raised in the Gambit articles. To hold their motion in abeyance or to further extend the amount of time to perfect is completely unjus-tified. Should Joint Intervenors wish to raise new matters, they are free to attempt to do so now, six months from now, or any other time in a properly conceived motion to reopen or in a request under 10 C.F.R. S 2.206. There is no need formally to hold open that prospect. The instant motion for extension'should be denied.

Respectfully submitted, SHAW, PITTMAN, POTTS & TROWBRIDGE

\ '

\

By: ,

Bruce H/ Churchill 7 P.C.

Ernest L. Blake, Jr., P.C.

Counsel for Applicant L

1800 M Street, N.W.

Washington, D.C. 20036 (202) 822-1000 Dated: April 6, 1984

a I

UNITED STATES OF AMERICA '

NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Appeal Board In the Matter of )

)

LOUISIANA POWER & LIGHT COMPANY ) Docket No. 50-382 OLA

)

(Waterford Steam Electric Station,- )

Unit 3) )

CERTIFICATE.OF SERVICE ,

This is to certify that copies of the foregoing " Applicant's Answer Opposing Joint Intervenors' Motion for Extension of Time" were served, by deposit in the United States mail, first class, postage prepaid, to all those on the attached Service List, except those marked with en asterisk were served by hand-delivery, this 6th day of April, 1984.

s n

Brdds W. Chruchill, P.C.

Dated: April 6, 1984 l

I

e I'

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Appeal Board In the Matter of )

)

LOUISIANA POWER & LIGHT COMPANY ) Docket No. 50-382

)

(Waterford Steam Electric )

Station, Unit 3) )

SERVICE LIST o Christine N. Kohl

  • Sheldon J. Wolfe Administrative Judge Administrative Judge Chairman, Atomic Safety and Chairman, Atomic Safety and Licensing Appeal Board Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Washington, D.C. 20555 o W. Reed Johnson Harry Foreman Administrative Judge Administrative Judge Atomic Safety and Licensing Atomic Safety and Licensing Appeal Board Board U.S. Nuclear Regulatory Ccmmission Director, Center for Population Washington, D.C. 20555 Studies Box 395, Mayo o Howard A. Wilber University of Minnesota Administrative Judge Minneapolis, MN 55455 Atomic Safety and Licensing Appeal Board Walter H. Jordan U.S. Nuclear Regulatory Commission Administrative Judge Washington, D.C. 20555 Atomic Safety and Licensing Board Sherwin E. Turk, Esquire 881 West Outer Drive Office of the Executive Oak Ridge, TN 37830 Legal Director U.S. Nuclear Regulatory Commission -Docketing & Service Section (3)

Washington, D.C. 20555 Office of the Secretary U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Washington, D.C. 20555 Appeal Board Panel U.S. Nuclear Regulatory Commission Atomic Safety and Licensing.

Washington, D.C. 20555 Board Panel

-U.S. Nuclear Regulatory Commission Washington, D.C. 20555 l

_ . _ ^

s

'r LP&L Service List-ASLAB Page Two Mr. Gary Groesch Luke B. Fontana, Esquire 2257 Bayou Road 824 Esplanade Avenue New Orleans, LA 70119 Ne'? Orleans, LA 70116 Brian Cassidy, Esquire Spence W. Perry, Esquire Federal Emergency Management Federal Emergency Management Agency Agency Region I Office of the General Counsel 422 J. W. McCormack 500 C Street, S.W., Room 840 Boston, MA 03109 Washington, D.C. 20472 Carole H. Burstein, Esquire 445 Walnut Street New Orleans, LA 70118 l

l N