ML20059L260

From kanterella
Revision as of 02:31, 1 April 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Millstone Unit 3 Cycle 5 COLR, Per TS 6.9.1.6.d
ML20059L260
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/08/1993
From: Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20059L262 List:
References
MP-93-893, NUDOCS 9311160401
Download: ML20059L260 (1)


Text

.

NORTHIEAST UTILITIES i n w n w oa.a - a, .c - -,

cenemi On,ce . seioen street. senin. Conn cucui 1 msna ss.c e3 uc.= cw "

P.O. BOX 270 H ARTFORD, CONNECTICUT 06141-0270 k k J U15m.w.s,.u$,7,$$C ca .o, tw

. (203) 665-5000 November 8, 1993 MP-93-893 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Reference:

Facility Operating License No. NPF-49 l Docket No. 50-423 Gentlemen:

Millstone Nuclear Power Station Unit 3 Transmittal of CORE OPERATING LIMITS REPORT (COLR)

In accordance with Millstone No. 3 Technical Specification 6.9.1.6.d, the Northeast Nuclear Energy Company hereby submits the CORE OPERATING LIMITS REPORT for Cycle 5 operation. This information addresses only four loop operation.

If you have any questions, please contact Jeffry Langan at (203) 444-5544 directly.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY j /

, y1 - - (6W Ste n E. Scace Vice President, Millstone Station - NNECo SES/JAL:kml Attachment cc: T.T. Martin, Region i Administrator P. Swetland, Senior Resident inspector, Millstone Unit Nos.1,2&3 V.L. Rooney, NRC Project Manager, Millstone Unit No. 3 I

l 15002' osse nov tes 9311160401 931108 0 )

PDR ADDCK 05000423 '

P PDR Q ]

, _