ML20069K996
From kanterella
ML20069K996 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 10/31/1982 |
From: | Mcnerney M AMERICAN RESOURCES GROUP, LTD. |
To: | |
Shared Package | |
ML20069K995 | List: |
References | |
NUDOCS 8211160322 | |
Download: ML20069K996 (37) | |
Similar Documents at Callaway | |
---|---|
Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML20207A7401999-03-30030 March 1999
[Table view]Draft, Evaluation of Risk of Induced Steam Generator Tube Rupture, for Callaway Plant ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20248C3681998-05-18018 May 1998 Non-proprietary Version of Rev 4 to HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants ML20249B2451998-05-18018 May 1998 Nonproprietary Version of Revised Chapters 4 & 5 to Rev 4 of HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants for Ue & Wcnoc. Chapters 4 & 5 Reflect Editorial Revs ML20092B6911995-08-31031 August 1995 Region 1 Spent Fuel Rack Criticality Analysis ML20085K1111995-01-31031 January 1995 Pump & Valve IST Program,Rev 14,Second Ten-Yr Interval ML20065N4611994-04-20020 April 1994 EALs Indications Bases ML20101F3311992-06-15015 June 1992 Rev 0 to NRC ERDS Data Point Library ML20101E9961992-05-31031 May 1992 Rev 0 to Callaway Plant Region 2 Spent Fuel Rack Criticality Analysis ML20079D3751991-06-30030 June 1991 Control Bank Reactivity Worth Determination Using Rod Swap Technique Rept ML20247F1321989-03-23023 March 1989 Post-Tensioning Sys Evaluation,Callaway Unit 1 Containment & Wolf Creek Unit 1 Containment ML20205N3911988-10-31031 October 1988 Operation of Callaway Plant W/Positive Moderator Temp Coefficient,Increased Rwst/Accumlator Boron Concentrations & SAT Sodium Hydroxide Concentration, Safety Evaluation ML20151N9641987-10-0202 October 1987 Eddy Current Insp & Mechanical Plugging ML20205S0361987-03-31031 March 1987 Union Electric Callaway Plant NSSS Uprating - 3,579 Mwt Licensing Rept ML20140A3741986-01-17017 January 1986 Final Rept of Independent Review of Environ Qualification Programs to NUREG-0588 ML20141H6201985-12-31031 December 1985 Nonproprietary Steam Generator Single-Tube Rupture Analysis for Snupps Plants Callaway & Wolf Creek ML20116E8171985-04-24024 April 1985 Final Rept:Task Analysis & Verification of Snupps Control Room ML20107C9331985-02-0404 February 1985 Union Electric Co Callaway Power Plant NPDES Permit Reapplication Feb 1985 ML20101K2821984-12-21021 December 1984 Draft Interim Justification Position for Seismic & Environ Qualification of In-Core Thermocouples,Connectors,Adaptors & Ref Junction Box (ESE-43 & ESE-44) ML20107A8271984-12-10010 December 1984 Rev 3 to Inservice Testing Program ML20107K8311984-08-0909 August 1984 Progressive Investigative Rept,Incident:Unauthorized Operation of Plant Equipment. Info Deleted ML20093A3911984-06-30030 June 1984 Rev 1 to Detailed Control Room Design Review Summary Rept for Snupps, in Response to Generic Ltr 82-33,(NUREG-0737, Suppl 1) ML20091Q6951984-05-31031 May 1984 Vols 1 & 2 of Operational Readiness Review ML20086L0211984-02-0202 February 1984 Detailed Control Room Design Review Summary Rept for Snupps, in Response to Generic Ltr 82-33,NUREG-0737, Suppl 1 ML20079Q3961984-01-27027 January 1984 Rev 1 to Rept on Control of Heavy Loads ML20079G5061984-01-13013 January 1984 Rev 1 to SAR for Safety Parameter Display Sys ML20079G3841983-12-31031 December 1983 Purge Valve Operability Rept,Snupps Project ML20084J4871983-12-31031 December 1983 Decommissioning Study for Callaway Nuclear Plant ML20090L6611983-09-12012 September 1983 Release for Operations Weekly Status Rept. Related Info Encl,Including Snupps Sys Identification,Sys Release for Test Rept,Charts & Preoperational Test Schedule ML20071E6841983-03-10010 March 1983 Rept of Independent Review of Environ Qualification Programs to NUREG-0588 ML20064G5891982-12-31031 December 1982 Pressurizer Safety & Relief Line Piping & Support Evaluation,Callaway Unit 1 & Wolf Creek Unit ML20069K9961982-10-31031 October 1982 Final Draft Cultural Resources Mgt Plan for Residual Lands at Union Electric Co Callaway Nuclear Power Plant,Callaway County,Mo ML20069L0051982-10-31031 October 1982 Final Draft Phase I Cultural Resources Survey & Assessment on Residual Lands at Union Electric Co Callaway Nuclear Power Plant,Callaway County,Mo ML20090L6671982-10-13013 October 1982 Preoperational Test Schedule. Related Info Encl,Including Oversized Documents,Preoperational Tests,Test Procedure Index,R Smart 830903 Memo,Hw Wilson 830912 Memo & Wh Wheeler 830711 Memo ML20054L4931982-06-15015 June 1982 Pressurizer & Safety Relief Line Piping & Support Evaluation & Action Plan, Interim Rept ML20010B0181981-07-15015 July 1981 Comparison of Finite Element & Lumped Mass Seismic Analysis Methods for Selected Snupps Bldgs. ML20005A2921981-06-26026 June 1981 Human Factors Evaluation of Snupps, Prepared for Nuclear Projects,Inc ML20004D6811981-05-31031 May 1981 Reliability Analysis of Snupps Auxiliary Feedwater Sys. One Oversize Drawing Encl.Aperture Card Will Be in PDR ML20003G2211981-02-28028 February 1981 Position Rept Requesting Relief from Certain Monitoring Requirements,Callaway Nuclear Power Plant. ML19341D4121981-02-27027 February 1981 Licensing Review Results for FSAR Chapter 8 (Electric Power) Re Operation of Snupps Plants. ML19339C0451980-08-27027 August 1980 Welds of Anchor Rods & Studs to Embedded Plates, Interim Rept ML19344E4721980-07-29029 July 1980 Results of Detailed Excavation Mapping,Ultimate Heat Sink Area,Essential Svc Water Sys, & Unit 1 Power Block Subgrade, for Facilities. ML19209B2001979-08-14014 August 1979 Preliminary Util Peak Demand Projection:Rept to Project Task Force. ML19268C0341979-08-0909 August 1979 Rept on Investigation of Weld Imperfections in ASME SA-312 Double Welded Austenitic Stainless Steel Pipe for Compliance W/Nrc IE Bulletin 79-03. ML19248C2671979-07-31031 July 1979 Rept on Pipe-Support Base Plate Designs Using Concrete Expansion Anchor Bolts. ML20248E4881979-02-0505 February 1979 Rev 12 to, Tech Spec for Furnishing,Fabricating & Delivering Reactor Bldg Liner Plate for Snupps 1999-03-30 Category:TEXT-SAFETY REPORT MONTHYEARML20217E2691999-09-30030 September 1999
[Table view]Monthly Operating Rept for Sept 1999 for Callaway Plant,Unit 1.With ML20212D0711999-09-14014 September 1999 Safety Evaluation Re GL 88-20, Individual Plant Exam for Severe Accident Vulnerabilities ML20212A3361999-09-14014 September 1999 1999 Biennial RERP Exercise, for Callaway Plant. Pages 7,8 & 9 (of 9) in Mini Scenario 1 Section of Incoming Submittal Not Included ML20211N0451999-09-0202 September 1999 Safety Evaluation Concluding That Util Has Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant That Are Susceptible to Pressure Locking & Binding ML20212A0201999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Callaway Plant,Unit 1.With ML20210P0441999-08-10010 August 1999 Safety Evaluation Granting Licensee Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code,For Second 10-year Interval ISI at Plant,Unit 1 ML20210Q8331999-08-0505 August 1999 Rev 4 to Callaway Cycle 10 Colr ML20210T9481999-08-0303 August 1999 Informs Commission Re Status of Issues Related to Risk Informed Decision Making That Were Raised During Staff Review of License Amend Approving Electrosleeve SG Tube Repair Method for Ue Callaway Plant,Unit 1 ML20216D8791999-07-31031 July 1999 Rev 3 to Callaway Cycle 10 Colr ML20210T4451999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Callaway Plant,Unit 1.With ML20210H6531999-07-30030 July 1999 SER Accepting Relief Request to Second Ten Year Inservice Insp Plant for Plant,Unit 1 ML20209H0881999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Callaway Plant,Unit 1.With ML20195H4831999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Callaway Plant,Unit 1.With ML20206R7111999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Callaway Plant Unit 1.With ML20205Q5561999-04-19019 April 1999 Safety Evaluation Accepting Relief for Request from Certain ASME Section Requirements for Containment Insp ML20205S5791999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Callaway Plant Unit 1.With ML20207A7401999-03-30030 March 1999 Draft, Evaluation of Risk of Induced Steam Generator Tube Rupture, for Callaway Plant ML20205G4071999-03-25025 March 1999 Security Event Rept:On 990304,failure to Properly Compensate for Loss of Safeguards Equipment That Could Have Resulted in Undetected Intrusion Into Protected or Vital Area,Was Discovered.Caused by Msk 325 Failure.Replaced Msk 325 ML20204B6741999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Callaway Plant,Unit 1.With ML20199E7011998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Callaway Plant.With ULNRC-03990, 1998 Annual Rept for Ameren Corp/Union Electric Co. with1998-12-31031 December 1998 1998 Annual Rept for Ameren Corp/Union Electric Co. with ML20198D9811998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Callaway Plant,Unit 1.With ML20195C8341998-11-10010 November 1998 Rev 20 to Operating QA Manual ML20195C8181998-11-0909 November 1998 Rev 19 marked-up Changes to Operating QA Manual ML20195D6931998-10-31031 October 1998 Non-proprietary Rev 3 to Electrosleeving Qualification for PWR Recirculating SG Tube Repair ML20195D3581998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Callaway Plant,Unit 1.With ML20154L4931998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Callaway Plant Unit 1.With ML20151Y5151998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Callaway Plant,Unit 1.With ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20237B8421998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Callaway Plant,Unit 1 ML20155H7381998-06-30030 June 1998 10CFR50.59 Summary Rept for Jan-June 1998. with ML20236Q9991998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Callaway Plant,Unit 1 ML20249C5851998-06-30030 June 1998 Rev 1 to Callaway Cycle 10,COLR ML20248M0501998-06-0808 June 1998 Special Rept 98-02:on 980502,Channel 3 of loose-part Detection Sys Was Declared to Be Inoperable.Caused by Failure of Component Inaccessible at Power.Addl Troubleshooting Will Be Performed ML20249A7681998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Callaway Plant,Unit 1 ML20249B2451998-05-18018 May 1998 Nonproprietary Version of Revised Chapters 4 & 5 to Rev 4 of HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants for Ue & Wcnoc. Chapters 4 & 5 Reflect Editorial Revs ML20248C3681998-05-18018 May 1998 Non-proprietary Version of Rev 4 to HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants ML20247G0811998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Callaway Plant Unit 1 ML20217R2031998-04-27027 April 1998 Cycle 10 Colr ML20216H0651998-04-15015 April 1998 SER Approving Licensee Proposed Alternative to Use Code Case N-508-1 for Rotation of Serviced Snubbers & Prvs for Purpose of Testing in Lieu of ASME B&PV Code,Section Xi,Article IWA-7000 Requirements ML20216K0531998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Callaway Plant,Unit 1 ML20217F3181998-03-24024 March 1998 SER Accepting Relief Request for Approval for Use of Alternate Exam Requirements for Plant Inservice Insp Program ML20216G3551998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Callaway Plant, Unit 1 ML20203M0101998-02-25025 February 1998 Rev 11 to Callaway Cycle 9 Colr ML20203A7951998-02-0909 February 1998 Rev 10 to Callaway Cycle 9 Colr ML20202D4821998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Callaway Plant ML20198S6361998-01-22022 January 1998 Ro:On 980121,determined That Plant Shutdown Would Be Required IAW TS 3.8.1.1,Action D.Caused by 'B' Train EES Charcoal Absorber Being Determined Inoperable.Requested 24 Hour Extension to Allow Restoration of EDG & ESW Train ULNRC-03775, 1997 Annual Rept for Union Electric1997-12-31031 December 1997 1997 Annual Rept for Union Electric ML20198Q0631997-12-31031 December 1997 Rev 9 to Callaway Cycle 9 Colr ML20198J6791997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Callaway Plant,Unit 1 1999-09-30 |