Meeting Summary with Entergy Operations, Inc. to Discuss the Licensee'S Probabilistic Risk Assessment Used to Support the Power Uprate
ML020320202
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 02/01/2002
From: Alexion T
NRC/NRR/DLPM
To:
Shared Package
ML020320555 List:
References
TAC MB0789
Download: ML020320202 (3)


Text

February 1, 2002 LICENSEE: Entergy Operations, Inc.

FACILITY: Arkansas Nuclear One, Unit 2 (ANO-2)

SUBJECT:

SUMMARY

OF MEETING TO DISCUSS THE LICENSEE'S PROBABILISTIC RISK ASSESSMENT USED TO SUPPORT THE POWER UPRATE (TAC NO. MB0789)

At a public meeting on December 18 and 19, 2001, two members of the U.S. Nuclear Regulatory Commission (NRC) staff conducted a site review of specific aspects of the ANO-2 risk evaluation that was performed by the licensee in support of their license amendment application requesting a 7.5 percent power uprate.

Prior to initiating the review, the licensee made a brief presentation on the ANO-2 power uprate risk impact assessment. The licensees presentation is provided herewith as Enclosure 1. In addition, an attendance list is provided herewith as Enclosure 2.

Based on the NRC staffs review of the license amendment application and supporting information that the licensee had formally provided, the site review focused on the licensees fire analysis and human reliability analysis. The NRC staff reviewed the licensees approaches and documentation in each of these areas to ascertain the fidelity of the licensees approach with the methodology that the licensee indicated that they had used and to verify the conservative nature of their analysis. This review involved considerable interactions between the NRC staff and the licensee in discussing the licensees approaches and the results of these analyses, including computer program demonstrations and manipulations of these analyses.

The findings of this site review will be incorporated into the NRC staffs safety evaluation on the power uprate.

/RA/

Thomas W. Alexion, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-368

Enclosures:

As stated (2) cc w/encls: See next page

February 1, 2002 LICENSEE: Entergy Operations, Inc.

FACILITY: Arkansas Nuclear One, Unit 2 (ANO-2)

SUBJECT:

SUMMARY

OF MEETING TO DISCUSS THE LICENSEE'S PROBABILISTIC RISK ASSESSMENT USED TO SUPPORT THE POWER UPRATE (TAC NO. MB0789)

At a public meeting on December 18 and 19, 2001, two members of the U.S. Nuclear Regulatory Commission (NRC) staff conducted a site review of specific aspects of the ANO-2 risk evaluation that was performed by the licensee in support of their license amendment application requesting a 7.5 percent power uprate.

Prior to initiating the review, the licensee made a brief presentation on the ANO-2 power uprate risk impact assessment. The licensees presentation is provided herewith as Enclosure 1. In addition, an attendance list is provided herewith as Enclosure 2.

Based on the NRC staffs review of the license amendment application and supporting information that the licensee had formally provided, the site review focused on the licensees fire analysis and human reliability analysis. The NRC staff reviewed the licensees approaches and documentation in each of these areas to ascertain the fidelity of the licensees approach with the methodology that the licensee indicated that they had used and to verify the conservative nature of their analysis. This review involved considerable interactions between the NRC staff and the licensee in discussing the licensees approaches and the results of these analyses, including computer program demonstrations and manipulations of these analyses.

The findings of this site review will be incorporated into the NRC staffs safety evaluation on the power uprate.

/RA/

Thomas W. Alexion, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-368 DISTRIBUTION:

PUBLIC SDinsmore

Enclosures:

As stated (2) PDIV-1 Reading DHarrison RidsNrrPMTAlexion SMorris, RIV EDO cc w/encls: See next page RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrDlpm (Zwolinski/Marsh)

RidsNrrDlpmLpdiv (Richards)

Package: ML020320555 RidsNrrDlpmLpdiv1 (Gramm)

Meeting Notice: ML013340314 RidsNrrLADJohnson : ML020320450 DMcCain, Nrr Communications Coordinator : ML020320463 RidsRgn4MailCenter (Brockman)

Accession Nos.: Summary: ML020320202 OFFICE PDIV-1/PM PDIV-1/LA SPSB SPSB/SC PDIV-1/SC NAME TAlexion DJohnson DHarrison MRubin MThadani for RGramm DATE 01/30/02 01/30/02 01/30/02 01/31/02 02/01/02 OFFICIAL RECORD COPY

Arkansas Nuclear One cc:

Executive Vice President Vice President, Operations Support

& Chief Operating Officer Entergy Operations, Inc.

Entergy Operations, Inc. P. O. Box 31995 P. O. Box 31995 Jackson, MS 39286-1995 Jackson, MS 39286-1995 Wise, Carter, Child & Caraway Director, Division of Radiation P. O. Box 651 Control and Emergency Management Jackson, MS 39205 Arkansas Department of Health 4815 West Markham Street, Slot 30 Mr. Craig G. Anderson Little Rock, AR 72205-3867 Vice President Operations, ANO Entergy Operations, Inc.

Winston & Strawn 1448 S. R. 333 1400 L Street, N.W. Russellville, AR 72801 Washington, DC 20005-3502 Mike Schoppman Framatome ANP, Richland, Inc.

Suite 705 1911 North Fort Myer Drive Rosslyn, VA 22209 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 310 London, AR 72847 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 County Judge of Pope County Pope County Courthouse Russellville, AR 72801 March 2001