Letter Sequence Other |
---|
|
|
MONTHYEARML0205304402002-03-21021 March 2002 Code Relief, Relief from ASME Code Requirements Related to the Inservice Inspection Program, Second 10-Year Interval, Relief Request S2-RR-B04 Project stage: Other 2002-03-21
[Table View] |
Similar Documents at Salem |
---|
Category:Code Relief or Alternative
MONTHYEARML23019A3482023-02-0202 February 2023 Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System Piping LR-N21-0052, Request for Relief from ASME Code Defect Removal for Service Water Buried Piping2022-04-0707 April 2022 Request for Relief from ASME Code Defect Removal for Service Water Buried Piping ML21145A1892021-06-10010 June 2021 Authorization and Safety Evaluation for Alternative Request No. SC-I4R-200 ML20099E2332020-04-20020 April 2020 Issuance of Alternative Request S1-I4R-191 for the Fourth 10-Year Inservice Inspection Interval LR-N19-0084, Proposed Alternative for Examination of ASME Section XI, Steam Generator and Pressurizer Nozzle Inside Radius Sections, Per Inservice Inspection Relief Request SC-I4R-1922019-09-10010 September 2019 Proposed Alternative for Examination of ASME Section XI, Steam Generator and Pressurizer Nozzle Inside Radius Sections, Per Inservice Inspection Relief Request SC-I4R-192 LR-N19-0083, Request for Relief S1-I4R-191 from Alloy 690 PWR Reactor Vessel Head Inspection Interval, Fourth 10-year Interval2019-09-10010 September 2019 Request for Relief S1-I4R-191 from Alloy 690 PWR Reactor Vessel Head Inspection Interval, Fourth 10-year Interval ML17219A1862017-08-17017 August 2017 Safety Evaluation of Relief Request SC-I4R-171 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program ML17132A0052017-05-19019 May 2017 Alternative Request to Adopt American Society of Mechanical Engineers Code Case OMN-20 (CAC Nos. MF8313 and MF8314) ML15349A9562015-12-24024 December 2015 Relief from the Requirements of the ASME Code ML15195A4952015-07-28028 July 2015 Relief from the Requirements of the ASME Code ML14153A1462014-06-23023 June 2014 Safety Evaluation of Relief Request No. S2-14R-131 Regarding the Fourth Ten-Year Inservice Inspection Interval (Tac ME2442) ML13088A2192013-04-18018 April 2013 Safety Evaluation of Relief Request No. S2-14R-123 Regarding the Fourth Ten-Year Inservice Inspection Interval Code Edition LR-N12-0157, Submittal of Relief Request Associated with the Fourth Ten-Year Inservice Inspection (ISI) Interval Code Edition2012-06-0707 June 2012 Submittal of Relief Request Associated with the Fourth Ten-Year Inservice Inspection (ISI) Interval Code Edition ML1124201752011-09-19019 September 2011 Safety Evaluation of Relief Requests Regarding Pressure Testing of Service Water System Buried Piping - Salem Nuclear Generating Station, Unit Nos. 1 and 2 LR-N10-0380, Request for Authorization to Continue Using a Risk-Informed Inservice Inspection Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements for Class 1 and 2 Piping2010-10-21021 October 2010 Request for Authorization to Continue Using a Risk-Informed Inservice Inspection Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements for Class 1 and 2 Piping ML0936500862010-01-0707 January 2010 Safety Evaluation of Relief Requests for the Third 10-Year Interval of the Inservice Inspection Program for Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML0920304642009-08-11011 August 2009 Safety Evaluation of Relief Requests for the Fourth 10-Year Interval of the Inservice Testing Program for Salem Nuclear Generating Station, Unit 1 & 2 (TAC ME0322, ME0323, ME0324, ME0325, ME0326, ME0327, ME0328, ME0329, ME0330, ME0331, ME03 LR-N09-0126, Relief Requests to Extend the Inservice Interval for Reactor Vessel Weld Examination2009-06-11011 June 2009 Relief Requests to Extend the Inservice Interval for Reactor Vessel Weld Examination ML0825502182008-10-10010 October 2008 Safety Evaluation of Relief Requests for the Third 10-Year Interval of the Inservice Testing Program for Salem Nuclear Generating Station, Unit Nos. 1 and 2 LR-N05-0446, ASME Code Relief Request Salem Units 1 and 22005-11-16016 November 2005 ASME Code Relief Request Salem Units 1 and 2 LR-N04-0473, Relief Request SC-13-RR-A14 Synchronization of Salem Units 1 and 2 ISI Programs Ten-Year Inservice Inspection Intervals2005-10-31031 October 2005 Relief Request SC-13-RR-A14 Synchronization of Salem Units 1 and 2 ISI Programs Ten-Year Inservice Inspection Intervals ML0525802662005-09-30030 September 2005 Evaluation of Relief Requests S1-RR-04-V01 and S1-RR-04-V02 Related to the Third 10-Year Interval Inservice Testing Program ML0511803442005-05-0404 May 2005 Evaluation of Relief Request S2-13-RR-F01 ML0511503792005-04-29029 April 2005 Evaluation of Relief Request S2-13-RR-A06 ML0428005542004-10-0606 October 2004 Request for Additional Information Relief Requests S1-RR-04-V01 and V02 ML0409203612004-04-23023 April 2004 Evaluation of Relaxation Request No. S1-RR-13-B22, First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors ML0320902002003-07-28028 July 2003 Relief, Relief from ASME Code Requirements Related to the Salem Inservice Inspection Program, Relief Request S1-RR-F01, MB6098 ML0305902162003-02-20020 February 2003 Inservice Inspection Program Relief Request HC-RR-A02 ML0305902072003-02-20020 February 2003 Inservice Inspection Program Relief Request HC-RR-A06 ML0224704092003-02-0303 February 2003 Relief, Use of ASME Code Case N-532-1, Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission, MB6089 ML0301607502003-01-16016 January 2003 Relief, ASME Code Requirements Related to the Salem Inservice Inspection Program, Relief Request S1-RR-B01 and S1-RR-C01 ML0228105402002-11-27027 November 2002 Relief Request, Evaluation of Relief Request SC-RR-E01 and SC-RR-L01 ML0228307152002-11-27027 November 2002 Relief Request, Evaluation of Relief Request SC-RR-A01, TAC Nos. MB5569 & MB5570 ML0232302982002-11-12012 November 2002 Request for Additional Information Inservice Inspection Program Relief Request S1-RR-B01 ML0226004852002-10-30030 October 2002 Relief Request, Relief from ASME Code Requirements Related to the Salem Inservice Inspection Program, Relief Request SC-RR-F02, ML0225506812002-10-0707 October 2002 Code Relief, ASME Code Section XI, Inservice Inspection Program Requirements Related to Pressure Testing of Class 3 Components ML0225504352002-10-0404 October 2002 Relief, ASME Code Requirements Related to the Salem Inservice Inspection Programs, MB6086 & MB6087 ML0206100052002-03-21021 March 2002 Generation Station, Units 1 and 2, Code Relief, Inservice Inspection Requirements of Reactor Pressure Vessel Nozzle Inner Radius Sections, MB4071 and MB4072 ML0205304402002-03-21021 March 2002 Code Relief, Relief from ASME Code Requirements Related to the Inservice Inspection Program, Second 10-Year Interval, Relief Request S2-RR-B04 ML0205904012002-02-11011 February 2002 Inservice Inspection Program Relief Request S2-RR-B04, Inspection of Reactor Pressure Vessel (RPV) Flange-to-Shell Weld 2023-02-02
[Table view] Category:Letter
MONTHYEARIR 05000272/20240032024-10-30030 October 2024 Integrated Inspection Report 05000272/2024003 and 05000311/2024003 ML24296B1932024-10-23023 October 2024 Project Manager Assignment LR-N24-0068, Core Operating Limits Report - Cycle 282024-10-21021 October 2024 Core Operating Limits Report - Cycle 28 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 05000272/LER-2024-001, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 ML24071A2132024-03-12012 March 2024 Senior Reactor and Reactor Operator Initial License Examinations LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24250A0582023-11-14014 November 2023 PSEG to Marine Mammal Stranding Center, Salem Sea Turtle Stranding Response Services IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report – Cycle 302023-11-0101 November 2023 Core Operating Limits Report – Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location 2024-09-23
[Table view] Category:Safety Evaluation
MONTHYEARML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML23192A8212023-08-14014 August 2023 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location ML23139A1472023-06-0505 June 2023 Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld Coverage ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report ML23081A4662023-05-0202 May 2023 Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel Generator ML23095A3682023-04-12012 April 2023 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership ML23044A1052023-03-13013 March 2023 Issuance of Amendment Nos. 345 and 326 Relocate Technical Specifications Requirements for Reactor Head Vents to Technical Requirements Manual ML23037A9712023-03-0909 March 2023 And Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report ML23019A3482023-02-0202 February 2023 Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System Piping ML22130A7912022-05-24024 May 2022 Issuance of Relief Request No. S1-I4R-210 Fourth Inservice Inspection Interval Limited Examinations ML22061A0302022-04-0404 April 2022 Issuance of Amendment Nos. 343 and 324 Revise Technical Specifications Surveillance Requirements for Auxiliary Feedwater ML22012A4352022-02-14014 February 2022 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Nos. 230, 342, and 323 Delete Definition in 10 CFR 20 and Figures of Site and Surrounding Areas ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21295A2292021-11-15015 November 2021 Issuance of Amendment Nos. 340 and 321 Revise Technical Specifications to Adopt TSTF 569, Revision of Response Time Testing Definitions ML21230A0182021-10-0808 October 2021 Issuance of Amendment No. 339 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report ML21202A0782021-09-0303 September 2021 Issuance of Amendment Nos. 338 and 320 Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21195A0622021-08-0303 August 2021 Issuance of Amendment No. 319 One-Time Request to Revise Technical Specification Action for Rod Position Indicators ML21110A0522021-07-19019 July 2021 Issuance of Amendment Nos. 337 and 318, Revise Technical Specifications to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML21145A1892021-06-10010 June 2021 Authorization and Safety Evaluation for Alternative Request No. SC-I4R-200 ML20338A0382021-02-23023 February 2021 Issuance of Amendment Nos. 336 and 317 Leak-Before-Break for Accumulator, Residual Heat Removal, Safety Injection, and Pressurizer Surge Lines ML20224A2982020-08-20020 August 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20191A2032020-08-0606 August 2020 Issuance of Amendment Nos. 335 & 316-Revise Minimum Required Channels, Mode Applicability, & Actions for Source Range/Intermediate Range Neutron Flux Reactor Trip System Instrumentation ML20099E2332020-04-20020 April 2020 Issuance of Alternative Request S1-I4R-191 for the Fourth 10-Year Inservice Inspection Interval ML20104A1862020-04-20020 April 2020 Issuance of Alternative Request SC-I4R-192 for Examination of ASME Code, Section XI, Steam Generator and Pressurizer Nozzle Inside Radius Sections ML20091K7302020-04-13013 April 2020 Issuance of Relief Request SC-I4R-190 for the Fourth 10-Year Inservice Inspection Interval ML20034E6172020-02-27027 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 222, 333, and 314 Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19352F2312020-02-18018 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Issuance of Amendment Nos. 221, 332, and 313 Revise Emergency Plan Staffing Requirements ML19330F1562020-01-14014 January 2020 Issuance of Amendment Nos. 331 and 312 Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19275D6942019-11-18018 November 2019 Issuance of Amendment Nos. 330 and 311 Revise Technical Specifications to Adopt TSFT-547, Clarification of Rod Position Requirements ML19105B1712019-05-31031 May 2019 Issuance of Amendment Nos. 329 and 310 Revise Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves, and Add New TS ML19077A3362019-04-11011 April 2019 Issuance of Amendment Nos. 328 and 309 Revise Technical Specifications to Extend Refueling Water Storage Tank Allowed Outage Time ML19050A3702019-03-0606 March 2019 Alternative to Reactor Vessel Nozzle Welds Examinations Inspection Interval (EPID-L-2018-LLR-0110) ML19044A6272019-03-0606 March 2019 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 214, 327, and 308 Revise Technical Specifications to Adopt TSTF-529 ML19009A4772019-01-25025 January 2019 Issuance of Amendment Nos. 326 and 307 Revise Technical Specifications to Increase Vital Instrument Bus Inverter Allowed Outage Time ML18318A2662018-12-19019 December 2018 Issuance of Amendment Nos. 325 and 306 Revise TS Reactor Trip System Instrumentation and Engineered Safety Features Actuation System Instrumentation Test Times and Completion Times ML18142B1262018-05-29029 May 2018 Use of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Inservice Inspection Activities ML18040A7782018-04-18018 April 2018 Issuance of Amendment Nos. 323 and 304 Relocation of Reactor Coolant System Pressure Isolation Valve Tables ML18085B1982018-04-18018 April 2018 Issuance of Amendment Nos. 324 and 305 Revise Technical Specification Actions for Rod Position Indicators ML17355A5702018-02-16016 February 2018 Issuance of Amendment Nos. 322, 303, & 210, to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 (CAC Nos. MF9268/MF9269/MF9270; EPID L-2017-LLA-0173) ML17349A1082018-01-18018 January 2018 Issuance of Amendments Containment Fan Coil Unit Allowed Outage Time Extension (CAC Nos. MF9364 and MF9365; EPID L-2017-LLA-0212) ML17227A0162017-11-14014 November 2017 Issuance of Amendments Accident Monitoring Instrumentation ML17304A9432017-11-0101 November 2017 Use of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Inservice Inspection Activities ML17219A1862017-08-17017 August 2017 Safety Evaluation of Relief Request SC-I4R-171 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program ML17172A5872017-07-17017 July 2017 Safety Evaluation of Relief Request S1-I4R-160 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program ML17165A2142017-06-28028 June 2017 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule App. to Section 5.5 Testing ML17132A0052017-05-19019 May 2017 Alternative Request to Adopt American Society of Mechanical Engineers Code Case OMN-20 (CAC Nos. MF8313 and MF8314) ML17093A8702017-05-16016 May 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Revised PSEG Nulcear LLC Cyber Security Plan Milestone 8 Implementation Schedule ML17012A2922017-02-0606 February 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Issuance of Amendments ML16351A1822017-01-19019 January 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 2024-07-15
[Table view] |
Text
March 21, 2002 Mr. Harold W. Keiser Chief Nuclear Officer & President PSEG Nuclear LLC - X04 Post Office Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
SALEM NUCLEAR GENERATING STATION, UNIT NO. 2 - RELIEF FROM ASME CODE REQUIREMENTS RELATED TO THE INSERVICE INSPECTION PROGRAM, SECOND 10-YEAR INTERVAL, RELIEF REQUEST S2-RR-B04 (TAC NO. MB3398)
Dear Mr. Keiser:
By letter dated November 7, 2001, as supplemented on February 11, 2002, PSEG Nuclear LLC (PSEG) submitted a request for relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (the Code),Section XI, requirements for certain inservice inspections (ISI) involving the Reactor Pressure Vessel (RPV) vessel-to-flange weld at Salem Nuclear Generating Station, Unit No. 2 (Salem). In the letters, PSEG requested use of alternative requirements by performing ultrasonic (UT) examination of the RPV vessel-to-flange weld from the vessel shell side in accordance with ASME Code,Section XI, Division 1, 1995 Edition, 1996 Addenda, Appendix VIII, Supplements 4 and 6, as amended by the Federal Register notice dated September 9, 1999 (64 FR 51370), in lieu of ASME Code,Section V, Article 4, requirements. Relief was requested for Salem for the second 10-year interval vessel examination scheduled for the spring 2002 refueling outage.
The U.S. Nuclear Regulatory Commission (NRC) staff has completed its review of the subject relief request. As documented in the enclosed Safety Evaluation (SE), the staff concludes that the proposed alternative will provide reasonable assurance of structural integrity. Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), the NRC staff authorizes the proposed alternative for Salem for the second 10-year ISI interval, on the basis that the proposed alternative provides an acceptable level of quality and safety.
Sincerely,
/RA/
James W. Clifford, Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-311
Enclosure:
Safety Evaluation cc w/encl: See next page
ML020530440 OFFICE PDI-2/PM PDI-2/LA EMCB/SC OGC PDI-2/SC NAME RFretz TClark TChan RHoefling JClifford DATE 03/06/02 3/6/02 3/8/02 3/15/02 3/21/02 PSEG Nuclear LLC Salem Nuclear Generating Station, Unit No. 2 cc:
Mr. Elbert C. Simpson Lower Alloways Creek Township Senior Vice President & c/o Mary O. Henderson, Clerk Chief Administrative Officer Municipal Building, P.O. Box 157 PSEG Nuclear - N19 Hancocks Bridge, NJ 08038 P.O. Box 236 Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Asst. Director Radiation Protection Programs Mr. Mark B. Bezilla NJ Department of Environmental Vice President - Technical Support Protection and Energy PSEG Nuclear - N10 CN 415 P.O. Box 236 Trenton, NJ 08625-0415 Hancocks Bridge, NJ 08038 Richard Hartung Mr. David F. Garchow Electric Service Evaluation Vice President - Operations Board of Regulatory Commissioners PSEG Nuclear - X10 2 Gateway Center, Tenth Floor P.O. Box 236 Newark, NJ 07102 Hancocks Bridge, NJ 08038 Regional Administrator, Region I Mr. Gabor Salamon U.S. Nuclear Regulatory Commission Manager - Nuclear Safety and Licensing 475 Allendale Road PSEG Nuclear - N21 King of Prussia, PA 19406 P.O. Box 236 Hancocks Bridge, NJ 08038 Senior Resident Inspector Salem Nuclear Generating Station Jeffrie J. Keenan, Esquire U.S. Nuclear Regulatory Commission PSEG Nuclear - N21 Drawer 0509 P.O. Box 236 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Ms. R. A. Kankus Joint Owner Affairs PECO Energy Company Nuclear Group Headquarters KSA1-E 200 Exelon Way Kennett Square, PA 19348
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO THE ULTRASONIC EXAMINATION OF REACTOR PRESSURE VESSEL (RPV) VESSEL-TO-FLANGE WELD IN ACCORDANCE WITH RELIEF REQUEST S2-RR-B04 PSEG NUCLEAR LLC SALEM NUCLEAR GENERATING STATION, UNIT NO. 2 DOCKET NO. 50-311
1.0 INTRODUCTION
By letter dated November 7, 2001, as supplemented on February 11, 2002, PSEG Nuclear LLC (PSEG) submitted a request for relief from the ASME Code,Section XI, requirements for certain inservice inspections (ISI) involving the Reactor Pressure Vessel (RPV) vessel-to-flange weld at Salem Nuclear Generating Station, Unit No. 2 (Salem). In the letters, PSEG requested use of alternative requirements by performing ultrasonic testing (UT) examination of the RPV vessel-to-flange weld from the vessel shell side in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code),Section XI, Division 1, 1995 Edition, 1996 Addenda, Appendix VIII, Supplements 4 and 6, as amended by the Federal Register Notice dated September 9, 1999 (64 FR 51370), in lieu of ASME Code,Section V, Article 4, requirements.
Relief was requested for Salem, Unit No. 2, for the second 10-year interval ISI scheduled for the spring 2002 refueling outage.
2.0 BACKGROUND
Regulatory Requirements The ISI of the ASME Code Class 1, 2, and 3 components is to be performed in accordance with Section XI of the ASME Code and applicable edition and addenda as required by Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a(g), except where specific written relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i). Pursuant to 10 CFR 50.55a(a)(3), alternatives to the requirements of paragraph (g) may be used, when authorized by the U.S. Nuclear Regulatory Commission (NRC), Director of the Office of Nuclear Reactor Regulation, if the licensee demonstrates that: (i) the proposed alternatives would provide an acceptable level of quality and safety, or (ii) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
ENCLOSURE
Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the pre-service examination requirements, set forth in the ASME Code,Section XI, "Rules for Inservice Inspection (ISI) of Nuclear Power Plant Components," to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that inservice examination of components and system pressure tests conducted during the first 10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein. The components (including supports) may meet the requirements set forth in subsequent editions and addenda of the ASME Code incorporated by reference in 10 CFR 50.55a(b) subject to the limitations and modifications listed therein and subject to Commission approval.
3.0 RELIEF REQUEST 3.1 Component Description Salem, Unit No. 2, ASME Section XI, Class 1, Category B-A Pressure Retaining Welds In RPV Item No. B1.30 shell-to-flange weld.
3.2 ASME Code Examination Requirement for which Relief is Requested ASME Code,Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, 1983 Edition with Summer 1983 Addenda, Subsection IWA-2232, requires UT examination of the RPV-to-flange weld to be in accordance with ASME Code,Section V, Article 4. In addition, Regulatory Guide (RG) 1.150, Revision 1, Ultrasonic Testing Of Reactor Vessel Welds During Preservice and Inservice Examinations, serves as regulatory guidance for the UT examination of RPV welds.
Relief was requested for Salem, Unit No. 2, for the second 10-year interval ISI scheduled for the spring 2002 refueling outage.
3.3 PSEGs Proposed Alternative to ASME Code PSEG proposes to perform a UT examination of the RPV vessel-to-flange weld from the vessel shell side in accordance with ASME Code,Section XI, Division 1, 1995 Edition, 1996 Addenda, Appendix VIII, Supplements 4 and 6, as amended by the Federal Register Notice dated September 9, 1999 (64 FR 51370), in lieu of ASME Code,Section V, Article 4, requirements.
3.4 PSEGs Basis for the Proposed Alternative In its letter dated November 7, 2001, PSEG provided its revised basis for requesting relief (as stated):
PSEG Nuclear Salem Unit 2 is required to perform in-service examination of the RPV flange weld in accordance with the requirements of ASME Section V Article 4 and the subsequent guideline requirements of Regulatory Guide 1.150 Rev 1.
Federal Register Notice 64 FR 51370 through 51400, dated September 22, 1999, revised the 1999 Edition of 10 CFR 50.55(a) Codes and Standards. This revision requires that ASME Section XI, Appendix VIII, Supplements 4, Qualification Requirements For The Clad/Base Metal Interface of Reactor Vessel, and Supplement 6, Qualification Requirements For Reactor Vessel Welds Other Than Clad/Base Metal Interface, be implemented for most of the RPV welds by Nov 22, 2000. The RPV vessel-to-flange weld is the only RPV circumferential weld not included in Appendix VIII.
This relief is requested to allow the use of a PDI qualified procedure to complete the UT examination of the RPV vessel-to-flange weld from the vessel side of the weld in accordance with ASME Section XI, Div. 1, 1995 Edition, 1996 Addenda, Appendix VIII Supplement 4 and 6 as amended by the Federal Register Notice 64 FR 51370 through 51400, dated September 22, 1999 in lieu of ASME Section V Article 4.
During the upcoming ten (10) year RPV weld examinations, we will be employing personnel, procedures and equipment, demonstrated and qualified by a Performance Demonstration Initiative (PDI) and in accordance with ASME Section XI, Div.1, 1995 Edition, 1996 Addenda, Appendix VIII Supplements 4 and 6 as amended by the Federal Register Notice 64 FR 51370 through 51400, dated September 22, 1999 for the adjacent welds.
The remote examinations will be performed using the WesDyne International Supreem Robot and WesDyne Paragon data acquisition system in accordance with PDI qualified procedure PDI-ISI-254 "Remote Inservice Examination of Reactor Vessel Shell Welds". The procedure was successfully demonstrated in accordance with ASME Section XI, Appendix VIII, Supplements 4 and 6 in 2001 (PDQS 404). The procedure complies with ASME Section XI, Appendix VIII, 1995 edition, 1996 Addenda as modified in final rule. [ ]
Appendix VIII was developed to ensure the effectiveness of UT examinations within the nuclear industry by means of a rigorous, item specific performance demonstration. The performance demonstration was conducted on a RPV mockup containing flaws of various sizes and locations. The demonstration established the capability of equipment, procedures and personnel to find flaws that could be detrimental to the integrity of the RPV.
Although Appendix VIII is not a requirement for this weld, the qualification process to Appendix VIII criteria demonstrates that the examination and evaluation techniques are equal or surpass the requirements of paragraph IWA-2232, "Ultrasonic Examination" of Section XI of the ASME Code and the guidance in RG 1.150.
A comparison between the ASME Section V Article 4 based UT methods and the procedures developed to satisfy the PDI/Appendix VIII can be best described as a comparison between a compliance-based procedure (ASME Section V Article 4) and a results-based procedure (PDI/Appendix VIII). ASME Section V
procedures use an amplitude-based technique and a known reflector. The proposed alternate UT method was established independently from the acceptance standards for flaw size found in ASME Section XI.
The PDI qualified sizing method is considered more accurate than the method used in ASME Section V Article 4[. ] The proposed alternate UT examination technique provides an acceptable level of quality and examination repeatability as compared to the Article 4 requirements[.]
The PDI Program's PDQS No. 404 attests that WesDyne procedure PDI-ISI-254 complies with the detection and sizing requirements of Appendix VIII. The PDI qualification method involves a blind test on realistic flawed samples using testing parameters strictly defined in the procedure. The sensitivity of the examination procedure is greater than specified by ASME Code Section V, Article 4 because interpretation and investigation of defects is carried out down to the baseline response level and is not subject to an amplitude threshold as is the case in the Code methodology[.]
The examination and sizing procedure use echo-dynamic motion and tip diffraction characteristics of the flaw instead of the amplitude characteristics required by ASME Section V Article 4. The search units interrogate the same examination volume as depicted by ASME Section XI, Figure IWB 2500-4, Shell-to-Flange Weld Joint.
The use of procedures for satisfying the requirements of ASME Section V Article 4 for the UT examination of the RPV to flange weld from the vessel shell has not received the same qualifications as PDI qualified procedure.
The use of Appendix VIII Supplements 4 and 6 for the completion of the RPV vessel-to-flange weld from the shell side (with PDI qualified procedures) is expected to reduce examination time, which translates to reduce personnel radiation exposure.
Additionally, this relief would allow a smooth transition to the welds adjacent to the RPV circumferential and longitudinal welds (welds B1.11 and B1.12) which do require an examination in accordance with Appendix VIII Supplement 4 and 6.
This would eliminate the need to switch to the different calibration, procedure and techniques required by ASME Section V Article 4 and the Regulatory Guide 1.150 Rev 1. This would result in a reduction in transition time to the different calibration, procedure and techniques required which translates to reduce personnel radiation exposure and is more cost effective.
The coverage for the RPV-to-flange weld from the shell side is 96% of the required volume as depicted in figure IWB-2500-4 and would be the same for both examinations (either the ASME Section V Article 4 or the proposed ASME Section XI Appendix VIII Supplement 4 and 6 as modified by the Final Rule).
The coverage for the RPV-to-flange weld from the shell during the first interval was 60%. The improvement in coverage to 96% is due to the fact the
transducers are no longer mounted together in one sled but rather they are spring loaded and individually suspended, allowing for more flexibility in the shell transition area.
The examination performed from the Reactor Pressure Vessel (RPV) flange surface earlier during this second interval provided 100% of the required volume from the flange surface.
It is concluded that the examination coverage of RPV-to-flange weld meets the requirements of Code Case N-460, Alternative Examination Coverage for Class 1 and Class 2 Welds, which requires the examination coverage of Class 1 welds be greater than 90%.
4.0 EVALUATION The 1983 Edition of Section XI requires the examination of vessel welds to comply with Article 4 of Section V as amended by IWA-2232 of Section XI. PSEG is requesting relief from the Code-required examination for the RPV-to-flange weld. PSEG performed an ASME Code UT examination of the weld from the flange, and proposed a performance-based UT technique alternative to the prescriptive UT technique required by Code for examination from the vessel.
Examination coverage is the sum of the volume examined from the flange and vessel sides of the weld.
In its letter dated February 11, 2002, PSEG stated that an examination of the RPV-to-flange weld was performed from the flange surface during the 2nd ISI interval. The coverage was 100% from the flange side of the weld. In order to complete the examination from the vessel side of the weld, PSEG proposed using procedures and personnel qualified according to the 1995 Edition with 1996 Addenda of the Code,Section XI, Appendix VIII, Supplements 4 and 6.
These are the same procedures that will be used to examine the RPV shell welds. The licensee stated that 96% of the volume as depicted in Figure IWB-2500-4 will be examined from the vessel side of the weld. Therefore, with the combined coverage from the flange and vessel sides of the weld, PSEG will obtain essentially full coverage of the RPV-to-flange weld.
The staff has reviewed and evaluated PSEGs alternative to use a UT technique (personnel, equipment, and procedures) qualified to Appendix VIII, Supplements 4 and 6 (See Table 1).
The Appendix VIII criteria was developed to ensure the effectiveness of UT examinations within the nuclear industry by means of a rigorous, item-specific performance demonstration. The performance demonstration was conducted on RPV mockups containing flaws of various sizes and locations. The demonstration established the capability of equipment, procedures, and personnel to find flaws that could be detrimental to the integrity of the RPV. The performance demonstration showed that the proposed UT technique is equal to or surpasses the requirements of the Code and the recommendations of RG 1.150. Therefore, the staff has determined that the alternative provides an acceptable level of quality and safety. Pursuant to 10 CFR 50.55a(a)(3)(i), the proposed alternative is authorized for the RPV-to-flange weld examination from the vessel shell side of the weld for the second 10-year ISI interval at Salem, Unit No. 2.
Staffs Conclusion Based on its review, the NRC staff finds that the proposed alternative described in PSEGs letter dated November 7, 2001, as supplemented on February 11, 2002, provides an acceptable level of quality and safety. Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), the staff authorizes the proposed alternative for Salem, Unit No. 2, ASME Section XI, Class 1, RPV-to-flange weld examination for the second 10-year ISI interval.
Principal Contributor: R. Fretz Date: March 21, 2002
TABLE 1 - COMPARISON OF REACTOR PRESSURE VESSEL SHELL WELD EXAMINATION TECHNIQUES ASME Section V, Article 4, 1983 Summer Edition Description ASME Section XI, 1983 Summer Edition WesDyne Examination Procedure PDI-ISI-254 (Code Reference) NRC Regulatory Guide 1.150, Revision 1, 1983 Requirements Examination Angle Section V, Article 4, T-441 requires the volume of weld Examinations are conducted with angles of 45 degree and adjacent base material be scanned by straight and Longitudinal wave; dual element, 45 degree Longitudinal angle beam techniques. Two angle beams, having wave single element and a 45 degree shear wave single nominal angles of 45 and 60 degrees with respect to a element transducer.
perpendicular to the examination surface shall generally be used. Other pairs of angle beams are permitted These three transducer types were qualified to examine provided the measured difference between the angles is the 11" thick Supplement 4 and Supplement 6 test at least 10 degrees. specimens.
Instrument Section V, Article 4, T-431 requires that instrument Instrument screen height and amplitude linearity are Calibrations screen height and amplitude linearity be evaluated at checked prior to and following completion of the least every 3 months. examinations of the PSEG Nuclear Salem Unit 2 reactor vessel.
Section XI, IWA-2232 requires that these screen height and linearity checks be performed at the beginning and end of the weld examination performed on a vessel during one outage.
System Calibrations Section V, Article 4, T-432 requires that the original System calibrations are conducted on a generic system calibration be performed on the Code basic calibration block designed to be a conservative calibration block. representation of vessel shell materials. The basic reflectors are side-drilled holes of smaller diameter than T-432 allows the use of different types of reference those specified by Code. Interim and final checks are blocks and electronic simulators to perform system performed by comparative histogram analysis of vessel calibration verifications. material noise levels.
Scanning Sensitivity Section V, Article 4, T-425 permits scanning to be Compared to ASME levels, scanning is performed at less performed at the reference level when electronic than the 10% of DAC level.
distance-amplitude correction (DAC) is used with automated recording.
TABLE 1 - CONTINUED ASME Section V, Article 4, 1983 Summer Edition Description ASME Section XI, 1983 Summer Edition WesDyne Examination Procedure PDI-ISI-254 (Code Reference) NRC Regulatory Guide 1.150, Revision 1, 1983 Requirements Recording Level Section V, Article 4, T-441 requires recording and For all inspection zones, all indications interpreted as evaluation of reflectors that produce a response equal to flaws are subject to measurement and assessment, or greater than 50% DAC. regardless of amplitude.
Regulatory Guide 1.150 requires recording and evaluation at 20% DAC for the inner 25% of material thickness.
Scan Index and Section V, Article 4, T-425 requires each pass of the A scan index of 0.5" is used for detection and indication Pulse Repetition search unit overlap a minimum of 10% of the transducer measurement.
Rate piezoelectric element dimension perpendicular to the direction of the scan. This scan index meets the requirements of T-424, IWA-2232 and Regulatory Guide 1.150.
Section XI, IWA-2232 requires each pass of the search unit overlap at least 50% of the transducer piezoelectric element dimension perpendicular to the direction of the scan.
NRC Regulatory Guide 1.150 requires a 25% maximum overlap for detection and 0.25-inch maximum increments for sizing.
Flaw Sizing and Section V, article 4, T-441 requires amplitude based All indications are characterized as valid or non-valid.
Evaluation sizing at 50% DAC. Diffraction signals and responses from indication features are used for determining the bounding size of the flaw.
Section V, Article 4, T-451 permits evaluation to Length sizing is accomplished by determining the number alternative standards. of scanning sweeps where features are present.