Letter Sequence Approval |
---|
EPID:L-2019-LLR-0092, Proposed Alternative for Examination of ASME Section XI, Steam Generator and Pressurizer Nozzle Inside Radius Sections, Per Inservice Inspection Relief Request SC-I4R-192 (Approved, Closed) |
|
|
Similar Documents at Salem |
---|
Category:Letter
MONTHYEARIR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23139A1472023-06-0505 June 2023 Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld Coverage ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report IR 05000272/20230012023-05-0303 May 2023 Integrated Inspection Report 05000272/2023001 and 05000311/2023001 ML23081A4662023-05-0202 May 2023 Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel Generator IR 05000272/20233012023-05-0101 May 2023 Initial Operator Licensing Examination Report 05000272/2023301 and 05000311/2023301 LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0033, Core Operating Limits Report Cycle 272023-04-26026 April 2023 Core Operating Limits Report Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location ML23089A0942023-04-17017 April 2023 NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23087A1492023-04-17017 April 2023 NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23103A3232023-04-13013 April 2023 Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23086A0912023-03-24024 March 2023 NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML23044A1052023-03-13013 March 2023 Issuance of Amendment Nos. 345 and 326 Relocate Technical Specifications Requirements for Reactor Head Vents to Technical Requirements Manual ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report IR 05000272/20230112023-03-0707 March 2023 Comprehensive Engineering Team Inspection Report 05000272/2023011 and 05000311/2023011 IR 05000272/20220062023-03-0101 March 2023 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 ML23034A1532023-02-0909 February 2023 Operator Licensing Examination Approval ML23019A3482023-02-0202 February 2023 Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System Piping LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 2024-02-05
[Table view] Category:Safety Evaluation
MONTHYEARML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location ML23139A1472023-06-0505 June 2023 Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld Coverage ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report ML23081A4662023-05-0202 May 2023 Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel Generator ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership ML23044A1052023-03-13013 March 2023 Issuance of Amendment Nos. 345 and 326 Relocate Technical Specifications Requirements for Reactor Head Vents to Technical Requirements Manual ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report ML23019A3482023-02-0202 February 2023 Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System Piping ML22130A7912022-05-24024 May 2022 Issuance of Relief Request No. S1-I4R-210 Fourth Inservice Inspection Interval Limited Examinations ML22061A0302022-04-0404 April 2022 Issuance of Amendment Nos. 343 and 324 Revise Technical Specifications Surveillance Requirements for Auxiliary Feedwater ML22012A4352022-02-14014 February 2022 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Nos. 230, 342, and 323 Delete Definition in 10 CFR 20 and Figures of Site and Surrounding Areas ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21295A2292021-11-15015 November 2021 Issuance of Amendment Nos. 340 and 321 Revise Technical Specifications to Adopt TSTF 569, Revision of Response Time Testing Definitions ML21230A0182021-10-0808 October 2021 Issuance of Amendment No. 339 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report ML21202A0782021-09-0303 September 2021 Issuance of Amendment Nos. 338 and 320 Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21195A0622021-08-0303 August 2021 Issuance of Amendment No. 319 One-Time Request to Revise Technical Specification Action for Rod Position Indicators ML21110A0522021-07-19019 July 2021 Issuance of Amendment Nos. 337 and 318, Revise Technical Specifications to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML21145A1892021-06-10010 June 2021 Authorization and Safety Evaluation for Alternative Request No. SC-I4R-200 ML20338A0382021-02-23023 February 2021 Issuance of Amendment Nos. 336 and 317 Leak-Before-Break for Accumulator, Residual Heat Removal, Safety Injection, and Pressurizer Surge Lines ML20224A2982020-08-20020 August 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20191A2032020-08-0606 August 2020 Issuance of Amendment Nos. 335 & 316-Revise Minimum Required Channels, Mode Applicability, & Actions for Source Range/Intermediate Range Neutron Flux Reactor Trip System Instrumentation ML20104A1862020-04-20020 April 2020 Issuance of Alternative Request SC-I4R-192 for Examination of ASME Code, Section XI, Steam Generator and Pressurizer Nozzle Inside Radius Sections ML20099E2332020-04-20020 April 2020 Issuance of Alternative Request S1-I4R-191 for the Fourth 10-Year Inservice Inspection Interval ML20091K7302020-04-13013 April 2020 Issuance of Relief Request SC-I4R-190 for the Fourth 10-Year Inservice Inspection Interval ML20034E6172020-02-27027 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 222, 333, and 314 Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19352F2312020-02-18018 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Issuance of Amendment Nos. 221, 332, and 313 Revise Emergency Plan Staffing Requirements ML19330F1562020-01-14014 January 2020 Issuance of Amendment Nos. 331 and 312 Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19275D6942019-11-18018 November 2019 Issuance of Amendment Nos. 330 and 311 Revise Technical Specifications to Adopt TSFT-547, Clarification of Rod Position Requirements ML19105B1712019-05-31031 May 2019 Issuance of Amendment Nos. 329 and 310 Revise Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves, and Add New TS ML19077A3362019-04-11011 April 2019 Issuance of Amendment Nos. 328 and 309 Revise Technical Specifications to Extend Refueling Water Storage Tank Allowed Outage Time ML19044A6272019-03-0606 March 2019 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 214, 327, and 308 Revise Technical Specifications to Adopt TSTF-529 ML19050A3702019-03-0606 March 2019 Alternative to Reactor Vessel Nozzle Welds Examinations Inspection Interval (EPID-L-2018-LLR-0110) ML19009A4772019-01-25025 January 2019 Issuance of Amendment Nos. 326 and 307 Revise Technical Specifications to Increase Vital Instrument Bus Inverter Allowed Outage Time ML18318A2662018-12-19019 December 2018 Issuance of Amendment Nos. 325 and 306 Revise TS Reactor Trip System Instrumentation and Engineered Safety Features Actuation System Instrumentation Test Times and Completion Times ML18142B1262018-05-29029 May 2018 Use of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Inservice Inspection Activities ML18040A7782018-04-18018 April 2018 Issuance of Amendment Nos. 323 and 304 Relocation of Reactor Coolant System Pressure Isolation Valve Tables ML18085B1982018-04-18018 April 2018 Issuance of Amendment Nos. 324 and 305 Revise Technical Specification Actions for Rod Position Indicators ML17355A5702018-02-16016 February 2018 Issuance of Amendment Nos. 322, 303, & 210, to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 (CAC Nos. MF9268/MF9269/MF9270; EPID L-2017-LLA-0173) ML17349A1082018-01-18018 January 2018 Issuance of Amendments Containment Fan Coil Unit Allowed Outage Time Extension (CAC Nos. MF9364 and MF9365; EPID L-2017-LLA-0212) ML17227A0162017-11-14014 November 2017 Issuance of Amendments Accident Monitoring Instrumentation ML17304A9432017-11-0101 November 2017 Use of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Inservice Inspection Activities ML17219A1862017-08-17017 August 2017 Safety Evaluation of Relief Request SC-I4R-171 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program ML17172A5872017-07-17017 July 2017 Safety Evaluation of Relief Request S1-I4R-160 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program ML17165A2142017-06-28028 June 2017 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule App. to Section 5.5 Testing ML17132A0052017-05-19019 May 2017 Alternative Request to Adopt American Society of Mechanical Engineers Code Case OMN-20 (CAC Nos. MF8313 and MF8314) ML17093A8702017-05-16016 May 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Revised PSEG Nulcear LLC Cyber Security Plan Milestone 8 Implementation Schedule ML17012A2922017-02-0606 February 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Issuance of Amendments ML16351A1822017-01-19019 January 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16229A5192016-09-29029 September 2016 Issuance of Amendments Correct Non-Conservative Technical Specifications and Other Discrepancies ML16137A5792016-06-29029 June 2016 Issuance of Amendments Extension of Implementation Period for Salem, Unit No. 1, License Amendment No. 311, and Salem, Unit No. 2 License Amendment No. 292 2023-08-14
[Table view] |
Text
April 20, 2020 Mr. Eric Carr President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 - ISSUANCE OF ALTERNATIVE REQUEST SC-I4R-192 FOR EXAMINATION OF ASME SECTION XI, STEAM GENERATOR AND PRESSURIZER NOZZLE INSIDE RADIUS SECTIONS (EPID L-2019-LLR-0092)
Dear Mr. Carr:
By letter dated September 10, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19253B644), PSEG Nuclear LLC (the licensee) submitted proposed alternative SC-I4R-192 to the nozzle inner-radius examination requirements of American Society of Mechanical Engineers (ASME) Boiler & Pressure Vessel Code (Code),Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, for the fourth inservice inspection (ISI) interval at Salem Generating Station Unit Nos. 1 and 2 (Salem).
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(2), the licensee requested to use the proposed alternative on the basis that complying with the specified requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
The U.S Nuclear Regulatory Commission (NRC) staff determined that the proposed alternative provides reasonable assurance that structural integrity and leaktightness of the subject components will be maintained during the fourth ISI interval at Salem. The NRC staff finds that complying with the nozzle inner-radius examination requirement would result in hardship or unusual difficulty without a compensating increase in quality and safety. Accordingly, the NRC staff concludes that the licensee has adequately addressed all the regulatory requirements set forth in 10 CFR 50.55a(z)(2). Therefore, the staff authorizes the use of Relief Request SC-I4R-192 for the fourth 10-year ISI intervals at Salem. The fourth ISI interval for Salem Unit No. 1, began on May 20, 2011, and is scheduled to end on December 31, 2020. The fourth ISI interval for Salem Unit No. 2, began on November 27, 2013, and is scheduled to end on December 31, 2021.
All other ASME Code,Section XI requirements for which relief was not specifically requested and approved remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
E. Carr If you have any questions, please contact the Salem Project Manager, James Kim, at 301-415-4125 or by e-mail to James.Kim@nrc.gov.
Sincerely,
/RA/
James G. Danna, Chief Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-272 and 50-311
Enclosure:
Safety Evaluation cc: Listserv
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION ALTERNATIVE REQUEST SC-I4R-192 RELIEF FROM ASME CODE, SECTION XI, INSERVICE INSPECTION REQUIREMENTS FOR NOZZLE INNER-RADIUS EXAMINATIONS SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 PSEG NUCLEAR LLC EXELON GENERATION COMPANY, LLC DOCKET NOS. 50-272 AND 50-311
1.0 INTRODUCTION
By letter dated September 10, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19253B644), PSEG Nuclear LLC (PSEG, the licensee), submitted proposed alternative SC-I4R-192 to the nozzle inner-radius examination requirements of American Society of Mechanical Engineers (ASME) Boiler & Pressure Vessel Code (Code),
Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, for the fourth inservice inspection (ISI) interval at Salem Generating Station Unit Nos. 1 and 2 (Salem).
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(2), the licensee requested to use the proposed alternative on the basis that complying with the specified requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
2.0 REGULATORY EVALUATION
Pursuant to 10 CFR 50.55a(g)(4), Inservice inspection standards requirement for operating plants, ASME Code Class 1, 2, and 3 components (including supports) must meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code,Section XI, Rules for lnservice Inspection of Nuclear Power Plant Components, to the extent practical within the limitations of design, geometry, and materials of construction of the components.
The regulation in 10 CFR 50.55a(b)(2)(xxi)(A) states, in part, that the provisions of Table IWB 2500-1, Examination Category B-D, Full Penetration Welded Nozzles in Vessels, Items B3.40 and B3.60 (Inspection Program A) and Items B3.120 and B3.140 (Inspection Program B) of the 1998 Edition must be applied when using the 1999 Addenda through the latest edition and addenda incorporated by reference in paragraph (a)(1)(ii) of this section.
Enclosure
The regulation in 10 CFR 50.55a(z)(2) states, in part, that alternatives to the requirements of paragraph (b) through (h) of 10 CFR 50.55a may be used, when authorized by the U.S. Nuclear Regulatory Commission (NRC), if the licensee demonstrates that compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Based on the above, and subject to the following technical evaluation, the NRC staff finds that regulatory authority exists for the NRC to authorize the licensees proposed alternative for Salem. Accordingly, the NRC staff reviewed and evaluated the licensees request pursuant to 10 CFR 50.55a(z)(2).
3.0 TECHNICAL EVALUATION
3.1 Licensees Request for Alternative Components Covered by Proposed Alternative Proposed alternative SC-I4R-192 covers several ASME Code,Section XI, Examination Category B-D, Item Number B3.120 and B3.140 (Inspection Program B) nozzle inside radius sections. The affected nozzles are described in Table 1.
Table 1: Nozzles Covered in Proposed Alternative ASME Code,Section XI Component Item Number Unit 1 and Unit 2 Steam Generators Hot and Cold Leg Nozzles B3.140 Unit 1 and Unit 2 Pressurizer Surge Line Nozzles B3.120 Unit 1 and Unit 2 Pressurizer Safety and Relief Nozzles B3.120 Unit 1 and Unit 2 Pressurizer Spray Nozzles B3.120
Applicable Code Edition and Addenda
Both units use the 2004 Edition of the ASME Code,Section XI.
The use of the 1998 Edition of the ASME Code,Section XI, Table IWB-2500-1, Category B-D, is required by 10 CFR 50.55a(b)(2)(xxi)(A).
Applicable Code Requirement
Volumetric examination of the volumes depicted in ASME Code,Section XI, Figures IWB-2500-7(a) through (d), as applicable, once during the inspection interval for all steam generator nozzle inside radius sections and all pressurizer nozzle inside radius sections with acceptance standard IWB-3512 is required by the 1998 Edition, as referenced in 10 CFR 50.55a(b)(2)(xxi)(A).
Proposed Alternative The licensee proposes to not perform any additional inside radius section examinations on the steam generator and pressurizer nozzles at Salem as currently specified in 10 CFR 50.55a(b)(2)(xxi)(A) during the current fourth ISI intervals.
Basis for Proposed Alternative The licensee performed a review of the operating experience for steam generator and pressurizer nozzle inside radius sections and did not identify any detected flaw indications or the presence of any degradation mechanism. The operational experience has demonstrated that neither the volumetric nor the visual examinations have indicated any evidence of degradation that justifies personnel exposure to the industrial safety hazard and radiation dose inherent in performing these examinations.
Hardship The estimated cumulative radiation exposure for the inspections is more than 1,000 millirem for each unit (2,000 millirem total), with the steam generator nozzle visual tests having an approximate dose of 600 millirem per unit and the pressurizer nozzle examinations having an approximate dose of 400 millirem per unit.
Duration of Proposed Alternative The proposed alternative covers the remainder of the current fourth ISI intervals for Salem, Unit Nos. 1 and 2, which are scheduled to end on December 31, 2020, and December 31, 2021, respectively.
3.2 NRC Staff Evaluation The NRC staff reviewed the proposed alternative to not perform the inside radius examinations at Salem. The staff evaluated the proposed alternative under 10 CFR 50.55a(z)(2) to determine if there is a hardship associated with the examinations and the associated reduction in the level of quality and safety associated with the proposed alternative.
The staff finds that the 2,000 mrem estimated dose to examination personnel provides a hardship for the examinations, meeting the first criterion in a review under 10 CFR 50.55a(z)(2).
To evaluate the second criterion, the staff evaluated the effects of not performing the inner-radius examinations. The requirements for examinations of inner nozzle radii in several components were developed in the ASME Code in reaction to the discovery of thermal fatigue cracks in the inner-radius section of boiling-water reactor (BWR) feedwater nozzles in the late 1970s. As described in NUREG/CR-7153, Expanded Materials Degradation Assessment (EMDA),
Volume 3: Aging of Reactor Pressure Vessels (ADAMS Accession No. ML14279A349), and NUREG-0619, Revision 1, BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking: Resolution of Generic Technical Activity A-10 (Technical Report) (ADAMS Accession No. ML031600712), the service-induced flaws that have been observed are cracks at feedwater nozzles associated with mixing of lower-temperature water with hot water in a BWR vessel with rare instances of underclad and shallow cladding cracking appearing in pressurized-water reactor (PWR) nozzles. Feedwater nozzle inner-radius cracking has not been detected since the plants changed operation of the low flow feedwater controller. Significant inspections and repairs were required in the late 1970s and early 1980s to address these problems. The redesign of safe-end/thermal sleeve configurations and feedwater spargers, coupled with changes in operating procedures, have been effective to date. No further occurrences of nozzle fatigue cracking have been reported for PWRs or BWRs.
When the new designs and operating procedures appeared to have mitigated the nozzle inner-radius cracking, the ASME Code,Section XI requirements to inspect steam generator and pressurizer nozzle inner radii were removed in the 1999 Addenda of the ASME Code,Section XI. Since the NRC imposed the condition requiring that these areas be inspected in 2002, no new cracking has been identified in steam generator or pressurizer nozzle inner radii.
In addition to operating experience, the staff has reviewed the nozzle inner radii examinations as part of approving alternatives and granting relief requests concerning inspections of the pressurizer and steam generator nozzle inner radii. In the safety evaluations for proposed alternatives, the staff has concluded that the fatigue analysis for a variety of plants shows that there is reasonable assurance that there will not be significant cracking at the steam generator or pressurizer nozzle inner radii before the end of the operating licenses of the nuclear power plants.
The staff finds that the reduction in the level of quality and safety associated with not performing the examinations is acceptable, given the hardship in performing the examinations.
4.0 CONCLUSION
As set forth above, the NRC staff determined that the proposed alternative provides reasonable assurance that structural integrity and leaktightness of the subject components will be maintained during the fourth ISI intervals at Salem. The NRC staff finds that complying with the nozzle inner-radius examination requirement would result in hardship or unusual difficulty without a compensating increase in quality and safety. Accordingly, the NRC staff concludes that the licensee has adequately addressed all the regulatory requirements set forth in 10 CFR 50.55a(z)(2). Therefore, the staff authorizes the use of Relief Request SC-I4R-192 for the fourth 10-year ISI intervals at Salem. The fourth ISI interval for Salem, Unit No. 1, began on May 20, 2011, and is scheduled to end on December 31, 2020. The fourth ISI interval for Salem, Unit No. 2, began on November 27, 2013, and is scheduled to end on December 31, 2021.
All other ASME Code,Section XI requirements for which relief was not specifically requested and approved remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: S. Cumblidge Date: April 20, 2020
ML20104A186 *by e-mail OFFICE DORL/LPL1/PM DORL/LPL1/LA DNRL/NPHP/BC* DORL/LPL1/BC DORL/LPL1/PM NAME JKim LRonewicz MMitchell JDanna JKim DATE 04/15/2020 04/15/2020 04/06/2020 04/18/2020 04/20/2020