Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARML0206100052002-03-21021 March 2002 Generation Station, Units 1 and 2, Code Relief, Inservice Inspection Requirements of Reactor Pressure Vessel Nozzle Inner Radius Sections, MB4071 and MB4072 Project stage: Acceptance Review 2002-03-21
[Table View] |
Similar Documents at Salem |
---|
Category:Code Relief or Alternative
MONTHYEARML23019A3482023-02-0202 February 2023 Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System Piping LR-N21-0052, Request for Relief from ASME Code Defect Removal for Service Water Buried Piping2022-04-0707 April 2022 Request for Relief from ASME Code Defect Removal for Service Water Buried Piping ML21145A1892021-06-10010 June 2021 Authorization and Safety Evaluation for Alternative Request No. SC-I4R-200 ML20099E2332020-04-20020 April 2020 Issuance of Alternative Request S1-I4R-191 for the Fourth 10-Year Inservice Inspection Interval LR-N19-0084, Proposed Alternative for Examination of ASME Section XI, Steam Generator and Pressurizer Nozzle Inside Radius Sections, Per Inservice Inspection Relief Request SC-I4R-1922019-09-10010 September 2019 Proposed Alternative for Examination of ASME Section XI, Steam Generator and Pressurizer Nozzle Inside Radius Sections, Per Inservice Inspection Relief Request SC-I4R-192 LR-N19-0083, Request for Relief S1-I4R-191 from Alloy 690 PWR Reactor Vessel Head Inspection Interval, Fourth 10-year Interval2019-09-10010 September 2019 Request for Relief S1-I4R-191 from Alloy 690 PWR Reactor Vessel Head Inspection Interval, Fourth 10-year Interval ML17219A1862017-08-17017 August 2017 Safety Evaluation of Relief Request SC-I4R-171 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program ML17132A0052017-05-19019 May 2017 Alternative Request to Adopt American Society of Mechanical Engineers Code Case OMN-20 (CAC Nos. MF8313 and MF8314) ML15349A9562015-12-24024 December 2015 Relief from the Requirements of the ASME Code ML15195A4952015-07-28028 July 2015 Relief from the Requirements of the ASME Code ML14153A1462014-06-23023 June 2014 Safety Evaluation of Relief Request No. S2-14R-131 Regarding the Fourth Ten-Year Inservice Inspection Interval (Tac ME2442) ML13088A2192013-04-18018 April 2013 Safety Evaluation of Relief Request No. S2-14R-123 Regarding the Fourth Ten-Year Inservice Inspection Interval Code Edition LR-N12-0157, Submittal of Relief Request Associated with the Fourth Ten-Year Inservice Inspection (ISI) Interval Code Edition2012-06-0707 June 2012 Submittal of Relief Request Associated with the Fourth Ten-Year Inservice Inspection (ISI) Interval Code Edition ML1124201752011-09-19019 September 2011 Safety Evaluation of Relief Requests Regarding Pressure Testing of Service Water System Buried Piping - Salem Nuclear Generating Station, Unit Nos. 1 and 2 LR-N10-0380, Request for Authorization to Continue Using a Risk-Informed Inservice Inspection Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements for Class 1 and 2 Piping2010-10-21021 October 2010 Request for Authorization to Continue Using a Risk-Informed Inservice Inspection Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements for Class 1 and 2 Piping ML0936500862010-01-0707 January 2010 Safety Evaluation of Relief Requests for the Third 10-Year Interval of the Inservice Inspection Program for Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML0920304642009-08-11011 August 2009 Safety Evaluation of Relief Requests for the Fourth 10-Year Interval of the Inservice Testing Program for Salem Nuclear Generating Station, Unit 1 & 2 (TAC ME0322, ME0323, ME0324, ME0325, ME0326, ME0327, ME0328, ME0329, ME0330, ME0331, ME03 LR-N09-0126, Relief Requests to Extend the Inservice Interval for Reactor Vessel Weld Examination2009-06-11011 June 2009 Relief Requests to Extend the Inservice Interval for Reactor Vessel Weld Examination ML0825502182008-10-10010 October 2008 Safety Evaluation of Relief Requests for the Third 10-Year Interval of the Inservice Testing Program for Salem Nuclear Generating Station, Unit Nos. 1 and 2 LR-N05-0446, ASME Code Relief Request Salem Units 1 and 22005-11-16016 November 2005 ASME Code Relief Request Salem Units 1 and 2 LR-N04-0473, Relief Request SC-13-RR-A14 Synchronization of Salem Units 1 and 2 ISI Programs Ten-Year Inservice Inspection Intervals2005-10-31031 October 2005 Relief Request SC-13-RR-A14 Synchronization of Salem Units 1 and 2 ISI Programs Ten-Year Inservice Inspection Intervals ML0525802662005-09-30030 September 2005 Evaluation of Relief Requests S1-RR-04-V01 and S1-RR-04-V02 Related to the Third 10-Year Interval Inservice Testing Program ML0511803442005-05-0404 May 2005 Evaluation of Relief Request S2-13-RR-F01 ML0511503792005-04-29029 April 2005 Evaluation of Relief Request S2-13-RR-A06 ML0428005542004-10-0606 October 2004 Request for Additional Information Relief Requests S1-RR-04-V01 and V02 ML0409203612004-04-23023 April 2004 Evaluation of Relaxation Request No. S1-RR-13-B22, First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors ML0320902002003-07-28028 July 2003 Relief, Relief from ASME Code Requirements Related to the Salem Inservice Inspection Program, Relief Request S1-RR-F01, MB6098 ML0305902162003-02-20020 February 2003 Inservice Inspection Program Relief Request HC-RR-A02 ML0305902072003-02-20020 February 2003 Inservice Inspection Program Relief Request HC-RR-A06 ML0224704092003-02-0303 February 2003 Relief, Use of ASME Code Case N-532-1, Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission, MB6089 ML0301607502003-01-16016 January 2003 Relief, ASME Code Requirements Related to the Salem Inservice Inspection Program, Relief Request S1-RR-B01 and S1-RR-C01 ML0228105402002-11-27027 November 2002 Relief Request, Evaluation of Relief Request SC-RR-E01 and SC-RR-L01 ML0228307152002-11-27027 November 2002 Relief Request, Evaluation of Relief Request SC-RR-A01, TAC Nos. MB5569 & MB5570 ML0232302982002-11-12012 November 2002 Request for Additional Information Inservice Inspection Program Relief Request S1-RR-B01 ML0226004852002-10-30030 October 2002 Relief Request, Relief from ASME Code Requirements Related to the Salem Inservice Inspection Program, Relief Request SC-RR-F02, ML0225506812002-10-0707 October 2002 Code Relief, ASME Code Section XI, Inservice Inspection Program Requirements Related to Pressure Testing of Class 3 Components ML0225504352002-10-0404 October 2002 Relief, ASME Code Requirements Related to the Salem Inservice Inspection Programs, MB6086 & MB6087 ML0206100052002-03-21021 March 2002 Generation Station, Units 1 and 2, Code Relief, Inservice Inspection Requirements of Reactor Pressure Vessel Nozzle Inner Radius Sections, MB4071 and MB4072 ML0205304402002-03-21021 March 2002 Code Relief, Relief from ASME Code Requirements Related to the Inservice Inspection Program, Second 10-Year Interval, Relief Request S2-RR-B04 ML0205904012002-02-11011 February 2002 Inservice Inspection Program Relief Request S2-RR-B04, Inspection of Reactor Pressure Vessel (RPV) Flange-to-Shell Weld 2023-02-02
[Table view] Category:Letter
MONTHYEARIR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23139A1472023-06-0505 June 2023 Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld Coverage ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report IR 05000272/20230012023-05-0303 May 2023 Integrated Inspection Report 05000272/2023001 and 05000311/2023001 ML23081A4662023-05-0202 May 2023 Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel Generator IR 05000272/20233012023-05-0101 May 2023 Initial Operator Licensing Examination Report 05000272/2023301 and 05000311/2023301 LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0033, Core Operating Limits Report Cycle 272023-04-26026 April 2023 Core Operating Limits Report Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location ML23089A0942023-04-17017 April 2023 NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23087A1492023-04-17017 April 2023 NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23103A3232023-04-13013 April 2023 Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23086A0912023-03-24024 March 2023 NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML23044A1052023-03-13013 March 2023 Issuance of Amendment Nos. 345 and 326 Relocate Technical Specifications Requirements for Reactor Head Vents to Technical Requirements Manual ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report IR 05000272/20230112023-03-0707 March 2023 Comprehensive Engineering Team Inspection Report 05000272/2023011 and 05000311/2023011 IR 05000272/20220062023-03-0101 March 2023 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 ML23034A1532023-02-0909 February 2023 Operator Licensing Examination Approval ML23019A3482023-02-0202 February 2023 Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System Piping LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 2024-02-05
[Table view] |
Text
March 21, 2002 Mr. Harold W. Keiser Chief Nuclear Officer & President PSEG Nuclear LLC - X04 Post Office Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 - RELIEF FROM ASME CODE REQUIREMENTS RELATED TO THE INSERVICE INSPECTION OF REACTOR PRESSURE VESSEL NOZZLE INNER RADIUS SECTIONS, RELIEF REQUEST SC-RR-B06 (TAC NOS. MB4071 AND MB4072)
Dear Mr. Keiser:
By letter dated February 11, 2002, PSEG Nuclear LLC (PSEG) submitted a request for relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code),Section XI, requirements for certain inservice inspection (ISI) requirements associated with the Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Salem), Reactor Pressure Vessel (RPV) nozzles inner radius sections. In the letter, PSEG requested use of alternative requirements by performing a remote enhanced VT-1 (EVT) visual examination of the M-N surface as shown in ASME Code,Section XI, Figures IWB-2500-7 (a) through (d) in lieu of the volumetric examination requirements of ASME Code,Section XI, Table IWB-2500-1, Examination Category B-D, Item No. B3.100. Relief was requested for Salem, Unit No. 2, for the second 10-year ISI interval, and for Salem, Unit No. 1, for the third 10-year ISI interval.
The U.S. Nuclear Regulatory Commission (NRC) staff has completed its review of the subject relief request. As documented in the enclosed Safety Evaluation (SE), the staff concludes that the proposed alternative will provide reasonable assurance of structural integrity. Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), the NRC staff authorizes the proposed alternative for Salem, Unit Nos. 1 and 2, for the third and second 10-year ISI intervals respectively, on the basis that the proposed alternative provides an acceptable level of quality and safety.
Sincerely,
/RA/
James W. Clifford, Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-272 and 50-311
Enclosure:
Safety Evaluation cc w/encl: See next page
ML020610005
- See previous concurrence OFFICE PDI-2/PM PDI-2/LA EMCB/SC OGC PDI-2/SC NAME RFretz TClark TChan RHoefling JClifford DATE 03/08/02 3/14/02 03/06/02 3/20/02 3/21/02 PSEG Nuclear LLC Salem Nuclear Generating Station, Unit Nos. 1 and 2 cc:
Mr. Elbert C. Simpson Lower Alloways Creek Township Senior Vice President & c/o Mary O. Henderson, Clerk Chief Administrative Officer Municipal Building, P.O. Box 157 PSEG Nuclear - N19 Hancocks Bridge, NJ 08038 P.O. Box 236 Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Asst. Director Radiation Protection Programs Mr. Mark B. Bezilla NJ Department of Environmental Vice President - Technical Support Protection and Energy PSEG Nuclear - N10 CN 415 P.O. Box 236 Trenton, NJ 08625-0415 Hancocks Bridge, NJ 08038 Richard Hartung Mr. David F. Garchow Electric Service Evaluation Vice President - Operations Board of Regulatory Commissioners PSEG Nuclear - X10 2 Gateway Center, Tenth Floor P.O. Box 236 Newark, NJ 07102 Hancocks Bridge, NJ 08038 Regional Administrator, Region I Mr. Gabor Salamon U.S. Nuclear Regulatory Commission Manager - Nuclear Safety and Licensing 475 Allendale Road PSEG Nuclear - N21 King of Prussia, PA 19406 P.O. Box 236 Hancocks Bridge, NJ 08038 Senior Resident Inspector Salem Nuclear Generating Station Jeffrie J. Keenan, Esquire U.S. Nuclear Regulatory Commission PSEG Nuclear - N21 Drawer 0509 P.O. Box 236 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Ms. R. A. Kankus Joint Owner Affairs PECO Energy Company Nuclear Group Headquarters KSA1-E 200 Exelon Way Kennett Square, PA 19348
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO THE EXAMINATION OF REACTOR PRESSURE VESSEL (RPV) NOZZLE INNER RADIUS INSPECTIONS IN ACCORDANCE WITH RELIEF REQUEST SC-RR-B06 PSEG NUCLEAR LLC SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311
1.0 INTRODUCTION
By letter dated February 11, 2002, PSEG Nuclear LLC (PSEG) submitted a request for relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code),Section XI, requirements for certain inservice inspection (ISI) requirements associated with the Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Salem), Reactor Pressure Vessel (RPV) nozzles inner radius sections. In the letter, PSEG requested use of alternative requirements by performing a remote enhanced VT-1 visual testing (EVT) of the M-N surface as shown in ASME Code,Section XI, Figures IWB-2500-7 (a) through (d) in lieu of the volumetric examination requirements of ASME Code,Section XI, Table IWB-2500-1, Examination Category B-D, Item No. B3.100.
Relief was requested for Salem, Unit No. 2, for the second 10-year ISI interval scheduled for the spring 2002 refueling outage, and for Salem, Unit No. 1, for the third 10-year ISI interval.
2.0 BACKGROUND
Regulatory Requirements The inservice inspection (ISI) of ASME Code Class 1, 2, and 3 components is to be performed in accordance with Section XI of the ASME Code and applicable edition and addenda as required by Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a(g), except where specific written relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i). Pursuant to 10 CFR 50.55a(a)(3), alternatives to the requirements of paragraph (g) may be used, when authorized by the U.S. Nuclear Regulatory Commission (NRC), Director of the Office of Nuclear Reactor Regulation, if the licensee demonstrates that:
(i) the proposed alternatives would provide an acceptable level of quality and safety, or (ii) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
ENCLOSURE
Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the pre-service examination requirements, set forth in the ASME Code,Section XI, "Rules for Inservice Inspection (ISI) of Nuclear Power Plant Components," to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that inservice examination of components and system pressure tests conducted during the first 10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein. The components (including supports) may meet the requirements set forth in subsequent editions and addenda of the ASME Code incorporated by reference in 10 CFR 50.55a(b) subject to the limitations and modifications listed therein and subject to Commission approval.
3.0 RELIEF REQUEST 3.1 Component Description PSEG is requesting relief from ASME Section XI, Class 1, RPV Nozzle Inner Radius examination requirements for the following Salem, Unit Nos. 1 and 2, components:
Summary Examination Area Number Identification Configuration Salem Unit No. 1 002900 29-RPV-1110-IRS Outlet Nozzle @ 202 degrees Outlet Nozzle Inner Radius Sections 003100 29-RPV-1120-IRS Outlet Nozzle @ 338 degrees 003300 29-RPV-1130-IRS Outlet Nozzle @ 158 degrees 003500 29-RPV-1140-IRS Outlet Nozzle @ 22 degrees Salem Unit No. 1 Inlet 003000 27.5-RPV-1110-IRS Inlet Nozzle @ 247 degrees Nozzle Inner Radius Sections 003200 27.5-RPV-1120-IRS Inlet Nozzle @ 293 degrees 003400 27.5-RPV-1130-IRS Inlet Nozzle @ 113 degrees 003600 27.5-RPV-1140-IRS Inlet Nozzle @ 67 degrees Salem Unit No. 2 002900 29-RPV-1110-IRS Outlet Nozzle @ 202 degrees Outlet Nozzle Inner Radius Sections 003100 29-RPV-1120-IRS Outlet Nozzle @ 338 degrees 003300 29-RPV-1130-IRS Outlet Nozzle @ 158 degrees 003500 29-RPV-1140-IRS Outlet Nozzle @ 22 degrees Salem Unit No. 2 Inlet 003000 27.5-RPV-1110-IRS Inlet Nozzle @ 247 degrees Nozzle Inner Radius Sections 003200 27.5-RPV-1120-IRS Inlet Nozzle @ 293 degrees 003400 27.5-RPV-1130-IRS Inlet Nozzle @ 113 degrees 003600 27.5-RPV-1140-IRS Inlet Nozzle @ 67 degrees
3.2 ASME Code Examination Requirement for which Relief is Requested Salem Unit No. 1 The ASME Code requirement for Salem Unit No. 1 is: ASME Code,Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, 1995 Edition up through and including 1996 Addenda; IWB-2500-1, Examination Category B-D, Full Penetration Welded Nozzles In Vessels, Code Item B3.100, Figures IWB-2500-7 (a) through (d).
Salem Unit No. 2 The ASME Code requirement for Salem Unit No. 2 is: ASME Code,Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, 1986 Edition with no Addenda; IWB-2500-1, Examination Category B-D, Full Penetration Welds Of Nozzles In Vessels, Code Item B3.100, Figures IWB-2500-7 (a) through (d).
3.3 PSEGs Proposed Alternative to ASME Code (as stated)
PSEG Nuclear, LLC proposes to perform a remote visual examination of the M-N surface as shown in Figures IWB-2500-7 (a) through (d) in lieu of the volumetric examination requirements of ASME Section XI, Table IWB-2500-1, Examination Category B-D, Item No. B3.100.
PSEG Nuclear proposes to perform an enhanced VT-1 (EVT) visual examination with essentially 100-percent coverage upon examination surface M-N. The enhanced aspect of the examination is to use 8x magnification video equipment to examine the inner radii. The resolution sensitivity for this remote examination will be established using a 1-mil diameter wire.
Crack-like surface flaws exceeding the acceptance criteria of Table IWB-3512-1 are unacceptable for continued service unless the reactor vessel meets the requirements of IWB-3142.2, IWB-3142.3 or IWB-3142.4.
3.4 PSEGs Basis for the Proposed Alternative In its letter dated February 11, 2002, PSEG provided its revised basis for requesting relief (as stated):
Pursuant to 10 CFR 50.55a(a)(3)(i), relief is requested on the basis that the proposed alternative examination provides an acceptable level of quality and safety and the granting of relief should not jeopardize the health and safety of the public.
As an alternative to ASME Section XI Table IWB-2500-1, Examination Category B-D, Item B3.100, which requires volumetric examination (Ultrasonic - UT) for Inner Radius of Class 1 Reactor Vessel Nozzles at Salem Units 1 & 2, PSEG Nuclear LLC proposes to perform a VT-1, Visual Examination of the surface M-N shown in Figures IWB-2500-7 (a) through (d) for those components previously identified above.
PSEG Nuclear Salem Units 1 and 2 are currently required to perform inservice examinations of these selected areas in accordance with the requirements of 10CFR50.55a, and ASME Section XI (Code Editions and Addenda are previously listed above). According to a NRC memorandum[1], the NRC staff indicated that an ultrasonic examination could be replaced by a VT-1 visual examination for the proposed nozzle inspections on the basis surveillance is maintained and VT-1 visual examination is performed.
The implementation of this relief is also expected to reduce vessel examination time by approximately 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />, which translates to significantly reduced personnel radiation exposure and cost savings.
In [the] NRC memorandum [ ], the NRC staff indicated that an ultrasonic examination could be replaced by VT-1 visual examination for the proposed RPV nozzle inspection on the basis surveillance is maintained and VT-1 visual examination is performed.
4.0 EVALUATION In the mid 1970s, fatigue-initiated cracking was discovered in the nozzle inner radius section of feedwater nozzles at 18 boiling water reactors (BWRs). Ultrasonic testing (UT) did not reveal the presence of these cracks. This situation prompted the NRC to prepare NUREG-0619, "BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking," which modified inspection guidance for these components.
In NUREG-0619, the NRC staff concluded that UT of the vessel nozzle inner radius section involves complex geometries, long examination metal paths, and inherent UT beam spread, scatter, and attenuation. During the intervening years, improvements in UT technologies were introduced (e.g., computer modeling, tip diffraction, and phased array scanning), which improved the quality of the examination for this component. However, the area remains difficult to examine completely.
The NRC staff finds that even with vessel examinations using improved NDE technology from the outside surface, the complex geometry of the RPV nozzle inner radius sections prevents complete UT coverage. The licensee proposed to perform an enhanced VT-1 (EVT) visual examination with essentially 100-percent coverage in lieu of the UT. The enhanced aspect of the examination is to use 8x magnification video equipment to examine the inner radii. The resolution sensitivity for this remote, in-vessel exam will be established using a 1-mil diameter wire.
The primary degradation mode in RPV nozzles is thermal fatigue, which produces hairline surface indications along the nozzles inner radius section. Given the 1-mil resolution capability of the EVT, it is highly unlikely that the licensee would not detect such flaws using high magnification cameras that can examine 100 percent of the nozzle inner radius section surface 1 NRC Memorandum from K.R. Wichman to W.H. Bateman dated May 25, 2000;
Subject:
The Third Meeting with the Industry to Discuss the Elimination of RPV Inner Radius Inspection (ADAMS Accession No. ML003718630).
area. The staff has determined that the high resolution image from the camera may be used in lieu of UT of the inner nozzle radius. PSEG has also committed to adhere to the allowable flaw length criteria in Table IWB-3512-1 of the ASME Code,Section XI, for the disposition of any linear flaws. This would require the licensee to declare a flaw found in the inside corner region unacceptable for continued service, unless the flaw was further determined to be acceptable through supplemental examinations, corrective measures (repair and/or replacement), or by analytical evaluation, in accordance with ASME Code,Section XI, IWB-3142. Therefore, the proposed alternative provides reasonable assurance of structural integrity.
Staffs Conclusion Based on its review, the NRC staff finds that the proposed alternative described in PSEGs letter dated February 11, 2002, provides an acceptable level of quality and safety. Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), the staff authorizes the proposed alternative for the Salem, Unit No. 2, second 10-year ISI interval, and the Salem, Unit No. 1, third 10-year ISI interval.
This authorization is limited to the RPV nozzle inner radius sections previously described in Section 3.1 of this Safety Evaluation.
Principal Contributor: R. Fretz Date: March 21, 2002