Letter Sequence Other |
---|
|
|
MONTHYEARML0409203612004-04-23023 April 2004 Evaluation of Relaxation Request No. S1-RR-13-B22, First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors Project stage: Other 2004-04-23
[Table View] |
Similar Documents at Salem |
---|
Category:Code Relief or Alternative
MONTHYEARML23019A3482023-02-0202 February 2023 Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System Piping LR-N21-0052, Request for Relief from ASME Code Defect Removal for Service Water Buried Piping2022-04-0707 April 2022 Request for Relief from ASME Code Defect Removal for Service Water Buried Piping ML21145A1892021-06-10010 June 2021 Authorization and Safety Evaluation for Alternative Request No. SC-I4R-200 ML20099E2332020-04-20020 April 2020 Issuance of Alternative Request S1-I4R-191 for the Fourth 10-Year Inservice Inspection Interval LR-N19-0084, Proposed Alternative for Examination of ASME Section XI, Steam Generator and Pressurizer Nozzle Inside Radius Sections, Per Inservice Inspection Relief Request SC-I4R-1922019-09-10010 September 2019 Proposed Alternative for Examination of ASME Section XI, Steam Generator and Pressurizer Nozzle Inside Radius Sections, Per Inservice Inspection Relief Request SC-I4R-192 LR-N19-0083, Request for Relief S1-I4R-191 from Alloy 690 PWR Reactor Vessel Head Inspection Interval, Fourth 10-year Interval2019-09-10010 September 2019 Request for Relief S1-I4R-191 from Alloy 690 PWR Reactor Vessel Head Inspection Interval, Fourth 10-year Interval ML17219A1862017-08-17017 August 2017 Safety Evaluation of Relief Request SC-I4R-171 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program ML17132A0052017-05-19019 May 2017 Alternative Request to Adopt American Society of Mechanical Engineers Code Case OMN-20 (CAC Nos. MF8313 and MF8314) ML15349A9562015-12-24024 December 2015 Relief from the Requirements of the ASME Code ML15195A4952015-07-28028 July 2015 Relief from the Requirements of the ASME Code ML14153A1462014-06-23023 June 2014 Safety Evaluation of Relief Request No. S2-14R-131 Regarding the Fourth Ten-Year Inservice Inspection Interval (Tac ME2442) ML13088A2192013-04-18018 April 2013 Safety Evaluation of Relief Request No. S2-14R-123 Regarding the Fourth Ten-Year Inservice Inspection Interval Code Edition LR-N12-0157, Submittal of Relief Request Associated with the Fourth Ten-Year Inservice Inspection (ISI) Interval Code Edition2012-06-0707 June 2012 Submittal of Relief Request Associated with the Fourth Ten-Year Inservice Inspection (ISI) Interval Code Edition ML1124201752011-09-19019 September 2011 Safety Evaluation of Relief Requests Regarding Pressure Testing of Service Water System Buried Piping - Salem Nuclear Generating Station, Unit Nos. 1 and 2 LR-N10-0380, Request for Authorization to Continue Using a Risk-Informed Inservice Inspection Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements for Class 1 and 2 Piping2010-10-21021 October 2010 Request for Authorization to Continue Using a Risk-Informed Inservice Inspection Alternative to the ASME Boiler and Pressure Vessel Code Section XI Requirements for Class 1 and 2 Piping ML0936500862010-01-0707 January 2010 Safety Evaluation of Relief Requests for the Third 10-Year Interval of the Inservice Inspection Program for Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML0920304642009-08-11011 August 2009 Safety Evaluation of Relief Requests for the Fourth 10-Year Interval of the Inservice Testing Program for Salem Nuclear Generating Station, Unit 1 & 2 (TAC ME0322, ME0323, ME0324, ME0325, ME0326, ME0327, ME0328, ME0329, ME0330, ME0331, ME03 LR-N09-0126, Relief Requests to Extend the Inservice Interval for Reactor Vessel Weld Examination2009-06-11011 June 2009 Relief Requests to Extend the Inservice Interval for Reactor Vessel Weld Examination ML0825502182008-10-10010 October 2008 Safety Evaluation of Relief Requests for the Third 10-Year Interval of the Inservice Testing Program for Salem Nuclear Generating Station, Unit Nos. 1 and 2 LR-N05-0446, ASME Code Relief Request Salem Units 1 and 22005-11-16016 November 2005 ASME Code Relief Request Salem Units 1 and 2 LR-N04-0473, Relief Request SC-13-RR-A14 Synchronization of Salem Units 1 and 2 ISI Programs Ten-Year Inservice Inspection Intervals2005-10-31031 October 2005 Relief Request SC-13-RR-A14 Synchronization of Salem Units 1 and 2 ISI Programs Ten-Year Inservice Inspection Intervals ML0525802662005-09-30030 September 2005 Evaluation of Relief Requests S1-RR-04-V01 and S1-RR-04-V02 Related to the Third 10-Year Interval Inservice Testing Program ML0511803442005-05-0404 May 2005 Evaluation of Relief Request S2-13-RR-F01 ML0511503792005-04-29029 April 2005 Evaluation of Relief Request S2-13-RR-A06 ML0428005542004-10-0606 October 2004 Request for Additional Information Relief Requests S1-RR-04-V01 and V02 ML0409203612004-04-23023 April 2004 Evaluation of Relaxation Request No. S1-RR-13-B22, First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors ML0320902002003-07-28028 July 2003 Relief, Relief from ASME Code Requirements Related to the Salem Inservice Inspection Program, Relief Request S1-RR-F01, MB6098 ML0305902162003-02-20020 February 2003 Inservice Inspection Program Relief Request HC-RR-A02 ML0305902072003-02-20020 February 2003 Inservice Inspection Program Relief Request HC-RR-A06 ML0224704092003-02-0303 February 2003 Relief, Use of ASME Code Case N-532-1, Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission, MB6089 ML0301607502003-01-16016 January 2003 Relief, ASME Code Requirements Related to the Salem Inservice Inspection Program, Relief Request S1-RR-B01 and S1-RR-C01 ML0228105402002-11-27027 November 2002 Relief Request, Evaluation of Relief Request SC-RR-E01 and SC-RR-L01 ML0228307152002-11-27027 November 2002 Relief Request, Evaluation of Relief Request SC-RR-A01, TAC Nos. MB5569 & MB5570 ML0232302982002-11-12012 November 2002 Request for Additional Information Inservice Inspection Program Relief Request S1-RR-B01 ML0226004852002-10-30030 October 2002 Relief Request, Relief from ASME Code Requirements Related to the Salem Inservice Inspection Program, Relief Request SC-RR-F02, ML0225506812002-10-0707 October 2002 Code Relief, ASME Code Section XI, Inservice Inspection Program Requirements Related to Pressure Testing of Class 3 Components ML0225504352002-10-0404 October 2002 Relief, ASME Code Requirements Related to the Salem Inservice Inspection Programs, MB6086 & MB6087 ML0206100052002-03-21021 March 2002 Generation Station, Units 1 and 2, Code Relief, Inservice Inspection Requirements of Reactor Pressure Vessel Nozzle Inner Radius Sections, MB4071 and MB4072 ML0205304402002-03-21021 March 2002 Code Relief, Relief from ASME Code Requirements Related to the Inservice Inspection Program, Second 10-Year Interval, Relief Request S2-RR-B04 ML0205904012002-02-11011 February 2002 Inservice Inspection Program Relief Request S2-RR-B04, Inspection of Reactor Pressure Vessel (RPV) Flange-to-Shell Weld 2023-02-02
[Table view] Category:Letter
MONTHYEARIR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23139A1472023-06-0505 June 2023 Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld Coverage ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report IR 05000272/20230012023-05-0303 May 2023 Integrated Inspection Report 05000272/2023001 and 05000311/2023001 ML23081A4662023-05-0202 May 2023 Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel Generator IR 05000272/20233012023-05-0101 May 2023 Initial Operator Licensing Examination Report 05000272/2023301 and 05000311/2023301 LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0033, Core Operating Limits Report Cycle 272023-04-26026 April 2023 Core Operating Limits Report Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location ML23089A0942023-04-17017 April 2023 NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23087A1492023-04-17017 April 2023 NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23103A3232023-04-13013 April 2023 Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23086A0912023-03-24024 March 2023 NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML23044A1052023-03-13013 March 2023 Issuance of Amendment Nos. 345 and 326 Relocate Technical Specifications Requirements for Reactor Head Vents to Technical Requirements Manual ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report IR 05000272/20230112023-03-0707 March 2023 Comprehensive Engineering Team Inspection Report 05000272/2023011 and 05000311/2023011 IR 05000272/20220062023-03-0101 March 2023 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 ML23034A1532023-02-0909 February 2023 Operator Licensing Examination Approval ML23019A3482023-02-0202 February 2023 Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System Piping LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 2024-02-05
[Table view] Category:Safety Evaluation
MONTHYEARML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location ML23139A1472023-06-0505 June 2023 Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld Coverage ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report ML23081A4662023-05-0202 May 2023 Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel Generator ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership ML23044A1052023-03-13013 March 2023 Issuance of Amendment Nos. 345 and 326 Relocate Technical Specifications Requirements for Reactor Head Vents to Technical Requirements Manual ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report ML23019A3482023-02-0202 February 2023 Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System Piping ML22130A7912022-05-24024 May 2022 Issuance of Relief Request No. S1-I4R-210 Fourth Inservice Inspection Interval Limited Examinations ML22061A0302022-04-0404 April 2022 Issuance of Amendment Nos. 343 and 324 Revise Technical Specifications Surveillance Requirements for Auxiliary Feedwater ML22012A4352022-02-14014 February 2022 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Nos. 230, 342, and 323 Delete Definition in 10 CFR 20 and Figures of Site and Surrounding Areas ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21295A2292021-11-15015 November 2021 Issuance of Amendment Nos. 340 and 321 Revise Technical Specifications to Adopt TSTF 569, Revision of Response Time Testing Definitions ML21230A0182021-10-0808 October 2021 Issuance of Amendment No. 339 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report ML21202A0782021-09-0303 September 2021 Issuance of Amendment Nos. 338 and 320 Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21195A0622021-08-0303 August 2021 Issuance of Amendment No. 319 One-Time Request to Revise Technical Specification Action for Rod Position Indicators ML21110A0522021-07-19019 July 2021 Issuance of Amendment Nos. 337 and 318, Revise Technical Specifications to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML21145A1892021-06-10010 June 2021 Authorization and Safety Evaluation for Alternative Request No. SC-I4R-200 ML20338A0382021-02-23023 February 2021 Issuance of Amendment Nos. 336 and 317 Leak-Before-Break for Accumulator, Residual Heat Removal, Safety Injection, and Pressurizer Surge Lines ML20224A2982020-08-20020 August 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20191A2032020-08-0606 August 2020 Issuance of Amendment Nos. 335 & 316-Revise Minimum Required Channels, Mode Applicability, & Actions for Source Range/Intermediate Range Neutron Flux Reactor Trip System Instrumentation ML20104A1862020-04-20020 April 2020 Issuance of Alternative Request SC-I4R-192 for Examination of ASME Code, Section XI, Steam Generator and Pressurizer Nozzle Inside Radius Sections ML20099E2332020-04-20020 April 2020 Issuance of Alternative Request S1-I4R-191 for the Fourth 10-Year Inservice Inspection Interval ML20091K7302020-04-13013 April 2020 Issuance of Relief Request SC-I4R-190 for the Fourth 10-Year Inservice Inspection Interval ML20034E6172020-02-27027 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 222, 333, and 314 Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19352F2312020-02-18018 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Issuance of Amendment Nos. 221, 332, and 313 Revise Emergency Plan Staffing Requirements ML19330F1562020-01-14014 January 2020 Issuance of Amendment Nos. 331 and 312 Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19275D6942019-11-18018 November 2019 Issuance of Amendment Nos. 330 and 311 Revise Technical Specifications to Adopt TSFT-547, Clarification of Rod Position Requirements ML19105B1712019-05-31031 May 2019 Issuance of Amendment Nos. 329 and 310 Revise Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves, and Add New TS ML19077A3362019-04-11011 April 2019 Issuance of Amendment Nos. 328 and 309 Revise Technical Specifications to Extend Refueling Water Storage Tank Allowed Outage Time ML19044A6272019-03-0606 March 2019 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 214, 327, and 308 Revise Technical Specifications to Adopt TSTF-529 ML19050A3702019-03-0606 March 2019 Alternative to Reactor Vessel Nozzle Welds Examinations Inspection Interval (EPID-L-2018-LLR-0110) ML19009A4772019-01-25025 January 2019 Issuance of Amendment Nos. 326 and 307 Revise Technical Specifications to Increase Vital Instrument Bus Inverter Allowed Outage Time ML18318A2662018-12-19019 December 2018 Issuance of Amendment Nos. 325 and 306 Revise TS Reactor Trip System Instrumentation and Engineered Safety Features Actuation System Instrumentation Test Times and Completion Times ML18142B1262018-05-29029 May 2018 Use of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Inservice Inspection Activities ML18040A7782018-04-18018 April 2018 Issuance of Amendment Nos. 323 and 304 Relocation of Reactor Coolant System Pressure Isolation Valve Tables ML18085B1982018-04-18018 April 2018 Issuance of Amendment Nos. 324 and 305 Revise Technical Specification Actions for Rod Position Indicators ML17355A5702018-02-16016 February 2018 Issuance of Amendment Nos. 322, 303, & 210, to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 (CAC Nos. MF9268/MF9269/MF9270; EPID L-2017-LLA-0173) ML17349A1082018-01-18018 January 2018 Issuance of Amendments Containment Fan Coil Unit Allowed Outage Time Extension (CAC Nos. MF9364 and MF9365; EPID L-2017-LLA-0212) ML17227A0162017-11-14014 November 2017 Issuance of Amendments Accident Monitoring Instrumentation ML17304A9432017-11-0101 November 2017 Use of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Inservice Inspection Activities ML17219A1862017-08-17017 August 2017 Safety Evaluation of Relief Request SC-I4R-171 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program ML17172A5872017-07-17017 July 2017 Safety Evaluation of Relief Request S1-I4R-160 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program ML17165A2142017-06-28028 June 2017 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule App. to Section 5.5 Testing ML17132A0052017-05-19019 May 2017 Alternative Request to Adopt American Society of Mechanical Engineers Code Case OMN-20 (CAC Nos. MF8313 and MF8314) ML17093A8702017-05-16016 May 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Revised PSEG Nulcear LLC Cyber Security Plan Milestone 8 Implementation Schedule ML17012A2922017-02-0606 February 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Issuance of Amendments ML16351A1822017-01-19019 January 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16229A5192016-09-29029 September 2016 Issuance of Amendments Correct Non-Conservative Technical Specifications and Other Discrepancies ML16137A5792016-06-29029 June 2016 Issuance of Amendments Extension of Implementation Period for Salem, Unit No. 1, License Amendment No. 311, and Salem, Unit No. 2 License Amendment No. 292 2023-08-14
[Table view] |
Text
April 23, 2004 Mr. Roy A. Anderson President & Chief Nuclear Officer PSEG Nuclear, LLC - X04 Post Office Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
SALEM NUCLEAR GENERATING STATION, UNIT NO. 1 - EVALUATION OF RELAXATION REQUEST NO. S1-RR-13-B22, RE: FIRST REVISED ORDER (EA-03-009) ESTABLISHING INTERIM INSPECTION REQUIREMENTS FOR REACTOR PRESSURE VESSEL HEADS AT PRESSURIZED WATER REACTORS (TAC NO. MC2266)
Dear Mr. Anderson:
On February 20, 2004, the U.S. Nuclear Regulatory Commission (NRC) issued First Revised Order EA-03-009. The original Order (EA-03-009), dated February 11, 2003, was superceded by the First Revised Order, and the revised Order continues to impose requirements for pressurized water reactor licensees to inspect reactor pressure vessel heads and associated penetration nozzles as stated in Sections IV.C.(5), (a) and (b).
Sections IV.C.(5)(b)(i), (ii) and (iii) mandate requirements for nondestructive examination (NDE) of each penetration.Section IV.F of the revised Order states that requests for relaxation associated with specific penetration nozzles will be evaluated by the NRC staff using its procedure for evaluating proposed alternatives to the American Society of Mechanical Engineers Code in accordance with Title 10 of the Code of Federal Regulations, Section 50.55a(a)(3).
By letter dated March 5, 2004, PSEG Nuclear LLC (PSEG) submitted Relaxation Request S1-RR-13-B22 requesting relaxation from the NDE requirements of the revised Order for the Salem Nuclear Generating Station, Unit No. 1, reactor vessel head vent nozzle penetration.
PSEGs basis for this request is predicated on the fact that the vent nozzle is fabricated from SA-508-64 low-alloy steel with low-alloy steel weld metal which is not susceptible to primary water stress corrosion cracking (PWSCC).
The NRC staff has completed its review, and concludes that you have demonstrated good cause for the requested relaxation, in that the proposed alternative provides an acceptable level of quality and safety because the First Revised Order EA-03-009 was not intended to apply to materials not susceptible to PWSCC. Therefore, pursuant to Section IV.F of the First Revised Order (EV-03-009), the NRC staff authorizes the proposed relaxation and alternative inspection of the head vent nozzle penetration during the period that the Order is in effect.
R. Anderson The NRC staffs Safety Evaluation is enclosed.
Sincerely,
/RA/
Allen G. Howe, Acting Director Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-272
Enclosure:
As stated cc w/encl: See next page
R. Anderson The NRC staffs Safety Evaluation is enclosed.
Sincerely,
/RA/
Allen G. Howe, Acting Director Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-272
Enclosure:
As stated cc w/encl: See next page DISTRIBUTION:
PUBLIC JClifford TChan PPatnaik CBixler, RGN-1 GHill (2)
ACRS DCollins CRaynor OGC PDI-2 R/F ADAMS Accession Number: ML040920361
- SE input provide by memo. ** previous concurrence OFFICE PDI-2/PM PDI-2/LA EMEB/SC* OGC PDI-2/SC** PDI/PD NAME DCollins CRaynor TChan NLO GLongo JClifford AHowe DATE 04/06/04 04/06/04 03/25/04 04/07/04 04/13/04 4/22/04 OFFICIAL RECORD COPY
Salem Nuclear Generating Station, Unit No. 1 cc:
Mr. A. Christopher Bakken, III Ms. R. A. Kankus Senior Vice President - Nuclear Operations Joint Owner Affairs PSEG Nuclear - X15 PECO Energy Company P.O. Box 236 Nuclear Group Headquarters KSA1-E Hancocks Bridge, NJ 08038 200 Exelon Way Kennett Square, PA 19348 Mr. Michael H. Brothers Vice President - Site Operations Lower Alloways Creek Township PSEG Nuclear - X15 c/o Mary O. Henderson, Clerk P.O. Box 236 Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Mr. John T. Carlin Dr. Jill Lipoti, Asst. Director Vice President - Nuclear Assessments Radiation Protection Programs PSEG Nuclear - N10 NJ Department of Environmental P.O. Box 236 Protection and Energy Hancocks Bridge, NJ 08038 CN 415 Trenton, NJ 08625-0415 Mr. David F. Garchow Vice President - Eng/Tech Support Brian Beam PSEG Nuclear - N28 Board of Public Utilities P.O. Box 236 2 Gateway Center, Tenth Floor Hancocks Bridge, NJ 08038 Newark, NJ 07102 Mr. Steven Mannon Regional Administrator, Region I Acting Manager - Licensing U.S. Nuclear Regulatory Commission PSEG Nuclear - N21 475 Allendale Road P.O. Box 236 King of Prussia, PA 19406 Hancocks Bridge, NJ 08038 Senior Resident Inspector Jeffrie J. Keenan, Esquire Salem Nuclear Generating Station PSEG Nuclear - N21 U.S. Nuclear Regulatory Commission P.O. Box 236 Drawer 0509 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELAXATION REQUEST NO. S1-RR-13-B22 FIRST REVISED ORDER (EA-03-009) ESTABLISHING INTERIM INSPECTION REQUIREMENTS FOR REACTOR PRESSURE VESSEL HEADS AT PRESSURIZED WATER REACTORS SALEM NUCLEAR GENERATING STATION, UNIT NO. 1 PSEG NUCLEAR, LLC DOCKET NO. 50-272
1.0 INTRODUCTION
On February 20, 2004, the U.S. Nuclear Regulatory Commission (NRC) issued First Revised Order EA-03-009. The original Order (EA-03-009), dated February 11, 2003, was superceded by the First Revised Order, and the revised Order continues to impose requirements for pressurized water reactor licensees to inspect reactor pressure vessel (RPV) heads and associated penetration nozzles as stated in Sections IV.C.(5), (a) and (b).
Sections IV.C.(5)(b)(i), (ii) and (iii) mandate requirements for nondestructive examination (NDE) of each penetration.Section IV.F of the revised Order states that requests for relaxation associated with specific penetration nozzles will be evaluated by the NRC staff using its procedure for evaluating proposed alternatives to the American Society of Mechanical Engineers (ASME) Code in accordance with Title 10 of the Code of Federal Regulations, Section 50.55a(a)(3).
By letter dated March 5, 2004, PSEG Nuclear LLC (PSEG or the licensee) submitted Relaxation Request S1-RR-13-B22 requesting relaxation from the NDE requirements of the revised Order for the Salem Nuclear Generating Station (Salem), Unit No. 1, reactor vessel head vent nozzle penetration. PSEGs basis for this request is predicated on the fact that the vent nozzle is fabricated from SA-508-64 low-alloy steel with low-alloy steel weld metal which is not susceptible to primary water stress corrosion cracking (PWSCC).
This relaxation would only apply during the period in which the First Revised NRC Order EA-03-009 is in effect.
2.0 REGULATORY EVALUATION
First Revised Order EA-03-009 requires ultrasonic, eddy current, and/or dye penetrant testing of RPV head penetration nozzles at various intervals depending on their susceptibility to PWSCC. The Salem, Unit No. 1, RPV head is currently in the high susceptibility category. The requirements governing ultrasonic, eddy current, and/or dye penetrant testing for RPV heads in the high susceptibility category are stated in Sections IV.C.(5)(b)(i), (II), and (iii) of the Order.
Section IV.C.(5)(b) requires for each penetration to perform a nonvisual NDE in accordance with either (i), (ii) or (iii):
(i) Ultrasonic testing of the RPV head penetration nozzle volume (i.e., nozzle base material) from 2 inches above the highest point of the root of the J-groove weld (on a horizontal plane perpendicular to the nozzle axis) to 2 inches below the lowest point at the toe of the J-groove weld on a horizontal plane perpendicular to the nozzle axis (or the bottom of the nozzle if less than 2 inches; OR from 2 inches above the highest point of the root of the J-groove weld (on a horizontal plane perpendicular to the nozzle axis) to 1.0-inch below the lowest point at the toe of the J-groove weld (on a horizontal plane perpendicular to the nozzle axis) and including all RPV head penetration nozzle surfaces below the J-groove weld that have an operating stress level (including all residual and normal operation stresses) of 20,000 pounds per square inch (or 20 ksi) tension and greater. In addition, an assessment shall be made to determine if leakage has occurred into the annulus between the RPV head penetration nozzle and the RPV head low-alloy steel.
(ii) Eddy current testing or dye penetrant testing of the entire wetted surface of the J-groove weld and the wetted surface of the RPV head penetration nozzle base material from at least 2 inches above the highest point of the root of the J-groove weld (on a horizontal plane perpendicular to the nozzle axis) to 2 inches below the lowest point at the toe of the J-groove weld on a horizontal plane perpendicular to the nozzle axis (or the bottom of the nozzle if less than 2 inches; OR from 2 inches above the highest point of the root of the J-groove weld (on a horizontal plane perpendicular to the nozzle axis) to 1.0 inch below the lowest point at the toe of the J-groove weld (on a horizontal plane perpendicular to the nozzle axis) and including all RPV head penetration nozzle surfaces below the J-groove weld that have an operating stress level (including all residual and normal operation stresses) of 20 ksi tension and greater.
(iii) A combination of (i) and (ii) to cover equivalent volumes, surfaces and leak paths of the RPV head penetration nozzle base material and J-groove weld as described in (i) and (ii). Substituation of a portion of a volumetric examination on a nozzle with a surface examination may be performed with the following requirements:
- 1. On nozzle material below the J-groove weld, both the outside diameter and inside diameter surfaces of the nozzle must be examined.
- 2. On nozzle material above the J-groove weld, surface examination of the inside diameter surface of the nozzle is permitted provided a surface examination of the J-groove weld is also performed.
3.0 TECHNICAL EVALUATION
3.1 Components Covered by the Proposed Relaxation Relaxation Request S1-RR-I3-B22 is applicable to the RPV head vent penetration nozzle for Salem, Unit No. 1.
3.2 Licensees Proposed Alternative Method PSEG proposes to perform only a bare metal visual examination around the head vent nozzle penetration in accordance with paragraph IV.C.(5)(a) of First Revised Order EA-03-009.
3.3 Licensees Basis for Relaxation As stated in Section 2.0, First Revised Order EA-03-009 requires that ultrasonic, eddy current, and/or dye penetrant testing be performed on all RPV nozzles. This would include the head vent nozzle for Salem, Unit No. 1. PSEG is requesting to exclude the head vent nozzle from inspection since it is not subject to the phenomena of PWSCC as identified in the Order.
For a penetration and its associated attachment weld to be susceptible to PWSCC, the following three conditions must be present.
- The nozzle and associated weld material must be fabricated from susceptible material.
- The penetration and the associated weld must be in contact with primary coolant water.
- A stress riser must be present.
It can be demonstrated that none of these conditions exist for the Salem, Unit No. 1 head vent nozzle and attachment weld.
CRDM penetrations and head vent penetrations are fabricated from Nickel-based alloys (e.g.,
Alloy 600) on most RPV heads. The weld material used to attach these penetrations to the head is also Alloy 600 on most RPV heads. Nickel-based alloys, and Alloy 600 in particular, are highly susceptible to PWSCC.
The Salem, Unit No. 1, head vent nozzle is fabricated from SA-508-64 low-alloy steel, and is not susceptible to PWSCC. Also, the weld filler material is low-alloy steel that is not susceptible to PWSCC. The inner diameter (ID) surface of the Salem, Unit No. 1 head vent nozzle and the ID surface to the attachment weld are clad with Type 316 stainless steel. Therefore, the only material in contact with the primary coolant is Type 316 stainless steel, which is not susceptible to PWSCC.
The CRDM housings at Salem, Unit No. 1, are attached to the head with a partial penetration J-groove weld. These weld joints have high residual stresses present because post-weld stress relief was not performed following welding. However, the Salem, Unit No. 1, head vent nozzle is a forged nozzle that is attached with a full penetration weld. The nozzle was installed prior to the post-weld heat treatment of the head, and was stress relieved. Therefore, the residual stresses in this nozzle are low. Based on the above, the Salem, Unit No. 1 head vent nozzle is
not susceptible to PWSCC and is [not subject to the] inspection required by First Revised NRC Order EA-03-009.
3.4 Evaluation The NRC staffs review of this request was based on Criterion (1) of paragraph F to Section IV of the Order, which states:
The proposed alternative(s) for inspection of specific nozzle will provide an acceptable level of quality and safety.
Within the context of PSEGs request for relaxation from the NDE requirement of Section IV.C.(5)(b) in accordance with either (i), (ii) or (iii) for the RPV head vent nozzle penetration, the licensee has stated that the nozzle material is SA-508-64 that is welded to SA-508 vessel head material using a low-alloy steel filler metal. The ID surface of the Salem, Unit No. 1 head vent nozzle and the ID surface to the pressure retaining weld are clad with type 316 stainless steel. Operating experience has shown that none of these materials are susceptible to PWSCC for which the Order would be applicable. Since PWSCC is not likely to occur in the base metal or in the weld metal made of low-alloy steel for the RPV head vent nozzle, or the nozzle cladding, the NRC staff finds the requested relief from the examination requirements of Section IV.C.(5)(b) of First Revised Order EA-03-009 to be acceptable for the RPV head vent nozzle penetration on the basis that an acceptable level of quality and safety will still be provided. However, the requirement to perform a bare metal visual examination of the head surface 360 degrees around this penetration is still required in accordance with Section IV.C.(5)(a) of the First Revised Order.
4.0 CONCLUSION
The NRC staff concludes that the licensees proposed alternative examination, as described in its request for relaxation from the nonvisual NDE requirements of Section IV.C.(5)(b) of First Revised Order EA-03-009 for the RPV head vent nozzle penetration, provides reasonable assurance of the structural integrity of the RPV head. Thus, the NRC staff concludes that the licensee has demonstrated good cause for the requested relaxation in that the proposed alternative provides an acceptable level of quality and safety. Therefore, pursuant to Section IV. F.(1) of First Revised Order EA-03-009, the staff authorizes the proposed alternative inspection for the RPV head vent nozzle penetration for Salem, Unit No. 1, during the time First Revised Order EA-03-009 is in effect.
All other ASME Code,Section XI, requirements for which relief was not specifically requested and authorized herein by the NRC staff remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: P. Patnaik Date: April 23, 2004