|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints ML20141G1941997-05-16016 May 1997 Proposed Tech Specs,Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint ML20134B9801996-09-19019 September 1996 Proposed Tech Specs Re Inverter/Battery Charger Mod ML20116F0471996-08-0202 August 1996 Proposed Tech Specs Re Increase in Allowed Outage Time for Charging Pump from 72 H to 7 Days ML20116E8651996-07-31031 July 1996 Proposed Tech Specs Modifying Inverter/Battery Chargers by Incorporating Listed Changes Into CPSES Units 1 & 2 TSs ML20116F3711996-07-31031 July 1996 Proposed Tech Specs 6.9.1.6b Including TR, SBLOCA Analysis Methodology, in List of NRC-approved Methodologies & Rev of Unit 1 Rx Trip Setpoints ML20115E8041996-07-10010 July 1996 Proposed TS 3/4.7.11,revising Lco,Actions & SRs to Take Credit for Addition of Train Oriented Fan Coil Units for Each UPS & Distribution Room ML20115C9461996-07-0909 July 1996 Proposed Tech Specs Re Steam Line pressure-low Allowable Value ML20113B5891996-06-21021 June 1996 Proposed Tech Specs,Removing Request to Relocate MSIV Full Closure Time Requirement to Program Administratively Controlled by TS & Revising Associated Bases to Include Info to Clarify Expanded Bases Specific to CPSES ML20106G8231996-03-13013 March 1996 Proposed Tech Specs,Supplementing LAR-95-007,revising TS LCO 3.9.4 to Allow Both Doors of Personnel Airlock to Remain Open as Long as One Pal Door Capable of Being Closed ML20101C5681996-03-12012 March 1996 Proposed Tech Specs 3/4.6.1 & 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J,Option B ML20100J0791996-02-22022 February 1996 Proposed Tech Specs 3/4.9.4,revising Units 1 & 2 TS Bases Allowing Both Doors of Pal to Remain Open as Long One Pal Door Is Capable of Closing ML20096B3281996-01-0505 January 1996 Proposed TS Re Wide Range RCS Temp.-Th Remote Shutdown Indication ML20095E8311995-12-15015 December 1995 Proposed TS Bases 2.2.1,deleting Unnecessary Details Re Time Delay Requirements for Undervoltage & Underfrequency RCP Trip Setpoints ML20094N6201995-11-21021 November 1995 Proposed Tech Specs,Allowing Containment Pal Doors to Remain Open During Movement of Irradiated Fuel & During Core Alterations for Plant ML20094N9011995-11-21021 November 1995 Proposed Tech Specs,Incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints, Resulting from Reload Analyses for CPSES Unit 2,Cycle 3 ML20087L4581995-08-15015 August 1995 Proposed Tech Specs Removing Several Cycle Specific Parameter Limits & Adding Limits to COLR 1999-09-10
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] |
Text
. . _ _ . _ _ _ ._. _ _ _ _. _ _ _ . - _ . _ . . _ _ _ _ _ _ . ~ . - -
2 Attachment 2 to TXX 91083 Pcge 8 of 8
?
INSTRUCTIONS FOR INC.QRPORATION
- REMOVE INSERT 4 page 3/4 3 3/4 3 20 page 3/4 3 19 3/4 3 20 4
page 3/4 3 23 3/4 3 24 page 3/4 3 23 3/4 3 23e i 3/4 3-23b- 3/4 3 24 i
i j
a I.
3 i
i i
i i
l 1
1 9104100018 910402 PDR ADOCK 05000443 a: . . _ _ . _.._ -..
-J
_ . __ . _. _. . - ....._,y_. . . _ _ _ _ . . . . _ _ _ _ - . . .. .
,N ;
. a --4 m 39 o 55 mz-c c, t 1 Altii 1. 3-2 (Cont inucil) '
I
.~"<*
I NGillll Hill %All lY 'll AlllRi s ACillAll0N NY',IIM IN5IRi!MI NI AIION :
I $
MINIMilM 7i so - i M 10IAl NO. CilANNII5
$$ IIINCl10NAl IINII Of CilANN11$ 10 IHIP CilANNI I 5 APPI ICAllt [ o"'!
OPI RAlli f M0lli 5 ACi10N 5!
$ /. Automatic' Initiation of ICCS 25 Switchover to Containment ;
i
- . ~
Sump (Continued)- . i
- b. RWSI level--low-Low 4 2 !
i 3 1, 2. 3, 4 26 '!
Coincident With:-Safety See I1em 1. .above.Ior al1 Saiety Injection.initiatini;.ionttions Injection !
ath! requirements. t
- 8. loss of' Power (6.9 kV & 480 V I Sa f eguards'. Sy: tem .Untiervo 1: age) ~
t
- a. 6.5 kV Preferred OfIsite 2/leus 2/ bus 1/lius I I I,2.3.4 1 1 7, 24 :
-Source thulervoitage
- j
- b. 6.9 kV' Alternate'.0ffsile. L2/ bus 2/leus' 1/ bus, Source Undervoltage I, 7, 3. 4 21a> A !
- c. 6.9 kV Bus Usulervoltage 2/ bus 2/ bus 1/ bus
- 1. 2. 3. 4 233,'A51
' d. 6.9 kV- Degravled Voltage' 7/ bus- J'/ bus
.-)
1/lius 1. 7. 3. 4 ? Ic 2Mt j i
- e. 480 V Degraded Voltage 2/ bus 2/ bus 1/ bus.
' 1. 2, 3, 4 - , 2 l
- o
+>< m -,-
om
'51 m
.o _I Alli I.__3_. _3_? ( Cun t inne.1_)
n U i NGIN_I I R_.111 SA_I I_ I Y_ .l 1 A IIIR_I 5 AC f_ilA_i 10_ N_ __SY_ Sil M _INSIRilMi Ni_A_l IO_N.
_.4 x x
" HINIHilM &.
,'% .IOfAl NO. CilANNI * % EllANNI i 5 APPIICAllii g l' fIINCI10NAL llNII Of filANNI I *, IO IRIt- UI'l RAlli i MODI S ACIION .$
<- 6 Aux iliary l eedwater (Continued) -
h 2) Start turliine- 74/stm. gen. 7/stm. gen. 3/stm. qs n. I , 2, l 1/ ,
.~ Driven : Ptmip in any in eath -
2 operatinig uparating sim. gen. sIm. gen.
- c. Safety injection ' See item 1. alove f or all Saf ety inject ion init iat enq sinict ions an.I Start Motor-Driven Pimps requirements.
- d. loss-of-Of(site Power 'l/ train 1/ train 1/ train I , 2, 3 16 w Start Motor-Driven '
};,. Pumps and,lurtiine '
w Driven Pump <
h e. Irip of All Main 7/AfW pump 2/AlW piimp 1/AlW pomp 1, 2 A 7h feedwater. Pumps Start Motor-Driven Pamps
- 1. Automatic Initiation of ECCS.
Switchover'to Containment-Sump a.- . Automatic Actuat. ion 2 1 2 '1, 2.'3. 4 12 Logic and Actaiation Relays-e S
- ' - - ' 'a - - * ' ' ' '
"1' '- ' '-- '"-""'*'"'-'-'*-'--'----"--'--9""-"-*-"'--*-"8
_._..__.__--"~i.<-- " - ' .-
' ATTACHMENT 3 0F TXX-91083 l
.PAGE 3'0F 6 i MBLE'3.3-2 (Cont bueo) j !
, ACTION STATEMENTS (Continueol- ;
ACTION 17 - Wiih the numoer of OPERABLE' channels one less-than tne Total Number of Channels, STARTUP ano/or:POWERLOPERATION may oroceed previoeo che fol. lowing conditions are satisfieo:
t
. a. Fhe inoperaole enannel is placed in the tripped concition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and
- b. The Minimum-Channels OPERABLE recuirement is. met; newever,-
one additional channel may be bypassed-for up to 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />s-for surveillance testing of other channels per Soecifica-tion 4.3.2.1.
ACTION 18 - With less than the Minimum Number of Channels OPERABLE, within l' hour determine'by ooservation of the associated permissive annunciator winoow(s)_that the interlock is in its required
~
state for the existing plant. condition, or_ apply Specification:
3.0.3.
ACTION 19 - With tne ' number of OPERABLE channels one 'less than tne Minimum-Channels OPERABLE requirement,-~be in at least HOT STAN0BY.within-12 hours and in at least HOT SHUTDOWN.within the following-6 hours; however,-one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3-2.:1 provided the-other enannel is OPERABLE.
ACTION 20 - With the numoer of OPERABLE channels o n less than the Total Number of Channels, restore ?the -inopert:le: channel to- OPERABLE stat: s witnin'48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at'least HOT SHUTDOWN witnin th.e following- '
'6 heurs, ACTION 21 - Witn tne numoer of 0PERABLE channels one less.than the' Total-l Numoer of Channels, restore the inoperaole channel to 0PERABLE i
i status witnin 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> orLdeclare the associated valve inoper-
,'- aole and take the ACTION requiced by Specification 3.7.1.5.
ACTION 22 - With'the number of 0PERABLE channels oneLiess than the Minimum Channels:0PERABLE requirement, be in at least-HOT STANDBY-within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />;' however,:ene channel may be : bypassed for up to-2 hours-for surveillance testing per- Specification 4.3.2.1 pro.vided the >
- ~ __other channel _is-OPERABLE.
N -.
ACTION 23 - With tne number'of OPERABLE channels one less-than the Total Num:er f Channels, STARTUP and/or-POWER OPERATION-may proceed
. provided-the:following conditions-are satisfied:
1
- a. -The~ inoperable channel-is placed.in the' tripped condition
-aithin 6 nours, and .
- b. The Minimum Channels OPERABLE re utrement-is met.
COMANCHE PEAK - UNIT 1 3/4 3-23
-, , - - _ _ _ . . ~ . _ n- _. .
ATTACHMENT 3 0F TXX-91083
, 1 ACTION 23 - a. With the number of OPERABLE channels one less than the Total Number of Channels, operation l may proceed provided the inoperable channel is I placed in the tripped condition within 6 l hours, and the Minimum Channels OPERABLE i requirement is met,
- b. With the number of OPERABLE channels less than I the Minimum Channels OPERABLE requirement, declare Preferred Offsite Power inoperable, take the Action required by Specification 3.8.1.1, and open the Preferred Offsite Power Breaker within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />,
- c. With the number of OPERABLE channels less than the Minimum Channels OPERABLE reqirement, declare Alternate Offsite Power inoperable, take the Action required by Specification 3.8.1.1, and open the Alternate Offsite Power Breaker within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />,
- d. With the number of OPERABLE Channels less than the minimum Channels OPERABLE requirement.
-declare the aporopriate Train A.C. Emergency Buses inoperable- and take the Action required by Specification 3.8.3.1 for the buses not '
_ . . - .m-- fully energizad. .
- e. With the number of OPERABLE Channels less than the minimum Channels OPERACLE requirement, declare both Offsite Power Sources -inoperable, take the Action required by Specification 3.8.1.1, and open both offsite power breakers to the affected bus within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
1 i
l l
l cswcBe PE9 r - 1N0' i 7/y 3 43a-
e a4 J '- " " + - -
'ATTCilMENT30FTXX-91083 '
PAGE.5 0F 6 l
8isak l
l 3/V J-JJ 6 co uk pg _ qua a
ATTACHMENT 3 0F TXX-91083 PAGE 6 0F 6 '
.;gL; 3 3,7 g;gnt4nu,g) .
ACTION STATEMENTS (Continuea)
ACTION 24 witn the number of OPERABLE channels one less than tre Minimum Channels ODERABLE recuirement, restore the inoperacle enannel to OPERABLE status within AB hours or initiate anc maintain eDeration of the Control Room Emergency Recirculation System.
ACTICN 25 *ith tne numeer of OPERABLE channels on one or more trains less than tre Minimum Channels OPERABLE recuirement, ceclare tne diesel generator (s) associated with the af fectec train (s) inocereole anc apply the appropriate ACTION for 5pecification 3*
- 3. B .1.1.
ACTION 26 - With the number of OPERABLE channels-one less than the Total Numoer oi' Channels, STARTUP and/or POWER OPERATION may proceed provicec the following conditions are satisfied;
- a. The inoperable channel is placed in a tripped condition within 6 nours, and b,
The Min' mum Channels OPERABLE requirement is met; nowever, one accitional cnannel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing of other enannels per Speci fi cation 4. 3. 2.1.
4 c
COMANCHE PEAK - UNIT 1. 3/4 3-24 l
_ _ _ _ - - - - - - -