MONTHYEARML20248E1991998-05-28028 May 1998 Informs That Staff Has Identified Six Ltrs (Enclosed) to GE Re Potential Proprietary Disclosure.Ltrs Specifically Requested That GE Review Encl to Determine If Contained GE Proprietary Info.Encl Withheld ML20247R4901998-05-20020 May 1998 Informs That Encl Staff Rept That Was Attached to Has Been Reviewed & Contains No GE Proprietary Info.W/O Encl ML20247M6911998-05-18018 May 1998 Forwards Staff Review of Rept, Giraffe Sbwr Sys Interactions Test Rept, (NEDC-3254OP,Revision-0).Informs That Review of Sbwr Was Terminated in 1996 ML20247M7021998-05-18018 May 1998 Forwards Staff Review of General Electric Panthers - IC Test Rept (Siet 00458RP95).Informs That Sbwr Was Terminated in 1996 ML20134L3181996-11-19019 November 1996 Advises That GE Pathers/Ic ATRs Submitted w/951025 Ltr Will Be Withheld from Public Disclosure Ref 10CFR2.790,based on Review of Listed Reasons for Maintaining Info as Proprietary ML20134F3861996-11-0101 November 1996 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 99900403/96-01 on 960708 ML20134D6271996-10-25025 October 1996 Provides Sbwr - Panthers/Ic Apparent Test Results,Phase 1 Affidavit Supporting Request to Withhold Info from Public Disclosure ML20129C2881996-10-21021 October 1996 Informs of Review & Determination That Info Identified in Apparent Test Results Contain Trade Secrets or Proprietary Commercial Info & Will Be Withheld from Public Disclosure ML20128M7491996-10-11011 October 1996 Provides Affidavit to Tests & Requests That NRC Accepts Request to Withhold Sbwr Panda steady-state Test S10-S13 Pcc Performance from Public Disclosure ML20128H4971996-10-0707 October 1996 Advises That GE Giraffe Sys Apparent Test Results Repts Will Be Withheld from Public Disclosure Ref 10CFR2.790,per 960321 Request ML20128H5141996-10-0707 October 1996 Informs That Licensee 951212 Request That GE Panda steady- State Tests S1 Through S6 Pcc Performance Apparent Test Results,Rev 1 Be Withheld from Public Disclosure,Per 10CFR2.790,granted ML20128H5301996-10-0707 October 1996 Informs That Licensee 960314 Request to Withhold GE Girafee Helium Tests Apparent Test Results Repts & Data Transmittal for Giraffe Helium Tests H3 & H4 from Public Disclosure,Per 10CFR2.790,granted ML20129F5031996-10-0303 October 1996 Advises That Info Submitted in 960109 Rept Entitled, Post-Test Calculations of Panda Pcc Steady-State Test, Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEC of 1954 ML20129F5061996-10-0303 October 1996 Advises That Info Submitted in 960109 Rept Entitled, Panther/Ic Apparent Test Results Phase 3, Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEC of 1954 ML20129E8831996-10-0202 October 1996 Informs That GE Panda Steady-State Tests Data Transmittal Rept Will Be Withheld from Public Disclosure,Per 10CFR2.790 (b)(5) & Section 103(b) of AEA of 1954,as Amended ML20129F6181996-10-0202 October 1996 Advises That Giraffe Sbwr Sys Interactions Test Rept Will Be Withheld from Public Disclosure Ref 10CFR2.790, Per 960617 Request ML20129F6341996-10-0202 October 1996 Advises That Panthers/Ic Atrs Will Be Withheld from Public Disclosure Ref 10CFR2.790,per 960222 Request ML20129G5841996-10-0202 October 1996 Advises That,Data Transmittal for Giraffe Helium Tests H1 & H2,as Requested by Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of 1954 AEA ML20129E6361996-10-0101 October 1996 Advises That GE Panda Transient Integral Test Data Transmittal Repts Will Be Withheld from Public Disclosure Ref 10CFR2.790,per 960816 Request ML20129E8681996-10-0101 October 1996 Informs That Licensee 960222 Request to Withhold GE Panda Steady-State Tests S10-S13 Performance from Public Disclosure Per 10CFR2.790.Request Denied Because No Affidavit Was Submitted ML20129G6311996-10-0101 October 1996 Advises That Giraffe Helium Series Test Rept,As Requested by Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of 1954 AEA ML20248F3891996-07-31031 July 1996 Forwards Rept on Staff Evaluation of GE Tracg Model Description,Rev 1,related to Containment Area,In Response to ML20115D0441996-07-11011 July 1996 Forwards Nonproprietary NEDO-32608, Giraffe Sbwr Helium Series Test Rept. Proprietary Rept Submitted by GE ML20115C4601996-07-0808 July 1996 Addresses Nonconformances Noted in Insp Rept 99900403/96-01 Re Panda Testing.C/A:Apparent Test Results Repts (ATR) Which Contains All Info Specified in ATRs in Test Spec & Test Plans Issued for Listed Tests ML20113C2071996-06-27027 June 1996 Forwards NEDO-32540, Giraffe Sbwr Sys Interactions Test Rept ML20113B5661996-06-24024 June 1996 Forwards Proprietary Test Rept for Giraffe Helium Series Tests.Test Procedures & Instrumentation Drawings Encl.Encls Withheld Per 10CFR2.790 ML20113A0111996-06-17017 June 1996 Forwards Proprietary Rev 0 of NEDC-32540P, Giraffe Sbwr Sys Interactions Test Rept. Transmittal Satisfies Items 38 & 39 of GE Re Updated Status of Test Documentation Submittals.Encl Withheld (Ref 10CFR2.790) ML20112J0791996-06-14014 June 1996 Forwards Proprietary Version of Rev 0 to 00458RP95, PANTHERS-IC Test Rept. Rept Prepared for GE by Siet S.P.A Under Contract to Enea.Rept Withheld from Public Disclosure Per 10CFR2.790 ML20117M9651996-06-14014 June 1996 Forwards non-proprietary Rev 0 to Siet 00458RP95, PANTHERS-IC Test Rept ML20117K7091996-06-10010 June 1996 Requests 30 Day Extension Until 960710 to Respond to NRC Re Nonconformances & Unresolved Items Noted in Insp Rept 99900403/96-01 on 960305-08 ML20112G6711996-06-0707 June 1996 Forwards Responses to NRC Questions & Comments Re Rev 1 of GE Scaling Rept NEDC-3228P, Scaling of Sbwr Related Tests ML20117H4561996-05-22022 May 1996 Clarifies Charges for TAC M84214,GE Sbwr - RAI - Initial Test Program (Chapter 14) on Invoice XM0439-96,dtd 960429 ML20117F5711996-05-14014 May 1996 Requests That Je Leatherman Be Removed from Svc List & Rh Buchholz Be Added ML20108B8451996-04-26026 April 1996 Requests Addl Review of Repts by Nrc,Per Input Provided by Domestic & Intl Utils to Go Further than Indicated in GE 960304 & 13 Ltrs W/Efforts on Tracg Qualification for Sbwr Application.Utils,Epri & GE Desire to Meet W/Nrc on 960528 ML20107A4681996-04-10010 April 1996 Requests Copies of English Translations of Repts on Par, to Facilitate Sbwr Review ML20101Q6961996-04-10010 April 1996 Forwards non-proprietary Apparent Tests Results (ATR) Repts for Helium Tests & tie-back Tests ML20101F8871996-03-21021 March 1996 Forwards Proprietary Apparent Test Results Rept (ATR) Sys Interaction Tests (Sit).Proprietary Repts Withheld (Ref 10CFR2.790) ML20101F2981996-03-20020 March 1996 Forwards Latest Revs of Panda Project Control Plan & QA Procedures ML20101B7591996-03-14014 March 1996 Advises That GE Redirecting Focus of Simplified BWR Programs from Plants of 670 Mwe Size to Plants of 1,000 Mwe or Larger ML20101C4731996-03-14014 March 1996 Forwards Proprietary & Nonproprietary Apparent Test Results Rept for Four Helium Tests & Two tie-back Tests.Proprietary Repts Withheld Per 10CFR2.790.Affidavit Encl ML20101B7381996-03-13013 March 1996 Discusses Redirecting Focus of Sbwr Programs from 670 Mwe Size to 1,000 Mwe or Larger Size Plants Reducing Activity Level on Tracg Effort as It Applies to 670 Mwe Plant ML20101B7501996-03-12012 March 1996 Discusses Sbwr Closure of Vacuum Breaker Test Program ML20100N9301996-03-0404 March 1996 Informs That GE Redirecting Focus of Sbwr Program from Plants of 670 Mwe Size to Plants of 1,000 Mwe or Larger. Listing of Open Activities,Desired Closure Objective & Schedule Encl ML20101B8011996-02-26026 February 1996 Discusses Sbwr Re NRC Site Visit & Insp to Panda,Ansaldo & Dodewaard ML20100J0321996-02-23023 February 1996 Submits non-proprietary Sbwr Highlights & GE Slides from NRC 960215 Meeting ML20100J0141996-02-23023 February 1996 Forwards Proprietary Sbwr Highlights & GE Slides from NRC 960215 Meeting.Encl Withheld ML20097F7101996-02-15015 February 1996 Forwards Sbwr Status & Schedule 960214 & Payments Made to NRC for Last Four Yrs,In Response to Ref Telcon Requests ML20149K0521996-02-15015 February 1996 Forwards Proprietary Test Results for Giraffe Helium Tests H1 & H2.Attachment 1 to Ltr Provides List of Instruments Included on Computer Disk.Encl Withheld (Ref 10CFR2.790) ML20100J4041996-02-12012 February 1996 Transmits Proprietary Rev 1 to Licensing Technical Rept NEDE-32176P, Tracg Model Description Open Items.Encl Withheld ML20100G8361996-02-12012 February 1996 Forwards Proprietary Rev 1 to Topical Rept NEDE-32176P, Tracg Model Description. Rev 1 to Topical Rept NEDE-32176P Withheld 1998-05-28
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20247R4901998-05-20020 May 1998 Informs That Encl Staff Rept That Was Attached to Has Been Reviewed & Contains No GE Proprietary Info.W/O Encl ML20134D6271996-10-25025 October 1996 Provides Sbwr - Panthers/Ic Apparent Test Results,Phase 1 Affidavit Supporting Request to Withhold Info from Public Disclosure ML20128M7491996-10-11011 October 1996 Provides Affidavit to Tests & Requests That NRC Accepts Request to Withhold Sbwr Panda steady-state Test S10-S13 Pcc Performance from Public Disclosure ML20115D0441996-07-11011 July 1996 Forwards Nonproprietary NEDO-32608, Giraffe Sbwr Helium Series Test Rept. Proprietary Rept Submitted by GE ML20115C4601996-07-0808 July 1996 Addresses Nonconformances Noted in Insp Rept 99900403/96-01 Re Panda Testing.C/A:Apparent Test Results Repts (ATR) Which Contains All Info Specified in ATRs in Test Spec & Test Plans Issued for Listed Tests ML20113C2071996-06-27027 June 1996 Forwards NEDO-32540, Giraffe Sbwr Sys Interactions Test Rept ML20113B5661996-06-24024 June 1996 Forwards Proprietary Test Rept for Giraffe Helium Series Tests.Test Procedures & Instrumentation Drawings Encl.Encls Withheld Per 10CFR2.790 ML20113A0111996-06-17017 June 1996 Forwards Proprietary Rev 0 of NEDC-32540P, Giraffe Sbwr Sys Interactions Test Rept. Transmittal Satisfies Items 38 & 39 of GE Re Updated Status of Test Documentation Submittals.Encl Withheld (Ref 10CFR2.790) ML20112J0791996-06-14014 June 1996 Forwards Proprietary Version of Rev 0 to 00458RP95, PANTHERS-IC Test Rept. Rept Prepared for GE by Siet S.P.A Under Contract to Enea.Rept Withheld from Public Disclosure Per 10CFR2.790 ML20117M9651996-06-14014 June 1996 Forwards non-proprietary Rev 0 to Siet 00458RP95, PANTHERS-IC Test Rept ML20117K7091996-06-10010 June 1996 Requests 30 Day Extension Until 960710 to Respond to NRC Re Nonconformances & Unresolved Items Noted in Insp Rept 99900403/96-01 on 960305-08 ML20112G6711996-06-0707 June 1996 Forwards Responses to NRC Questions & Comments Re Rev 1 of GE Scaling Rept NEDC-3228P, Scaling of Sbwr Related Tests ML20117H4561996-05-22022 May 1996 Clarifies Charges for TAC M84214,GE Sbwr - RAI - Initial Test Program (Chapter 14) on Invoice XM0439-96,dtd 960429 ML20117F5711996-05-14014 May 1996 Requests That Je Leatherman Be Removed from Svc List & Rh Buchholz Be Added ML20108B8451996-04-26026 April 1996 Requests Addl Review of Repts by Nrc,Per Input Provided by Domestic & Intl Utils to Go Further than Indicated in GE 960304 & 13 Ltrs W/Efforts on Tracg Qualification for Sbwr Application.Utils,Epri & GE Desire to Meet W/Nrc on 960528 ML20107A4681996-04-10010 April 1996 Requests Copies of English Translations of Repts on Par, to Facilitate Sbwr Review ML20101Q6961996-04-10010 April 1996 Forwards non-proprietary Apparent Tests Results (ATR) Repts for Helium Tests & tie-back Tests ML20101F8871996-03-21021 March 1996 Forwards Proprietary Apparent Test Results Rept (ATR) Sys Interaction Tests (Sit).Proprietary Repts Withheld (Ref 10CFR2.790) ML20101F2981996-03-20020 March 1996 Forwards Latest Revs of Panda Project Control Plan & QA Procedures ML20101B7591996-03-14014 March 1996 Advises That GE Redirecting Focus of Simplified BWR Programs from Plants of 670 Mwe Size to Plants of 1,000 Mwe or Larger ML20101C4731996-03-14014 March 1996 Forwards Proprietary & Nonproprietary Apparent Test Results Rept for Four Helium Tests & Two tie-back Tests.Proprietary Repts Withheld Per 10CFR2.790.Affidavit Encl ML20101B7381996-03-13013 March 1996 Discusses Redirecting Focus of Sbwr Programs from 670 Mwe Size to 1,000 Mwe or Larger Size Plants Reducing Activity Level on Tracg Effort as It Applies to 670 Mwe Plant ML20101B7501996-03-12012 March 1996 Discusses Sbwr Closure of Vacuum Breaker Test Program ML20100N9301996-03-0404 March 1996 Informs That GE Redirecting Focus of Sbwr Program from Plants of 670 Mwe Size to Plants of 1,000 Mwe or Larger. Listing of Open Activities,Desired Closure Objective & Schedule Encl ML20101B8011996-02-26026 February 1996 Discusses Sbwr Re NRC Site Visit & Insp to Panda,Ansaldo & Dodewaard ML20100J0141996-02-23023 February 1996 Forwards Proprietary Sbwr Highlights & GE Slides from NRC 960215 Meeting.Encl Withheld ML20100J0321996-02-23023 February 1996 Submits non-proprietary Sbwr Highlights & GE Slides from NRC 960215 Meeting ML20097F7101996-02-15015 February 1996 Forwards Sbwr Status & Schedule 960214 & Payments Made to NRC for Last Four Yrs,In Response to Ref Telcon Requests ML20149K0521996-02-15015 February 1996 Forwards Proprietary Test Results for Giraffe Helium Tests H1 & H2.Attachment 1 to Ltr Provides List of Instruments Included on Computer Disk.Encl Withheld (Ref 10CFR2.790) ML20100G8361996-02-12012 February 1996 Forwards Proprietary Rev 1 to Topical Rept NEDE-32176P, Tracg Model Description. Rev 1 to Topical Rept NEDE-32176P Withheld ML20100J4041996-02-12012 February 1996 Transmits Proprietary Rev 1 to Licensing Technical Rept NEDE-32176P, Tracg Model Description Open Items.Encl Withheld ML20097D1631996-02-0101 February 1996 Advises That Charges on TACs M84204 & M84214 Appear Inappropriate as Review of Sbwr Ssar Chapters 4 & 14 Were Stopped Months Before 951001-951223 Period & No Chapter 4 RAIs Have Been Received ML20117P2221996-01-27027 January 1996 Forwards Final Rept Thermal Properties of Concrete at High Temps, ML20096G5611996-01-18018 January 1996 Requests Withdrawal of Proprietary Version of TRACG02V User'S Manual & Associated Affidavit ML20096C0641996-01-0909 January 1996 Forwards Proprietary Responses to RAIs Re Sbwr License TR NEDE-32177P (Tracg Qualification).Responses Withheld Per 10CFR2.790 ML20096B8531996-01-0909 January 1996 Forwards Proprietary Info Re Sbwr - Panthers/Ic Apparent Test Results,Per .Encl Withheld (Ref 10CFR2.790) ML20095J5441995-12-18018 December 1995 Forwards Rev 0 to NEDO-32288, Scaling of Sbwr Related Tests ML20095G8551995-12-13013 December 1995 Requests Removal of Westinghouse TR WCAP-14416 from Sbwr Docket Stn 52-004 ML20094Q7271995-11-29029 November 1995 Forwards Proprietary GE Handouts During Meeting for 951128 & 29 ACRS Thermal & Hydraulic Subcommittee in San Jose,Ca. Handouts Withheld Per 10CFR2.790 ML20094Q6061995-11-29029 November 1995 Forwards Nonproprietary Handouts Presented by GE During 951128 & 29 ACRS Thermal Hydraulic Subcommittee Meeting in San Jose,Ca ML20100E1251995-11-10010 November 1995 Forwards Rev 1 to NEDO-32391,Suppl 1, Sbwr Test & Analysis Program Description Suppl 1 - Discussion of Pirt Parameters ML20094Q0061995-11-0808 November 1995 Forwards non-proprietary Version of RAI on Sbwr Design, ML20094P1841995-11-0707 November 1995 Responds to NRC Re GE 950216 Request for Exemption of Sbwr Drywell to Wetwell Vacuum Breaker from Single Failure Criteria ML20094E0411995-11-0101 November 1995 Forwards Nonproprietary Version of Tracg Containment Model Road Map as Agreed to at 950821 & 22 Meeting ML20095B0981995-10-31031 October 1995 Addresses NRC Unresolved Items Documented in Insp Rept 99900404/95-02 ML20094D0651995-10-31031 October 1995 Forwards Proprietary Response to RAI Re Simplified BWR, Including Questions Q901.75-78,81,82,84-88,92,95-102,105- 127,132-143,146-150 & 152-158.Encl Withheld (Ref 10CFR2.790) ML20094E8521995-10-27027 October 1995 Forwards Nonproprietary Version of Ref 2,in Response to NRC Ref 1 Request Re Sbwr Design, ML20094D0361995-10-26026 October 1995 Forwards Nonproprietary Response to Rea on Licensing Topical Repts NEDE-32176P,NEDE-32177P & NEDE-32178P ML20094E7691995-10-26026 October 1995 Informs That First & Third Noted Handouts Should Be Reclassified as non-proprietary.Second & Fourth Noted Handouts Should Continue to Be Classified as Proprietary ML20095L7781995-10-25025 October 1995 Forwards Proprietary Panthers/Ic Apparent Test Results, Phase 1.Encl Withheld 1998-05-20
[Table view] |
Text
-_
l
.'~ .. GENuclear Energy
) ..
Generei r:ecinc C:>nmay l
? 75 Canner Avenue. Sem Jase. CA 98125 January 6,1994 MFN No. 001-94 Docket STN 52 004 Document Control Desk U.S. Nuclear Regulatory Commission Washington DC 20555 Attention: Richard W. Borchardt, Director Standardization Project Directorate
Subject:
NRC Requests for Additional Informatica (RAls) on the Simplified Boiling Water Reactor (SBWR) Design
Reference:
Transmittal of Requests for Additional Information (RAIs) for the SBWR Design, Letter from M. Malloy to P. W. Marriott dated September 15,1993 f.le reference requested cdditionalinformation on the SBWR Design. In partial fulfillment of
.' Li s request, GE is submitting a response to RAI 900.46 regarding the University Condensation Te ning Program.
s
,]ncerely, g 7
. /M Mii% FED J. E. Leatherman SBWR Certification Manager MC-781, (408)925-2023 cc: M. Malloy, Project Manager (NRC) (2 attachments)
F. W. Ilasselberg Project Manager (NRC) (1 attachment)
.12007G rauwm yD {.
-940106 ?*
I2 [Ow. 05200004 g S PDR y w- _
1
/."
. RAI Nurnber: 900.46 .
Question:
Provide the test matrices GE agreed to transmit during the June 10, 1993, .;
meeting in San Jose. (The matrices should be complete for all tests run at both university test sites.) .t
.i i
1 i
n f
t l
I r
p l
I i
GE Response:
The following tables show the test matrices for all of the single tube condensation tests conducted at UCB and MIT. Ti oles 6 through 10 show the test matrices for the current UCB and MIT tests and contain all the information :
known at this time. Any further tests conducted will be reflected in the test ;
report which will be issued upon completion of the tests.
Run Inlet Pres. Inlet Run Inlet Pres. Inlet No. Air (MPa) steam No. Air (MPa) steam Mass flowrate Mass flowrate Frac. (kg/hr) Frac. (kg/hr) 1 0.00 0.047 12.9 19 0.14 0.304 12.3 2 0.00 0.061 13.0 20 0.18 0.244 7.57 -
3 0.00 0.059 8.53 21 0.054 0.173 12.2 4 0.0086 0.I11 12.9 22 0.038 0.159 19.0 5 0.023 0.108 8.16 23 0.081 0.262 19.2 6 0.00 0.148 8.21 24 0.082 0.378 18.6 7 0.016 0.108 8.16 25 0.00 0.050 18.5 -
8 0.012 0.112 13.0 26 0.095 0.374 18.7 9 0.14 0.172 8.30 27 0.013 0.119 23.1 10 28 0.039 0.274 23.5 11 0.13 0.214 8.07 29 0.00 0.050 23.9 :
12 0. I 1 0.220 13.0 30 0.049 0.318 23.8 4 13 0.15 0.181 8.12 31 0.055 0.412 23.8 l 14 32 0.055 0.452 28.8 15 0.00 0.047 12.8 33 0.002 0.049 28.3 ,
16 0.00 0.053 8.30 34 0.025 0.310 29.6 17 0.00 0.030 12.8 35 0.014 0.163 28.9 18 0.00 0.04 8.48 36 0.045 0.419 28.8 Table 1: Test matrix for Vierow. Rows not filled indicate tests for which steady-state was not achieved.
e Run Inlet Pres. Inlet Run Inlet Pres. Inlet l No. Air (MPa) steam No. Air (MPa) steam Mass flowrate Mass flowrate ;
Frac. (kg/hr) Frac. (kg/hr)-
1 0.09 0.107 8.93 27 0.27 0.243 20.70 2 0.15 0.112 8.83 28 0.31 0.252 20.35 3 0. I 8 0.I17 8.76 29 0.36 0.266 20.65 4 0.24 0.122 9.15 30 0.10 0.387 19.95 5 0.29 0.128 9.12 31 0.15 0.403 19,73 6 0.33 0.133 9.09 32 0.20 0.421 19.92 7 0.08 0.209 9.39 33 0.25 0.438 20.37 8 0.14 0.217 9.30 34 0.32 0.469 19.90 9 0. I 9 0.227 9.24 35 0. I 1 0.109 25.34 10 0.26 0.239 8.97 36 0.14 0.I14 27.08 11 0.33 0.260 9.38 37 0.19 0.118 28.63 12 0.42 0.287 8.80 38 0.24 0.124 28.84 13 0.11 0.389 7.98 39 0.30 0.131 28.76 14 0.18 0.410 8.04 40 0.35 0.137 28.97 15 0.24 0.432 7.95 41 0.10 0.213 30.41 16 0.30 0.454 8.00 42 0.15 0.221 30.97 '
17 0.34 0.475 7.92 43 0.20 0.230 30.35 18_ 0.12 0.I10 20.02 44 0.24 0.239 29.91 >
19 0.17 0.114 19.85 45 0.31 0.254 29.41 20 0.21 0.119 19.82 46 0.34 v.264 29.61 21 0.25 0.123 19.99 47 0.10 0.386 31.91 -
22 0.31 0.130 19.68 48 0.15 0.402 31.75-23 0.35 0.136 19.82 49 0.20 0.416 31.90 24 0.11 0.214 20.42 50 0.25 0.437 31.61 25 0.15 0.221 20.84 51 ,0.30 0.457 31.41 26 0.22 0.233 20.67 52 0.35 0.485 31.09 ,
Table 2: Test matrix for air / steam runs of Siddique ;
t t
a
Run Inlet Pres. Inlet steam f No. Ile (MPa) flowrate Mass (kg/hr)
Frac. ,
1 0.02 0.114 9.16 7 2 0.04 0.126 9.14 3 0.07 0.140 8.97 4 0.10 0.157 8.90 5 0.02 0.221 ___
8.77 ~j 6 0.05 0.244 8.72 7 0.08 0.273 8.68- !
8 0.11 0.303 8.63 9 0.03 0.400 8.78 r 10 0.04 0.428 8.65 '
11 0.06 0.466 8.60 -
12 0.02 0.118 18.51 ,
13 0.04 0.134 18.21 14 0.05 0.144 18.59 15 0.07 0.157 20.09 ;
16 0.02 0.214 18.54 17 0.05 0.252 18.72 <
18 0.07 0.271 18.47 19 0.09 0.293 18.04 ,
20 0.02 0.398 20.46 21 0.04 0.437 20.37 .
22 0.05 0.465 20.30 1 i
Table 3: Test matrix for h. lium/ steam runs of Siddique j i
l l
l
Run Inlet Pres. Inlet Run Inlet Pres. Inlet No. Air (MPa) steam No. Air (MPa) steam Mass flowrate Mass flowrate Frac. (kg/hr) Frac. (kg/hr) 8.1 0.0 0.115 72.7 15.1 0.05 0.286 72.7 ,
8.2 0.0 0.104 61.4 15.2 0.05 0.143 61.4 8.3 0.0 0.0983 50.0 15.3 0.05 0.124 50.0 ;
10.3 0.0 0.0979 38.6 15.4 0.10 0.139 38.6 11.1 0.0 0.100 27.3 16.1 0.10 0.153 27.3- ,
11.2 0.0 0.0989 15.9 16.2 0.15 0.123 15.9 11.3 0.40 0.106 15.9 17.1 0.02 0.252 72.7 11.4 0.15 0.106 27.3 17.2 0.02 0.145 61.4 12.1 0.10 0.110 72.7 17.3 0.02 0.133 50.0 12.2 0.10 0.111 61.4 17.4 0.05 0.126 38.6 12.3 0.10 0.110 50.0 18.1 0.05 0.118 27.3 12.4 0.15 O.108 38.6 18.2 0.02 0.105 27.3 13.1 0.40 0.122 38.6 18.3 0.10 0.110 15.9 ,
13.2 0.15 0.119 50.0 _18.4 0.05 0.106 15.9 .
13.3 0.15 0.132 61.4 19.1 0.01 0.186 72.7 13.4 0.15 0.144 72.7 19.2 0.01 0.154 50.0 14.1 0.40 0.122 50.0 19.3 0.01 0.180 61.4-14.2 0.40 0.107 27.3 19.4 0.02 0.139 38.6 Table 4: Test matrix for air / steam runs of Ogg i
1 l
i
Run inlet Pres. Inlet Run Inlet Pres. Inlet No. Air (MPa) steam No. Air (MPa) steam Mass flowrate Mass flowrate Frac. (kg/hr) ,
Frac. (kg/hr) -
20.1 0.01 0.274 72.7 23.2 0.005 0.135 61.4 20.2 0.01 0.216 61.4 23.3 0.005 0.156 50.0 -
20.3 0.01 0.127 50.0 23.4 0.01 0.137 38.6 20.4 0.02 0.160 38.6 24.1 0.01 0.107 27.3 21.1 0.05 0.145 27.3 24.2 0.01 0.105 15.9 21.2 0.02 0.109 27.3 2 4. 3 ,, 0.005 0.132 38.6 21.3 0.05 0.110 15.9 25.1 0.02 0.307 72.7 21.4 0.02 0.104 15.9 25.2 0.02 0.192 61.4 23.1 0.005 O. I 89 72.7 25.3 0.02 0.176 50.0 l Table 5: Test matrix for helium / steam runs of Ogg.
I i
t 6
i
[
i r
- Run Pres. Inlet Run Pres. Inlet No. (MPa) steam No. (MPa) steam flowrate flowrate (kg/hr) (kg/hr) 1.1-1 0.101 60 1.3-1 0.101 40 1.1 -l R 0.101 60 1.3 -l R 1 0.101 40 1.1-2 0.203 60 1.3 - l R 2 0.101 40 <
1.1 -2 R 0.203 60 1.3-2 0.203 40 1.1-3 0.304 60 1.3-2 R 1 0.203 40 l 1.1 -3 R 0.304 60 1.3 -2 R 2 0.203 40 ,
1.1-4 0.405 60 1.3-3 0.304 40 1.1 -4 R 1 0.405 60 1.3 -3 R 1 0.304 40 1.1 -4 R 2 0.405 60 1.3 -3 R 2 0.304 40 1.1 -4 R 3 0.405 60 1.3-4 0.405 40 1.1 -5 0.507 60 1.3-4 R 1 0.405 40 1.1 -5 R 1 0.507 60 1.3 -4 R 2 0.405 40 1.1 -5 R 2 0.507 60 1.3-5 0.507 40 1.1 -5 R 3 0.507 60 1.3 -5 R 1 0.507 40 1.2-1 0.101 50 1.3 -5 R 2 0.507 40 1.2-2 0.203 50 1.4-1 0.101 30 l 1.2-3 0.304 50 1.4-2 0.203 30 l 1.2 0.405 50 1.4-3 0.304 30 1.2 -4 R 1 0.405 50 1.4-4 0.405 30 l.2-5 0.507 50 1.4 -4 R 1 0.405 30 1.2 -5 R 0.507 50 1.4-5 0.507 30 :
Table 6: Test matrix for pure steam runs of Kuhn
t Inlet Pres. Inlet Run Inlet Pres. Inlet Air (MPa) steam No. Air (MPa) steam Run Mass flowrate Mass flowrate No. Frac. (kg/hr) Frac. (kg/hr) 2.1-1 0.01 0.405 50 2.2-11 0.30 0.101 50 2.1-2 0.02 0.405 50 2.2-12 0.35 0.101 50 2.1-3 0.03 0.405 50 2.2-13 0.40 0.101 50 2.1 -3 R 0.03 0.405 50 3.1-2 0.01 0.203 60 2.1-4 0.04 0.405 50 3.1-3 0.01 0.304 60 2.1-5 0.06 0.405 50 3.1-4 0.01 0.405 60 2.1 -5 R 0.06 0.405 50 3.1-5 0.01 0.507 60 2.1-6 0.08 0.405 50 3.2-1 0.05 0.101 60 2.1 -6 R 0.08 0.405 50 3.2-2 0.05 0.203 60 2.1-7 0.10 0.405 50 3.2-3 0.05 0.304 60 2.1-8 0.15 0.405 50 3.2-3 R 1 0.05 0.304 60 2.1 - 8 R 0.15 0.405 50 3.2-4 0.05 0.405 60 2.1-9 0.20 0.405 50 _
3.2-5 0.05 0.507 60 2.1-10 0.25 0.405 50 3.3-1 0.10 0.101 60 2.1 - 10 R 0.25 0.405 50 3.3-2 0.10 0.203 60 2.1-11 0.30 0.405 50 3.3-3 0.10 0.304 60 2.1-12 0.35 0.405 50 3.3-4 0.10 0.405 60 2.1 -12 R 0.35 0.405 50 3.3-5 0.10 0.507 60 2.1-13 0.40 0.405 50 3.4-2 0.20 0.203 60 2.2-1 0.01 0.101 50 3.4 -2 R 1 0.20 0.203 60 2.2-2 0.02 0.101 50 3.4-3 0.20 0.304 60 2.2-3 0.03 0.101 50 3.4-5 0.20 0.507 60 2.2-4 0.04 0.101 50 3.5-2 0.40 0.203 60 2.2-5 0.06 0.101 50 3.5 -2 R 1 0.40 0.203 60 2.2-6 0.08 0.101 50 3.5-3 0.40 0.304 60 2.2-7 0.10 0.101 50 3.5 -3 R 1 0.40 0.304 60 2.2-8 0.15 0.101 50 3.5-4 0.40 0.405 60 2.2-9 0.20 0.101 50 3.5-5 0.40 0.507 60 2.2-10 0.25 0.101 50 Table 7: Test matrix for air / steam runs of Kuhn.
Run Inlet Pres. Inlet Run Inlet Pres. Inlet No. Ile (MPa) steam No. Air (MPa) steam Mass flowrate Mass flowrate Frac. (kg/hr) Frac. (kg/hr) 4.1-2 0.01 0.203 30 4.3-5 0.10 0.507 30 4.1-3 0.01 0.304 30 4.4-2 0.20 0.203 30 4.2-2 0.05 0.203 30 4.4-3 0.20 0.304 30 4.2-3 0.05 0.304 30 4.4-5 0.20 0.507 30 4.2-5 0.05 0.507 30 4.5-2 .JO 0.203 30 4.3-2 0.10 0.203 30 4.5-3 6.40 0.304 30 4.3-3 0.10 0.304 30 4.5-5 0.40 0.507 30 i
Table 7: Test matrix for air / steam runs of Kuhn. (continued) ,
Run Inlet Pres. Inlet Run Inlet Pres. Inlet No. Ile (MPa) steam No. Air (MPa) steam Mass flowrate Mass flowrate Frac. (kg/hr) Frac. (kg/hr) 5.1-1 0.003 0.405 30 5.2-3 0.01- 0.405 45 5.1-2 0 005 0.405 30 5.2-4 0.03 0.405 45 5.1-3 0.01 0.405 30 5.2-4R 0.03 0.405 45 5.1-4 0.03 0.405 30 5.2-5 0.05 0.405 45 5.1-5 0.05 0.405 30 5.2-5 R 0.05 0.405 45 )
5.1-6 0.10 0.405 30 5.2-6 0.10 0.405 45 5.1-7 0.15 0.405 30 5.2-6R 0.10 0.405 45 5.2-1 0.003 0.405 45 5.3-1 0.003 0.405 60 5.2-l R 0.003 0.405 45 5.3-2 0.005 0.405 60 5.2-2 0.005 0.405 45 5.3-3 0.01 0.405 60 5.2-2 R I 0.005 0.405 45 5.3-4 0.03 0.405 60 5.2-2R2 0.005 0.405 45 5.3-5 0.05 0.405 ~60 Table 8: Test matrix for helium / steam runs of Kuhn.
. i
{. {
- I The following tables show .ne known test conditions for the current tests at MIT. More details will be available after the student, IIisham Hasanein, :
completes his dissertation.
Run Inlet IIe Inlet Inlet Set Mass Temp. steam No. Frac. (%) (C) flowrate (kg/hr) 1 0, 5, & 10 100 10 ,
2 0, 5, & 10 100 20 i 3 0, 5, & 10 100 40 ;
4 0, 5, & 10 140 10 5 0, 5, & 10 140 20 i 6 0, 5, & 10 140 40 '
Table 9: Test matrix for helium / steam runs of IIasanein 1 Run inlet Air Inlet He Inlet Inlet Set Mass Mass Temp. steam .
No. Frac. Frac. (%) (C) flowrate
(%) (kg/hr) 1 0 4, 7 & 10 100 20 2 10 4, 7 & 10 100 20 3 0 2, 5, & 10 140 20 4 10 2, 5. & 10 140 20 Table 10: Tmst matrix for air / helium / steam runs of IIasancin P
4-
REFERENCES:
Ilasanein, II.,1994, Doctor of Pfiilosophy Dissertation, Massachusetts Institute of Technology.
Kuhn, J. S. Z., Schrock, V. E., Peterson, P. F.,1993, in preparation.
Ogg, D. G.,1991, " Vertical Downflow Condensation IIcat Transfer in Cas-Steam Mixtures", M.S. Thesis, U.C. Berkeley Dept. of Nuclear >
Engineering.
Siddique, M.,1992, "The Effects of Noncondensable Gases on Steam Condensation under Forced Convection Conditions", Doctor of Philosophy-Dissertation, Massachusetts Institute of Technology.
Vierow, K. M.,1990, " Behavior of Steam-Air Systems Condensing in Cocurrent Vertical Downflow", M.S. Thesis, U.C. Berkeley Dept. of Nuclear Engineering.
i f
t i
,