MONTHYEARML22346A2052022-12-14014 December 2022 Acknowledgment of Response to NRC Inspection Report 05000313/2022011 and 05000368/2022011 and Notice of Violation ML21236A3222021-09-19019 September 2021 Request for Information ML21026A2682021-01-26026 January 2021 Request for Information ML19256A0192019-09-11011 September 2019 Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000313/2019004 and 05000368/2019004) and Request for Information IR 05000313/20184052018-10-22022 October 2018 NRC Cyber Security Inspection Report 05000313/2018405 and 05000368/2018405 ML17093A8622017-03-31031 March 2017 Notification of NRC Retake Operator Licensing Examination 05000313/2017302 IR 05000313/20164032016-07-19019 July 2016 Cover Letter for NRC Security Inspection Report 05000313/2016403 and 05000368/2016403 IR 05000313/20154022016-03-0202 March 2016 Non-Public Security Inspection Plan for Arkansas Nuclear One (NRC Physical Security Inspection Report Numbers 05000313/2015402 and 05000368/2015402) IR 05000313/20105012011-01-10010 January 2011 IR 05000313-10-501 & 05000368-10-501, Arkansas Nuclear One, Units 1 and 2, Emergency Preparedness Annual Inspection Report ML1013105012010-05-11011 May 2010 Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000313-10-006; 05000368-10-006) and Request for Information IR 05000313/20094012010-03-26026 March 2010 NRC Physical Security Annual Inspection Report 05000313-09-401 and 05000368-09-401 ML0822108242008-08-0808 August 2008 IR 05000313-08-006, and IR 05000368-08-006, on 09/08/2008, Arkansas Nuclear One, Units 1 and 2 - Site-Specific Implementation of B.5.B Phase 2 and 3, Mitigating Strategies Temporary Instruction Inspection IR 05000313/20060052007-04-0909 April 2007 Errata for Arkansas Nuclear One NRC Integrated Inspection Report 05000313-06-005 and 05000368-06-005 ML0708903512007-03-30030 March 2007 Errata for Arkansas Nuclear One NRC Integrated Inspection Report 05000313/2006005 and 05000368/2006005 IR 05000313/20050012005-03-0202 March 2005 Annual Assessment Letter - Arkansas Nuclear One (IR 05000313-05-001; 05000368-05-001) ML0335804052003-11-21021 November 2003 Letter to Craig G. Anderson - Response to Backfit Claim Re NRC IR 05000313-01-006, 05000368-01-006 ML0335803982003-11-21021 November 2003 Letter to Craig G. Anderson - Response to Backfit Claim Re NRC Inspection Report ML0335803952003-11-21021 November 2003 Letter to Craig G. Anderson from Merschoff with Enclosures - Response to Backfit Claim Re NRC IR 05000313-01-006, 05000368-01-006 2022-12-14
[Table view] Category:Letter
MONTHYEARML24295A1202024-10-21021 October 2024 Relief Request ANO2-RR-24-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 71 IR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000313/20240112024-09-0505 September 2024 Comprehensive Engineering Team Inspection Report 05000313/2024011 and 05000368/2024011 IR 05000313/20244042024-08-29029 August 2024 Cybersecurity Inspection Report 05000313/2024404 and 05000368/2024404 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24198A0722024-08-21021 August 2024 Correction to Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000313/20240052024-08-21021 August 2024 Updated Inspection Plan for Arkansas Nuclear One – Units 1 and 2 (Report 05000313/2024005, 05000368/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 IR 05000313/20240022024-08-0606 August 2024 Integrated Inspection Report 05000313/2024002 and 05000368/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24101A1792024-06-25025 June 2024 Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24143A0632024-05-22022 May 2024 Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information IR 05000313/20240012024-05-0808 May 2024 Integrated Inspection Report 05000313/2024001 and 05000368/2024001 ML24128A2472024-05-0808 May 2024 Project Manager Assignment ML24017A2982024-04-18018 April 2024 Summary of Regulatory Audit Regarding the License Amendment Request to Revise Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information IR 05000313/20243012024-04-16016 April 2024 NRC Examination Report 05000313/2024301 ML24086A5412024-04-10010 April 2024 Authorization of Request for Alternative ANO1-ISI-037 Regarding Extension of Reactor Vessel Inservice Inspection Interval IR 05000313/20244022024-04-0808 April 2024 Security Baseline Inspection Report 05000313/2024402 and 05000368/2024402 (Full Report) ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24031A6442024-03-14014 March 2024 Issuance of Amendment No. 282 to Modify Technical Specification 3.3.1, Reactor Pressure System (RPS) Instrumentation, Turbine Trip Function on Low Control Oil Pressure ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal IR 05000313/20230062024-02-28028 February 2024 Annual Assessment Letter for Arkansas Nuclear One- Units 1 and 2 Report 05000313/2023006 and 05000368/2023006 IR 05000313/20230042024-02-0808 February 2024 Integrated Inspection Report 05000313/2023004 and 05000368/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023002 ML24012A0502024-02-0202 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0054 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000313/20234052023-12-12012 December 2023 – Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 – Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle 2024-09-09
[Table view] |
Text
4t*^ tC1t, UNITED STATES 0 in NUCLEAR REGULATORY COMMISSION 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 760111-B064 Craig G. Anderson, Vice President Operations 0071 Arkansas Nuclear One Entergy Operations, Inc.
1448 S.R. 333 Russeliville, Arkansas 72801-0967
SUBJECT:
RESPONS GARDING NRC INSPECTION REPOR
Dear Mr. Anderson:
a ..
As documented in NRC Inspection Report 50-313;-368/01-06, dated August 20, 2001, the NRC identified an unresolved item in the Unit 1 emergency diesel generator corridor and the Unit 1.
north electrical switchgear room concerning use of manual actions in lieu of providing protection for cables associated with equipment necessary for achieving and maintaining hot shutdown as specified in 10 CFR Part 50, Appendix R.Section III.G.2. This issue was considered unresolved pending further NRC review and the determination of its risk. Subsequently, in an exit meeting held on August 30, 2001, the NRC informed Entergy Operations, Inc., that the existing configurations did not conform to the .requirements of 10 CFR Part 50, Appendix R, Section III.G.2. However, the issue remained unresolved pending the completion of the NRC's risk determination.
Your letter of September 28, 2001, claimed that our position that manual actions cannot be used to comply with 10 CFR Part 50, Appendix R, Section Il1.G.2, was a backfit. At issue is your use of manual actions for achieving and maintaining hot shutdown conditions in the event of a fire in the Unit 1 emergency diesel generator corridor (Fire Zone 98J) and north switchgear room (Fire Zone 99M). In this letter, you asserted that the NRC has accepted such manual actions in the past, and stated that our position with respect to disallowing the use of manual actions for complying with Section III.G.2 of Appendix R should be considered a backlit that is generic to all plants.
On October 26, 2001, and again on January 17, 2002, we convened a backfit panel in accordance with NRC Management Directive 8.4, NRC Program for Management of Plant-Specific Backfitting of Nuclear Power Plants," to review your backfit claim as stated in your letter of September 28, 2001. After careful consideration of your appeal, we have determined that (1) the NRC did not impose a regulatory staff position that is new or different from a
- previously applicable staff position relative to the requirements of 10 CFR Part 50, Appendix R, SectionJll.G.2; (2) the NRC did not approve the use of manhual'actions for complying with 10 CFR Part 50, Appendix R, Section III.G.2, in the Unit 1 diesel generator corridor and north
- ~ electrical switchgear room in lieu of meeting the requirements of 10 CFR Part 50, Appendix R, Section II.G.2.a, Il.G.2.b, or IllI.G.2.c; and (3) youflethodology for using manual actions (in 1he event of a fire in the Unit 1 diesel generator corridor and north switchgear room), in lieu of
. r-, *
.