Letter Sequence Draft Other |
---|
|
Initiation
- Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
|
MONTHYEARML0433703072004-12-0202 December 2004 Meeting with Firstenergy Nuclear Operating Company (Fenoc), ET Al., Regarding Beaver Valley Power Station, Units 1 and 2 (BVPS-1 and 2) Extended Power Uprate Project stage: Meeting ML0434401132005-01-0606 January 2005 Extended Power Uprate (EPU) Acceptance Review Project stage: Acceptance Review L-05-026, Supplemental Information Supporting License Amendment Request Nos. 302 and 173, Appendix a of Attachment D2005-02-23023 February 2005 Supplemental Information Supporting License Amendment Request Nos. 302 and 173, Appendix a of Attachment D Project stage: Supplement ML0506701272005-03-10010 March 2005 Notice of Meeting with Firstenergy Nuclear Operating Company, Senior Management Beaver Valley Power Station, Unit Nos. 1 and 2 Steam Generation Replacement (Unit 1 Only) and Extended Power Uprate Project stage: Meeting ML0506300622005-03-11011 March 2005 RAI, - Extended Power Uprate Project stage: RAI ML0511902682005-03-23023 March 2005 Meeting Presentation Slides - Summary of Meeting with FENOC Re Category 1, Pre-Application Review Re BVPS-1 Steam Generator (SG) Replacement and Related Alternate Source Term (AST) Approval Project stage: Meeting ML0510401672005-04-28028 April 2005 Summary of Meeting with FENOC Re Category 1, Pre-Application Review Re BVPS-1 Steam Generator (SG) Replacement and Related Alternate Source Term (AST) Approval Project stage: Meeting ML0511600692005-05-0505 May 2005 RAI, Extended Power Uprate (EPU) Project stage: RAI ML0513001472005-05-18018 May 2005 (BVPS-1 and 2) - Extended Power Uprate (EPU) Acceptance Review (TAC Nos. MC4645 and MC4646) Project stage: Acceptance Review L-05-078, Responses to a Request for Additional Information in Support of License Amendment Request Nos. 302 and 1732005-05-26026 May 2005 Responses to a Request for Additional Information in Support of License Amendment Request Nos. 302 and 173 Project stage: Request L-05-104, Probabilistic Safety Review for License Amendment Request Nos. 302 and 1732005-06-14014 June 2005 Probabilistic Safety Review for License Amendment Request Nos. 302 and 173 Project stage: Request ML0518004852005-07-19019 July 2005 (BVPS-1 and 2) - Extended Power Uprate (EPU) Acceptance Review Project stage: Acceptance Review L-05-130, Responses to a Request for Additional Information (RAI Dated June 30, 2005) in Support of License Amendment Request Nos. 302 and 1732005-07-28028 July 2005 Responses to a Request for Additional Information (RAI Dated June 30, 2005) in Support of License Amendment Request Nos. 302 and 173 Project stage: Request ML0520800052005-08-0202 August 2005 RAI, Extended Power Uprate Project stage: RAI L-05-140, Response to a Request for Additional Information (RAI Dtd August 2, 2005) in Support of License Amendment Request Nos. 302 and 173, Extended Power Uprate2005-09-0606 September 2005 Response to a Request for Additional Information (RAI Dtd August 2, 2005) in Support of License Amendment Request Nos. 302 and 173, Extended Power Uprate Project stage: Response to RAI ML0526600022005-09-30030 September 2005 RAI, Extended Power Uprate Project stage: RAI L-05-154, Supplemental Information for License Amendment Request Nos. 302 and 1732005-10-0707 October 2005 Supplemental Information for License Amendment Request Nos. 302 and 173 Project stage: Supplement L-05-168, Supplement to License Amendment Request2005-10-28028 October 2005 Supplement to License Amendment Request Project stage: Supplement ML0529700862005-11-0101 November 2005 Request for Additional Information (RAI) - Extended Power Uprate Project stage: RAI L-05-198, Supplemental Information for License Amendment Request2005-12-16016 December 2005 Supplemental Information for License Amendment Request Project stage: Supplement ML0603302622006-01-25025 January 2006 Additional Information in Support of License Amendment Request Nos. 302 and 173 Project stage: Other ML0603100312006-02-0606 February 2006 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit Nos. 1 and 2 (TAC No. MC4645 and MC4646) Project stage: Withholding Request Acceptance L-06-018, Units, 1 and 2,Supplemental Response in Support of License Amendment Request Nos. 302 & 1732006-02-14014 February 2006 Units, 1 and 2,Supplemental Response in Support of License Amendment Request Nos. 302 & 173 Project stage: Supplement ML0604503032006-02-16016 February 2006 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit Nos. 1 and 2 Project stage: Withholding Request Acceptance ML0604503422006-02-22022 February 2006 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure Ffor Beaver Valley Power Station, Unit Nos. 1 and 2 Project stage: Withholding Request Acceptance L-06-025, Supplemental Information Pertaining to License Amendment Request No. 3022006-02-22022 February 2006 Supplemental Information Pertaining to License Amendment Request No. 302 Project stage: Supplement L-06-035, Supplemental Information - EPU Implementation Plan & Power Ascension Testing: License Amendment Request Nos. 302 and 1732006-03-10010 March 2006 Supplemental Information - EPU Implementation Plan & Power Ascension Testing: License Amendment Request Nos. 302 and 173 Project stage: Supplement ML0610004692006-05-0303 May 2006 (BVPS-1 and 2) - Draft Environmental Assessment and Finding of No Significant Impact Related to Extended Power Uprate Project stage: Draft Other L-06-083, Supplemental Information in Support of License Amendment Request Nos. 302 and 1732006-05-12012 May 2006 Supplemental Information in Support of License Amendment Request Nos. 302 and 173 Project stage: Supplement L-06-114, Additional Information in Support of License Amendment Request Nos. 302 and 1732006-07-0606 July 2006 Additional Information in Support of License Amendment Request Nos. 302 and 173 Project stage: Request ML0617706052006-07-10010 July 2006 Final Environmental Assessment and Finding of No Significant Impact Related to Proposed Extended Power Uprate Project stage: Other ML0617202482006-07-19019 July 2006 (BVPS-1 and 2) - Issuance of Amendment 8-Percent Extended Power Uprate Project stage: Approval ML0620200662006-07-19019 July 2006 Issuance of Amendment Regarding the 8-Percent Extended Power Uprate, Technical Specifications Project stage: Approval L-08-340, Transmittal of 10 CFR 50.46 Report of Changes or Errors in ECCS Evaluation Models2008-11-26026 November 2008 Transmittal of 10 CFR 50.46 Report of Changes or Errors in ECCS Evaluation Models Project stage: Request ML14210A2392014-07-31031 July 2014 Correction Letter Regarding Amendment Nos. 275 and 156 Issuance of Amendment Regarding the 8-Percent Extended Power Uprate Project stage: Approval 2005-07-28
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000334/20240112024-10-17017 October 2024 License Renewal Phase IV Inspection Report 05000334/2024011 ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-038, License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References2024-09-17017 September 2024 License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References L-24-015, Twenty-Ninth Refueling Outage Inservice Inspection Summary Report2024-09-17017 September 2024 Twenty-Ninth Refueling Outage Inservice Inspection Summary Report ML24260A1912024-09-16016 September 2024 Operator Licensing Examination Approval IR 05000334/20240052024-08-29029 August 2024 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2024005 and 05000412/2024005) L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 L-24-199, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-08-22022 August 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20244022024-08-22022 August 2024 Security Baseline Inspection Report 05000334/2024402 and 05000412/2024402 (Cover Letter Only) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000334/20240022024-08-0505 August 2024 Integrated Inspection Report 05000334/2024002 and 05000412/2024002 ML24208A0462024-07-26026 July 2024 NRC Office of Investigations Case No. 1-2023-005 L-24-182, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-23023 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-161, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-19019 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 05000334/LER-2024-004, Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control2024-07-17017 July 2024 Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control L-24-014, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models2024-07-16016 July 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models ML24193A2912024-07-16016 July 2024 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule IR 05000334/20245012024-07-0808 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000334/2024501 and 05000412/2024501 05000334/LER-2024-003, Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping2024-07-0202 July 2024 Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping L-24-164, BV-2, Post Accident Monitor Report2024-06-27027 June 2024 BV-2, Post Accident Monitor Report IR 05000334/20244012024-06-26026 June 2024 Material Control and Accounting Program Inspection Report 05000334/2024401 and 05000412/2024401 (Cover Letter Only) L-24-094, Reactor Vessel Surveillance Capsule Withdrawal Schedule2024-06-24024 June 2024 Reactor Vessel Surveillance Capsule Withdrawal Schedule L-24-152, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-06-17017 June 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations 05000334/LER-2024-002, Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation2024-06-11011 June 2024 Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation 05000334/LER-2024-001, Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification2024-06-0606 June 2024 Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification ML24135A1702024-05-29029 May 2024 – Steam Generator Tube Inspection - Review of the Spring 2023 Tube Inspection Reports ML24135A2282024-05-29029 May 2024 Review of the Spring 2023 Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F Star Reports L-24-121, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-05-23023 May 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-021, Cycle 30 Core Operating Limits Report2024-05-23023 May 2024 Cycle 30 Core Operating Limits Report ML24141A1052024-05-20020 May 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000334/20240102024-05-15015 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000334/2024010 and 05000412/2024010 L-24-107, CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair2024-05-13013 May 2024 CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair IR 05000334/20240012024-05-0808 May 2024 Integrated Inspection Report 05000334/2024001 and 05000412/2024001 L-23-269, Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2024-05-0707 May 2024 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions L-24-054, Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological)2024-04-29029 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological) L-24-089, Emergency Preparedness Plan2024-04-23023 April 2024 Emergency Preparedness Plan L-24-088, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 20242024-04-22022 April 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 2024 ML24101A2752024-04-10010 April 2024 Response to Request for Additional Information Regarding Spring 2023 180-Day Steam Generator Tube Inspection Report L-24-082, Withdrawal of Exemption Request2024-04-0303 April 2024 Withdrawal of Exemption Request L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-24-064, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152024-03-13013 March 2024 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24044A0662024-03-0404 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0083 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24057A0752024-03-0101 March 2024 The Associated Independent Spent Fuel Storage Installations IR 05000334/20230062024-02-28028 February 2024 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2023006 and 05000412/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee 05000412/LER-2023-003-01, Missile Barrier Door Left Open Resulting in a Loss of Safety Function2024-02-20020 February 2024 Missile Barrier Door Left Open Resulting in a Loss of Safety Function IR 05000334/20230042024-02-12012 February 2024 Integrated Inspection Report 05000334/2023004 and 05000412/2023004 ML24025A0922024-01-25025 January 2024 Requalification Program Inspection 2024-09-17
[Table view] |
Text
May 3, 2006 Mr. James H. Lash Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077
SUBJECT:
BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 AND 2) -
DRAFT ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT RELATED TO PROPOSED EXTENDED POWER UPRATE (TAC NOS. MC4645 AND MC4646)
Dear Mr. Lash:
Enclosed is a copy of the Draft Environmental Assessment and Finding of No Significant Impact related to your application dated October 4, 2004, as supplemented by letters dated February 23, May 26, June 14, July 8 and 28, August 26, September 6, October 7, 28, and 31, November 8, 18, and 21, December 2, 6, 9, 16, and 30, 2005, and January 25, February 14 and 22, and March 10 and 29, 2006, for BVPS-1 and 2. The proposed amendment would authorize increasing the maximum steady-state reactor core power level from 2689 megawatts thermal (MWt) to 2900 MWt, which is an increase of approximately 8.0 percent. The proposed increase in power level is considered an extended power uprate.
The assessment is being forwarded to the Office of the Federal Register for publication. In this regard, the comment period will expire on June 8, 2006.
Sincerely,
/RA/
Timothy G. Colburn, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412
Enclosure:
Draft Environmental Assessment cc w/encl: See next page
May 3, 2006 Mr. James H. Lash Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077
SUBJECT:
BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 AND 2) -
DRAFT ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT RELATED TO PROPOSED EXTENDED POWER UPRATE (TAC NOS. MC4645 AND MC4646)
Dear Mr. Lash:
Enclosed is a copy of the Draft Environmental Assessment and Finding of No Significant Impact related to your application dated October 4, 2004, as supplemented by letters dated February 23, May 26, June 14, July 8 and 28, August 26, September 6, October 7, 28, and 31, November 8, 18, and 21, December 2, 6, 9, 16, and 30, 2005, and January 25, February 14 and 22, and March 10 and 29, 2006, for BVPS-1 and 2. The proposed amendment would authorize increasing the maximum steady-state reactor core power level from 2689 megawatts thermal (MWt) to 2900 MWt, which is an increase of approximately 8.0 percent. The proposed increase in power level is considered an extended power uprate.
The assessment is being forwarded to the Office of the Federal Register for publication. In this regard, the comment period will expire on June 8, 2006.
Sincerely,
/RA/
Timothy G. Colburn, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412
Enclosure:
Draft Environmental Assessment cc w/encl: See next page Accession Number: ML061000469 Draft EA: ML061000481 Package: ML OFFICE LPLI-1\PM LPLI-1\LA REBA\BC OGC LPLI-1\BC NAME TColburn SLittle AKugler RFranovich JBoska for RLaufer DATE 0412/06 04/12/06 04/12/06 05/02/06 05/03/06 Official Record Copy
DISTRIBUTION:
PUBLIC LPLI-1 Reading File C. Haney RidsNrrDorl C. Holden RidsNrrDorl R. Laufer RidsNrrDorlLpIa-1 TColburn RidsNrrPMTColburn R. Franovich RidsNrrDlrRebb L. Fields RidsOgcRp B. McDermott, R-I RidsRgn1MailCenter T. Alexion RidsNrrPMTAlexion ACRS RidsAcrsAcnwMailCenter cc: Plant Mailing List
Beaver Valley Power Station, Unit Nos. 1 and 2 cc:
Gary R. Leidich FirstEnergy Nuclear Operating Company President and Chief Nuclear Officer Beaver Valley Power Station FirstEnergy Nuclear Operating Company Mail Stop A-BV-SEB1 Mail Stop A-GO-19 P.O. Box 4, Route 168 76 South Main Street Shippingport, PA 15077 Akron, OH 44308 Lew W. Myers Joseph J. Hagan Executive Vice President, Special Projects Senior Vice President of Operations FirstEnergy Nuclear Operating Company and Chief Operating Officer Beaver Valley Power Station FirstEnergy Nuclear Operating Company Mail Stop A-BV-SGRP Mail Stop A-GO-14 P.O. Box 4, Route 168 76 South Main Street Shippingport, PA 15077 Akron, OH 44308 Manager, Site Regulatory Compliance Danny L. Pace FirstEnergy Nuclear Operating Company Senior Vice President, Fleet Engineering Beaver Valley Power Station FirstEnergy Nuclear Operating Company Mail Stop A-BV-A Mail Stop A-GO-14 P.O. Box 4, Route 168 76 South Main Street Shippingport, PA 15077 Akron, OH 44308 Commissioner James R. Lewis Jeannie M. Rinckel West Virginia Division of Labor Vice President, Fleet Oversight 749-B, Building No. 6 FirstEnergy Nuclear Operating Company Capitol Complex Mail Stop A-GO-14 Charleston, WV 25305 76 South Main Street Akron, OH 44308 Director, Utilities Department Public Utilities Commission David W. Jenkins, Attorney 180 East Broad Street FirstEnergy Corporation Columbus, OH 43266-0573 Mail Stop A-GO-18 76 South Main Street Director, Pennsylvania Emergency Akron, OH 44308 Management Agency 2605 Interstate Dr.
Manager, Fleet Licensing Harrisburg, PA 17110-9364 FirstEnergy Nuclear Operating Company Mail Stop A-GHE-107 Ohio EPA-DERR 395 Ghent Road ATTN: Zack A. Clayton Akron, OH 44333 P.O. Box 1049 Columbus, OH 43266-0149 James H. Lash Vice President
Beaver Valley Power Station, Unit Nos. 1 and 2 (continued) cc:
Dr. Judith Johnsrud Environmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA 16803 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077