ML20063N179

From kanterella
Revision as of 06:22, 23 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to 820902 Telcon Re Submittal Dates Associated W/ New Loads Issue.Fsar Amends 19 & 20 Will Be Submitted on 821030 & 1130,respectively.Info to Be Included in Amends Listed
ML20063N179
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/10/1982
From: Wuller G
ILLINOIS POWER CO.
To: Thomas C
Office of Nuclear Reactor Regulation
References
U-0541, U-541, NUDOCS 8209200066
Download: ML20063N179 (2)


Text

-

,N' U-0541

/LLINDIS POWER OOMPANY fp LO3-82(09-10)-6 500 SOUTH 27TH STREET, DECATUR, ILUNOIS 62525 September 10, 1982 Mr. Cecil 0. Thomas, Chief Standardization & Special Proj ects Branch Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Reference:

NRC letter 3/16/82, J. R. Miller to G. E. Wuller, IP, subject: Draft Acceptance Criteria for Mark III LOCA-Related Pool Dynamic Loads Clinton Power Station Unit 1 Docket No. 50-461 Transmittal of New Loads Information

Dear Mr. Thomas:

This letter is in response to the phone conversation of Larry Ruth, NRC CSB and Erich Kant, IP on September 2, 1982.

Mr. Ruth requested dates by which Illinois Power Company

! would make transmittals associated with the New Loads issue.

These dates were needed to schedule review resources in the NRC.

We have reviewed this request both internally and with Sargent & Lundy and feel that FSAR Amendments fl9 and #20 to be submitted by October 30 and November 30 respectively will contain the required information. Specific details of information to be provided includes the following:

Information to be included in FSAR Amendment #19 -

1) Confirmation of conformance to draft NUREG criteria as found in the referenced letter.
2) Revision to 3.9 to incorporate GE New Loads Report.
3) Revision to A3.8 (rams head and quencher loading).

} cyc) /

4) Revision to A3.9 (loads on submerged structures).
5) MEB Item #94 (table for NSSS load combination).
6) MEB Item #39 (analysis modeling procedures).

8209200066 820910 PDR A

ADoCK 05000461 PDR \

_D

U-0541

~

LO3-82(09-10)-6 September 10, 1982 Page 2 Information to be provided in FSAR Amendment #20 -

1) MEB Item #84 (completion of 3.9 tables)

Please review this schedule for completeness at your earliest convenience. These submittals will hopefully close out all open and confirmatory issues on New Loads. Please call me or Erich Kant (217)424-6580 for any additional information you may need on this matter.

Sincerely, G. E. Wuller '

Supervisor-Licensing Nuclear Station Engineering EWK/GEW/lt cc: J. H. Williams, NRC Clinton Project Manager H. H. Livermore, NRC Resident Inspector L. C. Ruth, NRC Containment Systems Branch Illinois Dept. of Nuclear Safety s