ML031130281

From kanterella
Revision as of 02:23, 23 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Annual Assessment Meeting Brunswick Steam Electric Plant
ML031130281
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 04/14/2003
From: Fredrickson P
NRC/RGN-II
To:
Shared Package
ML031130273 List:
References
Download: ML031130281 (20)


Text

Annual Assessment Meeting Brunswick Steam Electric Plant Nuclear Regulatory Commission April 14, 2003 Enclosure 2

Annual Licensee Assessment Meeting I I I

  • A public forum for discussion of the licensee's performance as outlined in the NRC's Annual Assessment Letter
  • Provide licensee with an opportunity to respond to the information in the Assessment Letter

Security & Safeguards Update l I

  • Creation of Office of Nuclear Security and Incident Response
  • Top-to-Bottom Review of Sec urity Program Initiated
  • Issuance of Orders / Interim Compensatory Measu res (ICM)
  • Verification of Licensee Actions on ICM

Security & Safeguards Update

  • Proposed Revisions to Design Basis Threat
  • Pending Orders on Fatigue/Guard Training
  • Initiation of Pilot Force-on-Force Exercise Program

NRC Performance Goals

  • Maintain safety and protect the environment
  • Enhance public confidence
  • Improve effectiveness , efficiency, and realism of processes and decision making
  • Reduce unnecessary regulatory burden

REGULATORY FRAMEWORK PUBLIC HEALTH AND SAFETY NRC's Overall AS A RESULT OF CIVILIAN Safety Mission NUCLEAR REACTOR OPERATION I II I I I Strategic REACTOR RADIATION Performance SAFEGUARDS SAFETY SAFETY Areas EMERENC RADIATION RADIATION PROTECTION SAFETYSAFDN


HUMAN ---------------- SAFETY CONSCIOUS WORK------------------- PROBLEM -----------------

PERFORMAt 4JCE ENVIRONMENT IDENTIFICATION AND RESOLUTION Cros -Cuting Areas

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Inspection Results 4, I'4 Significance Threshold r FqT!U,

.! z," I'TI ,

, N5V.P, g"'glI "-,

L 11 4 te; ..

'51 If , I . , :1, ";-

11., ,

A

4Nii Y,fill%,i.)

-6q institute; i", , ,,

Regulatory Response

Key Aspects of the Assessment Program

  • Objective review of licensee performance
  • "Action Matrix" identifies agency response commensurate with safety significance
  • Increasing safety significance results in:

% Increased levels of inspection

> Involvement of higher levels of NRC and Licensee management

> Increased regulatory action

  • Plant specific assessment information on NRC public web site:

> http://www.nrc.gov/NRR/ OVERSIGHT/ASSESS/

actionmatrixsummary.html

Action Matrix Licensee Regulatory Degraded Multiple/ Repetitive Unacceptable Response Response Cornerstone Degraded Cornerstone Performance Column Column Column Column Column All Assessment Inputs .one or Iwo White inputs (in One Degraded Comerstone Repetitive uegraded Overall Unacceptable (Performance Indicators different cornerstones) in a (2White Inputs or 1 Yellow Cornerstone, Multiple Performance; Plants

1) (Pis) and Inspection Strategic Performance Area; Input) or any 3 White Inputs Degraded Cornerstones, Not Permitted to Findings) Green; Cornerstone Objectives Fully in a Strategic Performance Multiple Yellow Inputs, or Operate Within this Cornerstone Objectives Met Area; Cornerstone 1 Red Input; Cornerstone Band, Unacceptable V) Fully Met Objectives Met with Moderate Objectives Met with Margin to Safety t Degradation in Safety Longstanding Issues or Performance Significant Degradation in Safety Performance None Branch Chief (BC) or RA (or EDO) Meet with Commission meeting Regulatory Performance Division Director (DD) Meet DD or Regional Administrator Senior Licensee with Senior Licensee Meeting ith Licensee (RA) Meet with Licensee Management Management U) Li~~censee cumulaiero Z .. cause evaluation with o

X Licensee Action Licensee root cause Licensee Corrective Action evaluation and corrective Licensee cumulative cause evaluaon with NRCroot Pefdormance of a consideration i) action with NRC Oversight Oversight Improvement Plan with a:_ NRC Oversight Ba-selineand Risk-Informed Baseline Baseline and supplemental Baseline and supplemental supplemental inspection NRC Inspection Inspection Program inspection procedure 95001 inspection procedure 95002 procedure 95003

-10 CFR 2.204 DFI Order to Modify, Supplemental inspection only Supplemental inspection only -10 CFR 50.54(f) Letter Suspend, or Revoke Regulatory Actions 1 None - CAL/Order Licensed Activities Z BC or DD review/sign RA review/sign o Assessment Letters assessment report (w/ lDD review/sign assessment RA review/sign assessment assessment report (w/

inspection plan) l^F* report (w/inspection plan) report (w/inspection plan) inspection plan)

C)SRI or BC Meet wih BC or DD Meet with Licensee RA (or DD) Discuss PA or EDO Discuss Z Annual Public Meeting Licensee with Performance with Licensee Performance with Senior

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Licensee M anagement _ _ _ _ _

Commission Meeting o Commission Involvement None None None Plant discussed at MRM with Senior Licensee C) ll l l l l__ Management INCREASING SAFETY SIGNIFICANCE ------------

Note 1: The regulatory actions for plants in the Multiple/Repetitive Degraded Cornerstone column are not mandatory agency actions. However, the regional office should consider each of these regulatory actions when significant new information regarding licensee performance becomes available.

BRUNSWICK PLANT NRC Inspection Activities in 2002

  • Security interim compensatory measures
  • Baseline inspection

BRUNSWICK PLANT Performance Summary

  • Preserved public health and safety
  • All cornerstone objectives fully met
  • In Licensee Response Column for all four quarters
  • All Performance Indicators and Inspection Findings were Green

End-of-Year 2002 Performance Summary Performance Indicators Brunswick Unit 1: Licensee Response Colunm Performance Indicators I

Lest Modified- denvsty SO, 2003

Year 2002 Performance Summary Inspection Findings Brunswick Unit 1: Licensee Response Column Most Significant Inspection Findings 4Q/2002 30 /20 I2 M

2012002 M M 10/2002 M M Additional Inspection & Assessment information

  • Assessment Re po rits/nspection Plans:
  • List of inspection Reports
  • List of Assessment LettersMnspection Plans 4Q/2002 3Q/2102 2Q/2002 1 Q0/2002
  • Cross Reference Of Assesenmnt Reports test Modlca. fmlrch 25, 2003

End-of-Year 2002 Performance Summary Performance Indicators Brunswick Unit 2: Licensee Response Column Performance Indicators M

Loi Modified;- denaei 30, 2003

Year 2002 Performance Summary Inspection Findings Brunswick Unit 2: Licensee Response Column Radieation L Safety Safeguards l

ionoi ion OcclIrprtiv I Public Radiation Safety Ii .

1lPrhysicis?

Protection

  • MostSignificant Inspection Findings-4Qf2 Ii[32 I

J012002 I -M 2 2$002

[

U M 1200f2O[ 111U1 Additional Inspection & Assessment Information

  • Assessment Reporollnspection Plans:
  • List of Inspection Reports
  • List of A cstnotent LettersInspection Plans 4Q/2002 3a2n02 ZQ4/2002 1 Q/2002
  • Cross Reforence Of Assessment Reports Lest Modaffectr March 25. 2003

ROP Action Matrix Summary for 2002 Column 1 - Licensee Response Column 2 - Regulatory Response Column 3 - Degraded Cornerstone i Column 4 - Multiple/ Repetitive Degraded Cornerstone

Column 5 - Unacceptable Performance (Nationwide number does not contain Davis Besse)

Contacts for additional information for:

Brunswick Nuclear Plant

  • Regional Public Affairs Officer:

> Name: Kenneth M. Clark

> Phone: 404-562-4416

> E-mail: kmc2@nrc.gov

  • State Liaison Officer:

> Name: Robert E. Trojanowski

> Phone: 404-562-4427

> E-mail: ret~nrc.gov

  • Branch Chief:

> Name: Paul E. Fredrickson

> Phone: 404-562-4530

  • Acting Senior Resident Inspector:

> Name: Kathy Weaver

> Phone: 910-457-9531

Contacting the NRC

  • Report an emergency

>~(301) 816-5100 (call collect)

  • Report a safety concern:

> (800) 695-7403 Allegation @nrc. gov

  • General information or questions

> www. nrc.gov

> Select "What We Do" for Public Affairs

Regional Organization I--g S3 S~!13 A,!_ 5 U.k. I 0 S I 0 0 I 0 0

- S - - A a--se - A A A A - A a-  :- . 3s --

3* 0 a- a

Regional Organization S S S a * * *.g 3- . - a I-. I s a

0 t -

- S. I .e a -

  • A

- S .

a - A

  • a -

0 -

  • - a * -. 0

- .6

  • 0 - -* *