From: |
Grzeck L Progress Energy Carolinas |
---|
To: |
Joseph Austin, Heather Gepford, Kuzo G NRC/RGN-II/DFFI, NRC/RGN-II/DRP/RPB4, NRC/RGN-II/DRS/PSB1 |
---|
References |
---|
FOIA/PA-2010-0209 |
Download: ML101940453 (42) |
|
|
---|
Category:E-Mail
MONTHYEARML23248A2612023-09-0505 September 2023 NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of License Amendment Request to Revise the 10 CFR 50.69 Categorization Process ML23202A0652023-07-19019 July 2023 NRR E-mail Capture - Request for Additional Information - Brunswick Steam Electric Plant, Units 1 and 2, Torus Liner Inspection Alternative Request (L-2022-LLR-0089) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23032A2472023-01-26026 January 2023 Document Request Letter for Brunswick Upcoming RP Inspection 2023002 ML23018A1892023-01-17017 January 2023 Document Request for RP Inspection at Brunswick Inspection Report 2023-01 ML23006A0642023-01-0606 January 2023 NRR E-mail Capture - Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308 ML23006A1892023-01-0606 January 2023 NRR E-mail Capture - Corrected - Acceptance Review Results for Brunswick, Unit Nos. 1 and 2 - Proposed Alternative Request RA-22-0308 NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22038A1572022-02-0707 February 2022 NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21357A0472021-12-23023 December 2021 NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of License Amendment Request Regarding Adoption of TSTF-580 ML21361A0122021-12-23023 December 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21277A0952021-10-0101 October 2021 NRR E-mail Capture - Request for Additional Information - Brunswick Exemption Request from 10CFR 55.47 License Operator Exam Two-year Waiver Limit ML21200A1582021-07-16016 July 2021 NRR E-mail Capture - Accepted for Review - Brunswick License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery ML21168A0042021-06-17017 June 2021 Notification of Inspection and Request for Information ML21137A1622021-04-26026 April 2021 NRR E-mail Capture - Accepted for Review - Brunswick License Amendment Request to Adopt TSTF-505 Risk-Informed Completion Time (L-2021-LLA-0060) ML21082A0162021-03-22022 March 2021 Accepted for Review - Brunswick License Amendment Request to Change Tech Spec Limit for Standby Liquid Control System Boron Solution Storage Tank Volume L-2021-LLA-0022 ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21019A3772021-01-13013 January 2021 002 Radiation Safety Baseline Inspection Information Request ML21007A3722021-01-0707 January 2021 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-19-0352 - Proposed Alternative for Reactor Vessel Close Stud Examinations (L-2020-LLR-0156) ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20309A5212020-10-29029 October 2020 Request for Additional Information - Brunswick License Amendment Request to Modify Its Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of SSC Categorization Process ML20294A0642020-10-20020 October 2020 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Adopt TSTF-582 RPV Water Inventory Control Enhancements(L-2020-LLA-0218) ML20297A3102020-10-13013 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0191 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 (L-2020-LLR-0126) ML20297A3082020-10-0707 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0263 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI for Repair/Replacement (L-2020-LLR-0124) ML20297A3092020-10-0606 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-4540(b) (L-2020-LLR-0125) ML20275A2972020-10-0101 October 2020 NRR E-mail Capture - Request for Additional Information - Brunswick Request for Alternate Examination of Reactor Vessel Nozzles ML21033A8562020-08-0505 August 2020 NRR E-mail Capture - Accepted for Review - Brunswick Relief Request for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements EPID-L-2020-LLR-0091 ML20121A1262020-04-29029 April 2020 Radiation Safety Baseline Inspection Information Request ML20111A1212020-04-20020 April 2020 NRR E-mail Capture - Accepted for Review - Brunswick Request for Alternative to Examination Category B-N-1 (VT-3) Visual Examination of Accessible Areas of the Reactor Vessel Interior - EPID: L-2020-LLR-0048 ML20017A1602020-01-17017 January 2020 E-mail Notification of Inspection and Request for Additional Information ML19283D0852019-10-0909 October 2019 Request for Additional Information - Brunswick Atrium 11 LAR ML19252A4572019-09-0808 September 2019 (FEMA Email 09-08-19) Tentative Notification of Brunswick Preliminary Capability Assessment Results ML19252A4092019-09-0606 September 2019 (E-mail to FEMA 09-06-19) FEMA Notification for Planned Restart of Brunswick Units 1 and 2 ML19219A2132019-08-0707 August 2019 NRR E-mail Capture - Duke Energy Fleet - Acceptance of Requested Licensing Action Amendment Requests to Relocate the TSs Staff Qualification Requirements to the Duke Energy Corporation QAPD ML19179A1312019-06-27027 June 2019 NRR E-mail Capture - Brunswick RAIs - LAR to Revise TS 5.5.12, Primary Containment Leakage Rate Testing Program for Permanent Extension of Maximum Appendix J Test Intervals (L 2019-LLA-0031) ML19177A0122019-06-25025 June 2019 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise TS 5.5.12, Primary Containment Leakage Rate Testing Program for Permanent Extension of Maximum Appendix J Test Intervals (L 2019-LLA-0031) ML19162A3902019-06-11011 June 2019 NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Fourth 10-Year Inservice Inspection Interval ISI-12 ML19162A3912019-06-11011 June 2019 NRR E-mail Capture - Duke Energy Fleet - Acceptance of Requested Licensing Action Relief Request (19-GO-001) Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination in Lieu of Radiography ML19092A1152019-04-0101 April 2019 NRR E-mail Capture - Brunswick Steam Electric Plant, Unit Nos. 1 and 2 - Acceptance of Requested Licensing Action Amendment Request to Modify Surveillance Requirements for Safety Relief Valves (L-2019-LLA-0043) ML19092A1142019-04-0101 April 2019 NRR E-mail Capture - Brunswick Plant, Unit 1 and 2 - Acceptance of Requested Licensing Action Amendment Request to Modify TS 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (L-2019-LLA-0031) ML19067A2712019-03-0707 March 2019 NRR E-mail Capture - Brunswick 3rd Round RAI - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML19065A0962019-03-0606 March 2019 NRR E-mail Capture - Brunswick RAIs - LAR to Revise Allowable Value for TS 3.3.8.1 Time Delay on Loss of Voltage ML19058A0742019-02-26026 February 2019 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise Allowable Value for TS 3.3.8.1 Time Delay on Loss of Voltage ML19056A2212019-02-25025 February 2019 NRR E-mail Capture - Brunswick Draft 3rd Round RAI - LAR to Allow Implementation of the Provisions 10 CFR 50.69 2023-09-05
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22091A1332022-04-0101 April 2022 Bru Har Combined 2021 Assessment Meeting Slides ML21041A4532021-02-17017 February 2021 Brunswick/Nrc Pre-submittal Meeting: LAR to Adopt TSTF-505, Rev. 2 (Risk-Informed Completion Times) Presentation ML21011A0822021-01-12012 January 2021 Pre-Submittal Meeting January 12, 2021, Revision to VRR-01, Full Stroke Testing of Safety/Relief Valves - Presentation Material ML20100G6342020-04-0909 April 2020 Revised- Bru 2019 Annual Assessment Meeting Slides ML20034F2842020-02-0303 February 2020 Implementation of TSTF-564 - NRC Conference Call - February 5, 2020 ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML18255A0102018-09-12012 September 2018 NRC Slides for Target Rock Public Meeting ML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 ML17297B7892017-10-26026 October 2017 Meeting Slide for Partially Closed Pre-submittal Public Meeting with Duke Energy for License Amendment Request to Adopt Areva'S XM-11 Fuel Methodology for Brunswick Steam Electric Plant ML17229B2942017-08-22022 August 2017 Meeting Slide Regarding Partially Closed Pre-submittal Public Meeting with Duke Energy for a License Amendment Request for Brunswick Steam Electric Plant ML16231A1322016-08-18018 August 2016 Materials for 8/18/16 Pre-Application Meeting Brunswick Mellla+ LAR ML16210A5152016-07-28028 July 2016 Bnp Commercial Grade Dedication Issue (Printable) ML16134A1742016-05-12012 May 2016 Summary of Public Meeting - 2015 Annual Assessment Regarding Brunswick, Units 1 and 2 ML15125A4602015-05-0505 May 2015 Summary of Public Meeting to Discuss the Annual Assessment of the Brunswick Steam Electric Plant with the Public for the Period of January 1, 2014, Through December 31, 2014 ML14140A1882014-05-19019 May 2014 Summary of Public Meeting - 2013 Annual Assessment Regrading Brunswick Steam Electric Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13277A0382013-09-24024 September 2013 GEH Presentation on Methods Applicability to Areva Atrium 10XM Fuel ML13277A0372013-08-20020 August 2013 Duke Energy Presentation - Brunswick Mellla+ Methods Applicability, Pre-Application Meeting, August 20, 2013 ML12206A3252012-08-0707 August 2012 G20120513/EDATS: OEDO-2012-0436 - Briefing Book for Meeting with Duke Energy on August 7, 2012 ML12188A0712012-07-11011 July 2012 G20120473/ EDATS: OEDO-2012-0404 - Briefing Book - Briefing Package for Meeting with Duke Energy on July 11, 2012 ML12158A3442012-06-0606 June 2012 Meeting Slides for Pre-Application Meeting with Carolina Power and Light Company Regarding Emergency Diesel Generator Completion Time Extension for Brunswick Steam Electric Plant, Units 1 and 2 ML12152A1452012-05-31031 May 2012 20120531 Bnp NRC Pre-LAR Application Meeting Final ML1115109972011-05-31031 May 2011 Category 1 Public Meeting - Meeting Summary - Annual Assessment of Brunswick Steam Electric Plant ML1020304622010-07-20020 July 2010 Groundwater Protection Status ML1016705232010-06-0808 June 2010 NRC Fire Protection Screening Criteria, Brunswick Nuclear Plant ML1015404182010-05-27027 May 2010 Meeting Summary - Public Meeting - Brunswick Steam Electric Plant Annual Assessment - Reactor Oversight Program 2009 Presentation Slides ML1001507632010-01-15015 January 2010 Meeting Presentation Brunswick Nuclear Plant Human Performance ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit ML1019404532008-05-21021 May 2008 Email from Grzeck, Lee to Heather Gepford, Austin, Joe, George Kuzo, England, Louise, Kemp, Daniel and Dale.Dusenbury@Ncmail.Net; Subject: Storm Drain Collection Basin and Storm Drain Stabilization.Pdf; Sampling Locations Data Updated 5-19- BSEP 07-0108, Areva Presentation Slides for Brunswick Fuel Transition License Amendment Request2007-07-31031 July 2007 Areva Presentation Slides for Brunswick Fuel Transition License Amendment Request ML0711503272007-04-23023 April 2007 Brunswick, EOC Slides, Cy 2006 ML0710803842007-04-18018 April 2007 Presentation Slides from Public Management Meeting to Discuss Brunswick Site and Emergency Diesel Generator Improvements ML0710804062007-04-0505 April 2007 Emergency Diesel Generator No. 1 Trip and Failure of Engine Crankshaft Bearing ML0615301932006-03-27027 March 2006 NFPA 805 Pilot Observation Visit Trip Report - March 2006 - Handouts ML0607903052006-03-10010 March 2006 Meeting Handouts for Summary of Meeting W/Carolina Power & Light Regarding the Fuel Transition Process and Licensing Submittals for Brunswick, Units 1 & 2 ML0529003762005-10-0505 October 2005 Meeting with Carolina Power & Light, Meeting Handouts, MSIV Leakage Rate Limit License Amendment Request ML0523604402005-08-11011 August 2005 Attachment 4 - Progress Energy Slides ML0511004572005-04-12012 April 2005 NRC CY2004 Annual Assessment Meeting - Brunswick - Southport, North Carolina, April 12, 2005 ML0504003192005-02-0404 February 2005 Summary of Meeting with Progress Energy Re Brunswick Steam Electric Plant ML0503902102005-01-27027 January 2005 Scoping Meeting Slides Re Brunswick Steam Electric Plant, Units 1 & 2 ML0436402692004-12-0909 December 2004 Progress Energy, Meeting Briefing of 12/9/04, Fire Protection Program ML0901504242004-08-25025 August 2004 Progress Energy Carolinas, Inc., Handouts for the Brunswick and H.B. Robinson NPP Tours During the Shearon Harris Scol Environmental Site Audit of Alternative Sites ML0403505052004-01-0707 January 2004 Meeting Handouts with Progress Energy to Discuss Fire Protection Initiatives ML0333601902003-11-25025 November 2003 Meeting Summary - Brunswick Steam Electric Plant ML0327206212003-09-24024 September 2003 Examiner - Vendor Matrix with Phone Number ML0327206112003-09-22022 September 2003 Exam Process 2022-09-14
[Table view] Category:Slides and Viewgraphs
MONTHYEARML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22109A2122022-04-20020 April 2022 Duke Energy Pre-Submittal Public April 20, 2022, Meeting Presentation ML22091A1332022-04-0101 April 2022 Bru Har Combined 2021 Assessment Meeting Slides ML21322A3262021-11-29029 November 2021 Duke Energy November 29, 2021 Pre-Submittal Public Meeting Slides for EOF Relocation Licensing Amendment Request ML21090A1162021-03-31031 March 2021 Combined 2020 Aam Presentation ML21041A4532021-02-17017 February 2021 Brunswick/Nrc Pre-submittal Meeting: LAR to Adopt TSTF-505, Rev. 2 (Risk-Informed Completion Times) Presentation ML21033A7022021-02-0303 February 2021 Pre-submitting for Planned LAR for Standby Liquid Control Tank Volume Increase ML21011A0822021-01-12012 January 2021 Pre-Submittal Meeting January 12, 2021, Revision to VRR-01, Full Stroke Testing of Safety/Relief Valves - Presentation Material ML20100G6342020-04-0909 April 2020 Revised- Bru 2019 Annual Assessment Meeting Slides ML20099C9992020-04-0808 April 2020 Har 2019 Mtg Slides ML20099D1282020-04-0808 April 2020 Bru 2019 Mtg Slides ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML19123A3532019-05-0202 May 2019 Public Meeting Summary - Brunswick Steam Electric Plant, Docket Nos. 05000325 and 05000324 ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 ML17297B7892017-10-26026 October 2017 Meeting Slide for Partially Closed Pre-submittal Public Meeting with Duke Energy for License Amendment Request to Adopt Areva'S XM-11 Fuel Methodology for Brunswick Steam Electric Plant ML17229B2942017-08-22022 August 2017 Meeting Slide Regarding Partially Closed Pre-submittal Public Meeting with Duke Energy for a License Amendment Request for Brunswick Steam Electric Plant ML16231A1322016-08-18018 August 2016 Materials for 8/18/16 Pre-Application Meeting Brunswick Mellla+ LAR ML16210A5152016-07-28028 July 2016 Bnp Commercial Grade Dedication Issue (Printable) ML16134A1742016-05-12012 May 2016 Summary of Public Meeting - 2015 Annual Assessment Regarding Brunswick, Units 1 and 2 ML14140A1882014-05-19019 May 2014 Summary of Public Meeting - 2013 Annual Assessment Regrading Brunswick Steam Electric Plant ML14135A5112014-04-17017 April 2014 Enclosure 4 to BSEP 14-0048 - Areva Mellla+ Methods Applicability Presentation (Non-Proprietary Version) ML14135A5092014-04-17017 April 2014 Enclosure 1 to BSEP 14-0048, Duke Energy Presentation - Brunswick Mellla+ Methods Applicability, Pre-Application Meeting ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13277A0382013-09-24024 September 2013 GEH Presentation on Methods Applicability to Areva Atrium 10XM Fuel ML13277A0372013-08-20020 August 2013 Duke Energy Presentation - Brunswick Mellla+ Methods Applicability, Pre-Application Meeting, August 20, 2013 ML13130A2552013-05-10010 May 2013 4/24/2013 - Meeting Summary - Category 3 Public Meeting - Annual Assessment of Brunswick Steam Electric Plant ML12181A0362012-06-29029 June 2012 Meeting Summary - Category 1 Public Meeting - Annual Assessment of Brunswick Steam Electric Plant, Docket Nos. 50-325, 50-324 ML12158A3442012-06-0606 June 2012 Meeting Slides for Pre-Application Meeting with Carolina Power and Light Company Regarding Emergency Diesel Generator Completion Time Extension for Brunswick Steam Electric Plant, Units 1 and 2 ML11102A0052011-04-12012 April 2011 Progress Energy - Slides for NFPA 805 Pre-LAR Application Meeting April 12, 2011 ML1020304622010-07-20020 July 2010 Groundwater Protection Status ML1016705232010-06-0808 June 2010 NRC Fire Protection Screening Criteria, Brunswick Nuclear Plant ML1015404182010-05-27027 May 2010 Meeting Summary - Public Meeting - Brunswick Steam Electric Plant Annual Assessment - Reactor Oversight Program 2009 Presentation Slides ML1001507632010-01-15015 January 2010 Meeting Presentation Brunswick Nuclear Plant Human Performance ML1001507042010-01-14014 January 2010 Human Performance Slides ML0930206712009-10-22022 October 2009 Emergency Diesel Generators - Progress Energy ML1019400952009-10-0808 October 2009 Marsh, River, and Creek Tritium Results Updated 10/08/09 ML1019400932009-10-0808 October 2009 Groundwater Well Samples Results, Updated 10/08/09 ML0923210802009-08-20020 August 2009 MELLLA Plus Implementation ML0921609632009-08-0404 August 2009 Meeting Summary - Public Meeting Category 1 - Preliminary White Finding - Brunswick Steam Electric Plant ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit ML1019404532008-05-21021 May 2008 Email from Grzeck, Lee to Heather Gepford, Austin, Joe, George Kuzo, England, Louise, Kemp, Daniel and Dale.Dusenbury@Ncmail.Net; Subject: Storm Drain Collection Basin and Storm Drain Stabilization.Pdf; Sampling Locations Data Updated 5-19- ML0813006582008-05-0101 May 2008 EOC 2007 NRC Slides ML0813006662008-05-0101 May 2008 EOC 2007 Progress Energy Slides ML1019405012008-04-0101 April 2008 Annual Report Slides BSEP 07-0108, Areva Presentation Slides for Brunswick Fuel Transition License Amendment Request2007-07-31031 July 2007 Areva Presentation Slides for Brunswick Fuel Transition License Amendment Request ML0711503272007-04-23023 April 2007 Brunswick, EOC Slides, Cy 2006 ML0710803842007-04-18018 April 2007 Presentation Slides from Public Management Meeting to Discuss Brunswick Site and Emergency Diesel Generator Improvements 2022-09-14
[Table view] |
Text
Gepford, Heather.
From: Grzeck, Lee [Lee.Grzeck@pgnmail.com]
Sent: Wednesday, May 21, 2008 3:22 PM To: Heather Gepford; Austin, Joe; George Kuzo; England, Louise; Kemp, Daniel; dale.dusenbury@ ncmail.net
Subject:
Brunswick Data/Slides for Thursday Conference Call Attachments: Storm Drain Collection Basin and Storm Drain Stabilization.pdf; Sampling Locations data updated 5-19-08.pdf; Updated 5-19-08 Well pictures with data and graphs.pdf Lee Grzeck Licensing and Regulatory Programs Brunswick Nuclear Plant Progress Energy Carolinas 910-457-2487 Work 910-412-0052 Pager
ý'*'%(,a 1
Marsh and River Tritium Sampling Locations Updated 5/19/08 ~2Progress Energy
jProgress Energy Waypoints 59, 60, 61, and 64 from Cape Fear .....
River .
5.
-J 4/28/07 6/17/07 8/6/07 9/25/07 11/14/07 1/3/08 2/22/08 4/12/08 6/1/08
-.o-WP-59 mU-WP-60 --h-WP-61 -u--WP-64 jProgress Energy
- 52:
Progress Energy
Waypoints 52, 53, 55, and 57 1,000 900 800 700 600
-J 500 400 300 200 A - ___
100 0
4/2 28/07 6/17/07 8/6/07 9/25/07 11/14/07 1/3/08 2/22/08 4/12/08 6/1/08
-.- WP-52 -M--WP-53 -*-WP-55 ---- WP-57 Progress Energy
wVP-82: 5/14/08, 725 Progress Energy
Waypoints 82, 84, and 88 in Gum Log Branch Marsh 3900 3400 2900 2400 0.
CL 1900 1400 900 4 1 400 1~
8/6/07 9/25/07 11/14/07 1/3/08 2/22/08 4/12/08 6/1/08
Progress Energy Waypoints 72, 74, and 76 29,000 24,000 19,000 CL 14,000 0.
9,000 I 4,000
-1,000 .....
4/28/07 6/17/07 8/6/07 9/25/07 11/14/07 1/3/08 2/22/08 4/12/08 6/1/08
$WP-72 -U--WP-74 -!& WP-76 jProgress Energy
106:
WP.
e Progress Energy
Waypoints 92 and 106 6,000 T 5,000 4,000
,-J
2,000 1,000 0
4/2 .8/07 6/17/07 8/6/07
/#+OxAAr~k 9/25/07 11/14/07 JrAP 1/3/08 abOU 2/22/08 4/12/08 6/1/08
-*-,WP-106pCi/L, OCA Nancy's Creek 0 WP-92, pCi/L, Marsh Area jProgress Energy
Storm Drain Collection Basin and Storm Drain Stabilization Pond Tritium Trends
SDCB Tritium, pCi/L 1.OOE+07 1.OOE+06 1.OOE+05 1.OOE+04 CJ 1.OOE+03 1.OOE+02 1.OOE+01 1.OOE+O0 --
10/10/06 1/18/07 4/28/07 8/6/07 11/14/07 2/22/08 6/1/08 9/9/08
- SDCB Tritium, pCi/L
SDSP Tritium, pCi/L 7.OOE+05 6.OOE+05 5.OOE+05 4.OOE+05
,,I 3.00E+05 2.OOE+05 1.OOE+05 O.OOE+O0 10/10/06 1/18/07 4/28/07 8/6/07 11/14/07 2/22/08 6/1/08
-,--SDSP Tritium, pCi/L
Progress Energy Shallow Wells 17C, 20C, 24C, and 31C Near Pond 25,000 20,000 15,000
-J CL 10,000 5,000 -
0 4/28/07 6/17/07 8/6/07 9/25/07 11/14/07 1/3/08 2/22/08 4/12/08 6/1/08 I
- ESS-1 7C -u-mESS-200 ESS-24C
&a- -*--ESS-3 10 Q Progress Energy
Shallow Wells 23C, 26C, and 27C Near Pond 800,000 700,000 600,000 500,000 c3400,000 300,000 200,000 100,000........'.. .
Approximate Lower Limit of Detection, 250 pi/
0 6/7/07 7/7/07 8/6/07 9/5/07 10/5/0711/4/0712/4/07 1/3/08 2/2/08 3/3/08 4/2/08 5/2/08 6/1/08
ESS-23C -a-ESS-26C -ESS-27C 6 Progress Energy
Shallow Wells 18C, 19C, and 22C Near Pond 800,000 .
700,000 .
600,000 500,000 400,000 300,000 200,000 100,000 4/28/07 6/17/07 8/6/07 9/25/07 11/14/07 1/3/08 2/22/08 4/12/08 6/1/08
-- ESS-18C -ESS-19C -ESS-22C
Shallow Wells 23C, 26C, and 27C Near Pond 800,000 700,000 '
600,000 500,000 300,00..... >,,,::..............
=. .. . ,:,::=, <.>: i*
S400, 000 0.
300,000 100,000 6/7/07 7/17/07 8/26/07 10/5/07 11/14/07 12/24/07 2/2/08 3/13/08 4/22/08 6/1/08
-4*--ESS-23C --U-ESS-26C -~ESS-27C SProgres Energy
Shallow Wells 21C, 25C, and 28C Near Pond 4,800 4,200 3,600 3,000 0..
2,400 1,800 -
1,200 -
600 0
4/23/07 6/7/07 7/22/07 9/5/07 10/20/07 12/4/07 1/18/08 3/3/08 4/17/08 6/1/08 7/16/08 I-,*--ESS-21C ESS-25C --&-ESS-28C L Progress Energy
Shallow Well 30C Near Pond 50,000 .
45,000 40,000 35,000 30,000 o25,000 CL 20,00 0
Ap*.*
Lower ro Lii im oft Detlton 250 "p-*i .-
15,000 10,000 5,000 0
7/12/07 8/11/07 9/10/07 10/10/07 11/9/07 12/9/07 1/8/08 2/7/08 3/8/08 4/7/08 5/7/08 6/6/08
-ESS-30C v! Progress Energy
Well ESS-STAB Inside Pond 800,000 700,000 600,000 500,000 CL 400,000 300,000 200,000 100,000 0
6/17/07 8/6/07 9/25/07 11/14/07 1/3/08 2/22/08 4/12/08 6/1/08 N Progress Energy
Latest Shallow Well Data Well Well Depth (ft) Sample Date Sample Results (pCi/L)
ESS-17C 26 5/7/08 4,245 ESS-18C 20 5/13/08 653,000 ESS-19C 20 5/12/08 535,600 ESS-20C 20.5 5/12/08 17,500 ESS-21C 20 5/13/08 533 ESS-22C 20 5/13/08 744,900 ESS-23C 23 5/13/08 172,500 ESS-24C 18 5/7/08 3,484 ESS-25C 22 5/15/08 <LLD ESS-26C 15 5/13/08 542,500 ESS-27C 15.5 5/13/08 270,400 ESS-28C 23 5/13/08 256 ESS-30C 15 5/7/08 24,120 ESS-31C 15 5/7/08 994 ESS-STAB 31 5/12/08 230,900 SProgress Energy
Progress Energy Marsh Wells at Gum Log Branch and Nancy's Creek 500 450 400
-J U 350 300 250 200 4/28/07 8/6/07 11/14/07 2/22/08 6/1/08
-- ESS-GLB-1 -u- ESS-NC-1 -- ESS-NC-2
-a-ESS-NC-3
- ESS-NC-4 - ESS-NC-5 t Progress Energy
Latest Marsh Well Data Well Well Depth (ft),, Sample Date Tritium Sample Results (pCiIL)
ESS-NC- 1 7.5 5/8/08 259 ESS-NC-2 8 5/8/08 <LLD ESS-NC-3 8 5/8/08 <LLD ESS-NC-4 8 5/8/08 <LLD ESS-NC-5 8 5/8/08 <LLD ESS-GLB-1 8 5/8/08 <LLD Progress Energy
-*~ '~4?i~J
& Progress Energy
Intermediate Wells 17B, 18B, and 20B Near Pond 1,000 900 800 700.........
600 0 500 400 300 200 A l 100 0
3/9/07 4/28/07 6/17/07 8/6/07 9/25/07 11/14/07 1/3/08 2/22/08 4/12/08 6/1/08
.ESS-17B 0 -§-ESS-18B ESS-20B
@ Progress Energy
Intermediate Wells 21B, 22B, 24B, and 25B Near Pond 1,000 900 800 700 600
( 500 CL 400 300 200D lD 100 0
Approximate Lower Limit of Detecti'on, 250pCi/L-01/18/07 04/28/07 08/06/07 11/14/07 02/22/08 06/01/08 09/09/08 M ESS-21B -u-ESS-22B --o-ESS-24B -+-ESS-25B SProgress Energy
Intermediate Well 19B Near Pond 40,000 35,000 30,000 25,000 o 20,000 CAproximat eLower Limnit of Detection, 250 pCi/L .
15,000 -
10,000 5,000 04/28/07 08/06/07 11/14/07 02/22/08 06/01/08 I-4--ESS-19B Progress Energy
Latest Intermediate Well Sample Data Well Well Depth (ft) Sample Date Sample Results,(pCi/L)
ESS-17B 53 5/7/08 <LLD ESS-18B 63 5/13/08 <LLD ESS-19B 42 5/12/08 24,770 ESS-20B 43 5/12/08 <LLD ESS-21B 67 5/7/08 <LLD ESS-22B 76 5/13/08 <LLD ESS-24B 53 5/7/08 <LLD ESS-25B 43 5/15/08 <LLD Progress Energy
Progress Energy Deep Wells 17A, 24A, and 27A Near Pond .
500 450 400 350 - --
300
_j 0.
o 250 200A 150 100 Tritium is non -detectable in all deep el 50pwel 0
1/18/07 4/28/07 8/6/07 11/14/07 2/22/08 6/1/08 9/9/08
-.ESS-17A -e-ESS-24A -*ESS-27A
~jProgress Energy
Latest Deep Well Sample Data Well Well Depth Sample Date Tritiun Sampe'Results, p i ESS-17A 150 5/14/08 <LLD ESS-24A 140 5/7/08 <LLD ESS-27A 140 5/13/08 <LLD JProgress Energy
Progress Energy Wells 3B, 3C, 13B, and 13C 1,750 1,500 1,250 1,000
-J 750 500 250 0 i i i 3/9/07 4/28/07 6/17/07 8/6/07 9/25/07 11/14/07 1/3/08 2/22/08 4/12/08 6/1/08 7/21/08
-- ESS-13C -ESS-3C -ESS-3B -u-ESS-13B Q Progress Energy
Miscellaneous Wells-I Well Well Depth (ft)'" Sample Date Tritium Sample Results (pCi/L)
ESS-3B 52.4 5/13/08 507 ESS-3C 14.3 5/13/08 343 ESS-13B 56.5 5/14/08 <LLD ESS-13C 24.8 5/14/08 <LLD C Progress Energy
jProgress Energy Switchyard Area Wells from Historical Radwaste Line Leak, Well 2C 1.O0E+08 1.OOE+07 1.OOE+06 1.0OE+05
.1.00E+04 1.OOE+03 1.OOE+02 1.OOE+01 1/31/93 10/28/95 7/24/98 4/19/01 1/14/04 10/10/06 7/6/09 e& Progress Energy
Switchyard Area Wells from Historical Radwaste Line Leak, Well 16 1.000E+08 1.000E+07 1.000E+06 1.000E+05 1.000E+04 1.000E+03 1.000E+02 1.000E+01 ---
1/31/93 10/28/95 7/24/98 4/19/01 1/14/04 10/10/06 7/6/09 2 Progress Energy
Miscellaneous Wells-2 Well Well Depth (ft) Sample Date., Titium Sample Results (pCiIL)
ESS-2C 23 5/15/08 2,008,000 ESS- 16 25.4 5/15/08 32,180 Progress Energy