ML101940501
ML101940501 | |
Person / Time | |
---|---|
Site: | Brunswick ![]() |
Issue date: | 04/01/2008 |
From: | Silar Services |
To: | Office of Information Services, Progress Energy Carolinas |
References | |
FOIA/PA-2010-0209 | |
Download: ML101940501 (19) | |
Text
Approximate scale: 1" = 600' Progress Energy Brunswick Nuclear Plant Southport, NC L4 Figure 1--2 Site Layout Map Source: Brunswick GIS Silar Services Inc.
K CME z
I SOURCE.,
McKim & Cred. JUne 15, 2007. LEGEND: Pmgms EM NOTES:
- 1. COORDINA TES ARE BASED ON NC GRID NAD83 S SHALLOW VELL Southpor NC
- 2. ELEVATIlONS ARE BASED ON NOWG29.
EXISTING SHALLOW KELL 2 S C.SCALE I'= 5W V orio q Ne L cc oo~o Mcp z
- MANHOLE 0 __0_250 500 1000 150
- WAYPOINT S Silar Services Inc.,
McKim & Creed, June 15. 2007. LEGEND: Progress Energy N07ES: Brunswick Nudew Plant 1.NOOT S AEBSD!
- 7. COORDINATEFS ARE BASED ON NC GRID NAD8J IN7ERMEDIA7E *FLL Southport, NC
- 2. EL.EVATIONS ARE BASED ON NGV29.
A EXIStiNG INTERMEDIA T *ELL Figure 2-2 SCALE 1" = 500' Intermediate Monitoring Welt Location Map 1 EL I IL 0 250 500 1000 1500 Silar Services Inc.
K 4
SOURCE:
McKim & Creed. June 15, 2007. LEGEND. Progress Energy NOTE-S 0 DEEP kOELL Brunswick Nuclear Plant
- 1. COORDINATES ARE BASED ON NC GRID NAD83 souepot, NC
- 2. ELEVATIONS ARE BASED ON NGWV29.
Figure 2-3 SCALE 1"=500' Deep Monitoring Well Location Map 0 25 50 1 10 0 250 500 1060 15D0 S~Silar Services Inc. Inc.
§§, Silar Services
Storm Drain Collection Basin Tritium Activity July-December 2007 3.50E+05 3.OOE+05 2.50E+05 4.' 2.00E+05 2
t 1.50E+05 --- SDCB H-3, pCi/L 1.00E+05 5.OOE+04 0.OOE+00 7/1/2007 8/1/2007 9/1/2007 10/1/2007 11/1/2007 12/1/2007 0:00 0:00 0:00 0:00 0:00 0:00 Date Progress Energy Brunswick Nuclear Plant Southport, NC Figure 3-1 Storm Drain Collection Basin Tritium Activity Silar Services Inc.
i McKim & Creed June 15, 200Z ISOCONCENTRAlION CONTOUR OF TRI77UMIN pCi/A Progress Energy NOTES: Brunswick Nuclear Plant SCALE 1" = 500' Southport, NC L. COORDINATES ARE BASED ON NC GRID NAD8J
- 2. ELEVAtliONS ARE BASED ON NGW429.
Figure 3-2 3 RESULTIS ARE pCi/L Shallow Aquifer Groundwater Results 0 250 500 1000 1500 August 2007 nS Silar Services Inc.
SOURCE," LEGEND:
McKim & Creed. June 15 2007. ISOCONCENTRATION CONTOUR OF IRI7IUM IN pC/L 1Proress EneyPlant Brunswick Nuclear NOTESS Southport, NC
- 1. COORDINATES ARE BASED ON NC GRID NAD8JSCALE I"= 5
- 2. ELEVA7iONS ARE BASED ON NGWI29. ENO Figure 3-3 J. RESUL 7S ARE pCi"L 0 250 60 1U Shallow Aquifer Groundwater Results September 2007 Silar Services Inc.
- cKim & Creed June 15. 2007. LEGEND
- Progress Energy Brunswick Nuclear Plont NOTES: ISOCONCENTRATION CONTOUROF TRITIUM IN pC,/L Southport, NC
- 1. COORDINATES ARE BASED ON NC GRID NAD83 SCALE 1"=500'
- 2. ELEVATIONS ARE BASED ON NGI,029. Figure 3-4 J RESULTS ARE pC/l. Shollow Aquifer Groundwater Results 0 250 500 1000 1500 October 2007 5$* Silar Services Inc.
C.. ~
-'ý , IV SOURCE: LEGEND:
McKim & Cree, JAmne15, 20OZ ISOCONCENTRAI7ON CONTOUROF 7RI77UMIN pCi/l Progress Energy Brunswick Nucleor Plont NOTES: Southport, NC I. COORDINATESARE BASED ON NC GRID NAD83 SCALE 1"= 500 E 2. ELEVARlONSARE BASED ON NGVD29. Figure 3-5 I. RESULTS ARE pCiL Shallow Aquifer Groundwatcr Results 0 250 500 1000 1500 November 200/
SSilar Services Inc.
0 SOURCE., LEGEND:
McKim & Creed June 15, 20DZ ISOCONCENTYRATON CONTOUR OF TRI77UMIN pCi/L Progress Energy Brunswick Nuclear Plant NOTES: Southport, NC I. COORDINATES ARE BASED ON NC GRID NAD83 SCALE I" = 500' E 2. ELEVA I7ONSARE BASED ON NGVD29. Figure 3-6
- 3. RESUL IS ARE pCI/L Shallow Aquifer Groundwater Resuits 0 250 500 1000 1500 December 2007 E
Silar Services Inc.
yii~i* % *
- Progress Energy SUC SMALLOW WELL - NEW Brunswick Nuclear Ph&~t SOURCEF Southport, NC SCALE 1" = 500' AMcKkm& Creed. June 15, 2007. SHALLOW HELL - EXIS77NG Figure 3-7 NOTES& GROUNDWATER FL0W DIRECt7ON Potentiometric Surface Map
- 1. COORDINA YES ARE BASED ON NC GRID NAD83 0 250 500 1000 1500 Shallow Aquifer- October 2, 2007
- 2. ELEVA7lONS ARE BASED ON NGV29. GROUNDWA7E CONTOUR R UNE (DASHED WMEREINFERRED) 2.1 ELEVA7lONMEAN SEA LEWL $ Silar Services Inc.
K LEGEND: Progress Energy Brunswic Nuclear Plant SOURCE: E] SHALLOW VELL - NEW SHALLOW KELL - EXISTING Southport NC SCALE 1"=5W McKim & Creed, #Jne 15, 2007 Figure 3-8 NOTES Potenofimetric Surface Map
- 1. COORDINATES ARE BASED ON NC GRID NAD83 0 250 500 1000 1500 Shallow Aquifer- October 16, 2007
- 2. ELEVATIONS ARE BASED ON NG, 29.
nS Silar Services Inc.
Tritium Activity vs. Time in Shallow Groundwater Aquifer 900000 800000
-*-- ESS-17C ESS-18C 700000 ESS-19C
ýA 00 ESS-20C 0
0 600000 CNI --- ESS-21C C- ":7 ESS-22C 0 L-J a- U 500000 ESS-23C
- ESS-24C 400000 ESS-25C IL ESS-26C z
z 300000 ESS-27C ESS-28C CO i m ESS-STAB 0
200000 0 ESS-30C ESS-31C a- 100000 0
EL S-ep-0 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 Month Progress Energy CL Brunswick Nuclear Plant Southport, NC z Figure 3-9 M
Tritum Activity vs. Time in Shallow Groundwater Aquifer
- Silar Services Inc.
LEGEND: Progress Energy RESUL 7S OF TRIRt7UM IN pCi/L Brunswick Nuclear Plant SOURCE. SCALE 1" = 500' Southport, NC McKirn & Creed, June 15. 2007. A INTERMEDIATE WELL - NEW A INTERMEDIA TE WELL- EXISTING Figure 3-10 NOTES:
- 1. COORDINATES ARE BASED ON NC GRID NAD83 250 500 1000 1500 Intermediate Aquifer Groundwater Results
- 2. ELEVATIONS ARE BASED ON NGVOV29.
SS* Silar Services Inc. Inc.
$5, Silar Services
LEGEND. Progress Energy Brunswick Nuclear Plant SOURCE., iW ELL - NEW INTERAMEDIAT Southport, NC McKim & Cree4 June 15. 2007. A INTERMEDIATE WELL- EXISntNG SCALE 1" = 500' Figure 3-1l NOTES: q G NDWA TERFLOW DIREC77ON Potentiometric Surface Mop
- 1. COORDINATES ARE BASED ON NC GRID NAD8J 0 250 500 1000 1500 Intermediate Aquifer- October 2. 2007
- 2. ELEVAtiONS ARE BASED ON NGV029. - GROUNDWATER CO*NTUR LINE (DASHED tW4EREINFERRED) 2.1 ELEVATON MEAN SEA LEWL S Silar Services Inc.
K LEGEND: Progress Energy Brunswick Nuclear Plant A INTERMEDIATE K*LL - NEW SOURCE. SCALE 1" = 500' Southport, NC McKim & Creed, June 15, 2007. A INlERMEDIA7E MU EXIS ING Figure 3-12 NOTES' -,.. = GROUNDWATER FLOW DIRECt7ON Potentiometric Surface Map
- f. COORDINA 7ES ARE BASED ON NC GRID NAD83 0 250 500 1000 1500 Intermediate Aquifer- October 16, 2007
- 2. ELEVATIONS ARE BASED ON NGVD29. - GROUNDWATER CONTOUR LINE (DASHED *Hq-ERE INFERRED) 2.1 ELEVA71ON MEAN SEA LEI-E
§, Silar Services Inc.
Summary of Tritium in Intermediate Groundwater Aquifer
-ESS-17B
-- 1ESS-18B 8000
.A
-I LI 6000 A ESS-19B
- 0. *ESS-20B
- 0-9 4000 Ar 7M 2000 - ESS-21B 0 ~1 S ESS-22 B Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 - -ESS-24B Month -ESS-25B Progress Energy Brunswick Nuclear Plant Southport, NC Figure 3-13 Tritium Activity vs. Time in Intermediate Groundwater Aquifer Silar Services Inc.
LEGEND:
SOURCE.,
Progress Energy McKim & Creed, June 15. 2007. DEEP MWLL- NEW Brunswick Nudeff Plant Soulhpod, NC SCALE 1" = 500' NOTESR DEEP WELL - EXIStiNG
- 1. COORDINATES ARE BASED ON NC GRID NAD83 M o I Im Figure 3-14
- 2. ELEVA7iONS ARE BASED ON NGVD29. <== GROUNDWA TER FLOW DIRECTION Potentiometric Surface Mop 0 250 500 1000 1500
- GROUNDWATER CONTOUR LINE(DASHED NIHERE INFERRED) Deep Aquifer- October 2, 2007 2.1 ELEVAliON MEAN SEA LEvL IS4 Silar Services Inc.
§§, Silar Services Inc.
Progress Energy SOURCE:
G DEEP KELL - NEW SCALE 1" = 500 Brunswick Nuclear Plant Southport, NC McKim & Creed. June 15. 200Z O DEEP VIELL- EXISt7NG Figure 3-15 NOTES. GROUNDWATER FLOW DIREC7ON Potentiometric Surfoce Map
- 1. COORDINATES ARE BASED ON NC GRID NAD83 0 250 500 1000 1500 Deep Aquifer- October 16, 2007
- 2. ELEVAT7ONS ARE BASED ON NGW)29. GROUNDWA TER CONTOUR LINE (DASHED V#IERE INFERRED) 2.1 EZEVA71ON MEAN SEA LEVEL $$ Silar Services Inc.