ML101940501
| ML101940501 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 04/01/2008 |
| From: | Silar Services |
| To: | Office of Information Services, Progress Energy Carolinas |
| References | |
| FOIA/PA-2010-0209 | |
| Download: ML101940501 (19) | |
Text
Progress Energy Brunswick Nuclear Plant Southport, NC L4 Figure 1--2 Site Layout Map Silar Services Inc.
Approximate scale: 1" = 600' Source: Brunswick GIS
K CME z
I SOURCE.,
McKim & Cred. JUne 15, 2007.
NOTES:
- 1. COORDINA TES ARE BASED ON NC GRID NAD83
- 2. ELEVATIlONS ARE BASED ON NOWG29.
C.SCALE I'= 5W z
0
__0_250 500 1000 150 LEGEND:
S SHALLOW VELL EXISTING SHALLOW KELL MANHOLE WAYPOINT Pmgms EM Southpor NC 2 S V
orio q Ne cc L
oo~o Mcp S Silar Services Inc.,
McKim & Creed, June 15. 2007.
LEGEND:
N07ES:
1.NOOT S AEBSD!
IN7ERMEDIA7E *FLL
- 7. COORDINATEFS ARE BASED ON NC GRID NAD8J Progress Energy Brunswick Nudew Plant Southport, NC
- 2. EL.EVA TIONS ARE BASED ON NGV29.
SCALE 1" = 500' 1 EL I
IL A
EXIStiNG INTERMEDIA T
- ELL Figure 2-2 Intermediate Monitoring Welt Location Map 1500 Silar Services Inc.
0 250 500 1000
K 4
LEGEND.
0 DEEP kOELL SOURCE:
McKim & Creed. June 15, 2007.
NOTE-S
- 1. COORDINATES ARE BASED ON NC GRID NAD83
- 2. ELEVATIONS ARE BASED ON NGWV29.
SCALE 1"=500' 0
25 50 1
10 Progress Energy Brunswick Nuclear Plant souepot, NC Figure 2-3 Deep Monitoring Well Location Map 0
250 500 1060 15D0 S~Silar Services Inc.
§§,
Silar Services Inc.
Storm Drain Collection Basin Tritium Activity July-December 2007 4.'
2 t
3.50E+05 3.OOE+05 2.50E+05 2.00E+05 1.50E+05 1.00E+05 5.OOE+04 0.OOE+00 7/1/2007 8/1/2007 9/1/2007 10/1/2007 11/1/2007 12/1/2007 0:00 0:00 0:00 0:00 0:00 0:00 Date SDCB H-3, pCi/L Progress Energy Brunswick Nuclear Plant Southport, NC Figure 3-1 Storm Drain Collection Basin Tritium Activity Silar Services Inc.
i McKim & Creed June 15, 200Z ISOCONCENTRAlION CONTOUR OF TRI77UM IN pCi/A NOTES:
L. COORDINATES ARE BASED ON NC GRID NAD8J
- 2. ELEVAtliONS ARE BASED ON NGW429.
3 RESULTIS ARE pCi/L Progress Energy Brunswick Nuclear Plant Southport, NC SCALE 1" = 500' Figure 3-2 Shallow Aquifer Groundwater Results August 2007 0
250 500 1000 1500 nS Silar Services Inc.
SOURCE,"
LEGEND:
McKim & Creed. June 15 2007.
ISOCONCENTRATION CONTOUR OF IRI7IUM IN pC/L NOTESS
- 1. COORDINATES ARE BASED ON NC GRID NAD8JSCALE I"= 5
- 2. ELEVA7iONS ARE BASED ON NGWI29.
J. RESUL 7S ARE pCi"L 1Proress Eney Brunswick Nuclear Plant Southport, NC 0
250 60 1U ENO Figure 3-3 Shallow Aquifer Groundwater Results September 2007 Silar Services Inc.
- cKim & Creed June 15. 2007.
LEGEND:
NOTES:
ISOCONCENTRATION CONTOUR OF TRITIUM IN pC,/L
- 1. COORDINATES ARE BASED ON NC GRID NAD83
- 2. ELEVATIONS ARE BASED ON NGI,029.
J RESULTS ARE pC/l.
Progress Energy Brunswick Nuclear Plont Southport, NC SCALE 1"=500' Figure 3-4 Shollow Aquifer Groundwater Results October 2007 0
250 500 1000 1500 5$*
Silar Services Inc.
Progress Energy Brunswick Nucleor Plont Southport, NC Figure 3-5 Shallow Aquifer Groundwatcr Results November 200/
SSilar Services Inc.
E C..
~
-'ý
, IV SOURCE:
LEGEND:
McKim & Cree, JAmne 15, 20OZ ISOCONCENTRAI7ON CONTOUR OF 7RI77UM IN pCi/l NOTES:
I. COORDINATES ARE BASED ON NC GRID NAD83
- 2. ELEVARlONS ARE BASED ON NGVD29.
I. RESULTS ARE pCiL SCALE 1" = 500 0
250 500 1000 1500
0 E
E SOURCE.,
LEGEND:
McKim & Creed June 15, 20DZ ISOCONCENTYRATON CONTOUR OF TRI77UM IN pCi/L NOTES:
I. COORDINATES ARE BASED ON NC GRID NAD83
- 2. ELEVA I7ONS ARE BASED ON NGVD29.
- 3. RESUL IS ARE pCI/L Progress Energy Brunswick Nuclear Plant Southport, NC SCALE I" = 500' 0
250 500 1000 1500 Figure 3-6 Shallow Aquifer Groundwater Resuits December 2007 Silar Services Inc.
yii~i* %
- SUC SMALLOW WELL -
NEW SOURCEF AMcKkm & Creed. June 15, 2007.
SHALLOW HELL -
EXIS77NG NOTES&
GROUNDWATER FL0W DIRECt7ON
- 1. COORDINA YES ARE BASED ON NC GRID NAD83
- 2. ELEVA7lONS ARE BASED ON NGV29.
GROUND WA 7E R
CONTOUR UNE (DASHED WMERE INFERRED) 2.1 ELEVA7lON MEAN SEA LEWL Progress Energy Brunswick Nuclear Ph&~t Southport, NC SCALE 1" = 500' 0
250 500 1000 1500 Figure 3-7 Potentiometric Surface Map Shallow Aquifer-October 2, 2007 Silar Services Inc.
K LEGEND:
E] SHALLOW VELL -
NEW SHALLOW KELL -
EXISTING SOURCE:
McKim & Creed, #Jne 15, 2007 NOTES
- 1. COORDINATES ARE BASED ON NC GRID NAD83
- 2. ELEVATIONS ARE BASED ON NG, 29.
SCALE 1"=5W Progress Energy Brunswic Nuclear Plant Southport NC Figure 3-8 Potenofimetric Surface Map Shallow Aquifer-October 16, 2007 0
250 500 1000 1500 nS Silar Services Inc.
Tritium Activity vs. Time in Shallow Groundwater Aquifer 900000 800000 00 0
0 CNI C-0 a-ILz z
CO 0
0 700000 600000
":7 L-J U 500000 400000
ýA ESS-17C ESS-18C ESS-19C ESS-20C ESS-21C ESS-22C ESS-23C ESS-24C ESS-25C ESS-26C ESS-27C ESS-28C ESS-STAB ESS-30C ESS-31C 300000 200000 100000 i
m a-0 EL CL zM 0
S-ep-Aug-07 Sep-07 Oct-07 Month Nov-07 Dec-07 Progress Energy Brunswick Nuclear Plant Southport, NC Figure 3-9 Tritum Activity vs. Time in Shallow Groundwater Aquifer Silar Services Inc.
LEGEND:
RESUL 7S OF TRIRt7UM IN pCi/L A
INTERMEDIATE WELL -
NEW A
INTERMEDIA TE WELL -
EXISTING Progress Energy Brunswick Nuclear Plant Southport, NC SOURCE.
McKirn & Creed, June 15. 2007.
NOTES:
- 1. COORDINATES ARE BASED ON NC
- 2. ELEVATIONS ARE BASED ON NGVO GRID NAD83 V29.
SCALE 1" = 500' Figure 3-10 Intermediate Aquifer Groundwater Results 250 500 1000 1500 SS*
Silar Services Inc.
$5, Silar Services Inc.
LEGEND.
SOURCE.,
INTERAMEDIAT iW ELL -
NEW McKim & Cree4 June 15. 2007.
A INTERMEDIATE WELL -
EXISntNG NOTES:
q G
NDWA TER FLOW DIREC77ON
- 1. COORDINATES ARE BASED ON NC GRID NAD8J
- 2. ELEVAtiONS ARE BASED ON NGV029.
GROUNDWATER CO*NTUR LINE (DASHED tW4ERE INFERRED) 2.1 ELEVATON MEAN SEA LEWL SCALE 1" = 500' Progress Energy Brunswick Nuclear Plant Southport, NC Figure 3-1l Potentiometric Surface Mop Intermediate Aquifer-October 2. 2007 0
250 500 1000 1500 S
Silar Services Inc.
K LEGEND:
SOURCE.
A INTERMEDIATE K*LL -
NEW McKim & Creed, June 15, 2007.
A INlERMEDIA7E MU EXIS ING NOTES'
= GROUNDWATER FLOW DIRECt7ON
- f. COORDINA 7ES ARE BASED ON NC GRID NAD83
- 2. ELEVATIONS ARE BASED ON NGVD29.
GROUNDWATER CONTOUR LINE (DASHED *Hq-ERE INFERRED) 2.1 ELEVA71ON MEAN SEA LEI-E SCALE 1" = 500' Progress Energy Brunswick Nuclear Plant Southport, NC Figure 3-12 Potentiometric Surface Map Intermediate Aquifer-October 16, 2007 0
250 500 1000 1500
§,
Silar Services Inc.
Summary of Tritium in Intermediate Groundwater Aquifer
-I LI 0.
- 0-9 8000 6000 4000 2000 0
.A Ar 7M -ESS-17B
-- 1ESS-18B A
ESS-19B
- ESS-20B ESS-21B S
ESS-22 B
-ESS-24B
-ESS-25B
~1 Aug-07 Sep-07 Oct-07 Month Nov-07 Dec-07 Progress Energy Brunswick Nuclear Plant Southport, NC Figure 3-13 Tritium Activity vs. Time in Intermediate Groundwater Aquifer Silar Services Inc.
LEGEND:
SOURCE.,
McKim & Creed, June 15. 2007.
DEEP MWLL -
NEW NOTESR DEEP WELL -
EXIStiNG
- 1. COORDINATES ARE BASED ON NC GRID NAD83
- 2. ELEVA7iONS ARE BASED ON NGVD29.
<==
GROUNDWA TER FLOW DIRECTION GROUNDWATER CONTOUR LINE (DASHED NIHERE INFERRED) 2.1 ELEVAliON MEAN SEA LEvL Progress Energy Brunswick Nudeff Plant Soulhpod, NC SCALE 1" = 500' M o I Im 0
250 500 1000 1500 Figure 3-14 Potentiometric Surface Mop Deep Aquifer-October 2, 2007 IS4 Silar Services Inc.
§§,
Silar Services Inc.
SOURCE:
McKim & Creed. June 15. 200Z NOTES.
- 1. COORDINATES ARE BASED ON NC GRID NAD83
- 2. ELEVAT7ONS ARE BASED ON NGW)29.
G DEEP KELL -
NEW O
DEEP VIELL -
EXISt7NG GROUNDWATER FLOW DIREC7ON GROUNDWA TER CONTOUR LINE (DASHED V#IERE INFERRED) 2.1 EZEVA71ON MEAN SEA LEVEL Progress Energy Brunswick Nuclear Plant Southport, NC SCALE 1" = 500 0
250 500 1000 1500 Figure 3-15 Potentiometric Surfoce Map Deep Aquifer-October 16, 2007 Silar Services Inc.