ML101940501

From kanterella
Jump to navigation Jump to search
Annual Report Slides
ML101940501
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 04/01/2008
From:
Silar Services
To:
Office of Information Services, Progress Energy Carolinas
References
FOIA/PA-2010-0209
Download: ML101940501 (19)


Text

Progress Energy Brunswick Nuclear Plant Southport, NC L4 Figure 1--2 Site Layout Map Silar Services Inc.

Approximate scale: 1" = 600' Source: Brunswick GIS

K CME z

I SOURCE.,

McKim & Cred. JUne 15, 2007.

NOTES:

1. COORDINA TES ARE BASED ON NC GRID NAD83
2. ELEVATIlONS ARE BASED ON NOWG29.

C.SCALE I'= 5W z

0

__0_250 500 1000 150 LEGEND:

S SHALLOW VELL EXISTING SHALLOW KELL MANHOLE WAYPOINT Pmgms EM Southpor NC 2 S V

orio q Ne cc L

oo~o Mcp S Silar Services Inc.,

McKim & Creed, June 15. 2007.

LEGEND:

N07ES:

1.NOOT S AEBSD!

IN7ERMEDIA7E *FLL

7. COORDINATEFS ARE BASED ON NC GRID NAD8J Progress Energy Brunswick Nudew Plant Southport, NC
2. EL.EVA TIONS ARE BASED ON NGV29.

SCALE 1" = 500' 1 EL I

IL A

EXIStiNG INTERMEDIA T

  • ELL Figure 2-2 Intermediate Monitoring Welt Location Map 1500 Silar Services Inc.

0 250 500 1000

K 4

LEGEND.

0 DEEP kOELL SOURCE:

McKim & Creed. June 15, 2007.

NOTE-S

1. COORDINATES ARE BASED ON NC GRID NAD83
2. ELEVATIONS ARE BASED ON NGWV29.

SCALE 1"=500' 0

25 50 1

10 Progress Energy Brunswick Nuclear Plant souepot, NC Figure 2-3 Deep Monitoring Well Location Map 0

250 500 1060 15D0 S~Silar Services Inc.

§§,

Silar Services Inc.

Storm Drain Collection Basin Tritium Activity July-December 2007 4.'

2 t

3.50E+05 3.OOE+05 2.50E+05 2.00E+05 1.50E+05 1.00E+05 5.OOE+04 0.OOE+00 7/1/2007 8/1/2007 9/1/2007 10/1/2007 11/1/2007 12/1/2007 0:00 0:00 0:00 0:00 0:00 0:00 Date SDCB H-3, pCi/L Progress Energy Brunswick Nuclear Plant Southport, NC Figure 3-1 Storm Drain Collection Basin Tritium Activity Silar Services Inc.

i McKim & Creed June 15, 200Z ISOCONCENTRAlION CONTOUR OF TRI77UM IN pCi/A NOTES:

L. COORDINATES ARE BASED ON NC GRID NAD8J

2. ELEVAtliONS ARE BASED ON NGW429.

3 RESULTIS ARE pCi/L Progress Energy Brunswick Nuclear Plant Southport, NC SCALE 1" = 500' Figure 3-2 Shallow Aquifer Groundwater Results August 2007 0

250 500 1000 1500 nS Silar Services Inc.

SOURCE,"

LEGEND:

McKim & Creed. June 15 2007.

ISOCONCENTRATION CONTOUR OF IRI7IUM IN pC/L NOTESS

1. COORDINATES ARE BASED ON NC GRID NAD8JSCALE I"= 5
2. ELEVA7iONS ARE BASED ON NGWI29.

J. RESUL 7S ARE pCi"L 1Proress Eney Brunswick Nuclear Plant Southport, NC 0

250 60 1U ENO Figure 3-3 Shallow Aquifer Groundwater Results September 2007 Silar Services Inc.

cKim & Creed June 15. 2007.

LEGEND:

NOTES:

ISOCONCENTRATION CONTOUR OF TRITIUM IN pC,/L

1. COORDINATES ARE BASED ON NC GRID NAD83
2. ELEVATIONS ARE BASED ON NGI,029.

J RESULTS ARE pC/l.

Progress Energy Brunswick Nuclear Plont Southport, NC SCALE 1"=500' Figure 3-4 Shollow Aquifer Groundwater Results October 2007 0

250 500 1000 1500 5$*

Silar Services Inc.

Progress Energy Brunswick Nucleor Plont Southport, NC Figure 3-5 Shallow Aquifer Groundwatcr Results November 200/

SSilar Services Inc.

E C..

~

-'ý

, IV SOURCE:

LEGEND:

McKim & Cree, JAmne 15, 20OZ ISOCONCENTRAI7ON CONTOUR OF 7RI77UM IN pCi/l NOTES:

I. COORDINATES ARE BASED ON NC GRID NAD83

2. ELEVARlONS ARE BASED ON NGVD29.

I. RESULTS ARE pCiL SCALE 1" = 500 0

250 500 1000 1500

0 E

E SOURCE.,

LEGEND:

McKim & Creed June 15, 20DZ ISOCONCENTYRATON CONTOUR OF TRI77UM IN pCi/L NOTES:

I. COORDINATES ARE BASED ON NC GRID NAD83

2. ELEVA I7ONS ARE BASED ON NGVD29.
3. RESUL IS ARE pCI/L Progress Energy Brunswick Nuclear Plant Southport, NC SCALE I" = 500' 0

250 500 1000 1500 Figure 3-6 Shallow Aquifer Groundwater Resuits December 2007 Silar Services Inc.

yii~i* %

  • SUC SMALLOW WELL -

NEW SOURCEF AMcKkm & Creed. June 15, 2007.

SHALLOW HELL -

EXIS77NG NOTES&

GROUNDWATER FL0W DIRECt7ON

1. COORDINA YES ARE BASED ON NC GRID NAD83
2. ELEVA7lONS ARE BASED ON NGV29.

GROUND WA 7E R

CONTOUR UNE (DASHED WMERE INFERRED) 2.1 ELEVA7lON MEAN SEA LEWL Progress Energy Brunswick Nuclear Ph&~t Southport, NC SCALE 1" = 500' 0

250 500 1000 1500 Figure 3-7 Potentiometric Surface Map Shallow Aquifer-October 2, 2007 Silar Services Inc.

K LEGEND:

E] SHALLOW VELL -

NEW SHALLOW KELL -

EXISTING SOURCE:

McKim & Creed, #Jne 15, 2007 NOTES

1. COORDINATES ARE BASED ON NC GRID NAD83
2. ELEVATIONS ARE BASED ON NG, 29.

SCALE 1"=5W Progress Energy Brunswic Nuclear Plant Southport NC Figure 3-8 Potenofimetric Surface Map Shallow Aquifer-October 16, 2007 0

250 500 1000 1500 nS Silar Services Inc.

Tritium Activity vs. Time in Shallow Groundwater Aquifer 900000 800000 00 0

0 CNI C-0 a-ILz z

CO 0

0 700000 600000

":7 L-J U 500000 400000

ýA ESS-17C ESS-18C ESS-19C ESS-20C ESS-21C ESS-22C ESS-23C ESS-24C ESS-25C ESS-26C ESS-27C ESS-28C ESS-STAB ESS-30C ESS-31C 300000 200000 100000 i

m a-0 EL CL zM 0

S-ep-Aug-07 Sep-07 Oct-07 Month Nov-07 Dec-07 Progress Energy Brunswick Nuclear Plant Southport, NC Figure 3-9 Tritum Activity vs. Time in Shallow Groundwater Aquifer Silar Services Inc.

LEGEND:

RESUL 7S OF TRIRt7UM IN pCi/L A

INTERMEDIATE WELL -

NEW A

INTERMEDIA TE WELL -

EXISTING Progress Energy Brunswick Nuclear Plant Southport, NC SOURCE.

McKirn & Creed, June 15. 2007.

NOTES:

1. COORDINATES ARE BASED ON NC
2. ELEVATIONS ARE BASED ON NGVO GRID NAD83 V29.

SCALE 1" = 500' Figure 3-10 Intermediate Aquifer Groundwater Results 250 500 1000 1500 SS*

Silar Services Inc.

$5, Silar Services Inc.

LEGEND.

SOURCE.,

INTERAMEDIAT iW ELL -

NEW McKim & Cree4 June 15. 2007.

A INTERMEDIATE WELL -

EXISntNG NOTES:

q G

NDWA TER FLOW DIREC77ON

1. COORDINATES ARE BASED ON NC GRID NAD8J
2. ELEVAtiONS ARE BASED ON NGV029.

GROUNDWATER CO*NTUR LINE (DASHED tW4ERE INFERRED) 2.1 ELEVATON MEAN SEA LEWL SCALE 1" = 500' Progress Energy Brunswick Nuclear Plant Southport, NC Figure 3-1l Potentiometric Surface Mop Intermediate Aquifer-October 2. 2007 0

250 500 1000 1500 S

Silar Services Inc.

K LEGEND:

SOURCE.

A INTERMEDIATE K*LL -

NEW McKim & Creed, June 15, 2007.

A INlERMEDIA7E MU EXIS ING NOTES'

= GROUNDWATER FLOW DIRECt7ON

f. COORDINA 7ES ARE BASED ON NC GRID NAD83
2. ELEVATIONS ARE BASED ON NGVD29.

GROUNDWATER CONTOUR LINE (DASHED *Hq-ERE INFERRED) 2.1 ELEVA71ON MEAN SEA LEI-E SCALE 1" = 500' Progress Energy Brunswick Nuclear Plant Southport, NC Figure 3-12 Potentiometric Surface Map Intermediate Aquifer-October 16, 2007 0

250 500 1000 1500

§,

Silar Services Inc.

Summary of Tritium in Intermediate Groundwater Aquifer

-I LI 0.

  • 0-9 8000 6000 4000 2000 0

.A Ar 7M -ESS-17B

-- 1ESS-18B A

ESS-19B

  • ESS-20B ESS-21B S

ESS-22 B

-ESS-24B

-ESS-25B

~1 Aug-07 Sep-07 Oct-07 Month Nov-07 Dec-07 Progress Energy Brunswick Nuclear Plant Southport, NC Figure 3-13 Tritium Activity vs. Time in Intermediate Groundwater Aquifer Silar Services Inc.

LEGEND:

SOURCE.,

McKim & Creed, June 15. 2007.

DEEP MWLL -

NEW NOTESR DEEP WELL -

EXIStiNG

1. COORDINATES ARE BASED ON NC GRID NAD83
2. ELEVA7iONS ARE BASED ON NGVD29.

<==

GROUNDWA TER FLOW DIRECTION GROUNDWATER CONTOUR LINE (DASHED NIHERE INFERRED) 2.1 ELEVAliON MEAN SEA LEvL Progress Energy Brunswick Nudeff Plant Soulhpod, NC SCALE 1" = 500' M o I Im 0

250 500 1000 1500 Figure 3-14 Potentiometric Surface Mop Deep Aquifer-October 2, 2007 IS4 Silar Services Inc.

§§,

Silar Services Inc.

SOURCE:

McKim & Creed. June 15. 200Z NOTES.

1. COORDINATES ARE BASED ON NC GRID NAD83
2. ELEVAT7ONS ARE BASED ON NGW)29.

G DEEP KELL -

NEW O

DEEP VIELL -

EXISt7NG GROUNDWATER FLOW DIREC7ON GROUNDWA TER CONTOUR LINE (DASHED V#IERE INFERRED) 2.1 EZEVA71ON MEAN SEA LEVEL Progress Energy Brunswick Nuclear Plant Southport, NC SCALE 1" = 500 0

250 500 1000 1500 Figure 3-15 Potentiometric Surfoce Map Deep Aquifer-October 16, 2007 Silar Services Inc.