Issue date | Title | Topic | |
---|---|---|---|
ML22251A235 | 14 September 2022 | Presentation Slides for September 14, 2022, Observation Public Meeting | |
ML22109A212 | 20 April 2022 | Duke Energy Pre-Submittal Public April 20, 2022, Meeting Presentation | Incorporated by reference Surveillance Frequency Control Program Operational leakage |
ML22091A133 | 1 April 2022 | Bru Har Combined 2021 Assessment Meeting Slides | Condition Adverse to Quality Coronavirus |
ML21322A326 | 29 November 2021 | Duke Energy November 29, 2021 Pre-Submittal Public Meeting Slides for EOF Relocation Licensing Amendment Request | |
ML21090A116 | 31 March 2021 | Combined 2020 Aam Presentation | Condition Adverse to Quality COVID-19 |
ML21041A453 | 17 February 2021 | Brunswick/Nrc Pre-submittal Meeting: LAR to Adopt TSTF-505, Rev. 2 (Risk-Informed Completion Times) Presentation | High winds Ultimate heat sink Internal Flooding Probabilistic Risk Assessment FLEX |
ML21033A702 | 3 February 2021 | Pre-submitting for Planned LAR for Standby Liquid Control Tank Volume Increase | Shutdown Margin Reactor Vessel Water Level |
ML21011A082 | 12 January 2021 | Pre-Submittal Meeting January 12, 2021, Revision to VRR-01, Full Stroke Testing of Safety/Relief Valves - Presentation Material | Stroke time Power Operated Valves |
ML20100G634 | 9 April 2020 | Revised- Bru 2019 Annual Assessment Meeting Slides | COVID-19 |
ML20099C999 | 8 April 2020 | Har 2019 Mtg Slides | Condition Adverse to Quality COVID-19 |
ML20099D128 | 8 April 2020 | Bru 2019 Mtg Slides | COVID-19 |
ML19318F291 | 18 November 2019 | Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request | Finite Element Analysis Stress corrosion cracking |
ML19214A056 | 7 August 2019 | Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 | |
ML19123A353 | 2 May 2019 | Public Meeting Summary - Brunswick Steam Electric Plant, Docket Nos. 05000325 and 05000324 | |
ML18255A014 | 12 September 2018 | BWROG Presentation Slides for Public Meeting Sept 12 2018 | Corrosion bonding |
ML17331A627 | 29 November 2017 | Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 | High winds |
ML17297B789 | 26 October 2017 | Meeting Slide for Partially Closed Pre-submittal Public Meeting with Duke Energy for License Amendment Request to Adopt Areva'S XM-11 Fuel Methodology for Brunswick Steam Electric Plant | MELLLA |
ML17229B294 | 22 August 2017 | Meeting Slide Regarding Partially Closed Pre-submittal Public Meeting with Duke Energy for a License Amendment Request for Brunswick Steam Electric Plant | |
ML16231A132 | 18 August 2016 | Materials for 8/18/16 Pre-Application Meeting Brunswick Mellla+ LAR | Downpower Power Uprate |
ML16210A515 | 28 July 2016 | Bnp Commercial Grade Dedication Issue (Printable) | Commercial Grade Dedication Commercial Grade |
ML16134A174 | 12 May 2016 | Summary of Public Meeting - 2015 Annual Assessment Regarding Brunswick, Units 1 and 2 | Open House |
ML14140A188 | 19 May 2014 | Summary of Public Meeting - 2013 Annual Assessment Regrading Brunswick Steam Electric Plant | Open House |
ML14135A511 | 17 April 2014 | Enclosure 4 to BSEP 14-0048 - Areva Mellla+ Methods Applicability Presentation (Non-Proprietary Version) | MELLLA Water rod |
ML14135A509 | 17 April 2014 | Enclosure 1 to BSEP 14-0048, Duke Energy Presentation - Brunswick Mellla+ Methods Applicability, Pre-Application Meeting | Exclusive Use Affidavit |
ML13312A988 | 8 November 2013 | Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications | |
ML13308A007 | 1 November 2013 | Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. | |
ML13277A038 | 24 September 2013 | GEH Presentation on Methods Applicability to Areva Atrium 10XM Fuel | |
ML13277A037 | 20 August 2013 | Duke Energy Presentation - Brunswick Mellla+ Methods Applicability, Pre-Application Meeting, August 20, 2013 | Power Uprate |
ML13130A255 | 10 May 2013 | 4/24/2013 - Meeting Summary - Category 3 Public Meeting - Annual Assessment of Brunswick Steam Electric Plant | |
ML12181A036 | 29 June 2012 | Meeting Summary - Category 1 Public Meeting - Annual Assessment of Brunswick Steam Electric Plant, Docket Nos. 50-325, 50-324 | |
ML12158A344 | 6 June 2012 | Meeting Slides for Pre-Application Meeting with Carolina Power and Light Company Regarding Emergency Diesel Generator Completion Time Extension for Brunswick Steam Electric Plant, Units 1 and 2 | High winds Internal Flooding Probabilistic Risk Assessment Coatings Thermoset |
ML11102A005 | 12 April 2011 | Progress Energy - Slides for NFPA 805 Pre-LAR Application Meeting April 12, 2011 | Safe Shutdown Fire Barrier Probabilistic Risk Assessment Operator Manual Action Multiple Spurious Operation Hemyc Fire Protection Program Weak link Power Uprate |
ML102030462 | 20 July 2010 | Groundwater Protection Status | |
ML101670523 | 8 June 2010 | NRC Fire Protection Screening Criteria, Brunswick Nuclear Plant | Safe Shutdown Probabilistic Risk Assessment Operator Manual Action Emergency Lighting Job Performance Measure |
ML101540418 | 27 May 2010 | Meeting Summary - Public Meeting - Brunswick Steam Electric Plant Annual Assessment - Reactor Oversight Program 2009 Presentation Slides | |
ML100150763 | 15 January 2010 | Meeting Presentation Brunswick Nuclear Plant Human Performance | |
ML100150704 | 14 January 2010 | Human Performance Slides | |
ML093020671 | 22 October 2009 | Emergency Diesel Generators - Progress Energy | |
ML101940095 | 8 October 2009 | Marsh, River, and Creek Tritium Results Updated 10/08/09 | |
ML101940093 | 8 October 2009 | Groundwater Well Samples Results, Updated 10/08/09 | |
ML092321080 | 20 August 2009 | MELLLA Plus Implementation | MELLLA Stress corrosion cracking |
ML092160963 | 4 August 2009 | Meeting Summary - Public Meeting Category 1 - Preliminary White Finding - Brunswick Steam Electric Plant | License Renewal Preliminary White Finding |
ML083080005 | 31 October 2008 | Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit | B.5.b License Renewal Dissimilar Metal Weld Power change Siren Power Uprate |
ML101940453 | 21 May 2008 | Email from Grzeck, Lee to Heather Gepford, Austin, Joe, George Kuzo, England, Louise, Kemp, Daniel and Dale.Dusenbury@Ncmail.Net; Subject: Storm Drain Collection Basin and Storm Drain Stabilization.Pdf; Sampling Locations Data Updated 5-19- | |
ML081300658 | 1 May 2008 | EOC 2007 NRC Slides | |
ML081300666 | 1 May 2008 | EOC 2007 Progress Energy Slides | Foreign Material Exclusion Siren |
ML101940501 | 1 April 2008 | Annual Report Slides | |
BSEP 07-0108, Areva Presentation Slides for Brunswick Fuel Transition License Amendment Request | 31 July 2007 | Areva Presentation Slides for Brunswick Fuel Transition License Amendment Request | Shutdown Margin Anticipated operational occurrence Feedwater Controller Failure Fuel cladding Power Uprate Overspeed trip Water rod |
ML071150327 | 23 April 2007 | Brunswick, EOC Slides, Cy 2006 | Power change |
ML071080384 | 18 April 2007 | Presentation Slides from Public Management Meeting to Discuss Brunswick Site and Emergency Diesel Generator Improvements | Foreign Material Exclusion Thermography |