MONTHYEARIR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20243012023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23212B2682023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23130A3902023-05-12012 May 2023 Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 ML22332A0132022-11-23023 November 2022 Operator Licensing Written Examination Approval 05000325/2022301 and 05000324/2022301 ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000324/20224032022-11-10010 November 2022 Cyber Security Inspection Report 05000324/2022403 and 05000325/2022403 ML22307A1762022-11-0707 November 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) IR 05000324/20220032022-11-0707 November 2022 Integrated Inspection Report 05000324/2022003 and 05000325/2022003 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000324/20220052022-08-24024 August 2022 Updated Inspection Plan for Brunswick Steam Electric Plant (Report 05000324/2022005 and 05000325/2022005) ML22230D0692022-08-22022 August 2022 Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-ichi Accident IR 05000324/20220022022-08-0505 August 2022 Integrated Inspection Report 05000324/2022002 and 05000325/2022002 IR 05000324/20220102022-06-27027 June 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000324 2022010 and 05000325 2022010 ML22028A1742022-05-12012 May 2022 Issuance of Amendment Nos. 309 and 337 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-580, Revision 1 IR 05000324/20220012022-05-10010 May 2022 Integrated Inspection Report 05000324/2022001 and 05000325/2022001 ML22119A1352022-05-0909 May 2022 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000325/2022403; 05000324/2022403 ML22082A2682022-05-0202 May 2022 Issuance of Amendment Nos. 308 and 336 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 ML22102A0502022-04-11011 April 2022 301 Corporate Notification Letter IR 05000324/20224012022-03-16016 March 2022 Security Baseline Inspection Report 05000324/2022401 and 05000325/2022401 ML22054A2152022-03-0808 March 2022 Correction to Amendments to Revise Standby Liquid Control System Boron Solution Storage Tank Volume Technical Specifications IR 05000324/20210062022-03-0202 March 2022 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 (Reports No. 05000324/2021006 and 05000325/2021006) IR 05000324/20210042022-02-14014 February 2022 Integrated Inspection Report 05000324/2021004 and 05000325/2021004 ML22035A1262022-02-0909 February 2022 Withdrawal of Exemption Request from the Requirements of 10 CFR Part 50, Appendix E, Section IV.F.2.d (EPID L-2021-LLE-0055 (COVID-19)) ML21354A5032022-01-24024 January 2022 Requested Exemption from 10 CFR 50, Appendix E, Section IV.F.2.D Not Required (EPID L-2021-LLE-0055 (COVID-19)) ML22018A1842022-01-18018 January 2022 Notification of Brunswick Steam Electric Plant, Units 1 & 2 - Design Bases Assurance Inspection - U.S. Nuclear Regulatory Inspection Report 05000324/2022010 and 05000325/2022010 ML21348A7192021-12-21021 December 2021 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times 2023-09-25
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22091A1332022-04-0101 April 2022 Bru Har Combined 2021 Assessment Meeting Slides ML21041A4532021-02-17017 February 2021 Brunswick/Nrc Pre-submittal Meeting: LAR to Adopt TSTF-505, Rev. 2 (Risk-Informed Completion Times) Presentation ML21011A0822021-01-12012 January 2021 Pre-Submittal Meeting January 12, 2021, Revision to VRR-01, Full Stroke Testing of Safety/Relief Valves - Presentation Material ML20100G6342020-04-0909 April 2020 Revised- Bru 2019 Annual Assessment Meeting Slides ML20034F2842020-02-0303 February 2020 Implementation of TSTF-564 - NRC Conference Call - February 5, 2020 ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML18255A0102018-09-12012 September 2018 NRC Slides for Target Rock Public Meeting ML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 ML17297B7892017-10-26026 October 2017 Meeting Slide for Partially Closed Pre-submittal Public Meeting with Duke Energy for License Amendment Request to Adopt Areva'S XM-11 Fuel Methodology for Brunswick Steam Electric Plant ML17229B2942017-08-22022 August 2017 Meeting Slide Regarding Partially Closed Pre-submittal Public Meeting with Duke Energy for a License Amendment Request for Brunswick Steam Electric Plant ML16231A1322016-08-18018 August 2016 Materials for 8/18/16 Pre-Application Meeting Brunswick Mellla+ LAR ML16210A5152016-07-28028 July 2016 Bnp Commercial Grade Dedication Issue (Printable) ML16134A1742016-05-12012 May 2016 Summary of Public Meeting - 2015 Annual Assessment Regarding Brunswick, Units 1 and 2 ML15125A4602015-05-0505 May 2015 Summary of Public Meeting to Discuss the Annual Assessment of the Brunswick Steam Electric Plant with the Public for the Period of January 1, 2014, Through December 31, 2014 ML14140A1882014-05-19019 May 2014 Summary of Public Meeting - 2013 Annual Assessment Regrading Brunswick Steam Electric Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13277A0382013-09-24024 September 2013 GEH Presentation on Methods Applicability to Areva Atrium 10XM Fuel ML13277A0372013-08-20020 August 2013 Duke Energy Presentation - Brunswick Mellla+ Methods Applicability, Pre-Application Meeting, August 20, 2013 ML12206A3252012-08-0707 August 2012 G20120513/EDATS: OEDO-2012-0436 - Briefing Book for Meeting with Duke Energy on August 7, 2012 ML12188A0712012-07-11011 July 2012 G20120473/ EDATS: OEDO-2012-0404 - Briefing Book - Briefing Package for Meeting with Duke Energy on July 11, 2012 ML12158A3442012-06-0606 June 2012 Meeting Slides for Pre-Application Meeting with Carolina Power and Light Company Regarding Emergency Diesel Generator Completion Time Extension for Brunswick Steam Electric Plant, Units 1 and 2 ML12152A1452012-05-31031 May 2012 20120531 Bnp NRC Pre-LAR Application Meeting Final ML1115109972011-05-31031 May 2011 Category 1 Public Meeting - Meeting Summary - Annual Assessment of Brunswick Steam Electric Plant ML1020304622010-07-20020 July 2010 Groundwater Protection Status ML1016705232010-06-0808 June 2010 NRC Fire Protection Screening Criteria, Brunswick Nuclear Plant ML1015404182010-05-27027 May 2010 Meeting Summary - Public Meeting - Brunswick Steam Electric Plant Annual Assessment - Reactor Oversight Program 2009 Presentation Slides ML1001507632010-01-15015 January 2010 Meeting Presentation Brunswick Nuclear Plant Human Performance ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit ML1019404532008-05-21021 May 2008 Email from Grzeck, Lee to Heather Gepford, Austin, Joe, George Kuzo, England, Louise, Kemp, Daniel and Dale.Dusenbury@Ncmail.Net; Subject: Storm Drain Collection Basin and Storm Drain Stabilization.Pdf; Sampling Locations Data Updated 5-19- BSEP 07-0108, Areva Presentation Slides for Brunswick Fuel Transition License Amendment Request2007-07-31031 July 2007 Areva Presentation Slides for Brunswick Fuel Transition License Amendment Request ML0711503272007-04-23023 April 2007 Brunswick, EOC Slides, Cy 2006 ML0710803842007-04-18018 April 2007 Presentation Slides from Public Management Meeting to Discuss Brunswick Site and Emergency Diesel Generator Improvements ML0710804062007-04-0505 April 2007 Emergency Diesel Generator No. 1 Trip and Failure of Engine Crankshaft Bearing ML0615301932006-03-27027 March 2006 NFPA 805 Pilot Observation Visit Trip Report - March 2006 - Handouts ML0607903052006-03-10010 March 2006 Meeting Handouts for Summary of Meeting W/Carolina Power & Light Regarding the Fuel Transition Process and Licensing Submittals for Brunswick, Units 1 & 2 ML0529003762005-10-0505 October 2005 Meeting with Carolina Power & Light, Meeting Handouts, MSIV Leakage Rate Limit License Amendment Request ML0523604402005-08-11011 August 2005 Attachment 4 - Progress Energy Slides ML0511004572005-04-12012 April 2005 NRC CY2004 Annual Assessment Meeting - Brunswick - Southport, North Carolina, April 12, 2005 ML0504003192005-02-0404 February 2005 Summary of Meeting with Progress Energy Re Brunswick Steam Electric Plant ML0503902102005-01-27027 January 2005 Scoping Meeting Slides Re Brunswick Steam Electric Plant, Units 1 & 2 ML0436402692004-12-0909 December 2004 Progress Energy, Meeting Briefing of 12/9/04, Fire Protection Program ML0901504242004-08-25025 August 2004 Progress Energy Carolinas, Inc., Handouts for the Brunswick and H.B. Robinson NPP Tours During the Shearon Harris Scol Environmental Site Audit of Alternative Sites ML0403505052004-01-0707 January 2004 Meeting Handouts with Progress Energy to Discuss Fire Protection Initiatives ML0333601902003-11-25025 November 2003 Meeting Summary - Brunswick Steam Electric Plant ML0327206212003-09-24024 September 2003 Examiner - Vendor Matrix with Phone Number ML0327206112003-09-22022 September 2003 Exam Process 2022-09-14
[Table view] |
Text
February 4, 2005 Carolina Power and Light Company ATTN: Mr. C. J. Gannon Vice President Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429
SUBJECT:
MEETING
SUMMARY
- PROGRESS ENERGY, BRUNSWICK STEAM ELECTRIC PLANT - DOCKET NOS. 50-325, 50-324
Dear Mr. Gannon:
This letter refers to the meeting conducted at your request at the Region II Office, Sam Nunn Atlanta Federal Center, 61 Forsyth Street SW, Atlanta, Georgia, 30303-8931 in Suite 24T20 on January 28, 2005. The meetings purpose was to discuss performance of the Brunswick Steam Electric Plant. Enclosed are a list of attendees and the presentation handout.
During the presentation, Mr. Neil Gannon, Site Vice-President, provided the introduction and overview, highlighting organization and management changes at the Brunswick site and the Progress Energy Voluntary Early Retirement Program (VERP). Mr. Tim Cleary, Director of Site Operations, provided a plant update of Units 1 and 2 to include 2004 highlights and challenges.
Mr. Ed Quidley, Manager of Outage & Scheduling, discussed plans for the upcoming Spring 2005 Unit 2 refueling outage. Mr. Ed ONeil, Manager of Nuclear Services & Regulatory Affairs, reviewed 2004 emergency preparedness activities and license renewal milestones. Finally, Mr.
Allen Brittain, Superintendent of Security, presented status of site security.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 562-4530.
Sincerely,
/RA/
Paul E. Fredrickson, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-325, 50-324 License Nos. DPR-71, DPR-62
Enclosures:
- 1. List of Attendees
- 2. Licensee Presentation Handout cc w/encl:(See page 2)
CP&L 2 cc w/encl: Chairman of the North Carolina T. P. Cleary, Director Utilities Commission Site Operations c/o Sam Watson, Staff Attorney Brunswick Steam Electric Plant Electronic Mail Distribution Progress Energy Carolinas, Inc.
Electronic Mail Distribution Robert P. Gruber Executive Director David H. Hinds Public Staff NCUC Plant Manager 4326 Mail Service Center Brunswick Steam Electric Plant Raleigh, NC 27699-4326 Carolina Power & Light Company Electronic Mail Distribution Public Service Commission State of South Carolina James W. Holt, Manager P. O. Box 11649 Performance Evaluation and Columbia, SC 29211 Regulatory Affairs PEB 7 Carolina Power & Light Company David R. Sandifer Electronic Mail Distribution Brunswick County Board of Commissioners Edward T. O'Neil, Manager P. O. Box 249 Support Services Bolivia, NC 28422 Carolina Power & Light Company Brunswick Steam Electric Plant Warren Lee Electronic Mail Distribution Emergency Management Director New Hanover County Department of Lenny Beller, Supervisor Emergency Management Licensing/Regulatory Programs P. O. Box 1525 Carolina Power and Light Company Wilmington, NC 28402-1525 Electronic Mail Distribution Distribution w/encls: (See page 3)
David T. Conley Associate General Counsel - Legal Dept.
Progress Energy Service Company, LLC Electronic Mail Distribution John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Beverly Hall, Acting Director Division of Radiation Protection N. C. Department of Environment and Natural Resources Electronic Mail Distribution Peggy Force Assistant Attorney General State of North Carolina Electronic Mail Distribution
CP&L 3 Distribution w/encl:
B. Mozafari, NRR L. Slack, RII EICS RIDSRIDSNRRDIPMLIPB PUBLIC OFFICE DRP:RII SIGNATURE NAME JPolickoski:aws DATE 2/ /2005 2/ /2005 2/ /2005 2/ /2005 2/ /2005 2/ /2005 2/ /2005 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: E:\Filenet\ML050400319.wpd
List of Attendees NRC Personnel W. Travers, Regional Administrator, Region II (RII)
L. Wert, Deputy Director, Division of Reactor Projects (DRP), RII C. Christensen, Deputy Director, Division of Reactor Safety (DRS), RII P. Fredrickson, Chief, Reactor Projects Branch 4, DRP, RII J. Polickoski, Project Engineer, DRP, RII E. Michel, Reactor Inspector, DRS, RII Licensee Personnel - Brunswick N. Gannon, Site Vice-President T. Cleary, Director of Site Operations E. Quidley, Manager of Outage and Scheduling E. ONeil, Manager of Nuclear Services & Regulatory Affairs A. Brittain, Superintendent of Security Enclosure 1