Summary of Meeting with Progress Energy Re Brunswick Steam Electric Plant
ML050400319
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 02/04/2005
From: Fredrickson P
Division of Nuclear Materials Safety II
To: Gannon C
Carolina Power & Light Co
Shared Package
ML050400316 List:
References
Download: ML050400319 (4)


Text

February 4, 2005 Carolina Power and Light Company ATTN: Mr. C. J. Gannon Vice President Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429

SUBJECT:

MEETING

SUMMARY

- PROGRESS ENERGY, BRUNSWICK STEAM ELECTRIC PLANT - DOCKET NOS. 50-325, 50-324

Dear Mr. Gannon:

This letter refers to the meeting conducted at your request at the Region II Office, Sam Nunn Atlanta Federal Center, 61 Forsyth Street SW, Atlanta, Georgia, 30303-8931 in Suite 24T20 on January 28, 2005. The meetings purpose was to discuss performance of the Brunswick Steam Electric Plant. Enclosed are a list of attendees and the presentation handout.

During the presentation, Mr. Neil Gannon, Site Vice-President, provided the introduction and overview, highlighting organization and management changes at the Brunswick site and the Progress Energy Voluntary Early Retirement Program (VERP). Mr. Tim Cleary, Director of Site Operations, provided a plant update of Units 1 and 2 to include 2004 highlights and challenges.

Mr. Ed Quidley, Manager of Outage & Scheduling, discussed plans for the upcoming Spring 2005 Unit 2 refueling outage. Mr. Ed ONeil, Manager of Nuclear Services & Regulatory Affairs, reviewed 2004 emergency preparedness activities and license renewal milestones. Finally, Mr.

Allen Brittain, Superintendent of Security, presented status of site security.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 562-4530.

Sincerely,

/RA/

Paul E. Fredrickson, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-325, 50-324 License Nos. DPR-71, DPR-62

Enclosures:

1. List of Attendees
2. Licensee Presentation Handout cc w/encl:(See page 2)

CP&L 2 cc w/encl: Chairman of the North Carolina T. P. Cleary, Director Utilities Commission Site Operations c/o Sam Watson, Staff Attorney Brunswick Steam Electric Plant Electronic Mail Distribution Progress Energy Carolinas, Inc.

Electronic Mail Distribution Robert P. Gruber Executive Director David H. Hinds Public Staff NCUC Plant Manager 4326 Mail Service Center Brunswick Steam Electric Plant Raleigh, NC 27699-4326 Carolina Power & Light Company Electronic Mail Distribution Public Service Commission State of South Carolina James W. Holt, Manager P. O. Box 11649 Performance Evaluation and Columbia, SC 29211 Regulatory Affairs PEB 7 Carolina Power & Light Company David R. Sandifer Electronic Mail Distribution Brunswick County Board of Commissioners Edward T. O'Neil, Manager P. O. Box 249 Support Services Bolivia, NC 28422 Carolina Power & Light Company Brunswick Steam Electric Plant Warren Lee Electronic Mail Distribution Emergency Management Director New Hanover County Department of Lenny Beller, Supervisor Emergency Management Licensing/Regulatory Programs P. O. Box 1525 Carolina Power and Light Company Wilmington, NC 28402-1525 Electronic Mail Distribution Distribution w/encls: (See page 3)

David T. Conley Associate General Counsel - Legal Dept.

Progress Energy Service Company, LLC Electronic Mail Distribution John H. O'Neill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Beverly Hall, Acting Director Division of Radiation Protection N. C. Department of Environment and Natural Resources Electronic Mail Distribution Peggy Force Assistant Attorney General State of North Carolina Electronic Mail Distribution

CP&L 3 Distribution w/encl:

B. Mozafari, NRR L. Slack, RII EICS RIDSRIDSNRRDIPMLIPB PUBLIC OFFICE DRP:RII SIGNATURE NAME JPolickoski:aws DATE 2/ /2005 2/ /2005 2/ /2005 2/ /2005 2/ /2005 2/ /2005 2/ /2005 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: E:\Filenet\ML050400319.wpd

List of Attendees NRC Personnel W. Travers, Regional Administrator, Region II (RII)

L. Wert, Deputy Director, Division of Reactor Projects (DRP), RII C. Christensen, Deputy Director, Division of Reactor Safety (DRS), RII P. Fredrickson, Chief, Reactor Projects Branch 4, DRP, RII J. Polickoski, Project Engineer, DRP, RII E. Michel, Reactor Inspector, DRS, RII Licensee Personnel - Brunswick N. Gannon, Site Vice-President T. Cleary, Director of Site Operations E. Quidley, Manager of Outage and Scheduling E. ONeil, Manager of Nuclear Services & Regulatory Affairs A. Brittain, Superintendent of Security Enclosure 1