ML032040128

From kanterella
Revision as of 20:24, 21 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Transmittal of Emergency Plan Procedures EPIP-EPP-27, Revision 11 and Emergency Public Information Procedure
ML032040128
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 07/15/2003
From: Detter G
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EPIP-EPP-27, Rev 11
Download: ML032040128 (46)


Text

P.O. Box 63 Lycoming, New York 13093 Constellaon Energy Group Nine Mile Point Nuclear Station July 15, 2003 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 RE: Nine Mile Point Unit 1 Nine Mile Point Unit 2 Docket No. 50-220 Docket No. 50-410 DPR-63 NPF-69 Gentlemen:

Enclosed please find a copy of the following procedure revision for Nine Mile Point Nuclear Station:

EPIP-EPP-27 Revision 11 Emergency Public Information Procedure This procedure revision is being submitted as required by Section V to Appendix E of 10 CFR Part 50. Should you have any questions, please feel free to contact Mr. James D.Jones, Director of Emergency Preparedness at (315) 349-4486.

Very truly o Mary n r anager Security & Emergency Preparedness gd/cr Enclosure pc: Mr. H.J. Miller, Regional Administrator, Region I (1 copy)

Mr. G.K. Hunegs, Senior Resident Inspector (1 copy)

Mr. P.S.Tam, Senior Project Manager, NRR (2 copies) 45

4 o o NINE MILE POINT NUCLEAR STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP-EPP-27 REVISION 11 EMERGENCY PUBLIC INFORMATION PROCEDURE Approved by:

G.L.Detter Manager Security and Emercy Prepdness Date /

THIS ISA FULL REVISION Effective Date: 06/16/2003 PERIODIC REVIEW DUE DATE JUNE, 2004

LIST OF EFFECTIVE PAGES Page No. Change No. Page No. Change No. Page No. Change No.

Coversheet 19 .... 40 ....

i.... 20 .... 41 ....

ii .... 21 .... 42 ....

1.... 22 ....

2.... 23....

3.... 24 ....

4.... 25 ....

5.... 26....

6.... 27 ....

7.... 28....

8.... 29 ....

9.... 30 ....

10.... 31 ....

11.... 32 ....

12.... 33 ....

13.... 34 ....

14.... 35 ....

15.... 36 ....

16.... 37 ....

17.... 38....

18 .... 39....

Page EPIP-EPP-27 Rev 11

TABLE OF CONTENTS SECTION PAGE 1.0 PURPOSE 1 2.0 RESPONSIBILITIES .

3.0 PROCEDURE. 2 3.1 Initial Actions 2 3.2 JNC Activation 3 3.3 JNC Operation . .. ,,,.4 4.0 DEFINITIONS. 6

5.0 REFERENCES

AND COMMITMENTS. 7 6.0 RECORD REVIEW AND DISPOSITION 8 ATTACHMENT 1: JNC ACTIVATION CHECKLIST. 9 ATTACHMENT2: PRESS RELEASE CHECKLIST .. 12 ATTACHMENT 3: JNC ADMINISTRATIVE MANAGER CHECKLIST 19 ATTACHMENT 4: JNC TECHNICAL BRIEFER CHECKLIST .23

\s.~,' ATTACHMENT 5: JNC RADIOLOGICAL BRIEFER CHECKLIST 25 ATTACHMENT 6: JNC RUMOR CONTROL COORDINATOR CHECKLIST 26 ATTACHMENT 7: MEDIA RESPONSE CHECKLIST ,,,,,,,, 28 ATTACHMENT 8: JNC RUMOR CONTROL CHECKLIST ,,, 29 ATTACHMENT 9: JNC MEDIA MONITORING CHECKLIST 30 ATTACHMENT 10: PUBLIC INQUIRY - MEDIA RESPONSE INQUIRY AND OFF AIR MONITOR FORM... 31 ATTACHMENT 11: JNC AUDIO VISUAL (CONTROL BOOTH) CHECKLIST .32 ATTACHMENT 12: JOINT NEWS CENTER STAFF SIGN IN(SAMPLE) .34 ATTACHMENT 13: JNC SHUTDOWN CHECKLIST ............................. 35 ATTACHMENT 14: JNC WORK AREAS ...................... 37 ATTACHMENT 15: JNC SPOKESPERSON ............................................ ,,,,.38 Page ii EPIP-EPP-27 Rev 11

1.0 PURPOSE This procedure defines the actions needed to accomplish coordinated public information functions at the Joint News Center (JNC) in an emergency involving Nine Mile Point. It Ismeant to compliment the radiological emergency response plans of New York State and Oswego County.

2.0 RESPONSIBILES 2.1 Director Nuclear Communications and Public Affairs (NUCAPA)

Prior to JNC activation, maintains responsibility for initial notifications to the news media inthe event of a declared emergency.

2.2 Joint News Center (JNC) Director 2.2.1 Maintains overall command and control of Joint News Center operations, including media response and rumor control functions.

2.2.2 Performs actions inaccordance with EPIP-EPP-23.

(Cl) 2.2.3 Reviews and approves technical information.

2.3 Director of Emergency Preparedness Ensures the JNC facilities, procedures and staff are maintained inaccordance with the Site Emergency Plan.

2.4 JNC Administrative Manager Directs all clerical/administrative/security support activities and functions at the Joint News Center (JNC) to include:

2.4.1 Opening/activating the JNC building when notified 2.4.2 Verifying and reporting JNC activating readiness to the JNC Director 2.4.3 Supervising all support activities and functions at the JNC 2.5 JNC Technical Briefer Supports the JNC Director by providing detailed technical information at pre-briefings to include:

2.5.1 Providing technically accurate information on the incident and plant operations for use by JNC personnel during media briefings.

2.5.2 Participating in preparations for news briefings Page 1 EPIP-EPP-27 Rev 11

2.5.3 Review of news release information for technical accuracy.

2.6 JNC Radiolo-iical Briefer Supports the JNC Director by providing detailed information at pre-briefings to include:

2.6.1 Providing technically accurate information associated with the radiological aspects on the incident and plant operations for use by JNC personnel during media briefings.

2.6.2 Participating inpreparations for news briefings 2.6.3 Review of news release information for accuracy associated with the radiological aspects of the incident.

2.7 JNC Writer Prepares written material including news releases, briefing summaries and other materials as directed by the JNC Director.

2.8 JNC Rumor Control Coordinator 2.8.1 Coordinates the efforts of rumor control, media response and media monitoring to ensure rumors are addressed and questions from both the media and general public are accurately answered.

2.8.2 Obtains approved information available to aid in response to rumor inquires.

2.9 JNC Spokesperson Supports the JNC Director by providing timely, technically accurate and complete briefings to the media when required or directed that are consistent with:

  • Nine Mile Point Nuclear Station LLC goals for Nuclear Safety, Personnel Safety and Plant Safety.
  • Information provided by the Oswego County, New York State and as applicable the NRC representatives.

3.0 PROCEDURE 3.1 Initial Actions (prior to JNC activation) 3.1.1 The Director NUCAPA, or designee will be notified of a declared emergency by normal ERO notification methods (pager, telephone call).

Page 2 EPIP-EPP-27 Rev 11

3.1.2 The Director NUCAPA, or designee should perform the following:

a. Develop a press release appropriate to the event. See Attachment 2 Figures 1 through 4 for sample of a press release.
b. Obtain approval (verbal OR written) of the press release contents from the SSS/ED.
c. Distribute press release to: EOF, JNC and other media as appropriate.
d. Periodically obtain updated information from the SSS/ED and make press releases inaccordance with Steps 3.1.2.a-d.
e. If the event isterminated, then perform appropriate notifications in accordance with Steps 3.1.2.a-d.
f. If appropriate, provide information to local and state officials.

3.2 JNC Activation 3.2.1 The JNC shall be activated upon declaration of an Alert emergency classification or higher, or any event expected to attract significant media attention.

3.2.2 If the JNC is being activated for causes other than a declared emergency, the JNC Director should ensure each unit SSS is notified.

3.2.3 The JNC Director should travel to and ensure that the JNC commences activation in accordance with Attachment 1.

3.2.4 The JNC Director should verify the JNC is staffed with the following positions:

  • JNC Director
  • JNC Spokesperson
  • Rumor Control Coordinator Rumor ControVMedia Response Staff (2)

Media Monitoring Staff (1)

Clerical staff (2)(assigned by EF Admin Logistics Manager)

Rad Briefer Technical Briefer JNC Administrative Manager JNC Writer Security

(* positions are required inorder to declare the JNC activated)

Page 3 EPIP-EPP-27 Rev 11

3.2.5 When the JNC is activated:

a. Direct the initiation of a pre-briefing for all parties
b. Update all parties on plant status
c. Inform all parties that the JNC activated inftial press briefing will be conducted at:

(Specify time for briefing)

d. Direct the JNC writer to initiate a press release indicating the JNC is activated.

3.3 JNC Operatlon 3.3.1 Initiation of activities of interest to media

a. The JNC Technical Briefer and/or the JNC Radiological Briefer should inform the JNC Director when notified of any of the following,
  • Classification level changes, or
  • Plant conditions significantly change, or
  • Radioactive Release begins, ends, or changes significantly, or
  • Event is terminated
b. When notified of any of the above the JNC Director should:
1. Initiate a status update session and inform all appropriate personnel of the change instatus. Coordinate status update sessions. 5 min. prior to status update session, use the PA system (dial 3899) and announce,

'Coordinators in5'. This is a good method to accomplish the plant status update session).

2. Verify message received and understood by all personnel.
3. Direct appropriate actions, such'as:
  • Spokesperson to commence a press briefing within about 30 minutes
  • JNC Writer to commence writing a press release, with expected completion in30 minutes
  • Rumor Control Coordinator provide personnel with updated information
  • JNC Administrator to assure clerical staff is made aware of change.
4. Establish time for pre-briefing session (typically 15 minutes after update)
5. Establish time for press briefing session (typically 30 minutes after update)

Page 4 EPIP-EPP-27 Rev 11

3.3.1 (Cont)

c. JNC Writer should ensure press releases are developed inaccordance with Attachment 2, Press Release Checklist".
d. The JNC Technical Briefer should perform actions in accordance with Attachment 4, JNC Technical Briefer Checklist.
e. The JNC Radiological Briefer should perform actions in accordance with Attachment 5,JNC Radiological Briefer Checklist.
f. JNC Spokesperson should complete actions inAttachment 15.
9. Rumor Control Staff should complete actions inAttachment 8.
h. Media Response Staff should complete actions inAttachment 7.
i. JNC Administrative Manager should complete actions inAttachment 3.
j. JNC Media Monitoring should complete actions inAttachment 9.
k. Rumor Control Coordinator should complete actions in Attachment 6.

3.3.2 Pre-Briefing sessions:

a. The JNC Director should initiate the pre-briefing session and assure:
  • All parties are aware of the reason for the pre-briefing session
  • Each spokesperson has a chance to review what they will be saying in the briefing.
  • Any un-answered questions from prior press briefings are addressed appropriately.
  • Rumor Control Coordinator is afforded the opportunity to address any issues of importance.
  • The proposed press briefing covers the following as a minimum:

- Protective actions (ifnew, assure county spokesperson speaks first)

- Plant status

- What changed, when and (ifavailable) why

- Actions taken to mitigate the event

- Status of security at the station

- Status of any injuries ( if none, say so)

  • The press briefing session will start on time.

Page 5 EPIP-EPP-27 Rev 1

3.3.3 Press Briefings:

a. The JNC Director should:
  • Use Attachment 15 Figure 1 as a guide,
  • Initiate all press/media briefings by introducing all participants and turning the floor over to the appropriate (e.g. utility, county or state) spokesperson.
  • If plant status changes during a briefing session, interrupt at an appropriate time using guidance listed inAttachment 15 Figure 1.

3.3.4 If a Corporate Officer isavailable and wishes to address the media, the JNC Director should:

  • Ensure the address is coordinated with the State and County personnel.
  • Ensure JNC process for media briefings isfollowed.
  • Authorize the Corporate Officer to address the media.
  • Monitor the address to ensure that any unanswered questions are addressed infuture briefings.

4.0 DEFINITIONS 4.1 Choices for Release Status:

  • Release of radioactive materials due to the event above federal limits.

Any monitored or unmonitored release pathway experiencing an increase following the event that result's inexceeding the limits defined in the Ul Technical Specifications or U2 Offsite Dose Calculafion Manual.

  • Release of radioactive materials due to the event below federal limits.

Any monitored or unmonitored release pathway experiencing an increase following the event but does NOT result inexceeding the limits defined inthe Ul Technical Specifications or U2 Offsite Dose Calculation Manual.

  • No release of radioactive materials as a result of the event, however the plant continues to release a small amount of radioactive material as part of its normal operational process as allowed by law (operating license).
  • There Isno release of radioactive materials from the plant above detectable levels.

Indicated by the fact that aD process streams are either showing no release of radioactive materials (0 ucl/sec), or all have been isolated and all downwind surveys indicate background radiation levels.

4.2 Coordinators in 5 - Implies a status update session will be conducted inthe pre-brief room in5 minutes. Term may be used to minimize alerting the media of a change inplant status session.

Page 6 EPIP-EPP-27 Rev 11

5.0 REFERENCES

AND COMMITMENTS 5.1 Technical Specifications None 5.2 Licensee Documentation Nine Mile Point Site Emergency Plan 5.3 Standards, Regulations, and Codes NUREG-0654, Rev 1,Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants 5.4 Policies. Programs, and Procedures None 5.5 Commitments Sequence Commitment Number Number Description 1 DER-NM-2001-4717 JNC Director review of technical information to verify accuracy (fatal flaw)

, . I .

I. I ,, d 1

. I.

Page 7 EPIP-EPP-27 Rev 11

6.0 RECORD REVIEW AND DiSPOSMON 6.1 The following records generated by this procedure shall be maintained by Records Management for the Permanent Plant File inaccordance with NIP-RMG-01, Records Management:

NOTE: This section only applies records are generated during an actual emergency.

Attachment 1, JNC Activation Checklist Attachment 2, Press Release Checklist Attachment 3, JNC Administrative Manager Checklist Attachment 3, Figure 1,JNC Registration Checklist Attachment 4, JNC Technical Briefer Checklist Attachment 5, JNC Radiological Briefer Checklist Attachment 6, JNC Rumor Control Coordinator Checklist Attachment 7, Media Response Checklist Attachment 8, Rumor Control Checklist Attachment 9, Media Monitoring Checklist Attachment 10, Rumor Control Media Response Inquiry and Off Air Monitor Form Attachment 11, JNC Audio Visual Checklist Attachment 12, JNC Staff Sign-In Attachment 13, JNC Shutdown Checklist Attachment 15, JNC Spokesperson Checklist 6.2 The following records generated by this procedure are not required for retention inthe Permanent Plant File:

NOTE: This section only applies if records are generated for any reason other than an actual emergency.

Attachment 1, JNC Activation Checklist Attachment 2, Press Release Checklist Attachment 3, JNC Administrative Manager Checklist Attachment 3, Figure 1,JNC Registration Checklist Attachment 4, JNC Technical Briefer Checklist Attachment 5, JNC Radiological Briefer Checklist Attachment 6, JNC Rumor Control Coordinator Checklist Attachment 6, Figure 1,Rumor Control Log Attachment 7, Media Response Checklist Attachment 8, Rumor Control Checklist Attachment 9, Media Monitoring Checklist Attachment 10, Rumor Control Media Response Inquiry and Off Air Monitor Form Attachment 11, JNC Audio Visual Checklist Attachment 12, JNC Staff Sign-In Attachment 13, JNC Shutdown Checklist Attachment 15, JNC Spokesperson Checklist LAST PAGE Page 8 EPIP-EPP-27 Rev 11

ATTACHMENT 1: JNC ACTIVATION CHECKLIST Page 1 of 3 NAME: DATE: l NOTE: 1. The first qualified JNC Director,'JNC Administrative Manager or their designee to arrive at the JNC should initiate the actions'requiredby this checklist.

2. If there is a power failure at th JNC, report t the Central Regional Control Center (CRCC) inaccordance with step 8 of this checklist.
3. Steps may be performed in any order (as appropriate)
4.
  • Indicates step must be completed prior to declaring the facility activated.-

'Complete NA 1.

    • Verify the following staff know they must sign inon the JNC Staffing sign-in sheet and they are to obtain the appropriate badge: ( indicates position required for JNC to be declared activated)

NOTE: Clerical staff may be used to obtain sign-ins to minimize delay infacility activation.

    • a. 'JNC Director .0 0
    • b. b. *JNC

'JNC Spokesperson................................................................................................................

Spokesperson .0........ 0

    • c. *Rumor Control Coordinator ..................... . . .
d. Rumor ControVMedia Response Staff (2) .0
e. Media Monitoring Staff (2).0
f. Clerical Staff (2) .0
g. Rad Briefer .00
h. Technical Briefer .. ° . 00
i. JNC Administrative Manager.0 ° 0...

JNC Writer............................................................................................................................... El 0

k. Security .. 0 0 NOTE: UNLOCK THE JNC DOORS ONLY AFTER JNC SECURITY ISASSURED.
2. Verify main door is unlocked and other outside doors are locked and remain locked (key is inNMP Room, key box) ... _,.;.°00
a. Ensure that security Inpre-briefing areas is assured to ensure privacy of pre-b efing sessions 0 0...................

NOTE: Failure of specific equipment to power up does NOT preclude activation of the JNC.

3. Inall rooms, power up or verify all NMP computers, printers and other equipment is powered up as required (Do not turn on equipment marked JAF).0 0 Page 9 EPIP-EPP-27 Rev 11

ATTACHMENTS (Cont)

Page2of3 NAME: DATE:

Complete NA

    • 4. In media monitoring room:
a. Verify on or turn on all TVs and VCRs .................................. ;0 0
b. Verify the VCRs are monitoring and recording TV stations as labeled ............................................ 0 0
c. Start up the computer used to monitor the intemet .................................. 0 0
d. Verify that the dish network boxes are powered up.0 0
5. IFall required personnel are at the JNC, the JNC may be activated at this point, notify the JNC director. The remainder of this checklist should be completed as time permmits.00
6. Inthe Main Briefing room:
a. Tum on rear projection screen video projector by pushing the PJ button and then the "power on' push-button on the remote control for the video projector (verify by ensuring a picture isdisplayed on the rear projection screen, this may take several seconds for the projector to warm up and light) .. .0 0
  • If the projection screen does not power up, verify that the projector has Power to it,and that the power is on.
b. Select the computer display by pressing the "S'(source) button on the video projector remote control until the computer display ispresented .
c. Tum on the computer located on the stage and log in using your own ID and password ................................................................................................................................
e. Using the computer mouse, double click on:
  • My Computer
  • common on nmcom2'(S:)
  • Emergency Prep
  • JNC Presentations
  • JNC Power Point Presentations
  • The appropriate icon for the unit (Unit 1 or Unit 2) having the emergency
  • Verify the program cycles through the power point presentation . ... O. 0
7. Perform or direct the performance of Steps 1through 7 Start-Up inAttachment 11, JNC Audio Visual Checklist .0 0 Page 10 EPIP-EPP-27 Rev 11

ATTACHMENT I,(Cont)

Page 3 of 3 K~-'NAE DATE:

.,1 I

Complete NA

8. Inthe electricalmechanical rooms verify water supplies are available and full. If not call for service per instructions on tanks.............................................................................. a 0
9. IFthe JNC experiences a loss of power, THEN call the CRCC Shift Supervisor at 460-2421 ... 0
a. Identify who you are, why you are calling, and provide the following information:
1. State the facility status, i.e. unoccupied, drill, exercise actual event, etc.
2. State the location of the facility as:

'This is the 9 Mile Point Emergency Media Center located on Route 176 (Whitaker Road) Fulton.

We are supplied by the Whitaker Rd. feeder number 29652. Our service pole is 55-1 and we are located adjacent to the Airport and the Nuclear Emergency Center.

Page 11 EPIP-EPP-27 Rev 11

ATTACHMENT 2: PRESS RELEASE CHECKLIST PagF1 of 7 1 NAME: DATE: P 1o7 NOTES: 1. Complete a new checklist for each press release.

2. Templates for press releases, (Figures 1 through 4) can be found at the following computer address: S:/Emergency Prep/JNC Presentations/Press Release templates and/or on desktop icon.
3. Make a copy of the template for your own use.

Complete NA

1. Comply with recommended times (to the maximum extent possible) by filling inAttachment 2 Press Release Tracking Table for each press release ....................................... CONTINUOUS
2. Press releases should be developed/approved within about 30 minutes of any of the ...............CONTINUOUS following:
  • Change inclassification
  • Significant change inplant status
  • Radioactive release begins, ends or changes significantly
  • Event isterminated
3. Ensure that all press releases contain the following information (ifappropriate) See figures 1 through 4 for sample format ........................................................ CONTINUOUS
  • Basic information about the plant
  • Concisely describes the event and states whether the event is:
i. Nuclear related ii. Safety related iii. Of radiological significance
  • When the incident took place and, if possible, how long the situation isexpected to last
  • Status of any radioactive release (see Section 4.0)
  • Identifies information contacts at NMP and, if necessary, emergency response agencies
  • The Public Rumor Control telephone numbers, if appropriate
  • The location of the Joint News Center
  • The current status of the plant Page 12 EPIP-EPP-27 Rev 11

ATACHMENT 2 (Cont)

Page 2 of 7 Complete NA

4. Prior to distributing the press release to the media, ensure each press release is: ..................... CONTINUOUS
  • Spell and grammar checked
  • Reviewed with the Technical Briefer (ifappropriate),
  • Reviewed with the Radiological Briefer (ifappropriate)
  • Reviewed by the JNC Director
  • Stamp with the approve stamp and fax to EOF for ED/RM approval
  • Reviewed and approved by the ED/RM, fax to EOF
  • Includes DateTime (time used should be time press release is ready for distribution and initialed
  • Remove uDraft7 from press release prior to final distribution
5. Provide final signed off press release to clerical staff for distribution ............. ..... CONTINUOUS
6. Correct any inaccurate information ina subsequent press release and ensure error are addressed ina press conference ........................................... CONTINUOUS Page 13 EPIP-EPP-27 Rev 11

ATTACHMENT2 (Cdt)

Page 3 of -

CONSTELLATION GENERATION GROUP NINE MILE POINT PRESS RELEASE TRACKING CHART PRESS RELEASE IF: THEN: PRESS RELEASE PRESS RELEASE 0 JNC is activated, or PRESS RELEASE APPROVED COPIED AND DISTRIBUTED Classification level changes, or DEVELOPED (BY ALL REQUIRED)

Plant conditions significantly change, or

[0 Radioactive Release begins, ends, or changes significantly, or Event is terminated EXPECTATION EXPECTATION EXPECTATION EXPECTATION T=0 min. T=10 min. T=30 min. T=40 min.

(Loq time) (Loq time) (Loq time) (Loq time)

_ __ _ . I___

21 4

8 10I Page 14 EPIP-EPP-27 Rev 11

ATrACHMENT 2 (Cont)

Page 4 of 7 Figure 1: Unusual Event (Sample Press Release)

Joint News Center Phone: 315-592-3740 Fax:315-592-3850 News Release For release _ _ EDT, Date:_

"UNUSUAL EVENT" DECLARED AT NINE MILE POINT UNIT SCRIBA An Unusual Event" was declared at _am/pm today by officials at Nine Mile Point Unit when a

. The plant isbeing shutdown officials said.

The "Unusual Event" isthe least serious of four emergency classifications as defined by the federal

<,> Nuclear Regulatory Commission. Inorder of increasing seriousness, the four classifications are: Unusual Event (least serious), Alert, Site Area Emergency, General Emergency (most serious).

There is no release of radiation into the atmosphere, and there are no injuries.

All appropriate local, state and federal agencies have been notified of the plant's status.

Nine Mile Point Unit _ is an megawatt boiling water reactor. Constellation Energy Group owns 100% of Unit 1 and 82% of Unit 2. The remaining 18% of Unit 2 is owned by the Long Island Power Authority. Constellation Energy Group (CEG), a Fortune 500 company based in Baltimore, Constellation Energy Group owns energy-related businesses, including a merchant power business that serves electrical load for wholesale and commercial and industrial customers inNorth America, and the Baltimore Gas and Electric Company (BGE), a regulated energy delivery company which serves more than 1.1 million electric customers and more than 600,000 natural gas customers incentral Maryland. At year-end 2001, Constellation Energy Group reported revenues of $3.9 billion and assets of $14.1 billion.

Page 15 EPIP-EPP-27 Rev 11

I ATTACHMENT. (Cont)

Page 5 of -

Figure 2: Alert (Samole Press Release)

Joint News Center Phone: 315-592-3740 Fax:315-592-3850 News Release For release _ _ EDT, Date:_

"ALERr DECLARED AT NINE MILE POINT UNIT SCRIBA An "Alert" was declared at am/pm today by officials at Nine Mile Point Unit -

when a_ . The plant is being shutdown officials said.

The "Alert is second of the four emergency classifications as defined by the federal Nuclear Regulatory Commission. Inorder of increasing seriousness, the classifications are: Unusual Event, (least serious),

Alert, Site Area Emergency, General Emergency (most serious).

There isno release of radiation into the atmosphere, and there are no injuries.

All appropriate local, state and federal agencies have been notified of the plant's status.

Nine Mile Point Unit _ is an megawatt boiling water reactor. Constellation Energy Group owns 100% of Unit 1and 82%of Uni 2.The remaining 18% of Unit 2is owned by the Long Island Power Authority. Constellation Energy Group (CEG), a Fortune 500 company based in Baltimore, Constellation Energy Group owns energy-related businesses, including a merchant power business that serves electrical load for wholesale and commercial and industrial customers in North America, and the Baltimore Gas and Electric Company (BGE),'a regulated energy delivery company which serves more than 1.1 million electric customers and more than 600,000 natural gas customers incentral Maryland. At year-end 2001, Constellation Energy Group reported revenues of $3.9 billion and assets of $14.1 billion.

Page 16 EPIP-EPP-27 Rev 11

ATTACHMENT 2 (Cont)

Page 6 of 7 Figure 3: Site Area Emerqency (Sample Press Release)

Joint News Center Phone: 315-592-3740 Fax:315-592-3850 News Release For release _ EDT, Date:

"SITE AREA EMERGENCY" DECLARED AT NINE MILE POINT UNIT SCRIBA A Site Area Emergency" was declared at _____am/pm today by officials at Nine Mile Point Unit when a

. The plant isbeing shutdown officials said.

The Site Area Emergency" is the third of the four emergency classifications as defined by the federal Nuclear Regulatory Commission. Inorder of increasing seriousness, the classifications are: Unusual Event, (least serious), Alert, Site Area Emergency, General Emergency (most serious).

There isno release of radiation into the atmosphere, and there are no injuries.

All appropriate local, state and federal agencies have been notified of the plant's status.

Nine Mile Point Unit isan megawatt boiling water reactor. Constellation Energy Group owns 100% of Unit 1 and 82% of Unit 2.The remaiiing 18% of Unit 2 is owned by the Long Island Power Authority. Constellation Energy Group (CEG), a Fortune. 500 company based in Baltimore, Constellation Energy Group owns energy-related businesses, incl)d-ig a merchant power business that serves electrical load for wholesale and commercial and industrial customers inNorth America, and the Baltimore Gas and Electric Company (BGE), a regulated energy delivery company which serves more than 1.1 million electric customers and more than 600,000 natural gas customersin central Maryland. Atyeaf-end 2001, Constellation Energy Group reported revenues of $3.9 billion and assets of $14.1 billion.

Page 17 EPIP-EPP-27 Rev 11

I ATTACHMENT2 (Cont)

Page 7 of Figure 4: General Emeraency (Sample Press Release)

Joint News Center Phone: 315-592-3740 Fax:315-592-3850 News Release For release EDT, Date:_

"GENERAL EMERGENCY" DECLARED AT NINE MILE POINT UNIT SCRIBA A 'General Emergency' was declared at _ _am/pm today by officials at Nine Mile Point Unit when a

. The plant isbeing shutdown officials said.

The "General Emergency" is the most serious of four emergency classifications defined by the federal Nuclear Regulatory Commission. Inorder of increasing seriousness, the classifications are: Unusual Event (least serious), Alert, Site Area Emergency, General Emergency (most-serious).

There is no release of radiation into the atmosphere, and there are no injuries.

All appropriate local, state and federal agencies have been notified of the plant's status.

Nine Mile Point Unit _ _ is an megawatt boiling water reactor. Constellation Energy Group owns 100% of Unit 1 and 82% of Unit 2.The remaining 18% of Unit 2 is owned by the Long Island Power Authority. Constellation Energy Group (CEG), a Fortune 500 company based in Baltimore, Constellation Energy Group owns energy-related businesses, including a merchant power business that serves electrical load for wholesale and commercial and industrial customers inNorth America, and the Baltimore Gas and Electric Company (BGE), a regulated energy delivery company which serves more than 1.1 million electric customers and more than 600,000 natural gas customers incentral Maryland. At year-end 2001, Constellation Energy Group reported revenues of $3.9 billion and assets of $14.1 billion.

Page 18 EPIP-EPP-27 Rev 11

MANAGER CHECKLIST A1TACHMENT 3: JNC ADMINISTRATIVE ATTACHMENT 3: JNC ADMINISTRATIVE MANAGER CHECKLIST Page 1of2 NAME: DATE:

I ' ' 1 ' I~~~~~~~~~

Complete NA

1. Upon notification of JNC activation, proceed to JNC........................................ 0.....

0

2. Pickup cordless telephone (ext. 3715) inthe NMP/JAFNPP room and keep it with you at all times to allow for personnel to contact you as needed while in the JNC ................................ 0
3. Activate the JNC inaccordance with Attachment 1,JNC Activation Checklist .................... 0 0
4. Assign first available JNC clerical staff to registration and direct them to perform actions in accordance with Attachment 3 Figure 1,JNC Registration Checklist ... 0 0
5. Verify the staffing chart (located on north wall of conference area) isfilled out as staff members arrive and assume their positions inthe JNC .. 0 0
6. Using the JNC staffing sign inlog (Attachment 12) as verification, inform and update the JNC Director (ext. 3712) as staffing of the JNC continues............................................................... 0 °
7. When time permits, ensure that all ERO members qualification status is current using the following actions: .. 0 0
a. Utilize the instructions on the first page of the ERO qualification list (located in the Nine Mile Point/JAF Room)
b. If an ERO members qualification status is lapsed OR cannot be determined:
1. Immediately replace the ERO member with a qualified individual OR
2. Provide direct oversight of the unqualified individual until such time that a qualified replacement can be obtained.

NOTE: Personnel who are not ERO qualified may perform required actions ONLY with direct oversight from an ERO member qualified inthe action(s) being performed.

8. Supervise and manage the following activiiesrfunctions:
a. Registration (Attachment 3,Fig 1)..... CONTINUOUS
b. Clerical services including fax, telephone, copy and poster enlargement functions ............ CONTINUOUS
c. Security needs ................................. ... CONTINUOUS
d. Communication of status information to clerical and security personnel ........................... CONTINUOUS Page 19 EPIP-EPP-27 Rev 11

ATTACHMENT 3 (Cont)

Page 2of2 NAME: DATE: P 2 l Complete NA

8. (Cont)
e. Ensure classification signs and associated postings are updated when appropriate ........... . .... .CONTINUOUS
f. Maintenance of JNC including:
  • Equipment setup .......... CONTINUOUS
  • Distribution and posting of news releases and briefing sumrmaries'in all areas of the JNC ........ CONTINUOUS
  • Post sufficient copies of all press releases and briefing summaries inthe bins located in the main briefing area for number of personnel present. , ,

CONTINUOUS

g. Coordinate needed auxiliary services (as necessary) with the Admin. Logistics Manager (593-5876) inthe EOF to include: ....................................... , ,,,.°. 0
  • Catering
  • Messenger services
  • Additional stenographic/typing
  • Transportation
  • Lodging
  • Laundry services
  • Additional equipment
9. Inconjunction with JNC Director develop 1st and 2nd shift staff assignment schedules, using duty rosters and qualification lists and fax these to the TLAM in the EOF (Phone # 593-5951) ............................... .. 0 0
10. Upon termination of the event and termination of required activities at the JNC, perform the following:
a. Collect registration logs and ensure all badges are returned and accounted for ............................ , 0
b. Tum over any documentary logs and related materials to JNC Director .0 0
c. Perform JNC shutdown checklist (Attachment 13) ............................... ,,,,.°.° 0 0.,
d. Report completion of termination activities to JNC Director ,,.,,,..0 Page 20 EPIP-EPP-27 Rev 11

A1TACHMENT 3 (Cont)

Figure 1: JNC Registration Checklist Page 1 of 2 NAME: -i- DATE:

Complete NA Start-up,

a. Set out individual registration sheets and badges with holders for:
    • observers mberersand nand visitors vtos -- blue pink ........................................................................ ..................... 0 °3 0°
  • media representatives - pink. 0
  • JNC staff (including state/county/federal officials) - yellow................................................ 0 (these people are permitted access to.anywhere inJNC)
b. Ensure NMPNS media kit and JNCinformation sheet are available for b meda.......................................................................................................................°00 ° use by media...................

use

c. Report readiness to JNC Administrative Manager (Ext. 3715) .................................... 0,,0
2. Operation Personnel granted access to the JNC is limited to only those individuals performing duties in an official capacity (e.g. media personnel with appropriate credentials).

Members of the general public or visitors who are unable to provide reasonable proof of authorization should not be granted access. (Ifuncertainty exists contact the JNC Administrative Manager for resolution).

NOTE: Prior to permitting any visitors or media personnel to enter the JNC, verify JNC security is assured.

a. Request identification from every individual entering the JNC ......................................CONTINUOUS See EPIP-EPP-14 for additional details.
b. Determine and provide badge color for each inividual entering the JNC .............. ..... CONTINUOUS
c. Ensure Utility, County, State and Federal,ernployees have picture identification either issued by a county or state disaster preparedness office, or from a federal agency (yellow badge) see EPIP-EPP-14 for additional details ....................... CONTINUOUS
d. Ifa question arises regarding authorization of an individual, contact the JNC Director (ext. 3712) ............... CONTINUOUS Page .21 EPIP-EPP-27 Rev 11

I I ATTACHMENT3 (Cont)

FigUre 1 (Cont)

--_ PaP 20f2 NAME: lDATE: lgo Complete NA

2. (Cont)
e. Issue each person a color-coded badge and holder filled in with his or her name, and affiliation:
  • Blue - observers and visitors .................... ,. CONTINUOUS
  • Pink - media: a separate log (pink) should be kept for print, radio and television media .CONTINUOUS
  • Yellow - all JNC staff. CONTINUOUS
f. Record badge number on appropriate color-coded log sheet .CONTINUOUS
g. Offer each media representative and visitor a press kit. Point out the media press telephones room and briefing area .CONTINUOUS
h. Ensure people leaving the JNC return their badges and check the returned column on the respective log . CONTINUOUS
3. Close down
a. Return unused registration materials to the proper place on the shelves or file cabinets behind registration desk 0°
b. Separate returned badges and then return holders to inventory..0 0
c. File pre-made badges, and destroy and dispose of used badges......................................0 0
d. Perform an inventory of registration supplies and report needs to the JNC Administrative Manager ....... 0[ 0
e. Turn over registration logs to the JNC Administrative Manager and report registration closure complete.0 0 Page 22 EPIP-EPP-27 Rev 11

ATTACHMENT 4: JNCTECHMCAL BRIEFER CHECKLIST

- ~~~~~~~~Page of2 NAME: DATE: a Complete NA

1. Obtain information on plant status and events via the Tech Information Line Headset ............................................... CONTINUOUS
2. Obtain and provide plant status updates to JNC Director and JNC staff (when necessary) ensuring all are kept up to date (use tech info line or travel to EOF as necessary). Upon plant status change (classification, significant event, etc.)
  • Log time of event
  • Update Emergency Status Report
  • Notify JNC Director/JNC Staff of plant status update
  • Provide update in pre-brief room of plant status change ............................................... CONTINUOUS
3. Direct clerical staff to update classification signs as appropriate . ..................................... CONTINUOUS
4. Maintain a log of events ...................................... CONTINUOUS
5. Complete Emergency Status Report (see Attachment 4, Figure 1for sample) initially and update the Emergency Status Report about every 30 minutes or as necessary ............................................................. CONTINUOUS
6. Assist inthe identification and organization of topics for the next media briefing ....................... CONTINUOUS
7. Review all press releases for technical accuracy ............................ CONTINUOUS
8. Attend all pre-briefing conferences to share information and coordinate with state and county representatives at the JNC . CONTINUOUS
a. Present information at pre-briefing sessions on the plant status and events, response of the station staff, and background on plant systems and design, as requested ............ CONTINUOUS
b. Participate ina pre-briefing session question and answer session, coordinated by the JNC Director ........  ; CONTINUOUS
9. Update the JNC Director and JNC staff on events and changes in plant status that occurred during each briefing... ....CONTINUOUS
10. Obtain responses to reporters' questions that remained unanswered during briefing. ... ,;,-;CONTINU
11. Begin gathering and organizing information for the next news briefing ....... CONTINUOUS
12. Upon termination of the event, ensure the JNC Director is notified 00.......
13. Upon termination of JNC activities ensure all logs, status boards and all paperwork isforwarded to the JNd Director for inclusion inthe permanent plant file.0.... . 0 Page 23 EPIP-EPP-27 Rev 11

ATTACHMENT 4 (Cont)

Page 2 of 2 Figure 1: Emergencv Status Report (Samole)

UNIT 1 0 20 DRILL: 0 ACTUAL EVENT: 0 EVENT TiME: EVENT DATE:_

EMERGENCY CLASSIFICATION:

CHANGE: YES NO 3 CIRCLE APPROPRIATE: UE ALERT SAE GE STATION EVACUATION STATUS:

0 NONE:

0 LOCAL AREA/BUILDING: (Location):.

0 PROTECTED AREA' 0 EXCLUSION AREA 2 RADIOACTIVE RELEASE:

0 NO RELEASE, ALL PROCESS STREAMS ARE ISOLATED 0 NO RELEASE ABOVE PRE-EVENT LEVELS 0 RELEASE ABOVE PRE-EVENT LEVELS, BUT BELOW TECH SPEC LIMITS 0 RELEASE ABOVE PRE-EVENT LEVELS AND ABOVE TECH SPEC LIMITS Radiation Levels At The Station: NORMAL 0 ABOVE NORMAL Radiation Monitoring Teams: NOT SENT 0 ARE BEING SENT OUT 0 DISPATCHED 0 PEOPLE INJURED: YES 0 Number Injured #_ NO FIRE STATUS: NONE 0 STILL BURNING 0 FIRE ISOUT 0 FIRE LOCATION: .

SECURITY STATUS: NONE SECURITY EVENT 0 PLANT STATUSICONDITIONS:

  • RX SHUTDOWN 3 YES 0 NO 0
  • RX WATER LEVEL: STABLE 0 LOWERING 0
  • PLANT CONDITIONS: IMPROVING 0 DEGRADING 0 STABLE 0

I Non-essential personnel evacuated to NLC and PBldg 2 Non-essential personnel evacuated to Offsite Assembly Area 3 EOP definition of shutdown Page 24 EPIP-EPP-27 Rev 11

ATTACHMENT 5: JNC RADIOLOGICAL BRIEFER CHECKLIST I Page1ofI NAME: I . DATE:

Complete NA

1. Obtain information on radiological status and release status from the EOF Dose Assessment Staff as necessary (travel to EOF as necessary) ............................. CONTINUOUS
2. Review radiological information with JNC Director and JNC staff ensuring all are kept up to date .................................................................................................. CONTINUOUS
3. Maintain a log of events ............. CONTINUOUS
4. Assist inthe identification and organization of topics for the next media briefing........... ,, ,CO
5. Review all press releases for accuracy ...................... CONTINUOUS
6. Attend all pre-briefing conferences to share information and coordinate with state and county representatives at the JNC .......................................... CONTINUOUS
7. Participate inpre-briefing question and answer sessions, coordinated by the JNC Director to include:

-* information on the radiological status,

  • events at the plant
  • response of the station HP staff,. ....... CONTINUOUS C...................,.,
8. Begin gathering and organizing information for the next news briefing .CONTINUOUS
9. Upon termination of JNC activities, ensure all logs, status boards and all paperwork isforwarded to the JNC Director for inclusiori inthe permanent plant file ......  ; ,

Page 25 EPIP-EPP-27 Rev 11

ATTACHMENT 6: JNC RUMOR CONTROL COORDINATOR CHECKLIST Page of 2 NAME: DATE:

Complete NA

1. Pick up cordless telephone (ext. 3767) and keep it with you while inthe JNC...............El in the JNC ~~~~~~......... ................................................................................... ............................;.......l
2. Verify all monitors (video and audio) are set to the appropriate electronic media outlet as below: (VCRs provide the channel number for the monitors)

TV Stations Channel3 .El 0 Channel05 ° 0 Channel9.0 Channel 9......... .......................................................................................................................... ........°.° I]

Primestar on CNN .l.. 0 Radio Stations WSYR (570 AM) .El °0 WHEN (570 AM) ...................................................................................................... ............... D WHEN (620 AM) .... ............................................ 0 00 ..........

WZZZ (1300 AM)..................................................l00 WRVO (89.9 FM) .... E..............

W WYYRVO (894-(94.5 FM) ........................................................................................................

.......................... ................. 0 0 .........l WBBS (104.7 FM) ........................................................... El 0 WWHT (107.9 FM) .......................................... .0

3. Ensure that video tapes are inserted inVCRs and press record as necessary to monitor and record broadcasts involving information concerning the event at Nine Mile Point.°
4. Ensure audio tapes are inserted intape players arid press record as necessary to monitor and record broadcasts involving information concerning the event at Nine Mile Point ..... 0 0
5. Maintain a log of all actions taken associated with rumor control ... ..................................... CONTINUOUS
6. Ensure that rumor control staff record all reports by the Media on the Rumor Control Form, Attachment 10 ............................................................................... CONTINUOUS Page 26 EPIP-EPP-27 Rev 11

.1: .1.,; .-.. . *ATTACHMENT 6 (Cont) .

rage 2 oT 2 l NAME: ,DATE:

Complete NA

7. Ensure that the Media Monitoring Staff use the PC inthe media monitoring room to monitor the Internet and log all reports concerning the event on the Attachment 10.CONTINUOUS
8. Provide immediate feedback to the JNC Director (ext. 3712) of any inaccurate or incorrect reports..... ,,CONTINUO
9. Secure video/audio tapes/print intemet page with inaccurate coverage for further review .......... ;.,,. CONTINUOUS 10 Ensure the media response team isadequately staffed by the Media Response Team composed of personnel from NMPNS, State and County.0 0
11. Ensure each member of the media response team issupplied with the information and materials to handle inquiries.........................................................................................0 0
12. Ensure the Rumor Control function isadequately staffed by personnel from NMPNS, State and County ........................... ° . 0 0.,.
13. Ensure corrections to inaccurate reports are part of the briefings by the appropriate spokesperson, or by contacts directly with the responsible station or publication........ CONTINUOUS
14. Ensure that the Public Rumor Control" telephone number isperiodically announced at news briefings .; CONTINUOUS
15. Ensure that the "Public Rumor Control nurnbfis distributed to the state, county, and utility telephone operators for public inquiry referral ............................................. 0 0 state,~~~~~~~~~~~~

an,...ytlehn oeao Iony ..

Page 27 EPIP-EPP-27 Rev 11

ATTACHMENT 7: MEDIA RESPONSE CHECKLIST

~~~~~~~~~~~~~~~~~~~~~Pag 1 of 11 NAME: DATE: P Complete NA

1. Each member of the Media Response team should:
a. Log all contacts using Attachment 10, including time of inquiry, identity, affiliation and telephone number of the caller and nature of the inquiry and response... CONTINUOUS
b. Provide authorized statements and answer questions based on approved information available at the time ................................ ,,,,,.,,,.,,,,,,CONTINUOUS
c. Provide authorized facts about Nine Mile Point which are intheir data and fact sheets, news releases and annual reports, if they are requested ........ CONTINUOUS
d. Provide times and locations of press conferences and briefings, as well as names and telephone numbers of appropriate contacts inother agencies........ CONTINUOUS
2. Refer inquiries requiring further elaboration or special response to the appropriate source ....................................... CONTINUOUS
3. Ifthe appropriate sources are unavailable, a return call should be offered, as soon as feasible'. Do not make guarantees to meet deadlines, but every effort should be made to do so.......... CONTINUOUS
4. Upon termination of JNC activities, ensure all logs, status boards and all paperwork is forwarded to the JNC Director for inclusion in the permanent plant file ............... ,.0 03
a. Provide one copy of all response logs to the NY State PlO ....................................... ,.0 0 Page 28 EPIP-EPP-27 Rev 11

ATTACHMENT 8: JNC 1JMOR CONTROL CHECKLIST Page 1of 1 INAME -E:

Complete NA NOTE: Ensure that information provided comes from written informational materials, Emergency Alert System (EAS) messages, and press releases.

Any message agreed upon by the state, county, or utility may be used, thus providing for the ability to address specific incorrect or inaccurate information.

1. Ensure the monitoring of the broadcast and print media for news report accuracy ..................... , CONTINUOUS
2. Ensure appropriate response to misinformation or rumors circulating through the public using Attachment 10 as appropriate.. .................................................... CONTINUOUS
3. Work under the guidance and direction of the Rumor Control Coordinator. ............................... CONTINUOUS
4. Answer the phone, saying Joint News Center (if appropriate add, THIS ISA DRILL), may I help you' ......................... . . . . . . .CONTINUOUS
5. Respond to inquiries using only the materials and information provided

-' by RumtheControl or Coordinator.C ..................... . . . . . . . . CONTINUOUS

6. Provide only factual Information relative to the caller's questions or concerns. , CONTINUOUS
7. If you are unsure how best to answer the caller's question, ask the Rumor Control Coordinator (Ext. 3767) . . . . . . ....... CONTINUOUS
8. Document all appropriate information on Attachment 10 ................................ CONTINUOUS
9. Turn in log sheets as they are completed to the Rumor Control Coordinator. .............................. CONTINUOUS Page 29 EPIP-EPP-27 Rev 11

ATTACHMENT 9: JNC MEDtA MONITORING CHECKLIST

-~~~~. , ?-.

Page 1 of 1 INAME: DATE:

Complete NA

1. Ensure audio/video equipment at the Joint News Center is used to monitor and record news broadcasts and bulletins carried by radio, television stations and the intemet . . CONTINUOUS
2. Log all reports concerning the event at Nine Mile Point on Attachment 10 . CONTINUOUS from the following, radio, T.V., intemet, scanner etc.
3. Ensure all broadcasts, as well as news reports inthe print media, are reviewed for accuracy ..................... CONTINUOUS
4. Review and monitor off-air monitoring and recording capability to ensure every opportunity for prompt identification of inaccurate or incorrect information is utilized ........ CONTINUOUS NOTE: When using the intemet periodically press the F5' key to refresh the Information posted.
5. Use the PC inthe media monitoring room to monitor the Internet and log all reports concerning the event on Attachment 10. CONTINUOUS Typical web sites include:
  • www.cnn.com www.cbsnews.com
  • www.bbcnews.com
  • www.abcnews.com www.msnbc.com
  • www.foxnews.com
  • www.nbc.comInbc/NBC_NEWS/
6. Ensure any reports with inaccurate or erroneous information are brought to the attention of the Rumor Control Coordinator ............................ CONTINUOUS
7. Upon termination of JNC activities, ensure all logs, status boards and all paperwork isforwarded to the JNC Director for inclusion inthe permanent plant file ............................................................ 0. 0 Page 30 EPIP-EPP-27 Rev 11

ATTACHMENT 10 (Sample Form: A similar form developed y NY State. Oswego County or JAF may be used)

Public Inquiry - Media Response Inquiry and Off Air Monitor Form Type of call:

]JPublic Inquiry [ Professional Inquiry [ Media Inquiry [ ]Media Monitor Report Date of Call/Broadcast: Time of CallBroadcast:

Name of responderlmonitor:

Media Name/Location:

Caller's/Reporter's Name: Phone:_

Question(s) Asked/naccurate Information:

Response Given/Correct Information and Source:

Was the call referred: ( JYes I) No If yes, to whom?

Further action required: I) Yes ( No Was this action completed? L) Yes L) No By:

Reported to the Rumor Control Coordinator at:

Rumor Control Coordinator notes: e Return completed form to the Rumor Control Coordinator.

Page 31 EPIP-EPP-27 Rev 11

ATTACHMENT 1 : JNC AUDIO VISUAL (CONTROL BOOTH) CHECKLIST Page of NAME: l DATE:

Complete NA NOTE: 1. Should any AV equipment fail, or any AV assistance is needed notify the EP Department at 349-4444 and leave a message, then call for assistance from Univisions at 437-0301.

2. An equipment setup manual for the entire audio visual system may be found inthe Equipment Manuals drawer inthe file cabinet located in the Fax/Copy room.

START-UP

1. Obtain key (labeled JNC Master) for control booth from key cabinet located inthe NMP/JAFNPP room and open door to booth ................................................... .......................... 0..
2. Turn on the audio system (green button, labeled main power switch, top section of the audio rack).................................................................................................................0 0
3. Turn on video recording and Internal Cable TV (ICTV) by placing power switches labeled power 2 and power 3 on video rack bottom to ON) ................................................. ... 0
4. Verify that the video camera powers up. If not, turn the DC power switch to RCU located at the top rear panel of the camera...........................................................................................0 0
5. Verify on or turn on the VCRs (3)used to record press briefings ................................................. 0°0
6. Activate wireless microphones as follows:
a. Turn on wireless mic. power switch (black button on power supply located just below top section of audio rack) .. 0
b. Obtain wireless mic's from bottom drawer of audio rack (2available) .0 0
c. Replace batteries (new batteries located on back sheif) inwireless mic units .......... 0 0
7. Verify at the podium that the Audio/isual box has the 'Input Select' button set to Channel 1 0 0 Page 32 EPIP-EPP-27 Rev 11

i, ATTACHMENT 11 (Cont)

Page 2 of 2 NAME: - DATE:

OPERATION Complete NA OPERATION

1. Coordinate setup of media cameras/equipment as necessary to ensure adequate coverage of briefings .......... .  ; e
2. Record all press briefings including all question and answer sessions ...................................... CONTINUOUS
3. Ensure that media isprovided with access to both video and audio outputs ......................................... El El
4. Ensure that media cabling isrouted through cable tray located on back stage and not run through doors ............................................... El
5. Ensure that safety isconsidered during the setup of cameras and recording equipment used by the media including tripping and shock hazards......................................El............... El
6. Turn on overhead lighting as needed during briefings using the three switches located on the wall opposite to the camera ........................................... El El
7. Provide assistance to media personnel as requested ................................ CONTINUOUS SHUTDOWN
1. Turn off power supplies:
  • Turn off green switch labeled main power switch .............................................................. El °3
  • Turn off red switches labeled power 2and power 3....................................................................... El E
  • Verify camera, VCRs and sound equipment, power down.E EO
  • Turn off wireless mic. power switch .................................... 0
  • Turn off briefing area overhead lights using the.3 wall switches opposite the camera 0 l
2. Turn off room and stage lights, lock door or verify locked, and return key to key cabinet .El E
3. Report any equipment problems, issues or needs to JNC Administrative Manager . 0 Page 33 EPIP-EPP-27 Rev 11

ATTACHMENT 12: JOINT NEWS CENTER STAFF SIGN IN(SAMPLE)

JOINT NEWS CENTER STAFF SIGN IN POSITION 1ST SHIFT 2ND SHIFT NMPNS JNC Director Spokesperson NMPNS JAFNPP Oswego County New York State FEMA NRC Others NMPNS Technical Briefer NMPNS Radiological Briefer NMPNS JNC Writer NMPNS Rumor Control Coordinator Rumor Control Phones NMPNS Audio Visual (as required)

NMPNS Security Staff NMPNS JNC Administrative Manager Clerical Support Registration Typist Posters Copy Room Fax Machines Other Oswego County Staff New York State Staff FEMA Liaison NRC Liaison Page 34 EPIP-EPP-27 Rev 11

ATTACHMENT 13:, JNC SHUTDOWN CHECKLIST Page 1 of 2 NAME: DATE:

NOTE: The JNC Administrative Manager or designee shall ensure the completion of this checklist prior to leaving the JNC.

Complete NA

1. Turn off lights throughout the JNC as you leave each room................................... ,.,.,,,, 1i U1
2. Verify water supply isavailable and full. If not call for service per instructions tanks.El instructios on tank........................................,.....................................................................................° El El
3. Call for septic tank to be pumped using number provided inelectric room ............................................ l El
4. Turn off all TVs and VCRs in media monitoring room ................................  ;

El

5. Shutdown or verify all computers, printers and other equipment are shutdown ....................................

El

6. Verify Rumor Control and Press phones are hung up .°
7. Adjust heating/cooling systems temperatures to 68 F..........................................................................° El
  • NRC/FEMA Room El
  • Nine Mile Point/JAF Room
  • Main Briefing Room El
8. Turn off video projector by pushing the PJ push-button (itshould light) and then holding the power off push-button on the remote control for the video projector until a message appears on the screen stating,

'waft a few Uwait few a moments".El momen.......................................................,........................................................................°

9. Perform or verify performance of Shutdown section of Attachment 11 (Control Booth) ........................... El
10. Verify that all coffee pots/urns are turned off, emptied and cleaned . ..

Page 35 EPIP-EPP-27 Rev 11

ATTACHMENT 13 (Cont)

Page 2 of 2 NAME: DATE:, i . l Complete NA

11. Review supply needs, specifically. . . ...................................................................................................... l.°
a. Copier paper needed adequate
b. Bottled water needed adequate
c. Condiments needed adequate -
d. Other specific needs
12. Perform an inventory of the JNC using the JNC Inventory Form from EPMP-EPP-02, and correct discrepancies inaccordance with EPMP-EPP-02 ...................................................... 0 l
13. Identify any adverse conditions or supply needs. . l.............
14. Using Lotus Notes, place ISR request to buildings and grounds for general cleanup/trash removal inthe JNC. Record ISR # .................................................... El
15. Using Lotus Notes, place ISR request to buildings and grounds and request they have the dumpster emptied. Record ISR # ....................................................... 0
16. Replace telephone used by JNC Admin. Manager (Ext. 3715) ...................................................... 0
17. Verify water inthe bathroom facilities is not running.................................... 0 0
18. Verify main door is locked and other doors are locked and remain locked ............................................ El E
19. Forward this checklist to Emergency Preparedness. 0 E.............

Page 36 EPIP-EPP-27 Rev 11

ATTACHMENT 14: JNC WORK AREAS JOINT NEWS CENTER 4-Press Kits containing information relating to the Nuclear Facility, Oswego County Emergency Planning and the Joint News Center are located here. '

Press Releases will be posted her.

All areas in

  • GRAY are accessible only 3 - Connection to JNC staff.

to internal sound and video available here. Please have your cameras placed here. 5 -Rear JNC Security Projection will permit screen, we will access for project important camera setup information here.

though the side door following registration at reception desk.

2 - Phones and 1 - Please sign in modem connections and out here. for the media are available here.

Page 37 EPIP-EPP-27 Rev 11

ATTACHMENT 15: JNC SPOKESPERSON-Paqe 1 of 5 NAME: 7 DATE:

Complete NAG

1. Inform the JNC Director that you have arrived . . 0 0
2. Sign in on JNC Staffing Board ............................................. .0 0
3. Press briefings should be developed/approved within about 30 minutes of any ................. CONTINUOUS of the following:
  • Change inclassification
  • Significant change inplant status
  • Radioactive release begins, ends or changes significantly
  • Event isterminated
4. Attachment 15, Fig 2, may be used as a guide to aid in tracking briefing sessions ................. CONTINUOUS
5. Obtain status update from the following personnel concerning planVevent status
  • JNC Director CONTINUOUS
  • JNC Radiological Bdefe:: *-... ..................................... CONTINUOUS
6. As necessary travel to the EOF and obtain a short status update from the ED/RM concerning event status, likelihood of escalation, radioactive release status, press releases approved....... CONTINUOUS
7. Review previously approved and distributed press releases for information supplied to minimize chance of providing contradictory or confusing information...............................El 0 NOTE: Press Briefings should be conducted as soon after a major plant or emergency status change as is practical.
8. As plant conditions or emergency status changes, request a pre-briefing session with Oswego County, New York State and the-NRC (ifapplicable) to prepare for the press briefing ....... CONTINUOUS
9. Participate infrequent pre-briefings to ensure that information that will be supplied by Oswego County, New York State and the NRC is consistent with the presentation you expect to provide....... CONTINUOUS
10. As questions arise in the pre-briefing session, provide or obtain answers as as appropriate ........ CONTINUOUS NOTE: To blank projection screen, press PJ button then PC mute.
11. When all parties are repared, enter the main briefing room and conduct the briefing, use Figure 1as a guide ....... CONTINUOUS
12. Review unanswered questions from the question and answer period and obtain answers as appropriate ....... CONTINUOUS
13. Provide answers to questions obtained during the Q/A session from the previous briefing at the next available briefing ........ CONTINUOUS Page 38 EPIP-EPP-27 Rev 11

ATTACHMENT45: JNC SPOKESPERSON -

... .ATE D. Page 2 of 5 NAME: DATE:

Complete NA

14. Upon termination of the emergency ensure that a briefing is planned that takes into account the following information/activities: .. CONTiNUOUS
  • Actions taken that provided for the event termination
  • Actions planned following termination to restore station
  • And as information becomes available or Ifapplicable:
a. Actions necessary for the return of evacuees if applicable
b. Financial and Legal implications
c. Regulatory/govemmental aspects
d. Environmental implications Page 39 EPIP-EPP-27 Rev 11

1 ATTACHMENT 15 Page 3 of 5 FIGURE 1 GUIDELINES FOR A GOOD BRIEFING SESSION (JD) 1. IF breaking news occurs that will delay the briefing session introduce yourself. THEN state,

'Our spokespeople are currently being updated on the situation, and the next briefing will be delayed for a short time so they can bring the most current information to you. The briefing will be held at (time).'

NOTE: 1. The briefing should be held no longer than 30 minutes from the time it was originally scheduled.

2. State the facts ina positive manner.

(JD) 2. Introduce yourself and all parties providing information at the briefing.

  • State that there will be a short overview session followed by 10 minutes of question and answers.
  • Explain that keeping the Q/A portion short will provide you with the opportunity to obtain updated information.
  • Request that all pagers and cell phones be placed insilent mode.
  • Thank everyone for coming (as appropriate)
  • Return to duties inJNC (as appropriate)

(SP) 3. Provide a brief overview of event(s) to date. (use Fig 2 as a guide to assist inthe presentation as appropriate)

(SP) 4. Ensure that Nine Mile Point LLC view point isstated (at least initially) and that it represents the priorities of:

a. Ensuring the health and safety of the public,
b. Safety of the employees,
c. The safety of the Nuclear Station.

(SP) 5. Initially review the categories of emergencies as necessary.(Use or point out the power point presentation as necessary).

(SP) 6. Review changes to plant status since last briefing (as applicable).

(SP) 7. Review changes to radioactive release status (as applicable).

(SP) 8. Ifavailable, provide a brief financial impact review of the event.( e.g. Impact on company stock, comments from investor community etc.)

Page 40 EPIP-EPP-27 Rev 11

a ATTACHMENT 15 Page 4 of 5 FIGURE 1 GUIDELINES FOR A GOOD BRIEFING SESSION (SP) 9. Provide answers to previously unanswered questions.

(SP) 10. Ask Oswego County to provide their information next.

(SP) 11. Ask New York State to provide their information next.

(SP) 12. Ask the NRC (ifavailable) to provide their information next.

(SP) 13. Open the floor for a 10-minute Question and Answer session.

(SP) 14. After 10-minutes, state that the session is over, and provide the approximate time for next session (estimate 30-45 minutes).

(JD) 15. As necessary, if breaking news occurs, stop briefing sessions in progress by stating:

'We need to interrupt this briefing so our spokespeople can be updated with the most current information and then brief you. We'll be back with you as soon as possible.'

NOTE: The time for the next briefing should be announced as soon as possible, with the briefing to be held no longer than 30 minutes from the time of interruption.

Responsibilities JD = JNC Director SP = JNC Spokesperson Page 41 EPIP-EPP-27 Rev 11

ATTACHMENT 15 (Cont)

FIGURE 2 Page 5 of 5 CONSTELLATION GENERATION GROUP NINE MILE POINT PRESS BRIEFING TRACKING CHART PRESS BRIEFING # IF: THEN: PRESS PRE-BRIEFING PRESS BRIEFING

  • JNC isactivated, or PRESS PRE-BRIEFING & COMPLETED BEGINS
  • Classification level changes, or BRIEFING SCHEDULED
  • Plant conditions significantly change, or
  • Radioactive Release begins, ends, or changes significantly, or
  • Event isterminated EXPECTATION EXPECTATION EXPECTATION EXPECTAlION T=0 min. T=5 min. T=25 min. T=30 min.

(Log time) (Log time) (Log time) (Log time) 3 6

7 10 Page 42 EPIP-EPP-27 Rev 11