ML16162A379

From kanterella
Revision as of 02:46, 19 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 5.3.1 Re Recovery Manager & Immediate Staff Group Plan & 5.3.4 Re Scheduling/Planning Support Group
ML16162A379
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire, 05000000
Issue date: 08/06/1982
From: Tucker H
DUKE POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML16162A378 List:
References
NUDOCS 8209150117
Download: ML16162A379 (2)


Text

DUKE POWER COMPANY P. 0. BOX 331 GEEA OFTELEPHONE: AREA 704 1GENERAL OFFICES 373-4011 422 SOUTH CHURCH STREET CHARLOTTE, N. C. 28242 August 6, 1987 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

McGuire Nuclear Station Oconee Nuclear Station Catawba.Nuclear Station Docket Nos. 50-369, -370; 50-269, -270, -287; 50-413, -414

Dear Mr. Denton:

Enclosed for NRC Staff use and review are ten copies of the latest revisions to the following Crisis Management Plan Implementing Procedures:

1) 5.3.1 - Recovery Manager and Immediate Staff Group Plan (Revision 3, dated July 9, 1982)
2) 5.3.4 - Scheduling/Planning. Support Group (Revision 4, dated July 9, 1982)
3) 5.3.6 - Health Physics/Radwaste Support Group (Revision 4, dated July 9, 1982)
4) 5.3.7 - Technical Supports (Revision 3,.,dated July 9, 1982)
5) 5.3.8 - Offsite Radiological Coordination Group (Revision 4, dated July 9, 1982)
6) 5.3.12 -Transmission of Follow-up Emergency Information to Offsite Agencies Oconee Nuclear Station (Revision 1, dated July 2, 1982)
7) 5.1.13 -Transmission of Follow-up Emergency Information to Offsite Agencies McGuire Nuclear Station (Revision 1, dated July 2, 1982)
8) 5.3.15 -Duke Power Company, Oconee Nuclear Station, Emergency Plan/Crisis Management Plan, Procedure for Environmental Surveillance Following a Large Unplanned Release of Radioactivity (Revision 1, dated July 9, 1982)
9) 5.3.16-Quarterly Inventory (Revision 1, dated June 30, 1982)

These revisions should be incorporated into your Crisis Management Plan manuals, removing any earlier version pages of this Plan.

Please delete privacy material in the form of personal telephone numbers prior to placing any material in the public document room, specifically:

1) Part IV, Notification Procedure - Call List, page 7 8209150117 826823 PDR ADOCK 05000269 F PDR 11

Mr. Harold R. Denton, Director August 6, 1982 Page 2

2) Part VI, Long Range Recovery Functions - Figure 3, page 13
3) Part V, Long Range Recovery Functions - Table 4, pages 18 and 19
4) Part VII, Emergency Conclusion - Figures 2 and 3, pages 19, 20, and 21
5) Part II, Functional Responsibilities - Section D, Emergency Actions and Response, page 8 Part VI, Procedure Reference - Table 4, pages 20 and 21
8) Enclosure No. 5.1, pages 9 and 10 Enclosure No. 5.6, page 25 By copy of this letter,. three copies of each of the above documents are being provided to NRC, Region II.

Very truly yours, H. B. Tucker, Vice President Nuclear Production Department WHM/php Enclosures cc: (w/3 copies of enclosure)

Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 (w/o enclosure)

Mr. P. R. Bemis Senior Resident Inspector McGuire Nuclear Station Mr. W. T. Orders Senior Resident Inspector Oconee Nuclear Station Mr. P. K. Van Doorn Senior Resident Inspector Catawba Nuclear Station