2003-04 Pilgrim Annual Assessment Invitational Letters for Safety Performance
ML040770014
Person / Time
Site: Pilgrim
Issue date: 03/16/2004
From: Anderson C
NRC/RGN-I/DRP/PB5
To: Delahunt W, Demacedo V, Dinocila F, Hadfield J, Harriman W, Lambert P, Mccomb C, Mckee D, Murray T, Nogee A, Nolan P, O'Brien T, Rodger T, Tavaras K, Walsh T
Citizens Urging Responsible Energy, City of Duxbury, MA, City of Kingston, MA, Emergency Management Agency, City of Plymouth, MA, City of Plymouth, MA, Board of Selectmen, Massachussetts Public Interest Research Group (MASSPIRG), State of MA, State of MA, Emergency Management Agency, State of MA, House of Representatives, State of MA, Senate, Town of Carver, MA, Emergency Management Agency, US HR (House of Representatives)
Shared Package
ML040620015 List:
References
Download: ML040770014 (16)


Text

March 16, 2004 Mr. Robert Waluliki Chairman Nuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360

SUBJECT:

PILGRIM NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Waluliki:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc., in which the NRC staff will discuss with Entergy our annual assessment of the safety performance of the Pilgrim Nuclear Power Station.

The meeting will be held at 1:00 p.m. on Wednesday, March 24, 2004, at the John Carver Inn, 25 Summer Street in Plymouth, Massachusetts. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Enterfy our assessment of the safety performance of Pilgrim and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Pilgrim and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Pilgrim Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to Entergy on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620015). ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Pilgrim Nuclear Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 24, 2004. In the interim, please do not hesitate to contact me at 610-337-5227, if I can be of further assistance to you.

Sincerely,

/RA/

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects

Enclosure:

As Stated

March 16, 2004 Mr. Alan Nogee MASSPIRG 29 Temple Place Boston, MA 02111

SUBJECT:

PILGRIM NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Nogee:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc., in which the NRC staff will discuss with Entergy our annual assessment of the safety performance of the Pilgrim Nuclear Power Station.

The meeting will be held at 1:00 p.m. on Wednesday, March 24, 2004, at the John Carver Inn, 25 Summer Street in Plymouth, Massachusetts. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Enterfy our assessment of the safety performance of Pilgrim and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Pilgrim and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Pilgrim Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to Entergy on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620015). ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Pilgrim Nuclear Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 24, 2004. In the interim, please do not hesitate to contact me at 610-337-5227, if I can be of further assistance to you.

Sincerely,

/RA/

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects

Enclosure:

As Stated

March 16, 2004 Pixi Lambert Chairman, Citizens Urging Responsible Energy P.O. Box 2621 Duxbury, MA 02331

SUBJECT:

PILGRIM NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Pixi:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc., in which the NRC staff will discuss with Entergy our annual assessment of the safety performance of the Pilgrim Nuclear Power Station.

The meeting will be held at 1:00 p.m. on Wednesday, March 24, 2004, at the John Carver Inn, 25 Summer Street in Plymouth, Massachusetts. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Enterfy our assessment of the safety performance of Pilgrim and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Pilgrim and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Pilgrim Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to Entergy on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620015). ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Pilgrim Nuclear Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 24, 2004. In the interim, please do not hesitate to contact me at 610-337-5227, if I can be of further assistance to you.

Sincerely,

/RA/

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects

Enclosure:

As Stated

March 16, 2004 The Honorable Therese Murray Commonwealth of Massachusetts, Senate Room 511-C State House Boston, MA 02133

SUBJECT:

PILGRIM NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Senator Murray:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc., in which the NRC staff will discuss with Entergy our annual assessment of the safety performance of the Pilgrim Nuclear Power Station.

The meeting will be held at 1:00 p.m. on Wednesday, March 24, 2004, at the John Carver Inn, 25 Summer Street in Plymouth, Massachusetts. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Enterfy our assessment of the safety performance of Pilgrim and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Pilgrim and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Pilgrim Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to Entergy on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620015). ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Pilgrim Nuclear Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 24, 2004. In the interim, please do not hesitate to contact me at 610-337-5227, if I can be of further assistance to you.

Sincerely,

/RA/

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects

Enclosure:

As Stated

March 16, 2004 The Honorable William D. Delahunt United States House of Representatives 1517 Longworth House Office Building Washington, DC 20515

SUBJECT:

PILGRIM NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Congressman Delahunt:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc., in which the NRC staff will discuss with Entergy our annual assessment of the safety performance of the Pilgrim Nuclear Power Station.

The meeting will be held at 1:00 p.m. on Wednesday, March 24, 2004, at the John Carver Inn, 25 Summer Street in Plymouth, Massachusetts. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Enterfy our assessment of the safety performance of Pilgrim and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Pilgrim and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Pilgrim Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to Entergy on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620015). ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Pilgrim Nuclear Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 24, 2004. In the interim, please do not hesitate to contact me at 610-337-5227, if I can be of further assistance to you.

Sincerely,

/RA/

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects

Enclosure:

As Stated

March 16, 2004 The Honorable Vinny deMacedo Massachusetts House of Representatives Room 443 State House Boston, MA 02133

SUBJECT:

PILGRIM NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Congressman deMacedo:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc., in which the NRC staff will discuss with Entergy our annual assessment of the safety performance of the Pilgrim Nuclear Power Station.

The meeting will be held at 1:00 p.m. on Wednesday, March 24, 2004, at the John Carver Inn, 25 Summer Street in Plymouth, Massachusetts. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Enterfy our assessment of the safety performance of Pilgrim and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Pilgrim and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Pilgrim Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to Entergy on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620015). ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Pilgrim Nuclear Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 24, 2004. In the interim, please do not hesitate to contact me at 610-337-5227, if I can be of further assistance to you.

Sincerely,

/RA/

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects

Enclosure:

As Stated

March 16, 2004 The Honorable Thomas J. OBrien Massachusetts House of Representatives Room 33 State House Boston, MA 02133

SUBJECT:

PILGRIM NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Congressman OBrien:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc., in which the NRC staff will discuss with Entergy our annual assessment of the safety performance of the Pilgrim Nuclear Power Station.

The meeting will be held at 1:00 p.m. on Wednesday, March 24, 2004, at the John Carver Inn, 25 Summer Street in Plymouth, Massachusetts. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Enterfy our assessment of the safety performance of Pilgrim and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Pilgrim and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Pilgrim Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to Entergy on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620015). ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Pilgrim Nuclear Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 24, 2004. In the interim, please do not hesitate to contact me at 610-337-5227, if I can be of further assistance to you.

Sincerely,

/RA/

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects

Enclosure:

As Stated

March 16, 2004 The Honorable Ken Tavaras Chairman, Board of Selectmen Town Hall 11 LIncoln Street Plymouth, MA 02360

SUBJECT:

PILGRIM NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Tavaras:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc., in which the NRC staff will discuss with Entergy our annual assessment of the safety performance of the Pilgrim Nuclear Power Station.

The meeting will be held at 1:00 p.m. on Wednesday, March 24, 2004, at the John Carver Inn, 25 Summer Street in Plymouth, Massachusetts. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Enterfy our assessment of the safety performance of Pilgrim and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Pilgrim and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Pilgrim Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to Entergy on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620015). ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Pilgrim Nuclear Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 24, 2004. In the interim, please do not hesitate to contact me at 610-337-5227, if I can be of further assistance to you.

Sincerely,

/RA/

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects

Enclosure:

As Stated

March 16, 2004 Mr. Thomas Walsh, Deputy Director Carver Emergency Management Agency Town of Carver P.O. Box 580 Carver, MA 02330

SUBJECT:

PILGRIM NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Walsh:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc., in which the NRC staff will discuss with Entergy our annual assessment of the safety performance of the Pilgrim Nuclear Power Station.

The meeting will be held at 1:00 p.m. on Wednesday, March 24, 2004, at the John Carver Inn, 25 Summer Street in Plymouth, Massachusetts. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Enterfy our assessment of the safety performance of Pilgrim and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Pilgrim and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Pilgrim Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to Entergy on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620015). ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Pilgrim Nuclear Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 24, 2004. In the interim, please do not hesitate to contact me at 610-337-5227, if I can be of further assistance to you.

Sincerely,

/RA/

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects

Enclosure:

As Stated

March 16, 2004 Chief William J. Harriman P.O. Box 2824 Fire Department Headquarters Duxbury, MA 02331

SUBJECT:

PILGRIM NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Chief Harriman:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc., in which the NRC staff will discuss with Entergy our annual assessment of the safety performance of the Pilgrim Nuclear Power Station.

The meeting will be held at 1:00 p.m. on Wednesday, March 24, 2004, at the John Carver Inn, 25 Summer Street in Plymouth, Massachusetts. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Enterfy our assessment of the safety performance of Pilgrim and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Pilgrim and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Pilgrim Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to Entergy on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620015). ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Pilgrim Nuclear Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 24, 2004. In the interim, please do not hesitate to contact me at 610-337-5227, if I can be of further assistance to you.

Sincerely,

/RA/

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects

Enclosure:

As Stated

March 16, 2004 Chief David McKee Kingston Emergency Management Agency 6 Maple Avenue Kingston, MA 02364

SUBJECT:

PILGRIM NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Chief McKee:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc., in which the NRC staff will discuss with Entergy our annual assessment of the safety performance of the Pilgrim Nuclear Power Station.

The meeting will be held at 1:00 p.m. on Wednesday, March 24, 2004, at the John Carver Inn, 25 Summer Street in Plymouth, Massachusetts. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Enterfy our assessment of the safety performance of Pilgrim and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Pilgrim and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Pilgrim Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to Entergy on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620015). ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Pilgrim Nuclear Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 24, 2004. In the interim, please do not hesitate to contact me at 610-337-5227, if I can be of further assistance to you.

Sincerely,

/RA/

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects

Enclosure:

As Stated

March 16, 2004 Mr. Douglas Hadfield Emergency Management Director 83 Court Street Plymouth, MA 02360

SUBJECT:

PILGRIM NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Hadfield:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc., in which the NRC staff will discuss with Entergy our annual assessment of the safety performance of the Pilgrim Nuclear Power Station.

The meeting will be held at 1:00 p.m. on Wednesday, March 24, 2004, at the John Carver Inn, 25 Summer Street in Plymouth, Massachusetts. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Enterfy our assessment of the safety performance of Pilgrim and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Pilgrim and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Pilgrim Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to Entergy on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620015). ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Pilgrim Nuclear Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 24, 2004. In the interim, please do not hesitate to contact me at 610-337-5227, if I can be of further assistance to you.

Sincerely,

/RA/

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects

Enclosure:

As Stated

March 16, 2004 Ms. Pam Nolan Town Manager Town Hall 11 Lincoln Street Plymouth, MA 02360

SUBJECT:

PILGRIM NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Ms. Nolan:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc., in which the NRC staff will discuss with Entergy our annual assessment of the safety performance of the Pilgrim Nuclear Power Station.

The meeting will be held at 1:00 p.m. on Wednesday, March 24, 2004, at the John Carver Inn, 25 Summer Street in Plymouth, Massachusetts. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Enterfy our assessment of the safety performance of Pilgrim and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Pilgrim and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Pilgrim Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to Entergy on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620015). ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Pilgrim Nuclear Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 24, 2004. In the interim, please do not hesitate to contact me at 610-337-5227, if I can be of further assistance to you.

Sincerely,

/RA/

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects

Enclosure:

As Stated

March 16, 2004 Christine McCoomb, Director Massachusetts Emergency Management Agency Office of Emergency Preparedness 400 Worcester Road Framingham, MA 01702-5399

SUBJECT:

PILGRIM NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Ms. McCoomb:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc., in which the NRC staff will discuss with Entergy our annual assessment of the safety performance of the Pilgrim Nuclear Power Station.

The meeting will be held at 1:00 p.m. on Wednesday, March 24, 2004, at the John Carver Inn, 25 Summer Street in Plymouth, Massachusetts. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Enterfy our assessment of the safety performance of Pilgrim and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Pilgrim and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Pilgrim Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to Entergy on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620015). ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Pilgrim Nuclear Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 24, 2004. In the interim, please do not hesitate to contact me at 610-337-5227, if I can be of further assistance to you.

Sincerely,

/RA/

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects

Enclosure:

As Stated

March 16, 2004 Mr. Tom Rodger, Director Massachusetts Emergency Management Agency Area II Headquarters P.O. Box 54 Bridgewater, MA 02324-0054

SUBJECT:

PILGRIM NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Rodger:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc., in which the NRC staff will discuss with Entergy our annual assessment of the safety performance of the Pilgrim Nuclear Power Station.

The meeting will be held at 1:00 p.m. on Wednesday, March 24, 2004, at the John Carver Inn, 25 Summer Street in Plymouth, Massachusetts. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Enterfy our assessment of the safety performance of Pilgrim and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Pilgrim and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Pilgrim Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to Entergy on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620015). ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Pilgrim Nuclear Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 24, 2004. In the interim, please do not hesitate to contact me at 610-337-5227, if I can be of further assistance to you.

Sincerely,

/RA/

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects

Enclosure:

As Stated

March 16, 2004 Mr. Fran DiNocila Massachusetts Emergency Management Agency Office of Emergency Preparedness 400 Worcester Road Framingham, MA 01702-5399

SUBJECT:

PILGRIM NUCLEAR POWER STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. DiNocila:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc., in which the NRC staff will discuss with Entergy our annual assessment of the safety performance of the Pilgrim Nuclear Power Station.

The meeting will be held at 1:00 p.m. on Wednesday, March 24, 2004, at the John Carver Inn, 25 Summer Street in Plymouth, Massachusetts. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with Enterfy our assessment of the safety performance of Pilgrim and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Pilgrim and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Pilgrim Nuclear Power Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003. We described our assessment results in a letter to Entergy on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040620015). ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at the Pilgrim Nuclear Power Station through the NRC Web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Your schedule permitting, I look forward to meeting you on March 24, 2004. In the interim, please do not hesitate to contact me at 610-337-5227, if I can be of further assistance to you.

Sincerely,

/RA/

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects

Enclosure:

As Stated